ClickCease C1DA--Solicitation Cancellation | Expand… (36C25925R0099) | Closed - MatchAwards

C1DA--Solicitation Cancellation | Expand Electrical Capability A&E Design Services

Status
Closed, the response deadline passed on Sep 5, 2025
Agency
United States Department of Veterans Affairs
Office
Greenwood Village, USA
Notice type
Presolicitation
Solicitation number
36C25925R0099
NAICS
541310 - Architectural Services
PSC
C1DA - ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES
Category
Construction Related Services (4.2)
Set-aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Posted
2025-09-02
Deadline
2025-09-05

Description

DESCRIPTION: This is a Pre-Solicitation Notice for the establishment of an Architect-Engineering (A-E) contract with services to be performed at the Veterans Affairs (VA) Medical Center, Grand Junction, CO, 81501. This requirement is being set-aside to Small Disabled Veteran Owned Small Business (SDVOSB) firms. THIS ANNOUNCEMENT IS NOT A REQUEST FOR PROPOSAL; NO SOLICITATION PACKAGE WILL BE ISSUED UNTIL AFTER AN EVALUATION HAS BEEN MADE ON THE PROVIDED SF-330s. The SF-330 can be downloaded through the GSA Forms Library at: https://www.gsa.gov/reference/forms/architectengineer-qualifications, scroll down to locate and click on the SF-330 hyperlink entitled, Architect-Engineer Qualifications. Written questions pertaining to this requirement should be submitted no later than 10:00 AM. Mountain Standard Time (MST), September 5, 2025. Interested firms should submit their current SF-330, Parts I and II, to Mark.Holland@va.gov. The SF-330s are due no later than 10:00 AM, MT, September 29, 2025. SCOPE OF WORK: This contract will provide designs for expanding the electrical capacity of the Grand Junction VA Medical Center. The A-E is to provide design services to expand the electrical capacity of the Grand Junction VA Medical Center (2121 North Ave, Grand Junction, CO  81501). The contractor shall design the following: Statement of Work: The Grand Junction VA Medical Center campus has 22 buildings, with 321,557 gross square feet of space. To expand services, the VA requires additional electrical power on the north and east sides of the campus. The northern electrical room remodel will support future expansions while the newly created eastern electrical room will support temporary facilities that provide workspaces for displaced employees. In the past, temporary spaces have been modular in nature and could be tents, trailers or other types of temporary facilities. Most work will be conducted indoors, however, Grand Junction, CO has a semi-arid climate, with hot summers and generally mild winters. During the summer months temperatures typically reach into the 90s Fahrenheit during the day, while evenings tend to remain comfortable and cool. Winters are usually mild, but snow does occur and temperatures can cool down to freezing averages. Spring and fall tend to be transitional seasons with moderate temperatures. The area receives around nine inches of precipitation per year with most of it falling from April through August. Grand Junction, Colorado gets 10 inches of rain, on average, per year. Specific project tasks: Remodel and add on to 1634-1 (433 SF) / 1635-1 (433 SF) to ensure adequate electrical utilities exist to support the north portion of the WCHCS on the Grand Junction, CO campus. This will include expanding the rooms by 800 SF to the west. This additional space will allow the hospital to add switchboards and panels when needed and enclose an Automatic Transfer Switch (ATS). Add a new electrical room to ensure adequate electrical utilities are in place on the eastern side of the WCHCS on the Grand Junction, CO campus. This will provide electrical capacity from location 1 on the western side of the WCHCS to location 2 (see attachment A) on the eastern side. The minimum power requirements are three-phase, 208V, 800A and includes normal, critical, life safety and emergency power circuits. This electrical run will terminate in a new conditioned electrical space at location 2 after passing through necessary electrical step-down equipment at site 3. Any future projects that have temporary facilities will be designed to be compatible with 208V and use no more than 80% of the amperage available per branch circuit. These facilities will be expected to run power from their location to the new electrical room distribution point designed at location 2. All aspects of the design must adhere to the NEC Design manuals posted on the VA technical information library at the following sites: http://www.cfm.va.gov/til/ and https://vatilms.va.gov/vatilms/catalog. All electrical, architectural, and mechanical work for these systems will be designed by the A-E. The installation must, at a minimum, be in accordance with all applicable codes indicated in the Department of Veterans Affairs (VA) Design Manuals and VA Publications (Master Construction Specifications, Construction Standards, National Fire Protection Association (NFPA), Underwriters Laboratory, International Building Code IBC 2003, NFPA and National Electric Code (NEC), building codes and standards, and VA Information Security Handbook 6500.6, etc.). DESIGN CRITERIA: As part of the design the following list needs to be considered: All electrical work will be terminated by the contractor. The design must be clear who and what is supplied for the termination equipment. Any penetrations through any fire barriers whether a floor or wall it will be done in this contract to meet VA standards and National Fire Protection Association (NFPA). Contractor shall obtain permits issued by the facility before any penetrations shall occur. The installed system and its components shall be tested and commissioned. This will be included in the design and construction documents. Implement new technologies in electrical systems to improve facilitate energy usage reductions. The system will be compatible with the existing control systems on station. All finishes will be coordinated with the VA interior designer and called out in a finish schedule. All testing and balancing parameters will be provided by the A-E. Design documents that show the red lines will be submitted by the contractor to the A-E, put into the AutoCAD drawings and submitted within 30 days of the completion of the construction project. According to VA standards as outline in the VA Specifications Technical Library. All existing utilities which are designed to be relocated or modified shall have direction to the contractor on the new location and modifications. INVESTIGATIVE SERVICES: A report on 8 1/2 x11 paper (bound) and an electric Portable Document Format (PDF) version will be submitted. It will provide pro and cons of the project. It shall include a preliminary cost estimate and any results from preliminary testing and investigations. The results and sketches from this report should be used to develop the design. Interview and work with medical center staff to determine how the current system is working and what needs there are from the Facilities Management staff. In person inspections are required before the start of design due to the need for phased designed in the specified areas. The A-E will need to understand the workings of the area to facilitate a smoother design. OFFERORS WILL BE EVALUATED ON THE FOLLOWING CRITERIA: The submitted SF-330s will be evaluated on the following criteria: This acquisition will be in accordance with FAR Part 36.602-1 and VAAR Part 836.601-1. The following evaluation criteria will be used to evaluate SF-330 technical proposals: The A/E must demonstrate its qualifications with respect to the published evaluation criteria for all services. Evaluation Criteria (1) through (4) are considered most important and equal among themselves; Criteria (5) and (6) are of slightly less importance than (1) through (4) but are equal value among themselves; Criteria (7) is least important and listed in descending order of importance. Specific evaluation criteria include: 1. Specialized experience and technical competence in the type of work required, including, where appropriate, experience in electrical switchgears, electrical automatic transfer switches, and electrical primary distribution. 2. Professional Qualifications necessary for satisfactory performance of required services. 3. Capacity to accomplish the work in the required time. 4. Past Performance on contracts with Government agencies and private industry in terms of cost control, quality of work and compliance with performance schedules. 5. Specific experience and qualifications of personnel proposed for assignment to the project and their record of working together as a team. 6. The extent to which potential contractors identify and commit to the use of service-disabled veteran-owned small businesses, veteran-owned small businesses, and other types of small businesses as subcontractors. 7. Experience in construction period services to include professional field inspections during the construction period, review of construction submittals, support in answering requests for information during the construction period, and support of construction contract changes to include drafting statements of work, and cost estimates shall be included as an evaluation criterion when construction period services is included in the statement of work for A-E services. Criterion 1 - Specialized experience and technical competence in the type of work required, including, where appropriate, experience in Paging System, LYNX system, low voltage systems and separation of systems. Offerors will be evaluated on specialized experience and technical competence in the performance of services similar to those anticipated under this contract with regard to: · Experience with electrical switchgears. · Experience with electrical automatic transfer switches. · Experience with electrical primary distribution. · Experience in providing post construction award services (shop drawing review, as-built drawing and Quality Assurance Plan (QAP) preparation, construction inspection services, and Operating and Maintenance Manuals). Submission requirements: Provide up to five (5) projects completed or substantially completed within the past five (5) years that best illustrate specialized experience of the proposed team in the areas outlined above. Example projects shall note project s square footage. All projects provided in the SF-330 must be completed by the office/branch/regional office/individual team member actually proposed to manage and/or perform work under this contract. To enable verification, firms should include the SAM UEI number along with each firm name in the SF-330 Part 1, Section F Item 25 Firms from Section C Involved in this Project, block (1). Include a contract number or project identification number in block 21. Include an e-mail address, and phone number for the point of contact in block 23(c). Include in the project description the contract period of performance, award contract value, current contract value, a summary of the work performed that demonstrates relevance to specialized experience as outlined above. If the contractor served as a subcontractor on a project, indicate the value of the work they provided towards the performance of the overall project. If a project was performed by a joint venture, and not all joint venture partners are on the team proposed for this contract, the offeror/team should specifically address the work performed by the joint venture partner offering/teaming on this contract. Likewise, if the offeror/team member worked as a subcontractor on a project, the description should clearly describe the work actually performed by the offeror/team member and the roles and responsibilities of each on the project, rather than the work performed on the project as a whole. If the project description does not clearly delineate the work performed by the entity/entities offering/teaming on this contract, the project could be eliminated from consideration. NOTE: If the Offeror is a joint venture, information should be submitted as a joint venture; however, if there is no information for the joint venture, information should be submitted for either joint venture partner, not to exceed a total of five (5) projects for this criterion. Projects shall be submitted on the SF-330. For submittal purposes, a task order on an IDIQ contract is considered a project, as is a stand-alone contract award. Do not list an IDIQ contract as an example of a completed project. Instead, list relevant completed task orders or stand-alone contract awards that fit within the definition above. Examples of project work submitted that do not conform to this requirement will not be evaluated. Failure to provide requested data, accessible points of contact, or valid phone numbers could result in a firm being rated lower. All information for Criterion 1 should be submitted in Part 1, Section F of the SF-330. The Government WILL NOT consider information submitted in addition to Part 1, Section F in evaluating Criterion 1. Criterion 2 - Professional Qualifications necessary for satisfactory performance of required services. Offerors will be evaluated in terms of the qualifications, competence and experience of the key personnel and technical team proposed to accomplish this work. Key personnel are individuals who will have major contract or project management responsibilities and/or will provide unusual or unique expertise. Provide a balanced licensed and or certified workforce in the following disciplines Architecture, Interior Design, Civil, Structural, Mechanical, Electrical, and Fire Protection Engineering. Submission requirements: Provide resumes for all proposed key personnel. Resumes are limited to one page each and should cite project specific experience and indicate proposed role in this contract. Provide professional registration, certification, licensure and/or accreditation. Indicate participation of key personnel in example projects in the SF-330 Part 1 Section G. Criterion 3 - Capacity to accomplish the work in the required time. Firms/teams will be evaluated in terms of their ability to plan for and manage work under the contract and capacity to accomplish the work in the required time. Submission requirements: Describe the firm s ability to concurrently perform and manage multiple projects in different locations to meet aggressive schedules, multiple disciplines, and control costs and the firm s capacity to accomplish multiple projects simultaneously. Criterion 4 - Past Performance Offerors will be evaluated on past performance with Government agencies and private industry in terms of work quality, compliance with schedules, cost control, and stakeholder/customer satisfaction. Evaluating past performance and experience will include information provided in Past Performance Questionnaires (PPQs) or CPARS/ACASS for Criterion 1 projects and may include other information provided by the firm, customer inquiries, Government databases, and other information available to the Government including contacts with points of contact in other criteria. Failure to provide requested data, accessible points of contact, or valid phone numbers could result in a firm being rated lower. NOTE: Past performance information for projects listed under Criterion 1. Submission requirements: SUBMIT A COMPLETED CPARS/ACASS EVALUATION FOR EACH PROJECT UNDER CRITERION 1. IF THERE IS NOT A COMPLETED CPARS/ACASS EVALUATION, the Past Performance Questionnaire (PPQ) included in this notice is provided for the offeror or its team members to submit to the client for each project the offeror includes under Criterion 1. AN OFFEROR SHALL NOT SUBMIT A PPQ WHEN A COMPLETED CPARS/ACASS IS AVAILABLE. IF A CPARS/ACASS EVALUATION IS NOT AVAILABLE, ensure correct phone numbers and email addresses are provided for the client point of contact. Completed PPQs should be submitted with your SF-330. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before the response date set forth in this notice, offerors should complete and submit with their responses the first page of the PPQ (Attachment), which will provide contract and client information for the respective project(s). Offerors may submit a PPQ previously submitted under a different Notice/RFP (legible copies are acceptable) as long as it is on the same form as posted with this Synopsis. Offerors should follow up with clients/references to ensure timely submittal of questionnaires. If requested by the client, questionnaires may be submitted directly to the Government's point of contact, Network Contracting Office 19, Attn: Mark Holland via email at Mark.Holland@VA.gov prior to the response date. Offerors shall not incorporate by reference into their response PPQs or CPARS previously submitted in response to other A/E services procurements. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. Criterion 5 - Knowledge of the general area (Grand Junction, CO); provided, that application of this criterion leaves an appropriate number of qualified firms, given the nature and size of the project. Provided that the application of this criterion leaves an appropriate number of qualified firms, given the nature and size of the contract, firms/teams will be evaluated on the locations of their office or offices that will be performing the work under this contract. Submission requirements: Indicate firms/teams location, including main offices, branch offices and any subconsultants offices and demonstrate how this will be advantageous to the Government. Criterion 6 - The extent to which potential contractors identify and commit to the use of service-disabled veteran-owned small businesses, veteran-owned small businesses, and other types of small businesses as subcontractors. Submission requirements: Offerors to submit evidence showing commitment to using Service-Disabled Veteran Owned Small Business (SDVOSB), Veteran-Owned Small Business (VOSB), and Small Business firms/teams previously used on projects submitted in Criterion 2. Criterion 7 - Experience in construction period services to include professional field inspections during the construction period, review of construction submittals, support in answering requests for information during the construction period, and support of construction contract changes to include drafting statements of work, and cost estimates shall be included as an evaluation criterion when construction period services is included in the statement of work for A-E services. Submission requirements: Offerors shall provide documentation based on using the projects submitted in Criterion 2 indicating the extent and magnitude of the construction period services provided on those regarding the areas stated above. SELECTION INTERVIEW: Interviews shall be scheduled with firms slated as the most highly qualified. Firms slated for interviews may be asked to explain or expand on information contained in the SF-330 submittal. Elaborate presentations are not desired. GENERAL INFORMATION: All design and work will conform to the current edition of the VA Master Specifications and VA Design Standards as published at the following site: www.cfm.va.gov; ASME, OSHA, IBC 2009, NFPA and NEC building codes and standards. Coordinate all work through the COR of Facilities Management Service. Contractor is responsible for all cleanups and refuse disposal throughout the construction period. The A-E firm will prepare drawings and specifications in sufficient detail such that qualified outside General Contracting companies can prepare accurate and timely proposals for the desired construction work. Microsoft Project scheduling and management software will be used by both the A-E and Contractors to allow for regular tracking of schedules and work by the VA Medical Center. Schedules with MS Project will be regularly sent to the COR upon project initiation and whenever significant changes occur in the schedule. The estimated magnitude of construction is between $2,000,000.00 and $5,000,000.00. The A-E will provide an initial estimate of cost to perform the above work and will design only those items that can be provided within the cost limitation. The Medical Center must remain operational throughout the construction period and a detailed sequence of work will be provi