ClickCease 6632--Automated Osmolality CPT Testing (36C24826Q0043) | Closed - MatchAwards

6632--Automated Osmolality CPT Testing

Status
Closed, the response deadline passed on Nov 6, 2025
Agency
United States Department of Veterans Affairs
Office
TAMPA, USA
Notice type
Presolicitation
Solicitation number
36C24826Q0043
NAICS
334516 - Analytical Laboratory Instrument Manufacturing
PSC
6632 - ANALYSIS INSTRUMENTS, MEDICAL LABORATORY USE
Category
Medical Equipment and Accessories and Supplies (10.2)
Posted
2025-11-06
Deadline
2025-11-06

Description

Pre-Solicitation This is a Pre-Solicitation for commercial items prepared in accordance with the format in Subpart 12.6 as supplemented with additional information included in this notice. THIS PRE-SOLICITATION NOTICE IS NOT A REQUEST FOR A QUOTE (RFQ). VENDORS SHOULD NOT SUBMIT FORMAL QUOTES UNTIL THE RFQ IS POSTED ON THIS WEBSITE. This notice is not to be construed as a commitment by the Government, nor will the Government pay for the information resulting from this posting. The Department of Veterans Affairs (VA), Veterans Integrated Service Network (VISN 8), James A. Haley Veterans Hospital (JAHVH), Tampa, FL, intends to issue a Request for Quote (RFQ), brand name only, for Neurostar Treatment Sessions. The applicable North American Industry Classification System (NAICS) code assigned to this procurement is NAICS Code 334516 - Analytical Laboratory Instrument Manufacturing. The small business size standard is 1,000 employees. See attached Statement of Need below. The actual Solicitation #36C24826Q0043 is anticipated to be posted to the Sam.gov website on or about 10/28/2025 with a closing date of 10/31/2025 at 4:30pm EST. Quoters should continue to monitor Sam.gov for the RFQ and any subsequent Amendments to that RFQ. All Quoters must be registered in the System for Award Management (SAM) database; see https://www.sam.gov for complete online Reps and Certs. SDVOSBs must be certified and verified by the Small Business Administration at https://veterans.certify.sba.gov/. Statement of Need: Automated Osmometer CPT SCOPE: The Contractor shall provide a two (2) fully automated Osmometer System, including, delivery, installation, training, reagents, consumables for the Tampa VA Healthcare Network (TVAHCN), Department of Pathology and Laboratory Medicine Service (P&LMS) located at 13,000 Bruce B. Downs Blvd., Tampa, Florida 33612. All work is to be performed in accordance with the guidelines established by Federal, State, and local ordinances. FDA and manufacturer's guidelines, with all terms, conditions, provisions, schedules, and specifications provided herein. The Contractor selected is responsible for system installation, maintenance coordination and supply procurement for all equipment. GENERAL REQUIREMENTS: The contractor is required to furnish all of the following: All reagents and supplies necessary to operate the contractor's equipment, including calibrators and or calibration material, reagents, linearity testing material, at least 2 levels of test control material, disposables, consumables, cleaning solutions, diluent solutions, sheath fluids, and any instrument part required for operating all analyzers and equipment. ADDITIONAL NOTES: Contractor shall provide enough reagents sufficient to perform testing at each location for a minimum of 30 days. Reagent quality must be high enough to satisfy proficiency testing of the College of American Pathologists and the Joint Commission. Contractor to provide all reagents, calibrators, and controls needed along with technical assistance to perform correlation studies from a single lot at no additional cost for new test methods or changes in test menus. (i.e., Contractor is to provide all manpower and reagents/supplies to do correlation studies). Equipment must be able to Interface to the Lab Information System (Vista) / middleware (Data Innovations). All consumables and user-defined replacement parts necessary to operate the contractor's equipment, including secondary, aliquot tubes. On- and/or Off-site training for end users and key operators. Delivery and installation of equipment at no additional charge as well as return shipping costs at end of contract (removal). Contractor to perform equipment and assay installation including full validation of system hardware and software as well as assay performance studies as applicable (assay correlations to existing instrumentation, carryover, linearity, dilution validation, precision, accuracy, reference range studies, and normal range studies). Accuracy studies for each analyte. A minimum of 30 samples, spanning the reportable range, will be run by the present and the new contracted method. Contractors will analyze numbers and provide statistical data to accept the new method. Statistics will consist of at least mean, bias, slope, y-intercept, correlation coefficient, analysis, and meet current standards defined by CLSI. Linearity analysis will be performed on new contracted instrument(s) for each analyte to determine reportable range. A 5-point linearity analysis that adheres to the Beer­ Lambert Law should be performed as a minimum. Precision study utilizing normal and abnormal control material will be performed. This should consist of a within run precision study of 10 normal and 10 abnormal controls and a day-to-day precision study of normal controls and abnormal controls for 10 days (may be run twice a day) for a total of 20 values per level of control. Calibration verification will be performed using samples of known value. These can be calibrators or CAP assayed survey samples, or equivalent. Sensitivity: Sensitivity may be validated concurrently with the linearity verifications. Reference Range: Determine a reference range for each analyte following CLSI guidelines. Samples used for the reference range study shall be representative of the patient population being tested. Reference range assessment shall be performed for each lab. One of the following protocols should be used: A verification of the manufacturer's suggested reference range may be performed as long as the suggested range is based on a comparable population of test subjects. The manufacturer shall provide specific information defining how the suggested range was determined. A minimum of 20 reference individuals shall be used to verify the manufacturer's range. Any apparent outliers should be discarded and new specimens obtained to provide a statistically valid verification. If the suggested manufacturer's range is not appropriate for the patient population, a reference range shall be established. Establishing a reference shall follow CLSI guidelines. This requires a minimum of 120 reference individuals be used to establish a reference range. The reference interval should be determined using the nonparametric method. If a laboratory is currently using the proposed instrument/reagent system, the "in-use" reference range can be transferred to the "new" system if a method comparison study between the two systems proves to be acceptable. If comparison studies are not acceptable, then an alternate test shall be provided. Therapeutic range validation studies shall be performed by Contractor for applicable analytes, using CLSI guidelines. Carryover studies shall be performed, as applicable, as part of the initial evaluation of the instrument. Contractor will provide interpretation of raw data for each instrument installed and validate no carryover exists within the test platforms. All technical procedures shall be provided by Contractor on diskette in CLSI format, using software compatible with each Laboratory's computer system, for local modification to meet CAP requirements. All shipping costs for reagents, consumables, supplies and equipment (install and removal at the end of contract) including delivery to the clinical laboratory at all sites. Note: includes emergency, overnight delivery as necessary. Special handling for emergency orders of supplies: If the supplies are found to be defective and unsuitable for use with the Contractor s equipment, or the Contractor has failed to comply with the requirements for routine supply delivery, the Contractor is required to deliver the supplies within 24 hours of receipt of a verbal order for emergency delivery. If either circumstance has occurred, the Contractor shall deliver to the Government site in the most expeditious manner possible without additional cost to the Government, the necessary consumables in sufficient quantity as required to allow operation of the Contractor s equipment for one week (under normal Government test load volume). If additional requests for emergency supply delivery are required by the Government, they shall be honored by the Contractor until the arrival at the laboratory of the monthly standing order/routine supplies delivery with no shipping expenses. EQUIPMENT SYSTEM TECHNICAL SPECIFICATIONS AND FEATURES: The purpose of this solicitation is to identify the NAME BRAND OR EQUIVALENT Osmometer instrument and specific functionality and performance-based requirements of the systems. The proposal shall provide descriptive literature that meets the following specifications. The vendor must provide NAME BRAND OR EQUIVALENT for all of the following list of equipment: One (1) Advanced Instruments OsmoPRO® MAX Automated Osmometer One (1) Advanced Instruments Osmo1® Single-Sample Micro-Osmometer Redundant equipment must use the same reagents, controls, calibrators, and consumables, and provide the same reference ranges. General System Requirements OsmoPRO® MAX Automated Osmometer: All equipment provided must be new. Dimensions (W x D x H): 14.0 x 16.5 x 18 (+ or 2 inches in any direction). Electrical voltage: 100 to 240 VAC (50/60 Hz) Operating Conditions (must operate ranges below or better): Temperature 18°C to 35°C (64°F to 95°F); 5 to 80% relative humidity (non-condensing) Sample type: Serum, plasma, and urine Sampling must be from the primary tube, no pipetting or aliquoting required Measurement Principle: Freezing point depression Minimum Required Sample Volume: 190 L Sample Capacity: Must support continuous loading of at least 500 samples or more. Resolution: 1 mOsm/kg H2O Range: 0 to 2000 mOsm/kg H2O Display: Touchscreen with onboard video instructions Memory capacity: 1,000 results / 10,000 events (+ or 5% for each results / events) Temperature effects: Less than 1 mOsm/kg H2O per 5 °C (9 °F) ambient temperature change Accuracy specifications: Mean value ±2 mOsm/kg H2O from nominal value between 0 and 400 mOsm/kg H2O (1 SD) Mean value ± 0.5% from nominal value between 400 and 1500 mOsm/kg H2O (1 SD) Mean value ±0.75% from nominal value between 1500 to 2000 mOsm/kg H2O (1 SD) Precision (within run) specifications (must meet range for deviation/ variation below, or better): Standard deviation 2 mOsm/kg H2O between 0 and 400 mOsmo/kg H2O Coefficient of variation 0.5% mOsm/kg H2O between 400 to 1500 mOsm/kg H2O Coefficient of variation 0.75% mOsm/kg H2O between 1500 to 2000 mOsm/kg H2O Systems must be barcode driven, random access, and have a precision delivery system. Must be 100% walk-away system, monitoring during specimen analysis must be minimal. Must be capable of rules-based resulting of which the operator is notified when flags or warnings occur. The system shall come ready for Auto-verification of negative results. Must not introduce additional chemicals or other fluids to sample that would contaminate the sample which would preclude additional testing if needed. Shall have accurate capability of monitoring reagent usage, and provide reagent inventory upon request, in real time. Regent handling should include on board reagent stability greater or equal to 30 days. Shall have calibration and lot (calibrator and reagent) tracking. The systems shall deliver well established, standout performance on proficiency surveys. The vendor must offer peer group analysis program. The systems shall have minimal maintenance, <30 minutes, with walkaway capability and minimize staff hands-on and free technologists for more critical tasks. An electronic operator s manual shall be furnished with each model supplied. Temperature and Humidity Requirements (must meet temperature and humidity requirements, or better than, i.e. a wider tolerance for the operating range): Temperature: Between 59- and 86-degrees Fahrenheit (I5 - 30° Celsius) Humidity: Relative humidity between 30 and 80 percent Note: Troubleshooting should be provided for instances in which the operating environmental conditions are out of range. Electrical Characteristics 100-120 VAC for each module, 50/60 Hz, 250 watts max General System Requirements Osmo1® Single-Sample Micro-Osmometer: All equipment provided must be new. Dimensions (W x D x H): 15 x 14 x 15 (+ or 2 inches in any direction). Electrical voltage: 100 to 240 VAC (50/60 Hz) Operating Conditions (must operate ranges below or better): Temperature 18°C to 35°C (64°F to 95°F); 5 to 80% relative humidity (non-condensing) Sample type: Serum, plasma, and urine Measurement Principle: Freezing point depression Minimum Required Sample Volume: 20 L Sample Capacity: One-step direct sampling, aspirate sample and load On-board printer Integrated barcode scanner for traceable sample identification and reduce transcription errors. SYSTEM DATA MANAGEMENT HARDWARE / SOFTWARE System shall interface instruments to Data Innovations or directly to the Lab Information System (LIS), Vista. Data Management with record storage, including instrument used for testing, for all patient results. Shall include all software and software licenses, interfaces, and hardware (e.g., servers, printers, printer drivers, monitors, UPS, etc.) required for complete system operations. Result, calibration and quality control reports must be available to be printed. PREVENTATIVE MAINTENANCE: The contractor shall provide maintenance, at their expense (travel, labor and parts), to keep the equipment in good operating condition and subject to security regulations. The government shall provide the contractor access to the equipment to perform maintenance services. The preventive maintenance shall be of a frequency that conforms to the manufacturer's operation and maintenance instructions for the supported equipment. Preventative maintenance tasks must be completed within 2 weeks of the due date, based on the date of the previously completed task. SERVICE AND SUPPORT Contractor shall respond with full service on-site technical support, Monday Friday, excluding federal holidays, 8am-5pm, for all equipment to keep the equipment in good operating condition and subject to security regulations. Response time within 3 days from date of call. Telephone technical support shall be available 24 hours/day, 7 days/week with follow up on all calls within one hour of initial call. Following determination that service is required, technical on-site support must be provided within 3 Days. The contractor will provide all parts and labor needed to repair the malfunction. Travel, per diem and other expenses associated with the repair will be borne by the contractor. The contractor shall furnish a comprehensive malfunction incident report to the installation upon completion of each maintenance call. The report shall include, at a minimum, the following: (a) date and time of notification (b) date and time of arrival (c) serial number type and model numbers(s) of equipment (d) time spent for repair, (e) description of malfunction and (f) proof of repair. Parts (e) and (f) shall be written verification of quality control of the sample run. During the contract period, should the repair record of any laboratory equipment reflect a downtime of 10% or more of the normal working days in one calendar month, a determination will be made by the contracting officer representative (COR) of the government to request a replacement the initial laboratory equipment with new equipment. Credit for Prolonged and/or Frequent Equipment Malfunction/Downtime: If a piece of equipment remains inoperative (unable to process patient specimens, perform patient testing, and/or report a valid test result) due to a malfunction through no fault or negligence of the government for a total of 48 hours consecutive hours or more, the contractor shall be assessed damages at the rate of 1/30 of the preceding average three month CPRR billings times the total number of days certified as downtime for each incident. The downtime shall start from the time the user makes a bona fide attempt to contact the contractor's designated representative (technical support hotline) until the equipment is returned to good operating order. Computer Patient Data Handling: No hardware, containing any VA patient information, is to be removed from either location, without the approval and removal of data by the VA Information Technology Department. Failure Mean Time Disclosure: The contractor will state the failure mean time (between failure and mean time to repair) for each piece of equipment offered. In addition, the Contractor will help establish normal ranges. The Contractor will provide emergency backup equipment. Only instruments which are FDA approved will be considered and shall be operational and interface with VA laboratory computer systems and upgrades. This shall be a "tum-key" system. Operator Procedure Manuals: Operator and Service manuals along with CLSI procedures shall be furnished for each instrument model supplied. DELIVERY, PERFORMANCE, INSPECTION AND ACCEPTANCE: General: The Contractor is responsible for performing all inspections and tests necessary to substantiate that the equipment, supplies and services furnished under the contract conform to contract requirements. The VA has the right to test all services ordered under the contract at all times and places throughout the term of the contract Government testing and inspection will not unduly delay any Contractor work being performed nor will it create a defect in services covered by this contract. Request for upgrades or replacement hardware/software, due to workload increase, excessive instrumentation failures will be evaluated as needed or at least annually with communication to the Contractor for modification of the contract. A high incidence of such problems with any equipment/analyzer or assay within the test menu supplied may indicate probable non-compliance with the terms of this contract and will entitle the government to its replacement with other analyzer(s) that can produce the required criteria of this contract satisfactorily. Downtime is defined as any time the equipment is not available for patient testing due to malfunction, unacceptable quality control, software system errors, or hardware failures. This includes time used for end-user troubleshooting, conversations with technical support or on-site engineer repair/support. Downtime for each incident shall start from the time the government makes a bona fine attempt to contact the contractor's designated representative at the prearranged contact point until the system or machine(s) is returned to the government in proper operating condition. Standard acceptable performance for the life of the contract is defined as a period of 30 consecutive calendar days by operating in conformation with the contractor's technical specification without prolonged downtime (>4 hours) per instance more than 3 times within 30 days or more than 10 instances of downtime (of any length of time) within 30 days. In the event the equipment or an assay does not meet the standard acceptable performance for 30 consecutive days, the government will notify the contractor of the ongoing unacceptable performance, and the performance will be monitored for an addition 90 consecutive days. If after 120 calendar days from the initial date of unacceptability, the vendor does not resolve the performance concerns to meet the governments expectations, the government, through the contracting officer, may request a replacement of the equipment / assay or terminate the order upon mutual agreement. Removal of the existing instrument by the Contractor shall be performed within 30 days following the acceptance of replacement equipment without additional charge to the government. Enhancements to the contractor's equipment shall be delivered to the government site and installed by the

Attachments

Contacts

Email and phone are in the source notice.

Source notice

More from United States Department of Veterans Affairs posted in October 2025

More lists