<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/department_of_veterans_affairs/posts/115932092808938395" -->

---
title: Z1NB-- BOILER PLANT TESTING & CALIBRATION Marion… (36C25526Q0147) | Closed - MatchAwards
description: Z1NB-- BOILER PLANT TESTING & CALIBRATION  Marion VA Medical Center  Marion, IL  62959-1165. United States Department of Veterans Affairs. Solicitation 36C25526Q0147. NAICS 811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance. SDVOSB...
canonical: https://matchawards.com/department_of_veterans_affairs/posts/115932092808938395
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: Z1NB-- BOILER PLANT TESTING & CALIBRATION Marion… (36C25526Q0147) | Closed
og:url: https://matchawards.com/department_of_veterans_affairs/posts/115932092808938395
og:description: Z1NB-- BOILER PLANT TESTING & CALIBRATION  Marion VA Medical Center  Marion, IL  62959-1165. United States Department of Veterans Affairs. Solicitation 36C25526Q0147. NAICS 811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance. SDVOSB...
og:image: https://matchawards.com/system/accounts/avatars/000/000/015/original/f59915e906ee2b19.png?1638825904
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# Z1NB-- BOILER PLANT TESTING & CALIBRATION Marion VA Medical Center Marion, IL 62959-1165

Status

Closed, the response deadline passed on Jan 23, 2026

Agency

[United States Department of Veterans Affairs](/department%5Fof%5Fveterans%5Faffairs)

Office

LEAVENWORTH, USA

Notice type

Solicitation

Solicitation number

36C25526Q0147

NAICS

[811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance](/groups/1092)

PSC

Z1NB - MAINTENANCE OF HEATING AND COOLING PLANTS

Category

[Facility Related Services (4.4)](/categories/facilities-and-construction/facility-related-services)

Set-aside

[Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)](/contracts/veteran-owned)

Posted

2026-01-20

Deadline

2026-01-23

Place of performance

Marion, Illinois, UNITED STATES

## Description

The Marion Veterans Affairs Medical Center (VAMC) has a central boiler plant to provide steam for heating and air conditioning, domestic hot water, kitchens, and sterilization. Boiler plant safety, reliability, efficiency, and equipment longevity are paramount concerns of VAMC management. Boilers are extremely dangerous if not maintained properly. Malfunctioning burners or controls can cause catastrophic events resulting in injuries and death as well as massive property damage. Inaccurate or inadequate data management and monitoring systems can fail to warn of unsafe or inefficient performance. Regular inspections, testing and calibration by expert technicians are an essential part of a program to address these concerns. Veterans’ Health Administration (VHA), Directive 1810 requires annual and/or semi-annual Boiler and associated plant equipment inspection, safety device testing, calibration, and combustion tuning. VHA Directive 1810 requires these services to be performed by a qualified professional third party that has documented knowledge and experience in the design and construction and VA’s standards for construction and testing of safety devices. In addition, the individual shall have demonstrated experience in conducting equipment assessments and performing testing in compliance with the VA safety device testing manual.

<!-- mobian-agent-ad sponsored="true" id="9def6469-f4f6-4395-97ec-37febd87013f" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories/facilities-and-construction/facility-related-services?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


1. This Performance Work Statement (PWS) is an annual maintenance contract on the Boilers and associated plant equipment at the Marion VA Medical Center to meet the requirements for the inspection, testing, tuning and calibration in accordance with VHA Directive 1810 and the current VHA Boiler Safety Device Testing Manual (currently 5th Edition) on Three (3) Superior, Fire Tube Boilers equipped with Webster burners, and Auxiliary Equipment that provide steam to VA facilities.
2. The contractor shall conduct one preliminary site visit prior to testing visitations to evaluate the boiler plant and site conditions.
3. This statement of work describes the requirements to be completed by qualified technicians as follows:
1. Boiler Safety Device Testing
2. Boiler Inspection
3. Boiler tuning /burner Combustion Analysis on:
1. Superior Boiler #1, Model 10-3.2-800, Serial# 19041, MAWP 200 psi, 8625 lbs./hr., Input Nat Gas/#2 fuel oil
2. Superior Boiler #2, Model 10-3.2-800, Serial# 19076, MAWP 200 psi, 8625 lbs./hr., Input Nat Gas/#2 fuel oil
3. Superior Boiler #3, Model 10-3.2-800, Serial# 19085, MAWP 200 psi, 8625 lbs./hr., Input Nat Gas/#2 fuel oil
1. Deaerator (DA) annual Inspection / NDT testing every 6th year
1. DA Tank. Superior Model# PC018T105-75 Serial# 19130, Vented 3” Line
1. Condensate storage tank annual Inspection / NDT testing every 6th year
1. Condensate storage tank. Superior Model# S0450-75D Serial# 19126, Vented 3” Line
1. Calibration and evaluation of all Instrumentation, Transmitters, Gages, Thermometers, and Sensidyne Gas Sensors equipment.
1. The annual Fiscal year schedule of visits for the boiler plant is as follows…
1. May,
1. Semi-Annual- safety device testing of boilers #1, #2, and #3 and auxiliary equipment.
2. Semi-Annual- Combustion tuning of all three (3) boilers on both natural gas and fuel oil firing.
3. Semi-Annual-Test and calibrate all controls, Instrumentation, Transmitters, and Sensidyne Gas Sensors equipment.
4. Annual test and calibration on gages and thermometers.
5. Annual Boiler inspections.
6. Annual DA Tank inspections.
7. Annual Condensate storage tank inspections.
1. Nov,
1. Semi-Annual- safety device testing of boilers #1, #2, and #3 and auxiliary equipment.
2. Semi-Annual- Combustion tuning of all three (3) boilers on both natural gas and fuel oil firing.
3. Semi-Annual-Test and calibrate all controls, Instrumentation, Transmitters, and Sensidyne Gas Sensors equipment.
1. The boiler inspections will have to be staged at least one week apart. The VA requires that two boilers be operable at any given time.
2. The Condensate tank and Deaerator tank annual visual inspections will have to be performed at least two weeks apart.
3. The selected contractor will coordinate the 6th year NDT inspections with the Contracting Officer’s Representative (COR) and present schedule in writing at least thirty (30) days prior to the scheduled inspection.
4. The VAMC will comply with any other requirements of the test personnel that are considered reasonable by VAMC and have been presented in writing at least two (2) weeks prior to the scheduled testing.

**SCOPE OF WORK:**

1. The selected contractor shall furnish all labor, materials, supplies, equipment, and transportation to the Marion VAMC, as necessary to accomplish the services contained within this SOW.
2. The selected contractor shall perform annual inspection on all three (3) boilers and associated plant equipment, calibrate all instruments, transmitters, recorders, gages, and thermometers on boilers and associated plant equipment contained within the boiler plant In Accordance With (IAW) VA Directive 1810.
3. The selected contractor shall perform semi-annual testing and calibration on the Sensidyne gas sensors.
4. The selected contractor shall perform semi-annual Safety Device testing on all three (3) of the boilers and associated plant equipment, ensuring that all safety devices are plumbed correctly and in its correct place, safety device set point is correct, safety device activates at the correct set point and the safety device produces the required effect. Safety device identification and labeling including set point and normal operating range is to be determined and set prior to test. Calibration/test sticker shall be affixed to each equipment and device after completion of tests.
5. The selected contractor shall perform semi-annual Boiler Combustion Emissions Tuning of all three (3) of the boilers as well as Non-Destructive Testing (NDT) on the DA and Condensate Storage Tank every 5th year.
6. All testing will be as specified in VHA Directive 1810, the current VHA Boiler Safety Device Testing Manual and where not defined will be IAW good engineering and proven past practice accepted by industry standards and equipment manufactures.
7. Estimated Period of Performance: 2/4/26 – 2/4/31 to include base year plus four option years.

**EMERGENCY ON SITE SERVICE:**

An unlimited number of emergency service calls if needed, will be provided to ensure continuity of boiler plant operation. The contractor, with their bid package, will provide per hour labor cost for any additional hours needed for emergency services.

**RESPONSE WINDOW:**

1. 1. The contractor will provide emergency service between scheduled preventative maintenance calls, Monday through Sunday, including holidays, 24 hours per day to minimize downtime. The Marion, VA will determine what constitutes an emergency.
1. 1. The contractor will be on-site to provide emergency service within 6 hours. Non-emergency calls, as determined by the Marion VA, will be scheduled as a separate repair visit and not on a scheduled preventative maintenance visit.
1. 1. The contractor shall provide 24-hour technical call in assistance. The 24 hour emergency

call in toll-free number will be provided to the contracting officer and COR .

**A “QUALIFIED PROFESSIONAL” IS DEFINED AS:**

1. A boiler inspector who has a valid commission from the National Board of Boiler and Pressure Vessel Inspectors (NB).
2. A boiler inspector who has qualified by passing a written examination under the laws, rules, and regulations of a jurisdiction of a state.
3. A boiler inspector who is regularly employed as a boiler inspector by a jurisdiction which has adopted and administers one or more sections of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code as a legal requirement, and has a representative serving as a member of the ASME Conference Committee.
4. A boiler inspector who is regularly employed by an insurance company which has been

licensed or registered by the appropriate authority of a State of the United States to write

boiler or pressure vessel insurance.

**TECHNICIAN QUALIFICATIONS:**

1. Technicians shall have completed at least a one-year trade school and have five years successful experience in this field. The experience shall be largely with institutional and industrial boiler plants similar in design to the VAMC plant. The VAMC COR/engineer may define and accept equivalent qualifications.
2. Technicians shall be familiar with and have ready access to the current versions of the following references. NFPA 85, Boiler and Combustion Systems Hazard Code, VHA Directive 1810, and current VHA Boiler Plant Safety Device Test Manual.
3. Technicians shall be equipped with portable electronic flue gas analyzers and other test instruments necessary for the required tests and calibrations, all calibrated within one month of the site visits. The technicians must be capable of programming the controls and have the appropriate hardware and software for this.

**QUALIFICATIONS FOR NON-DESTRUCTIVE-TESTING (NDT) TECHNICIANS:**

1. NDT Technicians must be certified to ASNT-TC-1A for the NDT technique used and is to be a Certified Weld Inspector (CWI) by the American Welding Society (AWS).
2. Testing will include visual inspection of tank shell, heads, penetrations, and welds. Contractor will perform 100% wet fluorescent magnetic particle testing (WFMPT) of tank welds.
3. Contractor will determine tank wall thickness by ultrasonic testing (UT). UT test points will be taken at 4 equidistant points around the tank shell and heads at 2-foot intervals.
4. The DA tank manway will be designated the 0-degree reference. All indication and low readings will be marked on the tank and brought to the Agency’s attention.
5. NDT contractor will provide a field report of findings before leaving the jobsite. A final report will be sent to the Agency within 2 weeks after the actual date of the inspection.

**SAFETY DEVICE TESTING REQUIREMENTS:**

Perform the required semi-annual maintenance specified by VHA Directive 1810 on Boiler Plant Safety Devices. The current VHA Boiler Plant Safety Device Testing Manual will be used as the only procedure to test all Boiler Safety Devices. All Boiler Safety Device Inspections must be scheduled with the COR. Boiler Safety Devices will be tested every 6 months and must not interfere with Boiler cleanings and inspections. A detailed report of inspection for each safety device tested must be supplied to the COR. All failures must be immediately reported to the COR and the Boiler Plant Supervisor/Operator. Replace any device that fails and is not able to be repaired or calibrated following the guidelines of unscheduled maintenance. Any new device must be calibrated to its proper set point and tested. If a test procedure will not achieve the desired results due to a fault in the written test procedure or configuration of the device, the contractor will devise a new procedure that will accomplish the same end results and submit the procedure to the COR for approval. The contractor will then be provided written direction on how to proceed.

1. Technicians shall provide all tools and labor necessary to perform inspection, tuning, testing, calibrating, and adjustments of burners, boiler and boiler plant controls as specified below. This shall be completed every 6 months in accordance with a schedule provided by VAMC.
2. Instrumentation, monitoring, and data management systems as listed below shall be calibrated every 6 months.
3. Provide at least 2-weeks-notice to the COR prior to performing the work. Work cannot be scheduled during heavy steam load periods. Only one boiler at a time can be out of service for the inspection, testing, and calibration procedures. Work must be conducted when the COR or his/her designate is available on site to monitor the work.
4. The VAMC will have the boilers that are to be serviced prepared for the technicians upon their scheduled arrival. This includes having the boilers fully warmed and at normal steam pressure, steam exhaust silencer system operable, all boiler, burner, and fuel train pressure gauges and thermometers in operation.
5. The VAMC will comply with any other requirements of the test personnel that are considered reasonable by VAMC and have been presented in writing at least two (2) weeks prior to the scheduled testing.

**THE FOLLOWING SAFETY DEVICES WILL BE TESTED:**

1. High Water Alarm on Condensate Tank (HWACT)

 Probe Type: Warrick 16MC 1AO/3E1B

1. Low Water Alarm on Condensate Tank (LWACT)

 Probe Type: MM64

1. High Water Alarm on Condensate Tank (HWADT)

 Probe Type: Superior

1. Low Water Alarm on Condensate Tank (LWADT)

 Probe Type: Superior

1. Deaerator Overflow Drain System (DAODS)

 Overflow valve: Belimo AFBUP-x1

1. Deaerator Safety Valve (DASV)

 Type: Kunkle, set 10psi

1. Steam Safety Valve Following PRV (SVRFPRV)-Deaerator

 Type: Kunkle, set 15 psi

1. Steam Safety Valve Following PRV (SVFPRV)- Main Steam

 Type: Kunkle, set 70 psi

1. Liquid Relief Valve on Pump Set (LRVOPS)

 Type: Kunkle

1. Liquid Relief Valve on Economizer (LRVE)

 Valve Type: Kunkle, set 275 psi

1. Economizer

Type: Superior-Base-4-\[B4SC\]

1. Propane Pilot Backup System
2. Low Water Alarm and Cutoffs on Boiler (LWA/LWCO/ALWCO)

 Probe Type: Warrick Controls, Float Type: McDonell & Miller

1. LWCO Shunt verification.
2. Primary & Secondary LWCO activation and alarm.
3. High Water Alarm on Boiler (HWAB)

Verify alarm operation.

1. High and High-High Boiler Steam Pressure Limit Switches (HSBPLS & HHBSPLS)

 Type: Ashcroft B420B-XFM

1. HSBPLS Limit Switch

Type: Ashcroft B420B-XFM

1. HHSBPLS Limit Switch

Type: Ashcroft B420B-XFM

1. Steam Safety Valves on Boiler (SVB)- 2 valves, set 105#, 110#
2. Low Fuel Gas Pressure Cutoff Switch (LFGPCS)

Switch Type: Ashcroft B420B-XFM

1. High Fuel Gas Pressure Cutoff Switch (HFGPCS)

Switch Type: Ashcroft B420B-XFM

1. Automatic Fuel Gas Shutoff Valves and Solenoid Vent Valve Seat Leakage (AFGSOV & AFGSVV) – Main Gas Line.

AFGSV Type: Maxon250CMALL-AA12-BB21AO

1. Solenoid Vent Valve

Type: Jefferson 2030LAR12NAt

1. Automatic Pilot Fuel Gas Shutoff Valves and Automatic Pilot Fuel Gas Solenoid Vent Valve Seat Leakage (APFGSOV &APFGSVV)- Pilot Line.
2. APFGSV

Type: Sensus model 496

1. APFGSVV

Type: Sensus model 496

1. Proof of Closure on Automatic Fuel Shutoff Valves (POC-AFGSOV)- Natural Gas.
2. AFGSOV

Type: Maxon

1. Flame Scanner for main flame out (FSMFO)
2. Flame Scanner

Type: Fireye 45UV5-1009

1. Flame Scanner not Sensing Igniter Spark (FSNIS)
2. Igniter Timing (IT)
3. Main Flame Ignition Timing (MFIT)
4. Pre- Purge and Post- Purge Timing (PPT)
5. Low Fire Proving Switch (LFPS)
6. Forced Draft Damper Wide-Open Pre-Purge Proving Switch (FDDWOPS)

 Type: Allen-Bradley, actuator end of travel switch.

1. Forced Draft Damper actuator

Type: Hays-Cleveland mskel F-00875-KO-AO2-CO1-DO3

1. Combustion Air Pressure Switch (CAPS)

Type: Cleveland Controls, model: AFS-227-161

1. Purge Airflow Proving Switch (PAPS)

Type: Cleveland Controls, model: AFS-227-161

1. Forced Draft Motor Interlock Switches (FDMIS)

Type: Hawkeye 909HV

1. Outlet Stack Damper Position Interlock Switch (OSDPI)

Type: Cleveland Controls

1. Furnace Pressure Interlock (FPI)

Type: Cleveland Controls AFS-952-55-B

1. Low Pilot Fuel Gas Pressure Cutoff Switch (LPFGPCS)

Type: Ashcroft B420B-XFM

1. Flue Gas Recirculation Damper Interlock (FGRDI)
2. Low Flue Gas Oxygen Level Interlock (LFGOLI)
3. Low Fuel Oil Pressure Cutoff Switch (LFOPCS)

Type: Ashcroft B420B-XFM

1. High Fuel Oil Pressure Cutoff Switch (HFOPCS)

Type: Ashcroft B420B-XFM

1. Low Atomizing Media Pressure Switch (LAMPS)
2. Secondary Low Atomizing Media Pressure Switch (SLAMPS)
3. Low Atomizing Media Flow Switch (LAMFS)
4. Automatic Fuel Oil Shutoff Valves (AFSOV)- for Seat Leakage.
5. Proof of Closure on Automatic Fuel Oil Shutoff Valves (POC-AOSV)-Oil.
6. Oil Burner Position Switch (OBPS)

Type: Toggle switch

1. Emergency Stop/Panic Buttons (EPSB)

5 switches for plant shutdown, (1 switch for each boiler.)

1. High Fuel Gas Pressure Alarm Main Gas Line (HFGPAMG)
2. High Fuel Gas Pressure Alarm Propane (HFGPALP)

**BOILER INSPECTION REQUIREMENTS:**

Boilers scheduled for internal inspection will be prepared for the inspection by VAMC prior to the scheduled arrival of the inspector. This includes cooling the boilers to near ambient temperature and having all m

## Attachments

* [Attachment 1](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c1b7978729c34bc685a30bad3c18f791/download)

[Source notice](https://sam.gov/workspace/contract/opp/e3bf679c866a4397afe896b4b1ea591e/view)

[More from United States Department of Veterans Affairs posted in January 2026](/department%5Fof%5Fveterans%5Faffairs/archive/2026-01)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Veteran-Owned Small Business Set-Aside Contracts (SDVOSB and VOSB) Available Now](/contracts/veteran-owned)

```json
{"@context":"https://schema.org","@type":"Demand","name":"Z1NB-- BOILER PLANT TESTING \u0026 CALIBRATION  Marion VA Medical Center  Marion, IL  62959-1165","description":"The Marion Veterans Affairs Medical Center (VAMC) has a central boiler plant to provide steam for heating and air conditioning, domestic hot water, kitchens, and sterilization. Boiler plant safety, reliability, efficiency, and equipment longevity are paramount concerns of VAMC management. Boilers are extremely dangerous if not maintained properly. Malfunctioning burners or controls can cause catastrophic events resulting in injuries and death as well as massive property damage. Inaccurate or inadequate data management and monitoring systems can fail to warn of unsafe or inefficient performance. Regular inspections, testing and calibration by expert technicians are an essential part of a program to address these concerns. Veterans’ Health Administration (VHA), Directive 1810 requires annual and/or semi-annual Boiler and associated plant equipment inspection, safety device testing, calibration, and combustion tuning. VHA Directive 1810 requires these services to be performed by a qualified professional third party that has documented knowledge and experience in the design and construction and VA’s standards for construction and testing of safety devices. In addition, the individual shall have demonstrated experience in conducting equipment assessments and performing testing in compliance with the VA safety device testing manual. This Performance Work Statement (PWS) is an annual maintenance contract on the Boilers and associated plant equipment at the Marion VA Medical Center to meet the requirements for the inspection, testing, tuning and calibration in accordance with VHA Directive 1810 and the current VHA Boiler Safety Device Testing Manual (currently 5th Edition) on Three (3) Superior, Fire Tube Boilers equipped with Webster burners, and Auxiliary Equipment that provide steam to VA facilities. The contractor shall conduct one preliminary site visit prior to testing visitations to evaluate the boiler plant and site conditions. This statement of work describes the requirements to be completed by qualified technicians as follows: Boiler Safety Device Testing Boiler Inspection Boiler tuning /burner Combustion Analysis on: Superior Boiler #1, Model 10-3.2-800, Serial# 19041, MAWP 200 psi, 8625 lbs./hr., Input Nat Gas/#2 fuel oil Superior Boiler #2, Model 10-3.2-800, Serial# 19076, MAWP 200 psi, 8625 lbs./hr., Input Nat Gas/#2 fuel oil Superior Boiler #3, Model 10-3.2-800, Serial# 19085, MAWP 200 psi, 8625 lbs./hr., Input Nat Gas/#2 fuel oil Deaerator (DA) annual Inspection / NDT testing every 6th year DA Tank. Superior Model# PC018T105-75 Serial# 19130, Vented 3” Line Condensate storage tank annual Inspection / NDT testing every 6th year Condensate storage tank. Superior Model# S0450-75D Serial# 19126, Vented 3” Line Calibration and evaluation of all Instrumentation, Transmitters, Gages, Thermometers, and Sensidyne Gas Sensors equipment. The annual Fiscal year schedule of visits for the boiler plant is as follows… May, Semi-Annual- safety device testing of boilers #1, #2, and #3 and auxiliary equipment. Semi-Annual- Combustion tuning of all three (3) boilers on both natural gas and fuel oil firing. Semi-Annual-Test and calibrate all controls, Instrumentation, Transmitters, and Sensidyne Gas Sensors equipment. Annual test and calibration on gages and thermometers. Annual Boiler inspections. Annual DA Tank inspections. Annual Condensate storage tank inspections. Nov, Semi-Annual- safety device testing of boilers #1, #2, and #3 and auxiliary equipment. Semi-Annual- Combustion tuning of all three (3) boilers on both natural gas and fuel oil firing. Semi-Annual-Test and calibrate all controls, Instrumentation, Transmitters, and Sensidyne Gas Sensors equipment. The boiler inspections will have to be staged at least one week apart. The VA requires that two boilers be operable at any given time. The Condensate tank and Deaerator tank annual visual inspections will have to be performed at least two weeks apart. The selected contractor will coordinate the 6th year NDT inspections with the Contracting Officer’s Representative (COR) and present schedule in writing at least thirty (30) days prior to the scheduled inspection. The VAMC will comply with any other requirements of the test personnel that are considered reasonable by VAMC and have been presented in writing at least two (2) weeks prior to the scheduled testing. SCOPE OF WORK: The selected contractor shall furnish all labor, materials, supplies, equipment, and transportation to the Marion VAMC, as necessary to accomplish the services contained within this SOW. The selected contractor shall perform annual inspection on all three (3) boilers and associated plant equipment, calibrate all instruments, transmitters, recorders, gages, and thermometers on boilers and associated plant equipment contained within the boiler plant In Accordance With (IAW) VA Directive 1810. The selected contractor shall perform semi-annual testing and calibration on the Sensidyne gas...","url":"https://matchawards.com/department_of_veterans_affairs/posts/115932092808938395","identifier":"36C25526Q0147","category":"811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"Z1NB - MAINTENANCE OF HEATING AND COOLING PLANTS"},{"@type":"PropertyValue","propertyID":"CM category","name":"Category Management category","value":"4.4 Facility Related Services","url":"https://matchawards.com/categories/facilities-and-construction/facility-related-services"}],"availabilityStarts":"2026-01-20","availabilityEnds":"2026-01-23","validThrough":"2026-01-23T23:59:59-05:00","areaServed":"Marion, Illinois, UNITED STATES","sameAs":"https://sam.gov/workspace/contract/opp/e3bf679c866a4397afe896b4b1ea591e/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Veteran-owned","item":"https://matchawards.com/contracts/veteran-owned"}]}
```