ClickCease J046--Water Treatment/Storage Tank Cleaning for… (36C26126Q0038) | Closed - MatchAwards

J046--Water Treatment/Storage Tank Cleaning for VA Las Vegas

Status
Closed, the response deadline passed on Sep 10, 2025
Agency
United States Department of Veterans Affairs
Office
MATHER, USA
Notice type
Sources Sought
Solicitation number
36C26126Q0038
NAICS
561210 - Facilities Support Services
PSC
J046 - MAINT/REPAIR/REBUILD OF EQUIPMENT- WATER PURIFICATION AND SEWAGE TREATMENT EQUIPMENT
Category
Industrial Products Install / Maintenance / Repair (5.5)
Posted
2025-09-03
Deadline
2025-09-10

Description

This is a SOURCES SOUGHT ANNOUNCEMENT ONLY The intent of this Sources Sought Announcement is to assist in our decision-making process for services procurement. This is not a solicitation, nor request for quotes or proposals. Through the receipt of responses, this will enable a more precise type of procurement process. The Government is not obligated to, nor will it pay for or reimburse any costs associated with responding to this sources sought synopsis request. This notice shall not be construed as a commitment by the Government to issue a solicitation or ultimately award of a contract, nor does it restrict the Government to a particular acquisition approach. Any inquiries are to be made in writing by email to the point of contact, Larry Facio, Contracting Officer. Responses to this notice shall be sent by email to larry.facio@va.gov by the due date and time of 09/10/2025 by 1:00 p.m. (Pacific Time). Upon receipt of capabilities statement, Contracting Officer may request additional market research aid such as informal pricing. Place of Performance: VA Southern Nevada Healthcare System (VASNHS) 6900 North Pecos Rd, N. Las Vegas, NV 89086 DESCRIPTION OF SERVICES/GENERAL INFO 1.0. SCOPE OF WORK VA Southern Nevada Healthcare System (VASNHS) is contracting water treatment services as well as the cleaning of 4 water storage tanks that provide a complete service-oriented water treatment, sampling, disinfect/cleaning and test program that supplies steam, chilled water service, domestic, industrial water and heating water service loops which include a solar heating loop. This contract is specifically for all industrial systems and all 4 water storage tanks. Access to these systems is located VA Medical Center Buildings 1, 2, 5, & 6. The contractor shall supply a complete service oriented water treatment program. A major component of maintaining equipment involves chemical treatment, real time monitoring, and water sampling. The contractor shall provide trained, qualified and certified personnel to perform required tasks. In addition, contractor shall provide all the necessary equipment, tools, materials, supervision, repair, replacement, and other services necessary to perform water treatment services at VASNHS facilities as defined in this Statement of Work (SOW) for Government-owned equipment. Services shall be provided at the VASNHS medical center, located at 6900 North Pecos Road, North Las Vegas, NV 89086. The contractor shall perform in accordance with all federal, state, and local regulations. Specific Requirements for Industrial Water: 1.1.2 The water treatment program shall service steam boilers, chillers, chilled water system, open condenser water loops, 9 closed hot water heating loops, a refrigeration condenser loop, and a Glycol energy recovery loop, along with all associated piping for the equipment listed below. This list is not all inclusive of the Government owned equipment that may require monitoring, testing, or other services associated with the overall treatment program. Contractor is to supply all equipment and services for real time monitoring of HVAC Cooling Tower open loop. Chilled Water: Global GTCHB2234F2615PC Side-stream Filter with MS30ES20 filter cartridges. Cooling Tower (Condenser Water): In-Line, Real-Time monitoring system controlling 3 LMI metering pumps and condenser water bleed valve. Puroflux PF64-060(B) centrifugal separator Glycol: Neptune 141-GFS251A.88 Steam/Condensate: The steam system has three LMI chemical metering pumps for the Boiler treatment, sulfite, phosphate and amine . Feed rates are set manually based on feed water / condensate testing by the operator. Each boiler is equipped with a pot feeder for start-up/emergency treatment. The other systems are manually dosed with pot feeders. 1.2 FREQUENCY OF SERVICE & TEST REQUIREMENTS 1.2.1. The following charts denote the frequency of service and testing requirements. 1.2.1.1 Specific System: Cooling Tower System, Open Loop, Building 2. Control Parameters Analytical Method Target Range Service Report Test Frequency pH, Makeup Water PH meter Record Weekly pH, System Water PH Meter 8.0-9.0 Weekly Conductivity, Makeup Conductivity Meter Record Weekly Conductivity, System Water Conductivity Meter 2400 ppm TDS Weekly Corrosion Inhibitor Colorimetry 15 30 ppm Weekly Calcium, Makeup Water DR890-PRG29 Record Weekly Calcium, System Water DR890-PRG29 <100 ppm Weekly Steel Corrosion Inhibitor (Active Polymer) DR890 PRG181 6-8ppm Weekly Iron DR890-PRG33 <1.0 ppm Weekly Free Halogen (Chlorine) Biocide DR890-PRG 90 0.05-0.5 ppm Weekly Bacteria: Total Heterotrophic Dip-slides 10^3-10^4 cfu/ml Weekly Bacteria: Sulphate Reducing Analytical Lab Sample ND Semi-Annual Bacteria: Iron Related Analytical Lab Sample ND Semi-Annual Steel Corrosion Inhibitor (Specify) Coupons <1.0 mpy Semi-Annual Copper Corrosion Inhibitor (Specify) Coupons <0.5 mpy Semi-Annual ND = non detect Note: Include tests for control parameters, from Program Calculation Sheet, Appendix A 1.2.1.2 Specific System: Chilled Water (Closed), Refrigerant Condenser Loop, Glycol Energy Recovery System, and Hot Closed Systems, Buildings 1, 2, 5, 6 . See Appendix D & E Control Parameters Analytical Method Target Range Service Report Test Frequency Corrosion Inhibitor (Nitrite) Titration 600-800 ppm Weekly pH PH Meter <10.5 Weekly Monthly for hot Conductivity Conductivity Meter Record Weekly Monthly for hot Steel Corrosion (Specify) Coupons <1.0 mpy Quarterly Copper Corrosion (Specify) Coupons <1.0 mpy Quarterly Iron (Total) DR890-PRG33 <2.0 ppm Weekly Monthly for hot Copper (Total) DR890-PRG22 <2.0 ppm Weekly Monthly for hot Bacteria: Total Heterotrophic Dip-slide <10^3 cfu/ml Monthly Bacteria: Sulfate Reducing Analytical Lab Sample ND Semi-annual Bacteria: Iron Related Analytical Lab Sample ND Semi-annual Bacteria: Nitrifying Analytical Lab Sample Minimal Semi-annual Bacteria: Denitrifying Analytical Lab Sample Minimal Semi-annual ND = non detect Note: Include tests for control parameters, from Program Calculation Sheet, Appendix A 1.2.1.3 Specific System: Steam Boiler System, Building 2. Control Parameters Analytical Method Target Range Service Report Test Frequency Makeup Water pH PH meter Record Weekly Makeup Water Conductivity Conductivity Meter Record Weekly Makeup Water - Hardness Drop Test Record Weekly Makeup Water Total Alkalinity DR890-PRG29 Record Weekly Feedwater Hardness Drop Test 0-2 ppm Weekly Feedwater Iron DR890-PRG33 <1.0 ppm Weekly Feedwater pH PH meter 8.3-10.5 Weekly Feedwater Conductivity Conductivity Meter 300 µmhos Weekly Feedwater P Alkalinity Titration Record Weekly Feedwater M Alkalinity Titration Record Weekly Feedwater Boiler Treatment DR890-PRG181 20-25ppm Weekly Boiler P Alkalinity Titration <300 Weekly Boiler M Alkalinity Titration <100 Weekly Boiler Oxygen scavenger Residual Sulfite low level test kit 30-60 ppm Weekly Boiler Conductivity On-Line Conductivity Meter <4500 µmhos Weekly Boiler Neutralized Conductivity DR890-PRG29 Boiler iron DR890-PRG33 <1.0 ppm Weekly Condensate - Conductivity Conductivity Meter <100 µmhos Weekly Condensate pH PH meter 8.0-10.0 Weekly Condensate Hardness Drop Test 0-1 ppm Weekly Condensate Iron DR890-PRG33 <1.0 ppm Weekly ND = non detect Note: Include tests for control parameters, from Program Calculation Sheet, Appendix A 1.2.1.4 Industrial Water Systems System Location Analytical Test Method Service Report Test Frequency Water Tank #1 Water Tank Yard A, B, C, E, F Monthly Water Tank #3 Water Tank Yard A, B, C, E, F Monthly Water Tank #4 Water Tank Yard A, B, C, E, F Monthly Cooling Towers BLD 2 A, B, C, D,E, F Weekly Industrial Water System Bldg 2, Rm 2-110 A, B, C, D, E Monthly 1.2.1.5 Industrial Water System Analytical Test Method: A. Chlorine residual, Free/Total; DPD Colorimeter USEPA (Hach Field Test) B. Conductivity / TDS; Ultrameter II Conductivity Meter C. PH; Ultrameter II PH Meter. D. Hardness; Drop Test, Titration E. Water Temperature, Ultrameter II, or Contact Thermometer. F. Dip-slide, Heterotrophic Bacteria, & Mold Indicating 1.2.2. METHOD OF TREATMENT 1.2.2.1. The contractor shall provide water treatment products to prevent scale, corrosion, fouling and microbiological fouling within all heating, chilled, and cooling water systems. 1.2.2.2. Water treatments shall be performed as indicated by testing on each system in all buildings. 1.2.2.3 Sodium Nitrite, or other corrosion inhibitor, applied to closed loops shall always include Leak Detection Dye. 1.2.2.4. Evaluate the flows, pressure and Total Dissolved Solids (TDS), weekly. 1.2.2.5. Cooling towers shall be treated by acid or soft water blend control. See Appendix B for system. 1.2.2.6 Delivery of all water treatment chemicals to points-of use shall be placed on spill containment pallets. It is the contractor s responsibility to ensure all safety precautions for chemicals have been taken. 1.2.2.7 Chemical Tanks - The tanks MUST provide the following features: Tank level indicators to determine chemical levels. Flooded suction inlets for chemical pumps to ensure pumps do not loose prime, or provide self-priming pumps. Containment basins capable of 150% of the tank storage capacity. Tank sizing shall be appropriate for chemical use; chemical shall be a minimum quantity of 31 days without replenishment. Chemical labels clearly visible on outside of tank. SDS sheets attached to tank container. Tank to tank chemical transfer preferred, when pumping from drums, empty drums shall be removed from VAMC property within 3 working days. Full spill containment. 1.2.2.7.1 Liquid chemicals shall be stored on site in Mini Porta Feed or equal containers. Containers shall be stainless steel or double walled polyethylene tanks as appropriate. Containers shall be supplied and maintained by the water treatment contractor. 1.2.2.7.2 All chemicals shall be directly injected in to their respective loops via corporation stop injectors whenever provided. Pot feeders are available at the boilers (start-up), and all closed loops. 1.2.3. TESTS 1.2.3.1. Routine Testing. The routine Cooling Tower testing to be performed according to the chart in 1.2.1.1, Closed Loops according to 1.2.1.2 and Boiler testing performed according to chart in 1.2.1.3. which will provide results showing:. Total Hardness, P Alkalinity, M Alkalinity, OH Alkalinity, Total Alkalinity, pH, Conductivity/TDS, Silica, Phosphates/orthophosphates, Nitrite, Calcium Hardness, Free Chlorine, Sulfite, Iron and Copper. Routine testing by the Contractor shall also provide services as listed in Appendix B and C. The contractor shall submit documentation of results and recommendations accurately and within required timeframe in accordance with Paragraph 1.2.10.1. 1.2.3.2. Weekly water tests and treatment for each operating system in building 2 shall provide: Boilers and Steam: Orthophosphate (PO4) (Operating Boiler s water) Sodium Sulfite (SO3) (Operating Boilers) P-Alkalinity (Operating Boiler s water) Conductivity (µmhos/cm) (Operating Boiler s water and Feed Water) Total Hardness, pH, iron, and conductivity (Feed Water, Condensate, High Pressure Drain, Condensate from Bldg 1. Add neutralizing amine blend to treatment tank, for injection into steam header outlet piping. Determine gallons/day feed rate for sodium polymethacrylate* and add to proper tank with proper adjustments to feed rate. (*or recommended chemical.) Add sodium sulfite in chemical feed tank for feedwater treatment. Add sodium hexametaphosphate*, caustic flake*, and adjustments for feed rates to boiler chemical feed tanks. ( *or recommended chemical). Sodium Nitrite added to (Hot & Chilled) closed loops to provide protection of metal piping and maintain residual. Cooling Tower / Open Condenser Loop: Organophosphonate Oxidizing and Non-Oxidizing Biocides 1.2.4. STANDARDS. The contractor shall inspect, monitor and document the cooling water characteristics for a stable condition. Conductivity Total Dissolved Solids (TDS) range shall be maintained within 2000 to 2500 µmhos/cm. The contractor shall conduct weekly total bacteria count tests on cooling tower water samples utilizing a dip-slide culture test. ORP measurements will be taken on condenser water to verify relationship between Biocide effective ness and corrosion of tower metal, maintain range of 250 to 450 mV. The contractor shall use test results to change or optimize the biocide feed rates and the timing of the biocide feed applications to maintain bacteria counts at 10,000 CFU/mL or less. The bacteria count, determined by dip-slide culture, shall be reported weekly on the service trip report and provided accordingly to 1.2.10.1. 1.2.4.1. The following standards apply to each operating system in building 2 and shall be on contractor s report. The contractor shall maintain systems within the standards listed in paragraph 1.2.4: Boilers Phosphate (PO4) = 15 25 PPM P-Alkalinity (CaCO3) = 300 600 PPM Sulfite (SO3) = 30 60 PPM Neutralized Conductivity (µmhos/cm): 3000-3500 Boiler PH = 10.5 12.0 PPM Condensate: PH = 8.3 9.2 SU Conductivity= < 100 µmhos Sodium Softeners: (Hardness Maximum) 1 PPM or 7.1 grains Low Temperature Hot Water Heat (HWH) the following standards apply: Nitrite = 1000-1500 ppm in nitrite. Test and record pH, conductivity, iron, copper. Chilled Water the following standards apply: Nitrite = 600-800 ppm as nitrite. Test and record pH, conductivity, iron, copper. Contractor shall clean and replace Side-Stream filters as necessary. Open Condenser Loop (Cooling Towers) the following standards apply: Conductivity= 3200 µmhos / TDS= 2400 ppm Organophosphonate = 15 30 ppm, PTSA trace = 160 170 Biocide = .05 0.5 ppm 1.2.5. MONITORING. The contractor shall inspect, monitor and document each system listed in Appendix B, C, D, & E. to measure effectiveness of the treatment program. The contractor shall inspect, monitor and document the below mentioned conditions. Results shall be documented IAW Section 1.2.10 and provided to COR. Scale formation onto waterside surfaces Corrosion of waterside metal surfaces Slime producing bacteria within the bulk water (dip-slide test) Make-up water rate Bleed-off/Blowdown rate Chemical treatment feed rates 1.2.6. INSPECTIONS 1.2.6.1. The contractor shall perform weekly inspections of the cooling tower, boilers and heat exchange systems to include: chemical feed equipment, chemical feed point locations, and sampling locations. This shall include weekly inspections of the side-stream filter installed in the condenser water system . Adjustments shall be made to backwash timing and frequency. Results and recommendations shall be documented IAW Section 1.2.10.1 and provided to COR. 1.2.6.2. The contractor shall conduct internal and external inspections of steam generation equipment during seasonal shutdowns and perform external inspections when the steam generation equipment is on-line. 1.2.6.3. The contractor shall inspect and document all waterside surfaces of opened heat exchangers and chillers for proper water treatment according to the type of system, its size and location . Inspection results shall include: the tube sheet, end bells, water box, and the end of the tubes. 1.2.7. REVIEWS AND ANALYSIS. 1.2.7.1. The contractor shall conduct a review and analysis of cooling and heating system operating logs and cooling tower including side-stream filters, heat exchangers, and closed system water treatment testing logs. The Contractor shall maintain an electronic data-site of all information. Trend analysis data generated using software shall be included in the Quarterly Report IAW 1.2.10. The contractor shall identify, document correctly, and submit to the COR, quarterly, any potential problem areas and assess trends of chemical consumption, costs, and residuals. 1.2.7.2. The contractor shall document results and recommendations for purposes of long-range planning. Documentation shall be IAW Section 1.2.10.3 and provided to COR. 1.2.7.3. The contractor shall provide actual values of: Bleed-off/Blowdown, Make-up, Drift, Cycles of concentration, and Chemical Feed Rates. The contractor shall document and compare values to theoretical values, and industry standards. The Contractor shall make recommendations to the government to optimize operations. All final decisions are by the government. Documentation shall be IAW Section 1.2.10.3. 1.2.7.4. The contractor shall document the collection of and analyze scale and other deposits found in the system. Results and recommendations shall be IAW Section 1.2.10.3 and provided to COR. 1.2.7.5. Condensate Quality Profile. A Quality Profile shall be created and documented for each condensate stream. Information and targeted performance guidelines shall include: pH (properly cooled) 8.0 9.0 Iron <0.10 ppm Conductivity < 50 µmhos/cm This data shall be reported quarterly IAW Section 1.2.10.2, report shall include all corrective action taken and provided to COR. 1.2.8. STUDIES. The contractor shall perform and document the following studies: 1.2.8.1. Corrosion Studies. Documented Corrosion studies shall include maintain continuous exposure periods for 90 days, conduct coupon analysis, review results and changes in the water treatment program to maintain acceptable Cooling Technology Institute (CTI) standards for Mild Steel Corrosion Rate (<5.00 mpy) and Copper Corrosion Rate (

Attachments

Source notice

More from United States Department of Veterans Affairs posted in September 2025

More lists