6515--GULDMANN CEILING LIFTS, Dayton
- Status
- Closed, the response deadline passed on Jul 22, 2025
- Agency
- United States Department of Veterans Affairs
- Office
- DAYTON, USA
- Notice type
- Combined Synopsis/Solicitation
- Solicitation number
- 36C25025Q0752
- NAICS
- 334510 - Electromedical and Electrotherapeutic Apparatus Manufacturing
- PSC
- 6515 - MEDICAL AND SURGICAL INSTRUMENTS, EQUIPMENT, AND SUPPLIES
- Category
- Medical Equipment and Accessories and Supplies (10.2)
- Posted
- 2025-07-17
- Deadline
- 2025-07-22
- Place of performance
- Dayton, Ohio 45428, UNITED STATES
Description
This is a combined synopsis/solicitation for commercial items prepared in accordance with (IAW) the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation will not be issued. The Government reserves the right to make no award from this solicitation.  This is a request for quote (RFQ), and the solicitation number is 36C25025Q0752. The Government anticipates awarding a firm-fixed price Purchase Order resulting from this solicitation. The solicitation document and incorporated provisions and clauses are those in effect through FAR Deviations JUN 2025 (eff. 06/11/2025) VAAR DEVIATION APR 2025 (eff. 04/01/2025). The associated NAICS Code is 334510, Electromedical and Electrotherapeutic Apparatus Manufacturing. The Department of Veterans Affairs, Network Contracting Office 10, is soliciting quotes from all sources to supply the Dayton VA Medical Center Ceiling Lift Systems. Respondents to this solicitation must fully demonstrate their capability by supplying detailed quote information, along with any other documents necessary to support the requirements below. This is a Brand Name only requirement for GULDMANN GH3+ Ceiling Lift Systems. Quotes are to be provided to Gina P. Crank, Contracting Officer, via email at gina.crank@va.gov, no later than July 22, 2025, by 5:00 PM EST. No telephone calls will be accepted. No submission received after the above-mentioned date and time will be accepted. A.1 PRICE/COST SCHEDULE ITEM INFORMATION ITEM NUMBER DESCRIPTION OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT 0001 3.00 EA $ $ 4x4 Room Covering System GH3+ 825lbs SWL Hoist w/Scale & Hanger Bar. Includes Certified Install (up to 1 mobilization) ACRN: 1 Requisition Number: 552-25-4-196-0030 Appropriation: 552-3650160-196-824100 Nursing Service-3131 Medical, Dental and Scien-SPP0D04A1 0002 3.00 EA $ $ Includes Certified Install (up to 1 mobilization) and uninstallation of previous system. GULDMANN CERTIFIED INSTALLATION. Non-Union Labor and hardware to install lifts in 1 room. [1] room per day, [2] mobilization(s) of the installation team. Electrical work, existing structure demo, modification, or reinstallation including but not limited to ceilings, walls, tile, patching, painting, acoustic caulking, asbestos abatement, smoke/firewall repair, fireproofing reapplication, sprinkler relocation and door header modification is outside the scope of work for Guldmann installers and Guldmann is not licensed for performing such work, nor is Guldmann responsible for hiring specific contractors/trades to perform such work. ICRA up to level II provided; additional is responsibility of facility. Guldmann will perform light cleaning of the area but returning room to original condition is outside of scope of work for Guldmann installers. If an Above Ceiling Work Permit is required, the facility must provide. ACRN: 1 Requisition Number: 552-25-4-196-0030 Appropriation: 552-3650160-196-824100 Nursing Service-3131 Medical, Dental and Scien-SPP0D04A1 0003 1.00 EA $ $ Stamped Engineered Drawings ACRN: 1 Requisition Number: 552-25-4-196-0030 Appropriation: 552-3650160-196-824100 Nursing Service-3131 Medical, Dental and Scien-SPP0D04A1 GRAND TOTAL $ Statement of Work: Added ceiling lift motor on existing track General Information Title of Project: Ceiling lift addition at Dayton VA MHC Scope of Work: The contractor shall provide all labor, supervision and all other resources required to deliver the requirements stated herein, except as may otherwise be specified in this statement of work. A 825-pound Guldmann GH3 ceiling lift is to be delivered, traverse rails installed, and tested in building 330 rooms: 2C143, 2C146, and 1B149. Details are provided in sections C and D below, Specific Mandatory Tasks and Associated Deliverables. Background: These additional lifts are required to provide dignified treatment to persons entering the SCI clinic and Interventional Radiology. These areas require overhead ceiling lifts to provide access to care and protect staff and Veterans from injury. Performance Period/Schedule: The contractor shall start the work required under this SOW by about July 2025 as coordinated with COR and treatment areas. If the contractor proposes an earlier completion date, and the Government accepts the contractor s proposal, the contractor s proposed completion date shall prevail. Installation dates and designs must be coordinated with Contracting Officer Representative (COR), and ICRA must be completed before beginning. Type of Contract: Firm-Fixed-Price Contract Award Meeting The contractor shall not commence performance on the tasks in this SOW until the CO has conducted a kick off meeting or has advised the contractor that a kick off meeting is waived. General Requirements All installation must comply with requirements of Patient Safety Alert AL14-07, including the Checklist for Installation and Relocation. The installation checklist must be filled out for each checklist, in addition to any checklist required by the manufacturer, and supplied to the COR. Contractor will provide evaluation of spaces where ceiling lifts are needed and submission of plans to Dayton VA MHC Engineering service, to ensure that workable versions are installed and comply with VA design requirements and relevant standards. Contractor will coordinate with Engineering service to verify access to engineering mechanical, HVAC, and fire systems components within the mounting area of the lift units. Contractor will coordinate with Contracting Officer Representative (COR) to schedule installations Contractor will participate in ICRA/PCRA site assessment and comply with all ICRA/PCRA requirements. Contractor will provide all qualified personnel, materials, equipment and services necessary to install ceiling lifts for the rooms described below under Location, including lifts, tracks, spreader bars, attachment hardware, and all other equipment necessary for safe operation. Detailed requirements are described in the Standards and Special Requirements sections. Lift systems may be configured in any way that covers the rooms best and meets the requirements. Contractor will provide installation and testing of all equipment for ceiling lifts, according to VA checklist requirements, resulting in a turnkey system. Contractor will provide as-built drawings and structural engineering drawings for lift units. Contractor will provide evidence of testing of all lift systems provided and schedule testing when it can be overseen by COR. Contractor will meet construction safety requirements, including construction orientation, safety training requirements, dust control requirements from the Infection Control Risk Assessment, TB testing, electrical safety requirements, and Above Ceiling Permit requirements including re-sealing any penetrations of fire barriers. NARA Records Management Language Clause Citations to pertinent laws, codes and regulations such as 44 U.S.C Chapter 21 , 29, 31 and 33; Freedom of Information Act (5 U.S.C. 552); Privacy Act (5 U.S.C. 552a); 36 CFR Part 1222 and Part 1228. Contractor shall treat all deliverables under the contract as the property of the U.S. Government for which the Government Agency shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Contractor shall not create or maintain any records that are not specifically tied to or authorized by the contract using Government IT equipment and/or Government records. Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected by the Freedom of Information Act. Contractor shall not create or maintain any records containing any Government Agency records that are not specifically tied to or authorized by the contract. The Government Agency owns the rights to all data/records produced as part of this contract. The Government Agency owns the rights to all electronic information (electronic data, electronic information systems, electronic databases, etc.) and all supporting documentation created as part of this contract. Contractor must deliver sufficient technical documentation with all data deliverables to permit the agency to use the data. Contractor agrees to comply with Federal and Agency records management policies, including those policies associated with the safeguarding of records covered by the Privacy Act of 1974. These policies include the preservation of all records created or received regardless of format [paper, electronic, etc.] or mode of transmission [e-mail, fax, etc.] or state of completion [draft, final, etc.]. No disposition of documents will be allowed without the prior written consent of the Contracting Officer. The Agency and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. Records may not be removed from the legal custody of the Agency or destroyed without regard to the provisions of the agency records schedules. Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under or relating to this contract. The Contractor (and any sub-contractor) is required to abide by Government and Agency guidance for protecting sensitive and proprietary information. Specific Mandatory Tasks and Associated Deliverables Location of Ceiling Lift Installation: 2C143, 2C146, and 1B149 Description of Tasks and Associated Deliverables: The contractor shall provide the specific deliverables described below within the performance period stated in Section A.4 of this SOW. Standards: Ceiling Lift Performance Requirements: Ceiling Lifts shall meet all Underwriters Laboratory requirements, life safety codes, national electric codes, fire safety codes, and all other applicable federal, state and local codes. Appropriate documentation should be provided. Ceiling Lifts shall comply with ISO 10535 (Hoists for the transfer of disabled persons Requirements and test methods). Ceiling lift manufacturer must allow and warrant the use of their lifts with the full range of Guldmann, Alpha Modalities and Barton/Humancare loop slings. The lifts shall be mounted on newly installed traverse rail systems and tested according to the AL14-07 checklist. Lifts must be capable of picking patients up off the floor. Lifts must not beep or flash during normal operation. Contractor must install lifts without relocating or interfering with operations of existing sprinkler heads, lights, HVAC grills, curtain tracks, IV tracks, televisions, permanent furniture, or other permanent structure. Contractor must describe any such fixtures that must be moved during contract bid and pre-construction meetings. Installation may be delayed, canceled, or moved to a mutually acceptable location if building changes cannot be made in ways that allow lift installation. Contractor shall not breach any firewalls during installation of these lifts. Any fire barrier that must be penetrated must be discussed with VA safety personnel and must immediately have fire barrier repaired. An Above Ceiling Permit must be filled out before ceiling work, and the COR will check the ceiling after ceiling work, to make sure any fire barrier penetration was repaired. Each room where lifts are installed shall be returned to original condition, excluding the newly installed ceiling lift. Ceilings must not be slotted exposing space above ceiling to the room below. Ceiling lift motors shall be capable of lifting at least 550 pounds or 825 pounds, as specified on the Location list. A specific opportunity for Service Agreements, Preventive Maintenance Agreements, and Extended Warranty Agreements should be presented. Maintenance and inspection shall be provided for two years from date of final acceptance. Warranty shall include all travel or shipping associated with any warranty repair. New lifts shall accept generic type replacement batteries without voiding any warranties. Motors shall be GFCI protected. Ceiling lifts must be motorized. Ceiling lifts must include a 2-point hanger bar suitable and allowable for use with the full range of Guldmann slings, Humancare/Barton slings, and Alpha Modalities repositioning slings, without easily breakable parts such as rubber flaps. Ceiling lifts must recharge automatically, by recharging at any location on the rail. Lifts that recharge without employee action will be preferred. Ceiling lifts must include safeguards to prevent patients from being trapped or hurt, such as emergency stop buttons or emergency lowering devices in case of power failure. Use of emergency lowering devices must not require tools or ladders. Contractor shall provide the following with the bid: Provide proof of multiple ceiling lift installations of the room covering style with continuous charge, direct connections between two traverse systems in different rooms, and minimum 20 x20 coverage in this or other Veterans Administration Hospitals. Provide proof of ongoing service quality and consistent management, including failure reports and any other applicable documentation. Manuals: Contractor shall provide electronic copies of the user manuals and repair manuals for each different model of lift installed under this order or contract at no additional cost to the government. Inspection: Each room s lift system shall be weight and function tested after installation in compliance with the VHA checklist required by Patient Safety Alert AL14-07. Each checklist shall be provided to the Contracting Officer Representative along with any checklist required by the manufacturer. Any changes in inspection requirements during the period of installation will be communicated to the Contractor immediately. Contractor conduct requirements: Equipment and supplies must not be shipped before designs are approved and contractor has approval to install. Dayton VA MHC cannot store uninstalled equipment for a significant length of time. All employees and subcontractors must wear a visible name and company identification when onsite. When more than one person is onsite performing work under this contract, one must be designated as a supervisor and must be fully responsible for the work to be performed. The Contractor shall provide all supplies, materials, equipment, qualified personnel, supervision, management, and transportation to perform all tasks as identified herein. All work is to be performed in accordance with the guidelines established by Federal, State, and local ordinances and The Joint Commission. The Contractor s procedures and quality control procedures shall conform to these guidelines. Contractor personnel must conduct their work so as not to interfere with the normal functioning of the facility and will stop work if asked by Dayton VA MHC personnel. Hours of work may need to be limited to daytime on units where patients sleep and night time in areas where patients would be exposed by daytime work. The Contractor shall take all precautions necessary to protect the lives and health of occupants of the building. The Contractor must follow procedures required by Dayton VA MHS Infection Control personnel and the construction safety committee, to include any required dust control specified in the Infection Control Risk Assessment. The Contractor must state what efforts will be made to minimize noise during installation of equipment. The Contractor shall immediately correct any fire and safety deficiencies caused by his personnel. If the contractor fails or refuses to correct deficiencies promptly, the Contracting Officer may issue an order stopping all or any part of the work and may hold the contractor in default of the contract. The Contractor shall comply with applicable Federal, State, and local safety and fire regulations and codes which are in effect at the beginning of the contract period. The contractor shall keep abreast of any changes in these regulations and codes applicable to the contract. All material and equipment will be removed from the facility or stored properly at the end of each workday and secured during the workday in the areas specified by the Contracting Officer s Technical Representative. The Contractor is responsible for supplying, completing, and submitting all reports required or requested by Federal, State, or local ordinances which pertain to any duties contained in the contract. The Contractor will be required to furnish the Dayton VA MHC with material safety data sheets for all chemicals used during installation. This information is required by the VA for emergency treatment in the event of ingestion of and/or contact with the material by humans and is required by OSHA regulations. The Contractor s onsite lead installer must attend a VANTHCS construction safety orientation and supply job hazard analyses as required by Construction Safety Officer to show how hazards to Contractor and VANTHCS personnel are being minimized. All Contractor personnel must have OSHA 10-hour construction safety training cards. The Contractor s personnel shall follow applicable policies of the Dayton VA MHC, to include policies concerning fire and disaster preparedness programs. The contractor shall furnish at his own expense all labor, materials, machinery, and appliances which may be necessary or appropriate in the performance of this contract. All accumulated rubbish is to be collected and placed in the dumpster provided by the Government. Special Requirements: The contractor must have visited the sites and assessed the structure of each ceiling lift location to ensure safe installation of the equipment and shall supply the installation plans to the COR, Dayton VA MHC Engineering Service and Construction Safety Group, who must accept them before installation. Ceiling lift installations shall comply with NFPA 13 for fire sprinklers and with NFPA 99 and NFPA 70 for proper grounding and bonding and access to electrical and safety systems. The contractor should not require movement of any lights, sprinklers, televisions, or other fixtures in order to install ceiling lifts. If movement of preexisting fixtures is unavoidable, the contractor must include such notice when the bid is submitted. Wall mounted lifts are acceptable in the place of ceiling mounts where they are more effective or cause less risk to install. Ceiling lifts must not add obstacles or impair any normal operations in patient care rooms. All installation that affects existing areas and electrical work shall be coordinated with the Dayton VA MHC Engineering service. The contractor will install all necessary mounts, braces, and any other components needed for full lift function and safety. Any electrical subcontractor must have health care experience, must have positive references, and must be directly overseen by the Contractor. Schedule for Deliverables: If for any reason any deliverable cannot be delivered within the scheduled time frame, the contractor is required to explain why in writing to the CO, including a firm commitment of when the work shall be completed. This notice to the CO shall cite the reasons for the delay, and the impact on the overall project. The CO will then review the facts and issue a response, in accordance with applicable regulations. Changes to Statement of Work: Any changes to this SOW shall be authorized and approved only through written corAttachments
Contacts
- Gina P. Crank, Contracting Officer
Email and phone are in the source notice.
More from United States Department of Veterans Affairs posted in July 2025