<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/department_of_veterans_affairs/posts/115314896706647419" -->

---
title: H112--FIRE ALARM SERVICE MAINT CONTRACT BASE +4… (36C25525Q0564) | Closed - MatchAwards
description: H112--FIRE ALARM SERVICE MAINT CONTRACT BASE +4 ME l EKH. United States Department of Veterans Affairs. Solicitation 36C25525Q0564. NAICS 561210 - Facilities Support Services. Deadline 2025-10-10. THIS REQUEST FOR INFORMATION (RFI)/SOURCES SOUGHT DISCLAIMER 1. This RFI is issued solely for...
canonical: https://matchawards.com/department_of_veterans_affairs/posts/115314896706647419
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: H112--FIRE ALARM SERVICE MAINT CONTRACT BASE +4… (36C25525Q0564) | Closed
og:url: https://matchawards.com/department_of_veterans_affairs/posts/115314896706647419
og:description: H112--FIRE ALARM SERVICE MAINT CONTRACT BASE +4 ME l EKH. United States Department of Veterans Affairs. Solicitation 36C25525Q0564. NAICS 561210 - Facilities Support Services. Deadline 2025-10-10. THIS REQUEST FOR INFORMATION (RFI)/SOURCES SOUGHT DISCLAIMER 1. This RFI is issued solely for...
og:image: https://matchawards.com/system/accounts/avatars/000/000/015/original/f59915e906ee2b19.png?1638825904
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# H112--FIRE ALARM SERVICE MAINT CONTRACT BASE +4 ME l EKH

Status

Closed, the response deadline passed on Oct 10, 2025

Agency

[United States Department of Veterans Affairs](/department%5Fof%5Fveterans%5Faffairs)

Office

LEAVENWORTH, USA

Notice type

Sources Sought

Solicitation number

36C25525Q0564

NAICS

[561210 - Facilities Support Services](/groups/940)

PSC

H112 - QUALITY CONTROL- FIRE CONTROL EQUIPMENT

Posted

2025-10-03

Deadline

2025-10-10

Place of performance

Leavenworth, Kansas 66048, UNITED STATES

## Description

THIS REQUEST FOR INFORMATION (RFI)/SOURCES SOUGHT DISCLAIMER 1\. This RFI is issued solely for information and planning purposes only and does not constitute a solicitation. All information received in response to this RFI that is marked as proprietary will be handled accordingly. Responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. Responders are solely responsible for all expenses associated with responding to this RFI. 2\. The submission of pricing, capabilities for planning purposes, and other market information is highly encouraged and allowed under this RFI In Accordance With (IAW) FAR Part 15.201(e). SOURCES SOUGHT DESCRIPTION: Dwight D. Eisenhower VA Medical Cent 1\. The Dwight D. Eisenhower VA Medical Center is protected by an existing fire detection alarm system, wet and dry sprinkler systems, standpipes, portable fire extinguishers, and special suppression systems. The building fire detection/alarm system is a Siemens system. The system includes the following building interfaces: (HVAC shutdown, elevator recall, smoke control, fire doors, etc.). 2\. Contractor shall provide parts, labor, material, preventive maintenance services, testing and emergency call back for the fire alarm and sprinkler system to include fire alarm, radio mesh network, clean agent systems, fire and smoke dampers, kitchen hoods, specialty suppression systems, monthly/annual fire extinguisher inspections, monthly standpipe & sprinkler valve inspections, 5 year internal pipe inspection, 5 year stand pipe flow and hydro, 5 year gauge replacement, annual & 5 year fire hydrant tests, 3 year dry pipe flow test, annual alarm, annual and semi-annual flows and tampers, annual dry pipe trip test, annual stand pipe hose valves, annual control valves manual operation, annual and monthly pump testing, annual main drain test, AHU shut down devices, Semi-annual flows and tampers, quarterly wet pipe sprinkler valves and accessories, quarterly fire department connections, quarterly stand pipe hose valves and piping, quarterly main drain test for backflow prevented systems, monthly stand pipe and sprinkler valve inspection, monthly fire pump run, sprinkler fire panel programming, software subscriptions, monitoring service, and related components at the Dwight D. Eisenhower VA Medical Center as indicated herein. Contractor will be responsible for providing automatic notification for the fire alarm systems in Buildings C and 122\. All services shall be performed in accordance with all current applicable National Fire Protection Association (NFPA) codes, local codes, and manufacturer s recommended procedures. 3\. Contractor shall be capable provide an individual(s) or subcontractors who are adequately trained and certified in Testing, Maintenance and Inspections and any necessary repairs to the major equipment manufacturer Siemens system. 4\. The contractor shall deliver a written report that describes the test and inspection results and services performed. A list of system components is enclosed within this document. The report shall contain the following: a. System information (make, model, all device types). (1) Pass/Fail for each feature and type of component tested. If a device fails, note device type, address and location on the facility. (2) Any comments on system (or device) condition as it pertains to service life and dependability. (3) Customizing the inspection reports shall be at no cost to government. The reports shall be acceptable to the COTR and JCAHO Standards and contain device summary sheets on all tested components. 5\. The contractor shall provide all transportation, shipping, labor, tools equipment and material to accomplish the following: a. All work to be completed between 7:00 a.m. and 4:00 p.m. Monday through Friday, except as requested or approved by the VA for special circumstances. b. Contractor must respond within two hours of receiving a call for emergency service. Appear onsite within 4 hours. c. All tests and inspections are to be performed in accordance with the most recent edition of NFPA 101, 25, 72, 10, 17A, 96, 2001, 80, 105, and 13 as applicable. d. Contractors need to have at least 5 years of experience in providing technical expertise in performing maintenance, testing and inspections on Fire Alarm & Sprinkler systems. e. No valves, gauges, or other parts will be replaced and charged to VA without prior approval from the Contracting Officer Representative (COR)/Occupational Safety and Health. f. No system will be left out of service at the end of a workday or over a weekend without permission of the Occupational Safety and Health Office. All systems must also be verified that they are reset prior to end of workday. g. Contractor will provide a fully completed written inspection form & electronic within 15 calendar days of the completing of inspection. h. Unlimited service calls shall be provided 24 hours a day, 7days a week, for repairs associated with normal equipment failures (provided during normal or after normal working hours Mon-Fri, times specified above, excluding holidays). This provision includes labor, travel, and mileage associated with equipment failures and as per contractual requirements. Emergency service will be provided within 4 hours of notification or per NFPA or contractual requirements as per times specified above. This provision covers all labor to troubleshoot and diagnose system problems. i. A key for most locked areas will be provided by the Safety Office. Those locked areas requiring VA assistance will require approximately one-half hour advance notice from the contractor to the Safety Office. j. Contractor must provide all tools, supplies, equipment and personnel to perform the work of this contract. Contractor is expected to work independently once oriented, with adequate personnel to accomplish all testing in an efficient manner. k. Contractor must possess and furnish written proof of a current NICET Certified or State Certified or other NFPA 72, NFPA 25, and NFPA 10 acceptable certification for personnel. Contractor shall also furnish information about qualifications, ability to perform the work, and references regarding related experience in health care facilities. Any NICET certifications must be on file with the VA Contracting Office. l. Contractor should assume the need for two hand-type two-way radios or touch-to-talk phones for communication between two contractor employees. m. Work is to be conducted in a manner which would present the least amount of disruption to the healthcare facility. Some inspections maybe required to be performed off normal hours. n. Warranty: upon completion and acceptance of all work, the contractor shall provide the VA Safety Office and/or Engineering service with the manufacturer s standard one year warranty on all parts and workmanship. o. In those cases where contractor is required to verify that alarms operate and transmit to VA main fire panel, the contractor may need to have a person at the building s fire alarm panel to confirm the signal. p. Work dates must be scheduled with the COR/Safety Office at least 48 hours in advance. q. If any services must be disconnected, even temporarily, due to scheduled contract work, the contractor will notify the COR at least 48 hours in advance. If the discontinued service is due to an emergency breakdown, the contractor will notify the COR/PM as soon as possible. r. Buildings covered under this agreement include buildings A, B, C, 122, 42, 160, 66, 21, 54, 110, 33, 71, 28, 39, 41, 153, 161\. s. Written and electronic reports shall be provided. Written reports shall be hand delivered to the COR / Safety Office and put into the contractor supplied binders or folders. t. Contractor shall report to the Safety Office, prior to starting and after Completion of the work. B. REQUIREMENT: The following services are needed at the Leavenworth VAMC 1\. SIN 561 001/NAICS 561621/ 561210FAC Fire Alarm System Preventive Maintenance and Repair Services in its entirety. 2\. SIN 561 002/NAICS 561621/ 561210FAC Water Based Fire Suppression System Preventive Maintenance and Repair Services in its entirety. a. Amendment to SIN 561 001 and 561 002: (1) NPFA 72 shall be the most current edition (2) NFPA 25 Shall be the most current edition (3) NFPA 10 Shall be the most current edition (4) SIN 561 001 and 561 002 Full Inspection, Testing and Maintenance #5: The contractor shall repair at contractors expense water-based fire suppression system and fire alarm problems costing less than $1,000.00 per device as part of normal maintenance. These repair cost under $1000.00 will be represented in the pricing submitted in the CLINS 0001AA and 0001AB in the base year of the agreement as well as the option years.Â Prior to repair, for items exceeding $1000.00, the contractor will submit a proposal to the COR for approval. The proposal will detail a Statement of Work (SOW) to be completed and will reflect the contractors agreed upon initial responsibility of $1000.00\. Any additional labor and equipment will be listed with itemized cost per the GSA Advantage 03 FAC, SINS 561-001 and 561-002 pricing.Â The portion of the repair in excess of $1,000.00 shall be ordered through CLIN 0001AC and associated CLIN S in the option years. Â The pricing for all repairs will be submitted quarterly to the COR for review and audit to insure they adhere to the current GSA Pricing Model and shall follow the section titled; Repairs and Unscheduled Work. C. SPECIFIC REQUIREMENTS 1\. Contractor shall perform inspections and maintenance in accordance with the most current editions of the following manuals: a. Manufacturer s maintenance manuals b. Manufacturer s recommendations. c. National Fire Protection Association Standards. (NFPA) d. National Electrical Code (NEC) e. National Fire Code f. Joint Commission requirements. (See below) 2\. Smoke Detectors: a. All detectors shall be tested with a listed spray test smoke. b. All detectors shall be tested in all areas accessible to the contractor. c. Validation of all building interfaces shall be noted on test report (HVAC shut-down, elevator recall, etc. 3\. Heat Detectors: a. All restorable heat detectors shall be tested utilizing a heat gun (on low setting) or according to industry standard. b. Validation of all building interfaces shall be noted on test report (HVAC shut-down, elevator recall, etc.). c. Non-restorable heat detectors SHALL NOT be tested using a heat source. 4\. Pull Stations: a. All pull stations shall be tested. b. Check for any physical damage c. Validation of all building interfaces shall be noted on test report (HVAC, Shut-down, elevator recall, etc.). 5\. Sprinkler Water flow Devices: a. Check for any physical damage. b. The Contractor shall activate each flow switch utilizing the inspector s test c. Time delay of alarm activation shall not exceed 90 seconds 6\. Sprinkler Main Drain Test: a. Check for any physical damage. b. Fully open each control valve and record the static and residual pressures 7\. Tamper/Supervisory Devices: a. Check for any physical damage. b. Each system valve tamper device shall be tested by partially closing the valve to initiate a tamper trouble signal. Each supervisory device shall be partially closing to initiate a supervisory alarm. 8\. Sprinkler Dry Valve: a. Check for any physical damage. b. Test pressure switch using the inspectors test located on valve. c. Verify the low air pressure switch setting and adjust if necessary d. Check, drain, and document all low points on dry sprinkler systems 8\. System Checks: a. Verify receipt of fire signal to central station monitoring facility. b. Building Interfaces: HVAC shutdown, elevator recall, smoke evac, fire partition, door locks, etc. c. All strobes, horns and bells should operate properly, and be free from any visible tampering. d. Visually check batteries for leakage or damage and load test each quarter. e. Disconnect battery for supervision signal. f. Open dedicated electrical breaker for supervision signal. D. ADDITIONAL WORK HYDRANTS, STANDPIPES AND FIRE PUMPS SIN 561 002 The Contractor will provide all labor, tools, equipment, materials and supervision for the monthly standpipe & sprinkler valve visual inspection, annual hydrant flow test and 5-year GPM calculation for each hydrant and quarterly & annual flow tests on the fire pumps. Annual and 5-year test, inspection and maintenance of the fire hydrants per NFPA specifications are to be done during the month of August or as agreed to by VA. Locations of the hydrants are to be provided by the COTR/Safety Office. Contractor shall contact Safety, Engineering, and city water department before flow testing of any hydrants. 1\. Monthly, Quarterly & Annual fire pump tests: SIN 561 002 a. Fire pumps shall be conducted monthly and quarterly no flow tests and annual flow tests conducted on all fire pumps. Fire Pumps are in Buildings B and 122\. b. Fire Pumps Info: 500 GPM, Electric c. The contractor will test each fire pump annually to determine flow rate, pump pressure, pump motor condition, current voltage and speed at peak load. All valves in suction line will be checked to assure that they are fully open. d. The inspector will record the date, total flow rate, test meter GPM, suction and discharge pressure, number and size of hose nozzles with corresponding psi and total GPM, pump motor current, voltage and speed, and sign for each fire pump. Performance curves will be documented showing pressure at 0%, 100%, and 150% flow rate of pump. e. This graph will be in accordance with NFPA 20-11.3\. 2\. Annual & 5 Year Fire Hydrant Flow Tests: SIN 561 002 Hydrant test will be performed as specified in most current NFPA 25 and NFPA 291\. b. Contractor will provide all tools required including a water diverter funnel which is necessary for fire hydrant testing. c. VA will verify the Hydrant numbers and locations on first day of work. d. VA will not provide any employees to assist contractor s employees. e. The work must be completed during month as approved by Safety f. Conduct annual flows of all fire hydrants to check for proper operation and run until the water stream is clear. g. Calculate and record GPM flow for each hydrant every five years. E. FIRE ALARM SYSTEM 1\. Initial Inspection and Test: The Contractor shall perform a full initial inspection and test of each device on the fire alarm system in accordance with the current edition of NFPA 72, National Fire Alarm Code. a. Testing Frequencies from the current edition of NFPA 72, Joint Commission & VHA requirements. b. Testing Methods from the current edition of NFPA 72 shall be used. 2\. Maintenance, Inspection and Testing Records: Within 15 days after completing the inspection and testing, the Contractor will furnish a written record to the Fire Safety Specialist or Authority Having Jurisdiction that includes the following: a. Contractor s Inspection and Testing Form that includes all the information required by the current edition of NFPA code. b. Date of manufacture of fire alarm system(s) and whether parts are readily available. c. The record shall include any problems noted with the system, including inoperable or unsupervised devices or equipment, or devices that cannot be calibrated, tested, or serviced in accordance with the manufacturer s recommendations. Findings noted shall include individual costs to correct/repair them. Each cost shall be broken down into both a parts cost and a labor cost. d. The record shall be provided electronically (by email) (formatted in Microsoft Word or Excel) and two sets of the reports, one for the Joint Commission books and a copy for the facility. 3\. Correcting Fire Alarm System Problems: The Contractor shall follow the requirements outlined in the Section titled Repairs and Unscheduled Work for correcting problems noted to the fire alarm system. Any repairs that can be made immediately shall be completed. 4\. The Contractor shall contact the COR / Fire Safety Specialist for assistance in coordinating the Initial fire alarm inspection and test. 5\. Notification: Before proceeding with any testing, the Contractor shall coordinate the notification of all persons and facilities that receive alarm, supervisory or trouble signals (e.g. Fire Safety Specialist, Boiler Plant, Telephone Operators, and Monitoring Company). The Contractor will coordinate with the COR / Fire Safety Specialist to ensure that all building occupants are notified. At the conclusion of testing, the Contractor shall notify those previously notified that the testing has been concluded. 6\. After Hours: The Contractor may be required to perform some work, inspections, and tests outside the normal working hours of the building occupants. Any scheduled work that is disruptive to the tenants (testing audible devices, elevator capture, fan shutdown, etc.) shall be performed after the building occupant s normal working hours. The Contractor shall coordinate with the COR/Safety Office to coordinate after-hours access to the building. 7\. Damage to Fire Alarm System: Any damage to the fire alarm or associated equipment (e.g. fans, elevators, generators, pumps) caused by normal testing shall be repaired by the Contractor at no additional cost to the Medical Center. At its discretion, the Safety Office may have representatives present to witness any or all such tests. All costs associated with this damage shall be borne by the Contractor. 8\. Safety Hazards: The Contractor shall immediately notify the COR or Safety Office of any recognized safety hazard that might severely affect the safety of the building occupants. 9\. Annual Testing - The contractor shall provide labor including subcontractors, time, materials and equipment necessary to perform annual testing and inspection of: a. Each fire alarm system control panel, all input and all output devices, Radio network to DESIGO head end, Radio receiver and antenna, radio mesh system, and load test on batteries. b. Test, inspection and operation to be performed on all manual fire alarms pull stations, smoke detectors (including elevator shafts), duct detectors, and heat detectors. Any initiating device that fails to operate properly will immediately be communicated to the COTR/Safety Office via email, phone call, or in person. c. Testing of Elevator Shunt Trip/Primary Recall/Secondary Recall d. Testing and inspection of all smoke and heat detectors. e. Inspection of all building alarm notification devices (audible devices, speakers, and visual devices) f. Inspection and testing of all electro-mechanical releasing devices. 10\. Quarterly Testing - The contractor shall provide labor, time, materials and equipment necessary to perform quarterly testing and inspection of: a. Fire alarm equipment for notifying off-site responders b. Supervisory Signals c. Fire alarm panel battery load tests. 11\. Semi-Annual Te 

<!-- mobian-agent-ad sponsored="true" id="6b8e633f-9125-4213-9efd-1ce6c04fef13" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


## Attachments

* [Attachment 1](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/1837b1166d2240eabc81433ed8278937/download)

[Source notice](https://sam.gov/workspace/contract/opp/78ae3f48430b4fcabce5033272cb57b8/view)

[More from United States Department of Veterans Affairs posted in October 2025](/department%5Fof%5Fveterans%5Faffairs/archive/2025-10)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)

```json
{"@context":"https://schema.org","@type":"Demand","name":"H112--FIRE ALARM SERVICE MAINT CONTRACT BASE +4 ME l EKH","description":"THIS REQUEST FOR INFORMATION (RFI)/SOURCES SOUGHT DISCLAIMER 1. This RFI is issued solely for information and planning purposes only and does not constitute a solicitation. All information received in response to this RFI that is marked as proprietary will be handled accordingly. Responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. Responders are solely responsible for all expenses associated with responding to this RFI. 2. The submission of pricing, capabilities for planning purposes, and other market information is highly encouraged and allowed under this RFI In Accordance With (IAW) FAR Part 15.201(e). SOURCES SOUGHT DESCRIPTION: Dwight D. Eisenhower VA Medical Cent 1. The Dwight D. Eisenhower VA Medical Center is protected by an existing fire detection alarm system, wet and dry sprinkler systems, standpipes, portable fire extinguishers, and special suppression systems. The building fire detection/alarm system is a Siemens system. The system includes the following building interfaces: (HVAC shutdown, elevator recall, smoke control, fire doors, etc.). 2. Contractor shall provide parts, labor, material, preventive maintenance services, testing and emergency call back for the fire alarm and sprinkler system to include fire alarm, radio mesh network, clean agent systems, fire and smoke dampers, kitchen hoods, specialty suppression systems, monthly/annual fire extinguisher inspections, monthly standpipe \u0026 sprinkler valve inspections, 5 year internal pipe inspection, 5 year stand pipe flow and hydro, 5 year gauge replacement, annual \u0026 5 year fire hydrant tests, 3 year dry pipe flow test, annual alarm, annual and semi-annual flows and tampers, annual dry pipe trip test, annual stand pipe hose valves, annual control valves manual operation, annual and monthly pump testing, annual main drain test, AHU shut down devices, Semi-annual flows and tampers, quarterly wet pipe sprinkler valves and accessories, quarterly fire department connections, quarterly stand pipe hose valves and piping, quarterly main drain test for backflow prevented systems, monthly stand pipe and sprinkler valve inspection, monthly fire pump run, sprinkler fire panel programming, software subscriptions, monitoring service, and related components at the Dwight D. Eisenhower VA Medical Center as indicated herein. Contractor will be responsible for providing automatic notification for the fire alarm systems in Buildings C and 122. All services shall be performed in accordance with all current applicable National Fire Protection Association (NFPA) codes, local codes, and manufacturer s recommended procedures. 3. Contractor shall be capable provide an individual(s) or subcontractors who are adequately trained and certified in Testing, Maintenance and Inspections and any necessary repairs to the major equipment manufacturer Siemens system. 4. The contractor shall deliver a written report that describes the test and inspection results and services performed. A list of system components is enclosed within this document. The report shall contain the following: a. System information (make, model, all device types). (1) Pass/Fail for each feature and type of component tested. If a device fails, note device type, address and location on the facility. (2) Any comments on system (or device) condition as it pertains to service life and dependability. (3) Customizing the inspection reports shall be at no cost to government. The reports shall be acceptable to the COTR and JCAHO Standards and contain device summary sheets on all tested components. 5. The contractor shall provide all transportation, shipping, labor, tools equipment and material to accomplish the following: a. All work to be completed between 7:00 a.m. and 4:00 p.m. Monday through Friday, except as requested or approved by the VA for special circumstances. b. Contractor must respond within two hours of receiving a call for emergency service. Appear onsite within 4 hours. c. All tests and inspections are to be performed in accordance with the most recent edition of NFPA 101, 25, 72, 10, 17A, 96, 2001, 80, 105, and 13 as applicable. d. Contractors need to have at least 5 years of experience in providing technical expertise in performing maintenance, testing and inspections on Fire Alarm \u0026 Sprinkler systems. e. No valves, gauges, or other parts will be replaced and charged to VA without prior approval from the Contracting Officer Representative (COR)/Occupational Safety and Health. f. No system will be left out of service at the end of a workday or over a weekend without permission of the Occupational Safety and Health Office. All systems must also be verified that they are reset prior to end of workday. g. Contractor will provide a fully completed written inspection form \u0026 electronic within 15 calendar days of the completing of inspection. h. Unlimited service calls shall be provided 24 hours a day, 7days a week, for repairs associated with...","url":"https://matchawards.com/department_of_veterans_affairs/posts/115314896706647419","identifier":"36C25525Q0564","category":"561210 - Facilities Support Services","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"H112 - QUALITY CONTROL- FIRE CONTROL EQUIPMENT"}],"availabilityStarts":"2025-10-03","availabilityEnds":"2025-10-10","validThrough":"2025-10-10T23:59:59-04:00","areaServed":"Leavenworth, Kansas 66048, UNITED STATES","sameAs":"https://sam.gov/workspace/contract/opp/78ae3f48430b4fcabce5033272cb57b8/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"}]}
```