<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/department_of_veterans_affairs/posts/115266671386773818" -->

---
title: J045--Loch Raven VAMC Boiler Maintenance… (36C24526Q0027) | Closed - MatchAwards
description: J045--Loch Raven VAMC Boiler Maintenance Contract  Base plus Four Option Years. United States Department of Veterans Affairs. Solicitation 36C24526Q0027. NAICS 238220 - Plumbing, Heating, and Air-Conditioning Contractors. Deadline 2025-10-09. Department of Veterans Affairs NCO 5 is seeking...
canonical: https://matchawards.com/department_of_veterans_affairs/posts/115266671386773818
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: J045--Loch Raven VAMC Boiler Maintenance… (36C24526Q0027) | Closed
og:url: https://matchawards.com/department_of_veterans_affairs/posts/115266671386773818
og:description: J045--Loch Raven VAMC Boiler Maintenance Contract  Base plus Four Option Years. United States Department of Veterans Affairs. Solicitation 36C24526Q0027. NAICS 238220 - Plumbing, Heating, and Air-Conditioning Contractors. Deadline 2025-10-09. Department of Veterans Affairs NCO 5 is seeking...
og:image: https://matchawards.com/system/accounts/avatars/000/000/015/original/f59915e906ee2b19.png?1638825904
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# J045--Loch Raven VAMC Boiler Maintenance Contract Base plus Four Option Years

Status

Closed, the response deadline passed on Oct 9, 2025

Agency

[United States Department of Veterans Affairs](/department%5Fof%5Fveterans%5Faffairs)

Office

LINTHICUM, USA

Notice type

Sources Sought

Solicitation number

36C24526Q0027

NAICS

[238220 - Plumbing, Heating, and Air-Conditioning Contractors](/groups/228)

PSC

J045 - MAINT/REPAIR/REBUILD OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT

Category

[Facility Related Services (4.4)](/categories/facilities-and-construction/facility-related-services)

Posted

2025-09-25

Deadline

2025-10-09

Place of performance

Baltimore, MD 21218

## Description

Department of Veterans Affairs NCO 5 is seeking responses from entities that are interested in this procurement and consider themselves to have the resources, capabilities, and qualifications necessary to provide the services required for Loch Raven VA Medical Center. Please respond to this RFI/Sources Sought 36C24526Q0027 with your: 1\. Business name (including Unique Entity ID (SAM.gov) 2\. Business type, socio-economic status (e.g., Veteran-Owned, Woman-Owned, Disadvantaged Small Business, 8(a), etc.), and 3\. Person of contact (including telephone number & email address). 4\. Capability statement and summary of previous experience providing these types of services for the Veterans Health Administration or other similar facilities. 5\. Available contract vehicles (GSA FSS, etc.) for use by Department of VA (include applicable NAICS) 6\. Brief Summary of categories of services that your company can/cannot provide. 7\. Certification(s) / Licenses for meeting the local requirements to provide these services at the Huntington VAMC (if applicable) 8\. Confirmation that your organization has the capability & expertise to meet the performance requirements while complying with applicable limitations in subcontracting by responding to the questions below with your response: a. Do you intend to self-perform this effort? b. If you are located outside the immediate area, how will you self-perform? c. Or do you intend to subcontract work under this contract? d. If you intend to subcontract work under this contract, how will you ensure compliance with the limitations on subcontracting? Response Instructions: Responses must be received by Thursday 10/09/ 2026 @ 11:00 AM EST. Responses to the information requested above must be submitted via email to William.Galletta@va.gov Loch Raven Boiler Preventative Maintenance Contract Loch Raven VAMC General: VISN 5 The VA Maryland Health Care System is dedicated to improving the lives of Veterans and their families every day. Our health care teams are deeply experienced and guided by the needs of Veterans, their families, and caregivers. The Loch Raven medical center boiler program is comprised of 12 decentralized boilers across 7 buildings. The proposed contract will improve preventative maintenance, inspections and service maintenance to this equipment. Preventative maintenance involvesÂ functional checks, servicing, repairing, or replacing of necessary parts for all boilers on campus. These cost-effective practices keep equipment operational and running smoothly, reducing down time extending operating life and decreasing impact to patients. About the sites: TheÂ Loch Raven VA Community Living & Rehabilitation Center Provides rehabilitation and recreation therapy for our recovering veterans. The main building also provides hospice, nursing home care and care for patients with Alzheimer s. The surrounding campus provides services including mental health care, audiology, care for Veterans who are blind or have low vision, and more. Planned preventative maintenance, which is scheduled maintenance aimed at making repairs BEFORE failure occurs. Tasks like cleaning equipment or replacing air/water filters represent a form of routine preventative maintenance because there is a set cadence that occurs regularly regardless of how the equipment is running. Here, you're preventing it from breaking down or running inefficiently. Planned unscheduled maintenance, which is having a strategy in place to repair or replace an asset as quickly as possible when it fails. Replacing and/or repairing gaskets or a compressor can be considered unscheduled because it usually occurs on an as-needed basis whenever wear is present or the unit breaks down. This situation can also incorporate a planning element by either having real OEM replacement parts on hand or budgeting for the cost of repairing/replacing a failed part. CONTRACTOR PERSONNEL A. Technician Qualifications. All work shall be performed by qualified boiler technicians, experienced and qualified to work on the specific makes and models of equipment listed in this contract. The Contractor shall submit to and for the approval of the Contracting Officer, certification and a list of credentials of the qualified boiler technicians. Technicians shall have completed at least a one-year trade school and have a minimum of five (5) years successful experience in the field. The experience shall be largely with institutional and industrial boilers. In addition, the technician shall have demonstrated experience in conducting equipment inspection and performing testing in compliance with the VA safety testing manual at three (3) or more VA facilities within the past three (3) years. Technicians shall demonstrate familiarity with and ready access to the current versions of the following references: NFPA 85, Boiler and Combustion Systems Hazard Code, latest edition. VHA Boiler Plant Safety Device Testing Manual, current edition. Terms: Stationary Engineer A stationary engineer, often referred to as a boiler operator or power engineer, is responsible for the operation, maintenance, and repair of stationary engines, boilers, and other mechanical equipment that provide utilities (such as heating, cooling, and power) to buildings, industrial plants, and other facilities. Technician should be qualified in several different makes and models of boiler equipment. Technician should be able to inform the agency of eminent equipment failure, dangerous conditions and future maintenance work that may need repair. Maintain clean and organized work areas. Provide equipment and materials to adhere with Infection Control Risk Assessment (ICRA) standards. Boiler Technician: A boiler technician will be responsible for adhering to the preventative maintenance program described in the local SOP and superseded by directive 1810\. All safety device testing will be in accordance with the United States Department of Veterans Affairs VHA Boiler and Associated Plant Safety Device Testing Manual, current edition. Technicians should be qualified or its equivalent to boiler WG-5402 series as described in the OPM guidelines. Technicians should be able to diagnose, troubleshoot, repair and inform the agency of eminent equipment failure, dangerous conditions and future maintenance work that may be required. Maintain clean and organized work areas. Provide equipment and materials to adhere with Infection Control Risk Assessment (ICRA) standards. Qualified Professional Inspector: A Qualified Professional Inspector is any one or combination of: a. A boiler inspector who has a valid certificate from the National Board of Boiler and Pressure Vessel Inspectors. b. A boiler inspector who has qualified by passing a written examination under the laws, rules and regulations of the State of Maryland. c. A boiler inspector who is regularly employed as a boiler inspector/testing by a jurisdiction that has adopted and administers one or more sections of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code as a legal requirement, and has a representative serving as a member of the AMSE Conference Committee. d. A boiler inspector who is regularly employed by an insurance company that has been licensed or registered by the appropriate authority of a state of the United States to write boiler and pressure vessel insurance. The contractor must provide a list of three (3) reference contacts that have been provided service on similar or identical equipment. The contractor must provide authenticated factory training certificates or credentials (or acceptable substitute as approved by the COR) for any personnel who are working on any VA equipment. The VA specifically reserves the right to reject any of the contractor s personnel and refuse them permission to work on VA equipment. Areas to be maintained: Loch Raven Rehabilitation & Medical Center is located at 3900 Loch Raven Boulevard, Baltimore MD, 21218 all boiler rooms. Loch Raven Equipment Model Model # Fuel# Location Boiler Cleaver Brooks OLO94490 CB200-060-030HW Dual Fuel Bldg #1 Basement G-19 Boiler Cleaver Brooks OLO94490 CB200-060-030HW Dual Fuel Bldg #1 Basement G-19 Boiler Lochinvar CBN215 Natural Gas Bldg #2 Rear Maintenance Room Boiler Patterson Kelly SC-1000 Natural Gas Bldg #4 Basement boiler Room Boiler Patterson Kelly SC-1000 Natural Gas Bldg #4 Basement boiler Room Boiler A.O. Smith 19-4 Natural Gas Bldg #5 Boiler Room #1 Boiler Solaris SOLO500BNB-cafm Natural Gas Bldg #5 Boiler Room #2 Boiler Solaris SOLO500BNB-cafm Natural Gas Bldg #5 Boiler Room #2 Boiler Wel Mclain EG-75 Natural Gas Bldg #6 Radiology Boiler LAARS PNCH1000NACN2CJX Natural Gas Bldg #7 Boiler Room Boiler LAARS PNCH1000NACN2CJX Natural Gas Bldg #7 Boiler Room Boiler Patterson Kelly SC-1000 Dual Fuel Bldg #7 Boiler Room Preventive maintenance breakdown The Contractor shall provide all personnel, management, material, parts, equipment, supplies, and labor to perform: Annual inspection, preventive maintenance, and repairs on eleven (12) hot water boilers located at the Loch Raven VAMC. The inspection, maintenance, and repairs shall be performed by qualified boiler technicians. The contractor will perform all preventive maintenance service and functional test to ensure that the equipment performs in compliance with manufacturers operating and maintenance instructions. A written service report will provide a detailed description of work performed and cost, which includes an itemized breakdown for labor, hours, parts, material, and warranty information. Inspection and testing frequency chart: # Item Frequency Note 1 Inspect furnace and other internal surfaces, closures and accessories Yearly \*Must be accomplished by a documented qualified third party professional inspector 2 Inspect exterior of unit, casing, supports, closures, accessories, valves, controls Yearly \*Must be accomplished by a documented qualified third party professional inspector 3 Check all boilers for fouling and combustion gas flow Yearly \*Must be accomplished by a documented qualified third party professional inspector 4 Tube leak check Yearly \*Must be accomplished by a documented qualified third party professional inspector 5 Adjust burner combustion settings and calibrate oxygen trim 6 Month 6 Check vibration of burner fans 6 Month 7 Calibrate instrumentation, monitoring, and control systems 6 Month 8 Calibrate pressure gauges and thermometers 6 Month 9 Operational test of Safety Devices 6 Month a. Low-water cutoff (slow drain) Monthly b. Fire each boiler and the pilot on the alternate fuel for 1 hour Monthly c. Low water cut off Monthly d. Auxiliary low water cut off (slow drain) Monthly e. High water alarm Monthly f. Low water alarm Monthly g. Water safety valves Yearly h. Water safety valve operational test 6 Month i. Flame scanner Monthly j. Check gas vent valve for leaks 6 Month k. High gas fuel pressure cut off 6 Month l. Low gas fuel pressure cut off 6 Month m. Gas fuel safety shut off valves proof of closure 6 Month n. Leak test gas fuel safety shut off valves 6 Month o. Low atomizing pressure for fuel oil 6 Month \*Building 1 boilers only p. High fuel oil pressure cut off 6 Month \*Building 1 boilers only q. Fuel oil safety shut off valves proof of closure 6 Month \*Building 1 boilers only r. Leak test fuel oil safety shut off valves 6 Month \*Building 1 boilers only s. Check operation of liquid petroleum gas pilot 6 Month \*Building 1 boilers only t. Low pilot gas pressure cut out 6 Month u. Forced draft fan motor interlock 6 Month v. Forced draft fan damper wide open for purge 6 Month w. Boiler outlet damper wide open for purge 6 Month x. Purge air flow interlock 6 Month y. Timing for pre-purge 6 Month z. Timing for post purge 6 Month aa. Igniter timing 6 Month bb. Low fire position interlock 6 Month cc. Combustion air interlock 6 Month dd. Main flame out; i.e. time to close valves 6 Month ee. Ignition flame out; i.e. time to close valves 6 Month ff. Minimum igniter flame test 6 Month gg. Scanner not sensing ignition spark 6 Month hh. Low oxygen alarm and/or cut out 6 Month ii. Pre-purge setting of flue gas recirculation damper 6 Month jj. Interlock of building outside air damper 6 Month kk. Burner/heating element control 6 Month ll. CO and combustion gas detection equipment testing 6 Month mm. Boiler emergency button testing 6 Month Contractor shall document all Preventative Maintenance in the binder provided by COR. Documentation will be in accordance with Loch Raven Boiler SOP & VHA Boiler Plant Safety Device Testing Manual, current edition. Quality control and Contractor leadership shall ensure the documentation is correct and accurate before turning in to COR. Annual Maintenance/Operational Maintenance A. Monthly a. Test and adjust water treatment b. Operate all alarm devices B. Semi-Annual a. Check furnace pressure b. Check combustion gas leaks into boiler room C. Annual a. Open Boilers b. Clean waterside of boilers c. Clean fireside and repair refractory Repairs A. All repairs to boilers and pressure vessels shall comply with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code. No welded repairs are permitted except by certified welders using Code-approved procedures. Repair and record of certification, and the qualification of welders must be provided to the COR upon completion of all repairs. Bids will be adjusted at a flat rate to include $100,000 at the base of the contract to account for emergency repairs annually. This emergency repair cost will be added to the estimated annual preventative maintenance cost. Additional funding may be required for additional repairs. B. Hydrostatic testing of boilers and pressure vessels must be conducted after a repair or a tube replacement, or when the boiler or pressure vessel integrity is in doubt. Hydrostatic pressure must be limited to 150 percent of normal operating pressure of the boiler or pressure vessel. Inspection, Testing and Calibration Requirements: A. Technicians shall provide all tools and labor necessary to perform inspection, tuning, testing, calibrating, and adjustments of burners and boiler controls as specified below. This shall be done in accordance with the schedule listed below. B. Instrumentation, monitoring and data management systems as listed below shall be calibrated every six months. Calibration shall follow VHA Boiler Plant Safety Device Testing Manual, current edition C. Provide at least two weeks notice to the Contracting Officer s Representative (COR) prior to performing the work. Work cannot be scheduled during heavy heat load periods. Only one boiler at a time can be out of service for the inspection, testing and calibration procedures. Work must be conducted when the COR is onsite to monitor the work. D. VAMC will have the boilers that are to be serviced prepared for technicians upon their scheduled arrival. This include having the boilers fully warmed and at normal operating temperature/pressure. E. The inspection, testing and calibration shall comply with: a. The recommendations and requirements of VHA Boiler Plant Safety Devices Testing Manual, current edition. b. The written recommendations of the equipment manufacturers. c. The requirements and recommendations of NFPA 85, Boiler and Combustion Systems Hazards Code, including applicable appendices. d. Burner performance requirements in this document. F. A summary of the work is as follows, the below summary is not inclusive, refer to the inspection/testing frequency: a. Review boiler log sheets and alarm and trouble reports. b. Review records that show combustion (flue gas oxygen and carbon monoxide). c. Perform overall visual inspection of systems. Verify that systems comply with referenced codes and VAMC requirements stated in this contract. d. Test and record the operation and set points of all burner/boiler safety interlock devices. Refer to list below. Verify that the set points and operating points are within approximately 20% of normal operating parameters. Make adjustments as necessary and record the new settings. The operation of a device must result in burner shutdown and/or proper alarm operation. e. Operate burner(s) on each fuel from low fire to high fire and back to low fire in at least six increments and record combustion performance (flue gas oxygen, carbon monoxide, NOx where applicable), fuel train pressures, atomizing train pressures, burner pressures, stack temperatures, boiler load output. f. Compare the combustion performance data with VAMC requirements (see below) and previous readings. If necessary, make adjustments to the fuel flow and combustion air controllers, control valves and dampers to obtain the required performance. Record the new performance data. g. Verify accuracy of instrumentation listed below. Verify that all devices are properly selected for the application in terms of type, size, set point range, performance, code approval. Calibrate all instruments that are not within manufacturer s specifications for accuracy. h. Immediately inform COR of any recommended repairs of modifications. G. All of interlocks and safety devices to be inspected and tested on each boiler/burner/equipment, are contained in the VHA Boiler Plant Safety Device Testing Manual, current edition, along with testing procedures. H. Required burner performance: a. Turndown (ratio of maximum and minimum firing rates): 10/1 8/1 5/1 4/1 (Refer to original burner specification). b. Achieve, but do not exceed, boiler maximum heat output rating. Measure fuel input at minimum and maximum firing rates. c. Maximum carbon monoxide: 200 parts per million (ppm) d. Maximum NOx: (refer to original burner specification) e. Flue gas oxygen: 2.4 4.2% f. Flue gas oxygen (low excess air burners): 1.0 2.0% g. No visible smoke, except on heavy oil fuel maximum opacity is 20%. Comply with local emissions regulations. h. Flames shall be stable with no pulsations, shall be retained near burner, no blow off or flashback, no constant flame impingement on refractory or water walls. I. List of instrumentation and controls to be inspected and calibrated: a. Boiler outlet draft controllers b. Boiler water level controllers c. All pressure and temperature sensors and transmitters d. All signal processing and readout devices J. Report requirements: a. Provide complete written report of the inspection fully describing all tests performed, all findings, and recommendations. The report shall have two sections the first section will be in a table form with four columns: i. The first column labeled FUNCTION with pass or fail ii. The second column labeled Devices list the device number and description in accordance with the VHA Boiler Plant Safety Devices Testing Manual, current edition. iii. The third column labeled Deficiencies-Recommendations iv. The fourth column labeled Corrective Actions list any corrective actions taken during the inspection. b. Furnish the report within one week of each inspection in Microsoft Word format by email to the COR. Provide hard copies of data sheets and flue gas analyzer strip printouts to the COR within one 

<!-- mobian-agent-ad sponsored="true" id="4279fda5-3c91-4d18-80ec-be4e3c401a12" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories/facilities-and-construction/facility-related-services?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


## Attachments

* [Attachment 1](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/02193468bf6b48a6a01350823fce6867/download)

## Contacts

* William Chris Galletta, Contracting Officer

Email and phone are in the source notice.

[Source notice](https://sam.gov/workspace/contract/opp/b9d9015d635443b283a20b5332663cb9/view)

[More from United States Department of Veterans Affairs posted in September 2025](/department%5Fof%5Fveterans%5Faffairs/archive/2025-09)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Construction Government Contracts Available Now](/contracts/construction)

```json
{"@context":"https://schema.org","@type":"Demand","name":"J045--Loch Raven VAMC Boiler Maintenance Contract  Base plus Four Option Years","description":"Department of Veterans Affairs NCO 5 is seeking responses from entities that are interested in this procurement and consider themselves to have the resources, capabilities, and qualifications necessary to provide the services required for Loch Raven VA Medical Center. Please respond to this RFI/Sources Sought 36C24526Q0027 with your: 1. Business name (including Unique Entity ID (SAM.gov) 2. Business type, socio-economic status (e.g., Veteran-Owned, Woman-Owned, Disadvantaged Small Business, 8(a), etc.), and 3. Person of contact (including telephone number \u0026 email address). 4. Capability statement and summary of previous experience providing these types of services for the Veterans Health Administration or other similar facilities. 5. Available contract vehicles (GSA FSS, etc.) for use by Department of VA (include applicable NAICS) 6. Brief Summary of categories of services that your company can/cannot provide. 7. Certification(s) / Licenses for meeting the local requirements to provide these services at the Huntington VAMC (if applicable) 8. Confirmation that your organization has the capability \u0026 expertise to meet the performance requirements while complying with applicable limitations in subcontracting by responding to the questions below with your response: a. Do you intend to self-perform this effort? b. If you are located outside the immediate area, how will you self-perform? c. Or do you intend to subcontract work under this contract? d. If you intend to subcontract work under this contract, how will you ensure compliance with the limitations on subcontracting? Response Instructions: Responses must be received by Thursday 10/09/ 2026 @ 11:00 AM EST. Responses to the information requested above must be submitted via email to William.Galletta@va.gov Loch Raven Boiler Preventative Maintenance Contract Loch Raven VAMC General: VISN 5 The VA Maryland Health Care System is dedicated to improving the lives of Veterans and their families every day. Our health care teams are deeply experienced and guided by the needs of Veterans, their families, and caregivers. The Loch Raven medical center boiler program is comprised of 12 decentralized boilers across 7 buildings. The proposed contract will improve preventative maintenance, inspections and service maintenance to this equipment. Preventative maintenance involvesÂ functional checks, servicing, repairing, or replacing of necessary parts for all boilers on campus. These cost-effective practices keep equipment operational and running smoothly, reducing down time extending operating life and decreasing impact to patients. About the sites: TheÂ Loch Raven VA Community Living \u0026 Rehabilitation Center Provides rehabilitation and recreation therapy for our recovering veterans. The main building also provides hospice, nursing home care and care for patients with Alzheimer s. The surrounding campus provides services including mental health care, audiology, care for Veterans who are blind or have low vision, and more. Planned preventative maintenance, which is scheduled maintenance aimed at making repairs BEFORE failure occurs. Tasks like cleaning equipment or replacing air/water filters represent a form of routine preventative maintenance because there is a set cadence that occurs regularly regardless of how the equipment is running. Here, you're preventing it from breaking down or running inefficiently. Planned unscheduled maintenance, which is having a strategy in place to repair or replace an asset as quickly as possible when it fails. Replacing and/or repairing gaskets or a compressor can be considered unscheduled because it usually occurs on an as-needed basis whenever wear is present or the unit breaks down. This situation can also incorporate a planning element by either having real OEM replacement parts on hand or budgeting for the cost of repairing/replacing a failed part. CONTRACTOR PERSONNEL A. Technician Qualifications. All work shall be performed by qualified boiler technicians, experienced and qualified to work on the specific makes and models of equipment listed in this contract. The Contractor shall submit to and for the approval of the Contracting Officer, certification and a list of credentials of the qualified boiler technicians. Technicians shall have completed at least a one-year trade school and have a minimum of five (5) years successful experience in the field. The experience shall be largely with institutional and industrial boilers. In addition, the technician shall have demonstrated experience in conducting equipment inspection and performing testing in compliance with the VA safety testing manual at three (3) or more VA facilities within the past three (3) years. Technicians shall demonstrate familiarity with and ready access to the current versions of the following references: NFPA 85, Boiler and Combustion Systems Hazard Code, latest edition. VHA Boiler Plant Safety Device Testing Manual, current edition. Terms: Stationary Engineer A...","url":"https://matchawards.com/department_of_veterans_affairs/posts/115266671386773818","identifier":"36C24526Q0027","category":"238220 - Plumbing, Heating, and Air-Conditioning Contractors","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"J045 - MAINT/REPAIR/REBUILD OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT"},{"@type":"PropertyValue","propertyID":"CM category","name":"Category Management category","value":"4.4 Facility Related Services","url":"https://matchawards.com/categories/facilities-and-construction/facility-related-services"}],"availabilityStarts":"2025-09-25","availabilityEnds":"2025-10-09","validThrough":"2025-10-09T23:59:59-04:00","areaServed":"Baltimore, MD 21218","sameAs":"https://sam.gov/workspace/contract/opp/b9d9015d635443b283a20b5332663cb9/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Construction","item":"https://matchawards.com/contracts/construction"}]}
```