657-23-117JC, Create Cohesive Wayfinding System for Veterans, Bldg.1
- Status
- Closed, the response deadline passed on Jan 28, 2026
- Agency
- United States Department of Veterans Affairs
- Office
- LEAVENWORTH, USA
- Notice type
- Presolicitation
- Solicitation number
- 36C25526R0045
- NAICS
- 541310 - Architectural Services
- PSC
- C1DA - ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES
- Category
- Construction Related Services (4.2)
- Set-aside
- Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
- Posted
- 2026-02-05
- Deadline
- 2026-01-28
- Place of performance
- Saint Louis, Missouri 63125, UNITED STATES
Description
SYNOPSIS:
PROJECT NUMBER / TITLE:
657-23-117 CREATE WAYFINDING SYSTEM FOR VETERANS BUILDING 1
CONTRACT INFORMATION
a. This A-E Services requirement is being procured in accordance with the Brooks Act (Public Law (PL0582) and implemented in accordance with the Federal Acquisition Regulation (FAR) Subpart 36. Firms will be selected based on demonstrated competence and qualifications for the required work.
b. This procurement is restricted to Service-Disabled Veteran Owned Small Business (SDVOSB) firms. This requirement is being procured in accordance with VAAR 836.606-73 as implemented in FAR Subpart 36.6.
c. This is not a Request for Proposal and an award will not be made with this announcement. This announcement is a request for SF 330’s from qualified contractors that meet the professional requirements.
d. The selection criteria for this acquisition will be in accordance with FAR 36.602-1 and VAAR 836.602-1 and are listed below in descending order of importance. The completed SF 330 will be evaluated by the St. Louis VA Health Care System Evaluation Board in accordance with FAR 36.602-5(a) and the selection report shall serve as the final selection list, which will be provided directly to the Contracting Officer. The Government will not pay nor reimburse any costs associated with responding to this request. The Government is under no obligation to award a contract as a result of this announcement.
e. Award of any resultant contract is contingent upon the availability of funds.
f. No solicitation document is available and no other information pertaining to project scope, etc. is available at this time. Any request for assistance with submission or other procedural matters shall be submitted via email only to gislaine.dorvil@va.gov. Personal visits to discuss this announcement will not be allowed.
g. The NAICS Codes for this procurement is 541310 Architectural Services and small business size standard of $12.5M, PSC: C1DA. Award of a Firm Fixed Price contract is anticipated. The anticipated time for completion of design is approximately 199 calendar days including time for VA reviews.
h. DATABASE REGISTRATION INFORMATION:
VERIFICATION OF STATUS OF APPARENTLY SUCCESSFUL OFFEROR THIS ACQUISITION IS 100% SET-ASIDE FOR QUALIFIED SERVICE-DISABLED VETERAN OWNED SMALL BUSINESS AE FIRMS INCOMPLIANCE WITH VAAR 852.219-10. ONLY BUSINESSES VERIFIED AND LISTED IN THE VENDOR INFORMATION PAGES DATABASE, (http://www.Vetbiz.gov), SHALL BE CONSIDERED.
i. SYSTEM FOR AWARD MANAGEMENT (SAM):
Federal Acquisition Registrations require that federal contractors register in the System for Award Management (SAM) database at www.sam.gov and enter all mandatory information into the system. Award cannot be made until the contractor has registered. Offerors are encouraged to ensure that they are registered in SAM prior to submitting their qualifications package.
j. THE EXCLUDED PARTIES LIST SYSTEM (EPLS):
To ensure that the individuals providing services under the contract have not engaged in fraud or abuse regarding Sections 1128 and1128A of the Social Security Act regarding federal health care programs, the contractor is required to check the Excluded Parties List System (EPLS) located at www.sam.gov for each person providing services under this contract. Further the contractor is required to certify that all persons listed in the qualifications package have been compared against the EPLS list and are NOT listed. During the performance of this contract the Contractor is prohibited from using any individual or business listed on the List of Excluded Individuals/Entities.
k. E-VERIFY SYSTEM:
Companies awarded a contract with the federal government shall be required to enroll in E-Verify within 30 days of the contract award date. They shall also need to begin using the E-Verify system to confirm that all of their new hires and their employees directly working on federal contracts are authorized to legally work in the United States. E-Verify is an Internet-based system that allows an employer, using information reported on an employee's Form I-9, to determine the eligibility of that employee to work in the United States. There is no charge to employers to use E-Verify. (FAR 52.222-54)
l. A-E firms are required to respond if interested by submitting one (1) completed Standard Form 330 qualification package Parts I and II to include all consultants (form available on-line at: http://www.gsa.gov/portal/forms/download/116486) Must include in Part I Section H an organizational chart of the firm (excludes consultants) and a design quality management plan. Submission information incorporated by reference is not allowed. All submissions shall be made electronically.
m. Completed package shall be delivered electronically on or before 1/28/2026 at 2:00PM Central Standard Time to the NCO 15 Contracting Office, Attn: Gislaine Dorvil, Contracting Officer to gislaine.dorvil@va.gov.
PROJECT INFORMATION
This contract is for A/E Services for Create Cohesive Wayfinding for Veterans, B1 JC. VASTLHCS John Cochran Building 1 is an existing 11-story building with multiple additions that contain multiple medical services and clinics. The existing elevator lobbies and corridor finishes are outdated, rundown, and do not provide an intuitive wayfinding experience to veterans and guests. This project will focus on improving the Veteran experience through replacement of existing architectural finishes (floors, walls & ceilings) in public areas, updating lighting fixtures to raise light levels as necessary, replacing damaged corridor doors as well as coordination of door finishes on a floor-to-floor basis. Wayfinding improvements will include directional kiosks & signage, informational monitors & built-in displays honoring each branch of the military. Project shall conform to all Records Management and Privacy Language. The scope of work shall include but is not limited to the following:
Supplement B Overview
SUPPLEMENT B (For Schematics, Design Development, Construction Documents, Construction Cost Estimate and Construction Period Services)
DESIGN TIMEFRAME: A/E shall deliver final construction documents No Later Than (NLT) 199 days after the Award/Notice to Proceed Letter.
CONSTRUCTION BUDGET/DESIGN LIMITATION: Magnitude of Project between $500,000.00 and $1,000,000.00 AE will also be required to incorporate contract line items (CLINS) into the (CLIN) documents that will allow for a 20% budget reduction.
B1 Schedule of Services:
I. INTRODUCTION:
The mission of the Veterans Affairs Saint Louis Health Care System (VASTLHCS) is to provide the highest quality health care to our nation’s veterans. In order to accomplish this mission, VASTLHCS’ Facility Engineering Service (FES) intends to partner with an A/E Firm on a project to create a cohesive wayfinding system at Building 1 of the VASTLHCS John Cochran Division. The existing elevator lobby and corridor finishes are outdated and do not provide an intuitive way finding experience to veterans and guests. This project will focus on improving the Veteran experience through replacement of existing architectural finishes (floors, walls & ceilings) in public areas, directional kiosks, informational monitors & built in displays honoring each branch of the military. These improvements will include JC Building 1 A&B elevator lobbies, waiting rooms and corridors on all floors. The A/E Firm must provide Basic Professional Services as delineated in the Scope of Work. As part of the Basic Professional Services, FES expects the following primary A/E disciplines to be included: Architectural, Mechanical, Electrical, Plumbing (Including Fire Protection), Physical Security Specialist, and VPIH.
The AE Design Firm must provide Basic Professional Services as delineated in the Scope of Work.
II. SCOPE OF CONSTRUCTION PROJECT:
1. Existing Conditions: VASTLHCS John Cochran Building 1 is an existing 11-story building with multiple additions that contain multiple medical services and clinics. The existing elevator lobbies and corridor finishes are outdated, rundown, and do not provide an intuitive way-finding experience to veterans and guests.
2. Project Intent: This project will focus on improving the Veteran experience through replacement of existing architectural finishes (floors, walls & ceilings) in public areas, updating lighting fixtures to raise light levels as necessary, replacing damaged corridor doors as well as coordination of door finishes on a floor-to-floor basis. Wayfinding improvements will include directional kiosks & signage, informational monitors & built-in displays honoring each branch of the military.
III. SCOPE OF WORK FOR A/E:
1. Design Development:
a. The A/E shall make investigations necessary to thoroughly evaluate the area. This may include, but not limited to, hazardous materials identification in the direct area of work and areas impacted by the project. All designs shall be in accordance with A/E Submission Instructions for Minor and NRM Construction Program, Program Guide PG-18-15, Volume C. The design will also encompass Asbestos Abatement Design Manual (PG 18-10) Compliance: https://www.cfm.va.gov/til/dManual/dmASBhosp.pdf.
b. Upon completion of initial field survey and assessment, provide a comprehensive report of existing conditions and findings to VASTLHCS’ Facility Engineering Service. Report will include initial cost estimate for all work included in the Create Cohesive Wayfinding for Veterans, B1 JC project. Hazardous material surveys and design shall be in compliance with National Emissions Standard for Hazardous Air Pollutants (NESHAP) requirements for renovation and demolition projects. This report will be considered the Design Narrative as referenced in” B5 DESIGN REVIEW AND COMPLETION SCHEDULE” below.
2. Construction Document:
a. After the VAMC approves the A/E's design development, the A/E shall prepare construction documents necessary to accomplish the approved design development.
b. As part of the 100% design submission, the A/E shall provide a written synopsis describing the overall scope of the construction project as well as any pertinent information about the project that would assist potential bidders in preparing a comprehensive bid package. This synopsis is intended to be a general description of the project not to exceed two written pages in length.
c. The final design documents from a resultant task order will be subject to review and approval (by signature) of all members of an Integrated Project Team (IPT) consisting of medical center personnel. These individuals will be identified by the COR at the first design review meeting.
3. Construction Period Service:
a. After the VAMC approves the A/E's design development, the A/E shall prepare construction documents necessary to accomplish the approved design development.
b. As part of the 100% design submission, the A/E shall provide a written synopsis describing the overall scope of the construction project as well as any pertinent information about the project that would assist potential bidders in preparing a comprehensive bid package. This synopsis is intended to be a general description of the project not to exceed two written pages in length.
c. The final design documents from a resultant task order will be subject to review and approval (by signature) of all members of an Integrated Project Team (IPT) consisting of medical center personnel. These individuals will be identified by the COR at the first design review meeting.
4. Functional Product:
a. It is important to emphasize that the A/E shall perform design development and detailed design work, and prepare detailed construction documents, keeping in mind that the end result is a completely functional and fully operational system to include Abatement Design.
b. VPIH Survey: The A/E Firm will complete a survey, to include testing, identifying any and all asbestos and lead containing materials within the project area. This project will remove all lead and asbestos in areas being renovated. A/E CONTRACT SUPPLEMENT B PROJECT NUMBER 657-23-117JC Create Cohesive Wayfinding System for Veterans, B1 JC Page 3 of 19
c. Reference VA Asbestos Abatement Design Manual (PG 18-10) July 2011:
1.8 DESIGN REQUIREMENTS: The following elements are required for all asbestos abatement project designs for VA facilities:
i. All project designs must be developed and/or reviewed and approved by an EPA Model Curriculum trained and applicable state accredited Asbestos Project Designer. This is to ensure that all applicable federal, state and local regulations are followed regarding the design of asbestos abatement projects. These regulations include, but are not limited to, EPA NESHAP requirements, City of St. Louis Air Pollution division requirements St. Louis County Air Pollution division requirements, and Missouri Department of Natural Resources (MDNR) requirements. VA representatives conducting peer review of asbestos designs need not be accredited Asbestos Project Designers.
ii. All asbestos inspections performed in VA facilities for the purposes of gathering information for the development of the asbestos abatement project design must be performed by EPA Model Curriculum trained and applicable state-accredited Asbestos Building Inspector.
iii. VA Master Specifications have been developed for typical asbestos abatement work. The appropriate sections shall be edited to meet the project scope of work and specific project requirements.
iv. The A/E shall carefully coordinate specifications with the drawings so that all work required by the drawings is included in the specifications. Specification content that does not apply to the project shall be deleted.
v. The A/E shall modify the existing Master Specifications, when feasible, to address any abatement that is not specifically identified by the VA Master Specifications.
1.9.2 DRAWINGS: The following criteria must be used when creating drawings to be used in support of the asbestos abatement project.
i. Refer to VA Design and Construction Procedures for general drawing requirements.
ii. Consolidate notes and place them on the right-hand side of the sheet.
iii. Show scale, compass point, orientation, key plan, title, column grids and numbers, match-lines, room numbers and titles corresponding to the Architectural drawings.
iv. Clearly identify all locations of materials to be removed during the asbestos abatement project.
v. Clearly identify any life-critical systems that exist in abatement areas to ensure that these systems are isolated and not disturbed during the project.
1.9.3 SEQUENCE OF ASBESTOS ABATEMENT DRAWINGS
i. Symbols and abbreviations
ii. Demolition Plans
iii. Asbestos materials location plans
iv. Details
v. Summary of asbestos material quantities
vi. Coordination with A/E Design Submission Requirements (PG 18-15).
2.3.1 ABATEMENT WORK TASKS: The specific ACM to be abated during the asbestos abatement project must be identified on the detailed plan and project drawings. A summary for each work task to be performed during the abatement project, as well as a summary of the techniques to be used, in addition to safety precautions and methods must be included in the design.
2.3.2 UNEXPECTED DISCOVERY OF ASBESTOS: For any previously untested building components suspected to contain asbestos and located in areas to be impacted by the work,
additional samples will need to be collected of any materials found to determine the presence or absence of asbestos. The sampling must be performed by an AHERA accredited Asbestos Building Inspector.
a. All spaces within the scope of work must be designed according to applicable codes and standards.
e. The A/E shall submit a design narrative (15%) and design plans (35%, 65%, 95%, 100% Contract Docs for Bidding, and Release for Construction Set) specifications, submittals schedule, estimates and other documentation in accordance with the “B4 DESIGN DELIVERABLES” section of this Supplement B. The construction work will be performed under a separate Firm-Fixed-Price contract awarded by the VA. As a result, the Construction Documents must conform to the estimated Total Construction Cost Price, not including any contingencies, and convey the entire construction work completely and clearly, such that any bidder can produce an accurate bid without surveying the work site.
f. The A/E will also participate in the VASTLHCS Pre-Construction Risk Assessment to determine the requirements for Infection Control, Interim Life Safety Measures, occupational safety and health, patient safety, public safety, security controls for physical and logistical access, and environmental controls and limitations on vibrations, noise, and disruptions to operations and utilities. The results of these assessments will be included in documentation submitted by the A/E pursuant to, and inclusive of, the Construction Documents.
g. Prior to submitting a response to this proposal the A/E shall meet with the Contracting Officer’s Representative (COR) at the proposed project site to review the scope of services and the project goals. The COR will provide A/E with a copy of the portions of the latest Facilities Condition Assessment (FCA) applicable to this project.
h. Overall, site plans will be provided as a Reference Drawing with Room Numbers showing the areas within the project boundary.
i. The C&A requirements do not apply, and a Security Accreditation Package is not required.
Sustainability Requirements:
a. Design shall comply with the most current version of the VA Sustainable Design Manual at time of award found on the VA technical Information Library https://www.cfm.va.gov/til/sustain.asp
b. The following deviations are allowed: None
c. GUIDING PRINCIPLES CHECKLIST: AE shall complete and submit the appropriate Federal Energy Management Guiding Principles Checklist
https://energy.gov/eere/femp/downloads/guiding-principles-checklists-new-constructionand-modernization-and-existing
IV. A/E FEE DETERMINATION:
The A/E is to present their fee proposal for evaluation and negotiation in the following format:
1. Submit completed Price Proposal on NCO 15 Form 10-6298. The spreadsheet is to have the work broken out in hours by position, by discipline and by design phase. Include a list of the number of drawings required for each design phase broken out by drawing type per discipline. Include a summary of the foregoing with the number of hours required for each drawing type and each major task. The spreadsheet will be used to facilitate review and comprehension of work effort and document fee. Include Part IV in cover letter and Part V (signed) as a separate attachment. Submit the electronic file of the spreadsheet upon request.
2. Include a letter of understanding with the price proposal that presents a detailed