Y1AZ--Renovate 6B for Outpatient Mental Health Project 526-19-122
- Status
- Closed, the response deadline passed on Mar 4, 2026
- Agency
- United States Department of Veterans Affairs
- Office
- ALBANY, USA
- Notice type
- Presolicitation
- Solicitation number
- 36C24226B0002
- NAICS
- 236220 - Commercial and Institutional Building Construction
- PSC
- Y1AZ - CONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS
- Category
- Construction Related Services (4.2)
- Set-aside
- Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
- Posted
- 2026-02-24
- Deadline
- 2026-03-04
Description
Page 4 of 4 THIS IS A PRE-SOLICITATION NOTICE ONLY Project No. 526-19-122; Renovate 6B for Outpatient Mental Health at the James J. Peters VA Medical Center, Bronx, New York. CONSTRUCTION SERVICES PROJECT SCOPE/ Statement of Work. The Contractor must furnish all labor, materials, tools and supervision to complete the following: The Department of Veterans Affairs is accepting proposals from qualified firms to provide Construction services for labor, material and supervision related to the Renovate 6B for Outpatient Mental Health Project located at the James J Peters VA Medical Center, 130 West Kingsbridge Road, Bronx, New York 10468 in accordance with all NFPA, federal and local requirements. All work shall be completed in accordance with all published applicable local/state/federal/national codes, ordinances, and regulations, along with all related VA directives, design guides and manuals, specifications, and standards plus all VA requirements (federal or local) that are project specific to the documented scope of work on this site. The Contractor is required to visit site and meet with Contracting Officer s Representative (COR) prior to bidding. Project Tasks: Construction services should include but are not limited to asbestos abatement, demolition, concrete, metals, rough carpentry, water protection, doors, windows, finishes, specialties, equipment, fire protection, plumbing, heating ventilation and air conditioning, electrical, communications, and security in support of the Renovate 6B for Mental Health project at the James J Peters VA Medical Center. The Contractor must furnish all labor, materials, tools and supervision to complete a fully functioning suite. Drawings and specifications are provided under separate cover. The work should be completed in 400 calendar days Scope of Work Architectural: Demolition: Project renovation requires a total demolition of the interiors to include: · Removal of interior partitions and finishes. · Removal of existing M/E/P infrastructure/piping. · Removal of all floor finishes, including VCT, sheet vinyl ceramic tile and associated grout and/ or mastic where needed. Hazardous Materials Abatement: Contractor to investigate the need for hazardous material abatement and proceed with testing and abatement during the demolition phase. New work: Interior Partitions: · Existing interior partition system will be removed and replaced with new 4 metal stud walls with 5/8 gypsum board panels on both sides. Sound Attenuation: · Acoustical attenuation panels will be specified for walls of exam rooms and all office/consultation rooms. Fire Protection Existing sprinkler mains on the sixth floor will be demolished and redistributed/modified per the new reflected ceiling plan. Sprinkler protection shall be provided in all spaces including, but not limited to, elevator machine rooms, walk-in freezers and cold rooms, computer rooms, telephone switch rooms, radiology and MRI suites, loading docks, electrical rooms, plumbing or utility closets, audiometric booths, vaults, paint spray booths, dry type lint collectors, dust collectors, and generator rooms. Recover and dispose of R123 refrigerant according to EPA regulations from Trane cylinders on site (Waste Manifest should be provided every month). Sprinkler systems shall be hydraulically calculated by any design approach allowed by NFPA 13, except that the Special Design Approach shall not be used for Health Care facilities. A safety factor shall be included by calculating the demand to a point no greater than 10% below the available water supply curve. Or a ten percent safety factor shall be provided (subtract 10% from the available water supply curve) for each sprinkler demand including the required hose streams. Sprinklers to be installed in VA facilities are required to be Factory Mutual (FM) approved as quick response. At the present time, concealed sprinklers are not permitted to be used for new construction in VA facilities because there are none that have passed the FM test for quick response. Plumbing Demolition work shall consist of demolition of all plumbing fixtures and associated piping serving the existing spaces within the project area, and the installation of new plumbing fixtures and piping to serve the new rooms. All plumbing fixtures in the renovated wing shall tie into the existing domestic cold water, hot water, hot water recirculation, sanitary and vent systems. MEDICAL GAS: Medical gas work shall consist of demolition of all medical piping routed on 6th floor ceiling, cut and cap existing piping back to the main and leaving; no new services will be provided. All associated existing med gas panels and control valves shall be disconnected and removed in its entirety. WATER DISTRIBUTION SYSTEM: The existing CW, HW and HWR water risers and mains serving the sixth floor will be re-utilized. Domestic water piping serving demolished plumbing fixtures will be demolished back to the mains where it will be capped. New CW, HW and HWR water piping shall be connected at the 6th floor ceiling and routed at the 6th floor ceiling space and down to fixtures and connect to anti-ligature fixtures. Anti-ligature fixtures shall be provided with a control box located outside the toilets for nurse s access and shall be provided with lockable access panel. Anti-ligature fixtures shall be hands-free activation. HWR piping shall be routed down and connect as close to the fixture as possible. The new work will include new plumbing fixtures, piping, valves, and piping insulation necessary for a fully functional system. The system will be designed to serve all plumbing fixtures from overhead and provide the most efficient installation. All domestic water piping will be provided with ball type isolation valves at each fixture or group of fixtures. All new above-grade piping will be type K copper with wrought copper fittings and soldered joints. Mineral fiber insulation with vapor barrier will be provided on all above grade domestic water (hot and cold) supply. Piping supports for the new system will be provided in accordance with the IPC. Inspections, disinfection, and testing for the new domestic water system will be provided in accordance with the IPC. SANITARY/VENT DISTRIBUTION SYSTEM The existing sanitary piping serving demolished plumbing fixtures will be demolished back to the sanitary stack where it will be capped or prepared for new connection. All new sanitary piping will be cast iron pipe with 4 -brand type heavy duty shielded couplings or copper DWV tube with wrought copper fittings and soldered joints. The existing vent piping serving demolished plumbing fixtures will be demolished back as shown on plumbing drawings; existing vent piping and vent thru roof piping will be re-utilized for new plumbing fixtures. Existing sanitary and vent piping serving fixtures from the 5th floor and 7th floor shall be re-connected and ensure existing fixtures are in proper working order. Remove and replace existing floor drain in mechanical room and replace with new. Provide new floor drain in the mechanical room to serve new humidifier and RO system. Existing sanitary and domestic water piping routed above the new TR shall be provided with a drain pan to be drained to the new floor drain/mop basin. Water detection alarm shall be installed on the drain pan and connected to the BMS. Mechanical Demolition: All supply, return and exhaust ductwork that is associated with AHU-26 that servs the area of renovation will be demolished and removed along with associated dual duct mixing boxes. For the area of the project that is served from AHU-34, the branch ductwork that serves the remodeled spaces will be removed and capped at the mains, but AHU-34 will remain intact. AH-26 and all associated ductwork, piping and controls will be demolished and replaced with new. The piping, once removed, will be capped back that the mains. The return fan and exhaust fan for the 6B wing and their associated wall mounted VFD s will also be removed. New Work: AHU-26 should be York, that provides ventilation for the 6B wing, will be removed and replaced with a new Variable Air Volume (VAV) air handling unit with steam pre-heat coil, chilled water-cooling and humidification coil. New VAV boxes with hot water reheat coils and DDC compatible thermostats will be provided for each space to provide the code required cooling, ventilation and heating. The perimeter spaces will be provided with hot water baseboard heat. These baseboard heating devices will provide heat for the spaces as needed during times when the air handling unit may not be running. The required heating hot water for the VAV boxes and the baseboard heating elements will be provided from a steam-to-water heat exchanger, located in the mechanical room, utilizing the buildings medium pressure (60 psi) steam. Two heat exchangers will be installed. Each heat exchanger will be sized for the required building heating load. Thus, providing an N+1 redundancy. Additionally, two new bases mounted hot water pumps will also be provided to circulate the hot water throughout the floor. One pump will be used as a standby also providing the N+1 redundancy. Because the building steam isn t considered to be clean enough for humidification, a new steam-to steam humidifier will be installed. This humidifier will take the medium pressure steam from the building, reduce the pressure down to 15 psi and then create clean steam that is suitable to route to the humidifier section in the air handling unit. A new direct drive exhaust fan and VFD will be provided to exhaust all the bathrooms, HAC rooms and any other spaces that require exhaust. A new inline return fan with VFD will be interlocked with the air handling unit to return air back or relieve it to the outdoors. Electrical Demolition: · All the cables and conduit to existing receptacles in existing 6B Outpatient Mental Health wing will be demolished to various source panels located in electrical closet #6B-26A. All existing receptacles will be demolished. · All the cables and conduit to existing luminaires in existing 6B Outpatient Mental Health wing will be demolished to source panels located in electrical closet #6B-26A. All existing luminaires and exit lights will be demolished. · All the cables and conduit to existing voice/data cables will be demolished to existing telecommunication/data room #6B-26. All existing data/voice outlets will be demolished. Existing cable tray will be demolished. · All the existing wireless access point devices will remain in place and protected from debris during construction. Same devices will be re-used and place within 2ft of original location. · All the existing fire alarm devices (including strobes, pull stations, and smoke detectors) will be removed and demolished. New Work: Receptacles: · Each Exam room location will be provided with a minimum four (4) receptacles. All receptacles will be hospital grade. · Each workstation will be provided with duplex type receptacle and will be supplied from normal branch. · Red color duplex receptacles will be provided from critical branch panel for nurse s workstation in the nurse s station. · Convenience outlets will be provided in common spaces for general purpose. They will be connected to normal power. · One (1) duplex receptacle in corridors, 25 -0 on center will be provided for cleaning purposes with dedicated circuits. · Equipment such as refrigerators and freezers will be connected to dedicated circuits. · Receptacles in common offices, general support rooms, etc., (depending on room layout) will be provided with a minimum of four (4) outlets with one (1) outlet on each wall. · Dedicated outlets will be provided to serve miscellaneous office equipment like copiers, fax machines and printers. · Ground fault protection will be provided for outlets within 6 -0 of a sink edge and other wet locations. Electrical outlets will be individually ground fault (GFCI) protected. No GFCI circuit breakers will be used for circuit protection. · General purpose receptacles will be connected to 20-amp branch circuits. (Maximum 6 duplex receptacles per circuit and maximum 4 quadraplex receptacles per circuit). · Duplex and quadraplex receptacles will be hospital grade, grounding type NEMA 5-20R. · For common area such as nurse stations and waiting area will be provided with Legrand model TR8300HUSB hospital grade or equal dual USB combo outlets. Receptacles labeling will be provided as per specification i.e. emergency circuit will be labeled Engraved with red letter, and normal circuit will be labeled with black letters on clear background. Exam rooms and patient toilet rooms will be equipped with tamper resistant receptacles. Lighting: Lighting system will be designed to comply with the ANSI/ASHRAE/IESNA 90.1. All the light fixtures will be energy saving LED type with dimmable driver where applicable. Space specific lighting level will be provided as per the Lighting Design Manual (LDM) and The Illuminating Engineering Society of North America (IESNA). · Lighting fixtures will be selected for each specific area based on the task to be performed. · Lighting power will be fed from existing area sub panels. · A night lighting system will be provided. Approximately 10% of lights in general lighting system will be on continuously on as night lights. Emergency Lighting System: · AC powered LED type exit marker signs will be provided throughout facility to identify pathways to and doors of egress. Exit signs will be anti-ligature installation. Lighting Control: · To maximize energy efficiency, dual technology occupancy sensor or vacancy sensor and dimming controls will be provided for private offices, administration areas and storage rooms. Corridor lighting will be time clock controlled with local override switches throughout the corridors. Hours of operation will be coordinated with VA for lighting controls programming. Voice / Data / Video Cabling: · Electrical contractor will install complete raceway/back box system and cable tray system for the telecommunications / Data systems. · Voice Jack: CAT 6A type cable will be provided for voice port with corresponding jack color at user end. The facility utilizes traditional analog PBX system. Voice jack connections will be terminated to new TR Room to allow for future VoIP upgrade. From the new TR ROOM voice cabling will be extended on to existing S66 punch blocks located in telecommunication room #6B-26. Cables on S66 punch down block(s) will follow labeling method currently used on that block. Voice cable labeling will be consistent at both ends. ·Data Jack: CAT 6A type cable will be provided for data port with corresponding jack color at the user ends. Data jack connection will be terminated to new 48 port patch panels located in TR Room 6B-52. Cables on patch panel and at corresponding data jack will be labeled in this manner. CLOSET# - PATCH PANEL PORT # - JACK# . · Standard Data/voice drop consists of one phone and three data jacks. For ease of tracing, cable jacket colors must be blue for the data jacks, white for voice jacks. · Minimum of 3 data/voice outlets will be provided in each office room. Fire Alarm System: · All new fire alarm devices will be connected to existing fire alarm control panel. · Fire Alarm Control Panel and annunciator will be configured as required. · Fire alarm notification appliance devices will be protected by a clear polycarbonate guard and fire alarm smoke detectors will be protected by a heavy-duty metallic enclosure with remote keyed testing switches in patient / publicly accessible areas. · A duct smoke detector with a remote test switch will be provided to the supply side of the new air handling unit. · A fire alarm pull station will be provided at the nurse s station. Patient Education and Entertainment System: · Patient Education and Entertainment system will be provided for waiting rooms, TV signal cable type will be coaxing type. Coax outlets, wall brackets, TVs and power outlets will be by GC. · Coax cables from all the TVs in the project area will be routed to Electrical # 6B-26A to existing connection enclosure. · Final connections to each TV and connection are by contractor. WAP Devices: New Ethernet network cable will be pulled for guest Wi-Fi access points back to the new TR Room. Final connection at switch end and to WAP devices is by contractor. Basic Electrical Material and Methods: The following guidelines for the electrical equipment and materials selection will be used: · Conductors will be copper with 600V, type THHN/THWN insulation. · Conductors No.12 and smaller will be solid copper. Conductors No. 10 and larger will be stranded. · Branch circuits supplying, personal computers, dimmable lighting and other harmonic generating equipment will be provided with individual neutral. · All materials will be new; VA approved and complies with local code requirements. · Only UL listed materials, equipment and devices will be specified. · Conductor ampacities will be based on 75° C ratings. · Minimum wire size will be #10 AWG for branch circuits. · Power wiring will be sized to limit voltage drop in branch circuits to 3% at farthest outlet. Total voltage drop for feeders and branch circuits will be limited to 5% overall. Raceways: · 600V and auxiliary systems wiring will be installed in conduit or raceway. Minimum conduit size for 600V and auxiliary systems wiring will be ¾ (minimum) inside diameter. Open wiring is prohibited. · Electrical Metallic Tubing (EMT) with compression type coupling/connector fittings will be utilized for the interior work in all finished spaces. Conduit will be installed concealed behind the dry wall and above suspended ceilings, except electrical room, telecommunication room, and mechanical rooms. · Rigid Metal Conduit (RMC) with threaded fittings will be provided for exposed interior locations. In general, RMC will be galvanized steel. · Galvanized rigid steel conduit will be used for all conduits larger than 3 . · Conduit fill will be 40% or less as required by code. · All raceways will be independently supported from building structure. All raceways shall contain an equipment grounding conductor. · Recessed outlet and device boxes will be steel. Surface mounted boxes will be galvanized steel. · Flexible Metallic Conduit (FMC) will be provided for lighting fixture connections, at motor connections, transformer, and at equipment connections subject to vibration. · Conduit penetration through wall and floor will be sealed. · Conduit requirements for fire alarm, telephone, data transmission, and other auxiliary systems will be like that for 600V wiring. Conduit in office or other finished areas will be stubbed into space above suspended ceilings. · Color coding on all power, lighting, life safety, and other low voltage conduits will be provided as follows: · Fire Alarm conduit Red · Emergency lighting conduit Yellow · Normal lighting conduit Green · Normal power conduit White · HVAC control conduit Blue Electrical Distribution System: · Electrical distribution system will consist of existing and new normal and emergency panelboards located in electrical closer 6B-26A. · All the new outlets and new lighting power requirement will be connected to existing and new area panels located in electrical closet 6B-26A. · All the red outlets on critical power will be connected to new emergency panel located in electrical closet 6B-26A. · Life safety power requirement will connect to existing emergency panel located in electrical closet 6B-26A. · Panel L6B and the bus plug feeding it will be replaced for a non-fused disconnect bus plug and new panelboard with a main circuit breaker to facilitate circuit breaker coordination. · A short-circuit and selective coordination study and arc flash calculations and analysis will beAttachments
- Attachment 1
- Attachment 2
- Attachment 3
- Attachment 4
- Attachment 5
- Attachment 6
- Attachment 7
- Attachment 8
- Attachment 9
- Attachment 10
- Attachment 11
- Attachment 12
- Attachment 13
- Attachment 14
- Attachment 15
More from United States Department of Veterans Affairs posted in October 2025