<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/department_of_veterans_affairs/posts/115473458133489597" -->

---
title: J045--ANNUAL BOILER Maintenance Base Plus 4… (36C25926Q0011) | Closed - MatchAwards
description: J045--ANNUAL BOILER Maintenance Base Plus 4 Option Years for ECHCS. United States Department of Veterans Affairs. Solicitation 36C25926Q0011. NAICS 238220 - Plumbing, Heating, and Air-Conditioning Contractors. Total small business set-aside. Deadline 2025-11-21. The purpose of this amendment 0002...
canonical: https://matchawards.com/department_of_veterans_affairs/posts/115473458133489597
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: J045--ANNUAL BOILER Maintenance Base Plus 4… (36C25926Q0011) | Closed
og:url: https://matchawards.com/department_of_veterans_affairs/posts/115473458133489597
og:description: J045--ANNUAL BOILER Maintenance Base Plus 4 Option Years for ECHCS. United States Department of Veterans Affairs. Solicitation 36C25926Q0011. NAICS 238220 - Plumbing, Heating, and Air-Conditioning Contractors. Total small business set-aside. Deadline 2025-11-21. The purpose of this amendment 0002...
og:image: https://matchawards.com/system/accounts/avatars/000/000/015/original/f59915e906ee2b19.png?1638825904
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# J045--ANNUAL BOILER Maintenance Base Plus 4 Option Years for ECHCS

Status

Closed, the response deadline passed on Nov 21, 2025

Agency

[United States Department of Veterans Affairs](/department%5Fof%5Fveterans%5Faffairs)

Office

Greenwood Village, USA

Notice type

Combined Synopsis/Solicitation

Solicitation number

36C25926Q0011

NAICS

[238220 - Plumbing, Heating, and Air-Conditioning Contractors](/groups/228)

PSC

J045 - MAINT/REPAIR/REBUILD OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT

Category

[Facility Related Services (4.4)](/categories/facilities-and-construction/facility-related-services)

Set-aside

[Total Small Business Set-Aside (FAR 19.5)](/contracts/small-business)

Posted

2025-11-14

Deadline

2025-11-21

Place of performance

Aurora, 80045

## Description

The purpose of this amendment 0002 to request for quote (RFQ) 36C25926Q0011 is to post updated Statement of Work (SOW) dated 11.13.2025 and answer vendor questions. The quote deadline is 16:00 MT 11/21/2025\. Updated statement of work dated 11.13.2025 is hereby incorporated into the solicitation. Questions and answers as indicated below: Q1\. May the combustion tuning be done alongside the semiannual safety device testing? A1\. No, this is completed a week after the Annual boiler inspections are done. See section 1A. page 1 of SOW. dated 11.13.2025\. Q2\. Can the De-aerator (DA) tank be inspected during an internal boiler inspection? For 4 total NB inspection visits. A2\. Yes. See section 6E. page 5-6 of SOW dated 11.13.2025\. Q3\. According to the VHA, the DA tank is what needs a 5-year magnetic particle testing, but the SOW does not specify which pressure vessels need this and how frequently. Please clarify. A3\. DA tank needs a 6-year magnetic particle testing. The pressure vessel should be the Deaerator Tank. Frequency is every 6 years. See section 4K page 4 of SOW dated 11.13.2025\. Q4\. Does the Condensate tank also need to be internally inspected annually? A4\. Yes. See section 3C. ii. Page 1-2 of SOW dated 11.13.2025\. Q5\. If the condensate tank needs to be internally inspected annually can this be done along one of the internal boiler inspections? A5\. Yes. See section 3C. ii. Page 1-2 of SOW dated 11.13.2025\. Q6\. Need clarification if the boilers and tanks to be cleaned and prepared by the contractor before NB annual inspections. A6\. Yes. See section 3A page 1 of SOW dated 11.13.2025\. Q7\. Is the site or contractor providing gaskets for the internal inspections? A7\. The VA will provide the gaskets See section 6J. iii. page 6 of SOW dated 11.13.2025\. Q8\. How often do the safety pressure relief valves need to be tested and certified? E.g. - semiannual or annually. A8\. All safety pressure relief valves should be tested and certified at least semi-annually. See section 1B. i. pg.1 of SOW dated 11.13.2025\. Q9\. Should we include the price of all new valves in the bid or is this to be quoted after awarded and tested? A9\. This has been removed from the SOW please see updated SOW dated 11.13.2025\. Q10\. Can the VA open and close the tanks for internal inspections? A10\. Yes. See section 6K. ix. #3 page 7 of SOW dated 11.13.2025\. Q11\. The scope of work does not identify that the existing valves are not in compliance due to construction material and capacity requirements and MUST be changed. A11\. The removal of the valves have been removed from this requirement. See updated SOW dated 11.13.2025\. Q12\. The scope does not address that the new compliant valves are now flanged, instead of threaded, therefore code welded spool pieces must be supplied by a holder of a NB Stamp for B31.1 code piping. A12\. The removal of the valves have been removed from this requirement. See updated SOW dated 11.13.2025\. Q13\. The scope does not address that the new relief valves will now have 4 outlets instead of the existing smaller sizing, which will now require a 2nd 6 pipe to be run parallel to an existing large enough safety relief vent line from boiler and out through the rear boiler room wall and travel on the exterior of the wall behind the existing solar panels (in the view of the public). A13\. The removal of the valves have been removed from this requirement. See updated SOW dated 11.13.2025\. A14\. Is this solicitation requiring the contractor to upgrade the known existing non-compliant valves to the proper compliant steel body Kunkle valves models: 300LLJ01-AS set @ 135 and 300LMK01-AS set @ 14\. Item 2) Relief Valve Capacity: in accordance with: VHA Boiler and Boiler Plant Safety Device Testing Manual 8th edition (issued Feb, 2024) Checklist for Steam Safety Valves on Boiler (SVB) (For High Pressure Steam Boiler System) \* Max lift pressure of 3% higher than rated lift pressure. Reseat pressure must be prior to reset point of the first steam limit switch. \* Maximum accumulation pressure seen with all SVB s open and boiler in high fire should not exceed 110% of highest SVB setpoint and never exceed boiler rated pressure. \* The safety relief valve with the lowest setpoint must have a relief capacity of approximately 80% of boiler steam capacity. The safety valve with the higher set pressure must have a relief capacity of at least 100% of boiler steam generating capacity. In order to meet the compliance requirement of 80% and 100% the new safety relief valves must be resized. There are three existing valves with sizes of 1-1/2 , 1-1/2 & 2 . New Kunkle valves sized to meet the capacity would now be two valves at 2-1/2 & 3 inlets and both valves now have 4 outlets requiring new drip pan elbows and new 6 vent piping. The existing third safety valve is not required by the testing manual and does not reduce the capacity requirement on either valve (set at 80% and 100%). Therefore, the third valve can be eliminated. A14\. The removal of the valves have been removed from this requirement. See updated SOW dated 11.13.2025\. Q15: Is this solicitation requiring that if these new valves are to be installed on EACH BOILER, the contractor will be required to run new vent outlet piping as follows: A) A Kunkle 300LLJ01-AS valves set @ 135 psi with a capacity of 19,834 lbs/hr (approx. 85% of total boiler requirement) is added; then the existing relief valve piping can stay in place and be re-used for this new valve. B) A Kunkle 300LMK01-AS valves set @ 140 psi with a capacity of 25,848 lbs/hr (approx. 110% of total boiler requirement) is added; then the existing relief valve outlet piping must be replaced with new 6 pipe ran parallel to the existing piping that is running out through the back wall and up the exterior of the plant wall behind the existing solar panels to a safe point of discharge with a minimum of 6 ft above the roof line. C) The new outlet piping would be approximately 600 ft for each line of 6 welded pipe on one safety relief valve (4 in total) for all four boilers. A15\. The removal of the valves have been removed from this requirement. See updated SOW dated 11.13.2025\. Q16\. If we are unable to attend a site visit, will that not allow us to submit a proposal? A16\. No, the site visit was not mandatory. Q17\. Is there an incumbent? A17\. There is no incumbent this is a new requirement. Q18\. How would you like this quote submitted? A18\. Quote should be submitted in accordance with the instructions provided in the combined synopsis solicitation section (j). 

<!-- mobian-agent-ad sponsored="true" id="642f199d-fe76-49e2-b967-b064bd91745a" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories/facilities-and-construction/facility-related-services?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


## Attachments

* [Attachment 1](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/0d6d2944cecb455080db6ac77b921ec2/download)
* [Attachment 2](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/32eb4f936f244f158ae6d7b0209d6cff/download)
* [Attachment 3](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/35e466051af24572850b42c64ad917a3/download)
* [Attachment 4](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/3c41113009674c37a03035a96a7586f9/download)
* [Attachment 5](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/3ec4b9dccec14ab5a965cde0ea90e3e5/download)
* [Attachment 6](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/7f01ba1452144fbf92d981ba840259a3/download)
* [Attachment 7](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/9cdf936518f74e7488ea3dda0e10e82e/download)
* [Attachment 8](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a251130a71ce4834aa18d630976f5135/download)
* [Attachment 9](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/bd78074d868c4cd9aca12ea07b86ee40/download)
* [Attachment 10](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ce1c29ae76ad40b9a73e556437d89844/download)

[Source notice](https://sam.gov/workspace/contract/opp/0ce1af5d8e4b4ba0bd8df1e786f1ca53/view)

[More from United States Department of Veterans Affairs posted in October 2025](/department%5Fof%5Fveterans%5Faffairs/archive/2025-10)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Small Business Set-Aside Government Contracts Available Now](/contracts/small-business)
* [Construction Government Contracts Available Now](/contracts/construction)

```json
{"@context":"https://schema.org","@type":"Demand","name":"J045--ANNUAL BOILER Maintenance Base Plus 4 Option Years for ECHCS","description":"The purpose of this amendment 0002 to request for quote (RFQ) 36C25926Q0011 is to post updated Statement of Work (SOW) dated 11.13.2025 and answer vendor questions. The quote deadline is 16:00 MT 11/21/2025. Updated statement of work dated 11.13.2025 is hereby incorporated into the solicitation. Questions and answers as indicated below: Q1. May the combustion tuning be done alongside the semiannual safety device testing? A1. No, this is completed a week after the Annual boiler inspections are done. See section 1A. page 1 of SOW. dated 11.13.2025. Q2. Can the De-aerator (DA) tank be inspected during an internal boiler inspection? For 4 total NB inspection visits. A2. Yes. See section 6E. page 5-6 of SOW dated 11.13.2025. Q3. According to the VHA, the DA tank is what needs a 5-year magnetic particle testing, but the SOW does not specify which pressure vessels need this and how frequently. Please clarify. A3. DA tank needs a 6-year magnetic particle testing. The pressure vessel should be the Deaerator Tank. Frequency is every 6 years. See section 4K page 4 of SOW dated 11.13.2025. Q4. Does the Condensate tank also need to be internally inspected annually? A4. Yes. See section 3C. ii. Page 1-2 of SOW dated 11.13.2025. Q5. If the condensate tank needs to be internally inspected annually can this be done along one of the internal boiler inspections? A5. Yes. See section 3C. ii. Page 1-2 of SOW dated 11.13.2025. Q6. Need clarification if the boilers and tanks to be cleaned and prepared by the contractor before NB annual inspections. A6. Yes. See section 3A page 1 of SOW dated 11.13.2025. Q7. Is the site or contractor providing gaskets for the internal inspections? A7. The VA will provide the gaskets See section 6J. iii. page 6 of SOW dated 11.13.2025. Q8. How often do the safety pressure relief valves need to be tested and certified? E.g. - semiannual or annually. A8. All safety pressure relief valves should be tested and certified at least semi-annually. See section 1B. i. pg.1 of SOW dated 11.13.2025. Q9. Should we include the price of all new valves in the bid or is this to be quoted after awarded and tested? A9. This has been removed from the SOW please see updated SOW dated 11.13.2025. Q10. Can the VA open and close the tanks for internal inspections? A10. Yes. See section 6K. ix. #3 page 7 of SOW dated 11.13.2025. Q11. The scope of work does not identify that the existing valves are not in compliance due to construction material and capacity requirements and MUST be changed. A11. The removal of the valves have been removed from this requirement. See updated SOW dated 11.13.2025. Q12. The scope does not address that the new compliant valves are now flanged, instead of threaded, therefore code welded spool pieces must be supplied by a holder of a NB Stamp for B31.1 code piping. A12. The removal of the valves have been removed from this requirement. See updated SOW dated 11.13.2025. Q13. The scope does not address that the new relief valves will now have 4 outlets instead of the existing smaller sizing, which will now require a 2nd 6 pipe to be run parallel to an existing large enough safety relief vent line from boiler and out through the rear boiler room wall and travel on the exterior of the wall behind the existing solar panels (in the view of the public). A13. The removal of the valves have been removed from this requirement. See updated SOW dated 11.13.2025. A14. Is this solicitation requiring the contractor to upgrade the known existing non-compliant valves to the proper compliant steel body Kunkle valves models: 300LLJ01-AS set @ 135 and 300LMK01-AS set @ 14. Item 2) Relief Valve Capacity: in accordance with: VHA Boiler and Boiler Plant Safety Device Testing Manual 8th edition (issued Feb, 2024) Checklist for Steam Safety Valves on Boiler (SVB) (For High Pressure Steam Boiler System) * Max lift pressure of 3% higher than rated lift pressure. Reseat pressure must be prior to reset point of the first steam limit switch. * Maximum accumulation pressure seen with all SVB s open and boiler in high fire should not exceed 110% of highest SVB setpoint and never exceed boiler rated pressure. * The safety relief valve with the lowest setpoint must have a relief capacity of approximately 80% of boiler steam capacity. The safety valve with the higher set pressure must have a relief capacity of at least 100% of boiler steam generating capacity. In order to meet the compliance requirement of 80% and 100% the new safety relief valves must be resized. There are three existing valves with sizes of 1-1/2 , 1-1/2 \u0026 2 . New Kunkle valves sized to meet the capacity would now be two valves at 2-1/2 \u0026 3 inlets and both valves now have 4 outlets requiring new drip pan elbows and new 6 vent piping. The existing third safety valve is not required by the testing manual and does not reduce the capacity requirement on either valve (set at 80% and 100%). Therefore, the third valve can be eliminated. A14. The removal of the valves...","url":"https://matchawards.com/department_of_veterans_affairs/posts/115473458133489597","identifier":"36C25926Q0011","category":"238220 - Plumbing, Heating, and Air-Conditioning Contractors","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"J045 - MAINT/REPAIR/REBUILD OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT"},{"@type":"PropertyValue","propertyID":"CM category","name":"Category Management category","value":"4.4 Facility Related Services","url":"https://matchawards.com/categories/facilities-and-construction/facility-related-services"}],"availabilityStarts":"2025-11-14","availabilityEnds":"2025-11-21","validThrough":"2025-11-21T23:59:59-05:00","areaServed":"Aurora, 80045","sameAs":"https://sam.gov/workspace/contract/opp/0ce1af5d8e4b4ba0bd8df1e786f1ca53/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Small business","item":"https://matchawards.com/contracts/small-business"}]}
```

