<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/department_of_veterans_affairs/posts/114669444943769490" -->

---
title: 6115--526-26-102 Replace Main EMD Generators and… (36C24225B0038) | Closed - MatchAwards
description: 6115--526-26-102 Replace Main EMD Generators and Cooling Towers. United States Department of Veterans Affairs. Solicitation 36C24225B0038. NAICS 238210 - Electrical Contractors and Other Wiring Installation Contractors. SDVOSB set-aside. Deadline 2025-09-22. Page 4 of 4 THIS IS A PRE-SOLICITATION...
canonical: https://matchawards.com/department_of_veterans_affairs/posts/114669444943769490
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: 6115--526-26-102 Replace Main EMD Generators and… (36C24225B0038) | Closed
og:url: https://matchawards.com/department_of_veterans_affairs/posts/114669444943769490
og:description: 6115--526-26-102 Replace Main EMD Generators and Cooling Towers. United States Department of Veterans Affairs. Solicitation 36C24225B0038. NAICS 238210 - Electrical Contractors and Other Wiring Installation Contractors. SDVOSB set-aside. Deadline 2025-09-22. Page 4 of 4 THIS IS A PRE-SOLICITATION...
og:image: https://matchawards.com/system/accounts/avatars/000/000/015/original/f59915e906ee2b19.png?1638825904
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# 6115--526-26-102 Replace Main EMD Generators and Cooling Towers

Status

Closed, the response deadline passed on Sep 22, 2025

Agency

[United States Department of Veterans Affairs](/department%5Fof%5Fveterans%5Faffairs)

Office

ALBANY, USA

Notice type

Presolicitation

Solicitation number

36C24225B0038

NAICS

[238210 - Electrical Contractors and Other Wiring Installation Contractors](/groups/227)

PSC

6115 - GENERATORS AND GENERATOR SETS, ELECTRICAL

Set-aside

[Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)](/contracts/veteran-owned)

Posted

2025-09-10

Deadline

2025-09-22

Place of performance

New York 10468, UNITED STATES

## Description

Page 4 of 4 THIS IS A PRE-SOLICITATION NOTICE ONLY Project No. 526-26-102; Replace Main EMD Generators and Cooling Towers at the James J. Peters VA Medical Center, Bronx, New York. CONSTRUCTION SERVICES GENERAL SCOPE/Statement of Work. The Contractor must furnish all labor, materials, tools and supervision to complete the following: The department of Veterans Affairs is soliciting offers/bids from qualified SDVOSB firms for Construction services to provide labor, material and supervision for the Replace Main EMD Generators and Cooling Towers project located at the James J Peters VA Medical Center, 130 West Kingsbridge Road, Bronx, New York 10468 and as specified on the plans, specifications, and contract documents. General Scope: . The purpose of this project is to The primary project objective is to replace the Main EMD Generators at the Bronx, NY VAMC. This includes renovations to the existing Motor Pool Building. As part of this effort, the tasks include evaluating locations for a new Load Bank and ensuring the project meets VA Physical Security and Resiliency Design Manual (PSRDM) mitigation measures. As part of the overall project, modifications to the site area around the Motor Pool Building and other new project features will be necessary to achieve the overall project goal. We are explicitly noting that it is the General Contractor s responsibility to complete all required work related to: Final relay settings Field testing and commissioning Coordination with the neutral grounding resistors All Protective Relays and PLCs are to be replaced with NEW equipment It is the General Contractor's responsibility to complete all required work related to all aspects of this contract. The VA has completed prior Market Research to identify acceptable sub-contractors for specific specialized work tasks. The coordination with all subcontractors is the FULL responsibility of the General Contractor. The pre-approved subcontractors and the related specific specialized work tasks are included within Drawing E-604\. It is the Contractor s responsibility to ensure that the new configuration of the circuit breakers, controls, protective replaying, PT s, CT s, Test Switches, etc provide the specified emergency system operation scheme. The project entails design for replacement of existing EMD generators and their associated cooling towers. Modification of the existing Motor Pool Building to house new electrical switchgear serving the EMD Generators. Compliance with the PSRDM is required. The Motor Pool building has offices, work areas and a storage areas. The office and work areas are to remain. Existing storage room will be demolished. A new addition will be constructed to house the new electrical switchgear. Two means of egress are required, not through the Motor Pool Building. Addition must be constructed in accordance with the VA PSRDM. Two new dry coolers will replace the existing cooling towers and will be located on the roof of the new addition. The existing building is currently protected with a fire sprinkler system. The sprinkler system will be modified as necessary for this project. Piping will be extended from the existing system and designed to provide protection for the new switchgear room. The fire alarm system will be extended to provide notification and initiation devices for the new switchgear room. The existing building fire alarm site-wide panel is located on the first floor in the Graphic Control Room. All work shall be completed as specified on the plans, specifications, and contract documents. REPLACE EMD GENERATORS: CIVIL 1) Per PSRDM mitigation measures, bollards are needed near the building southwest corners and new exterior door locations. 2) Sidewalks, ramps and elevated pad are needed to accommodate new building exterior doors. 3) All exterior grades around the Motor Pool Building will be adjusted as necessary to accommodate the renovated building. 4) Curbing shall be replaced where necessary due to utility trenching. 5) The new load bank will be placed on a slope requiring a retaining wall to create a level pad area for the structure. The load bank is proposed to be best situated to conform to the existing slope and to avoid impact to the nearby existing sanitary sewer line. All grades shall be adjusted as necessary to accommodate the load bank pad and wall. A sidewalk/access will be needed to the load bank. 6) The building is proposed to expand over an existing sanitary manhole. The sanitary manhole collects sewage from Building 101, stormwater from the parking area north of the Motor Pool Building and overflow from a sand trap manhole to the south. The stormwater is currently piped under the Motor Pool Building. All existing stormwater connections to this manhole are proposed to be rerouted around the building. The manhole shall be removed, and the sanitary line extended to a new manhole outside of the new building expansion where it shall be routed back to the existing downstream sanitary sewer line. 7) The sanitary lateral from the Motor Pool Building shall also be replaced/reset to accommodate the access ramp to a new building doorway. 8) The existing out of service steam line from Building 101 to Building 16 shall be removed where needed to accommodate all new infrastructure, capped and abandoned in other areas. 9) A new security gate will be added near Building 102 (Fisher House). 10) Temporary erosion controls will be needed during construction. 11) All disturbed asphalt and concrete areas will need to be restored. All pavement markings disturbed shall be repainted. 12) All disturbed turf grass areas will need revegetated. STRUCTURAL 1) The existing walkway (Elev. 158 -5 ) needs to be demolished and replaced with a new platform to meet the maintenance requirement of the new equipment. 2) The existing generator pad will be verified with the installation requirement of the new generator. 3) New concrete equipment pad. 4) Extension on the existing equipment pad. 5) Partially demo the existing Motor Pool Building (MPB) to build the Electrical Switch Gear Building (ESGB). 6) Supporting new load bank 7) New cast-in-place concrete equipment pads will be installed for the proposed electrical and mechanical equipment as required. 8) Existing cast-in-place equipment pads will be extended as required to fit new equipment as required. 9) Two SCRs will be located at different elevations. The SCR 101-SCR-01 will be located on the radiator room floor while the SCR 101-SCR-02 will be installed in the generator room located on the SCR platform. 10) Additional WF steel will be added as required to support the new equipment on the floor and hangers for supporting the platforms in the generator room. 11) A new service platform will be installed to support two DPFs, starting from the North access door/landing (located at EL. 158 -5 ) to the edge location of the existing platform on the south side, between Column B6 and C4\. The railing of the North access door/landing will be removed to accommodate this extension. 12) The door at the South-East shall be demolished and the opening of the door will be moving down to the floor elevation (EL. 158 -5 ) to accommodate the new access to the DPF s platform. (ii) A staircase will be attached to the new platform on the North side to facilitate access to the existing platform. (iii) A ladder will be installed on the South side to serve as an additional access point to the existing platform. 13) A platform for SCR (Selective Catalytic Reduction) equipment, including a 3ft wide maintenance area, will be installed approximately 4 ft above the existing platform. A ship ladder will be affixed to allow access to the maintenance area. 14) Safety guardrails will be installed around the service platform as per applicable safety standards and regulations to ensure the safety of personnel working on or around the platform. 14) The service platform will be supported by posts on the North wall side, while hangers will be used on the other side to ensure structural stability. Lateral supports and bracings will be installed for bracing the platform to move horizontally. 15) A blast catch system shall be adapted for the overhead rollup door of the generator room to mitigate the effects of an explosion. 16) The blast catch system's curtain shall be anchored to the existing floor slab at the bottom of the curtain to prevent the system from moving during an explosion. 17) A couple of pipes shall penetrate the north exterior wall of the generator room. As the pipes are relatively close to each other, top three courses of the CMU wall shall be removed for the pipe penetration. The opening shall be grouted, and the wall shall be reinforced with a C8 channel steel and braced back to the radiator floor frame. 18) The Motor Pool Building will be partially demolished for the new Switchgear Building (SGB). Sheet piles will be utilized for foundation excavation. 19) The new Electrical Switchgear Building (ESGB) will be a steel-framed structure. The steel frame will consist of moment connection frames in the South-North and East-West direction respectively to resist lateral loads such as wind, seismic, and blast loads. 20) For blast protection purposes, a high parapet will be provided on the three exterior sides of the building. The height of the parapet will be the same as that of the radiators. 21) The load bank will be located on the opposite side of the drive from the ESGB. 22) A retaining wall will be adopted for developing a flat area for locating the load bank. The exterior mat foundation will be used for supporting the load bank. 23) The backfill under the mat foundation shall be 95% engineering compacted fill. 24) In accordance with Section 1704 of the international building code, and all applicable state and local requirements, the Contractor shall contract with an independent approved agency to make periodic and/or continuous inspections of the construction progress in accordance with the following requirements: Steel Construction Section 1705.2 Concrete Construction Section 1705.3, Table 1705.3 ARCHITECTURAL 1) Demolition of the southern (plan west) portion of the one-story Motor Pool Building (Building 113) corresponding with Storage, Bathroom and Office approximately 1,000 sq. ft. The Storage area will be permanently removed, while the Bathroom and Office area (approximately 390 sq. ft.) will be rebuilt after structural modifications are complete. 2) The existing drywall partition at the Motor Pool Storage room will be the location of a new demising wall between the proposed addition and the remaining Motor Pool structure. The demising wall will be a load-bearing concrete masonry wall on concrete foundation with furred gypsum board on the Office and Bathroom side. Structural work includes a new steel framed roof, and concrete slab. The Office and Bathroom will be recreated. Finishes, doors, and windows include the following: (i) Painted walls. Office and Bathroom walls will be gypsum board over metal studs. (ii) Porcelain tile floors and ceramic tile wainscot in the Bathroom. (iii) Prefabricated shower stall, toilet fixture and accessories in the Bathroom. (iv) Vinyl floor tile with 4 high rubber base in the Office. (v) Acoustic panel ceilings in the Office and Bathroom. The open shop ceiling will be exposed structure. (vi) Wood doors on hollow metal frames. (vii) Office interior windows tempered glass in hollow metal frames. 3) Existing Generator and Switchgear Rooms: Several doors will be replaced including the overhead coiling door, exterior exit door, and doors at the exiting switchgear room. To meet blast resistance requirements, the new insulated coiling door will have a blast curtain catchment system located behind. Other doors will be blasting resistance. A door will be added between the Generator Room and the new addition to allow for staff access between these spaces. The Generator Room walls, and floor will be repainted. 4) Addition Construction: One-story addition on the south (plan west) side of the Motor Pool Building to house electric switchgear, and cooling towers on the roof. The addition will be approximately 1,070 sq. ft. with reinforced concrete masonry exterior walls, steel framed, concrete slab-on-grade, and steel roof deck. The masonry exterior walls extend above the roof to shield the cooling towers. New structure (columns and roof) will be 1-hour fire rated. 5) The floor of the addition will align with the existing Motor Pool floor elevation. Due to the sloping site, a stair and elevated walk will be required at entries to the addition. 6) Exterior walls and the roof screen of the addition are designed to be blast resistant. Exterior wall cladding will be 2-inch-thick insulated metal panels (R-16) over 1-inch girts. Insulated panels will extend at least 24 below the finished floor elevation to provide slab edge insulation. At the masonry screen wall (above the roof) metal panels will be uninsulated. 7) The addition will have two exterior doors. Double doors on the west (plan north) side for staff and equipment access, and a secondary exit on the south (plan west) side. Exterior doors will be hollow metal 14-gauge for blast resistance. 8) The existing built-up Motor Pool roof will be replaced with a new cold applied SBS modified bituminous roof system with R-30 insulation. The addition will have a similar new roof system with tapered insulation (R-30 average) & flashing work at curbs and penetrations for equipment. To avoid roof drains over electrical equipment, the new roof will drain to scuppers and downspouts on the north and south sides. The roof will be accessed from an interior ladder and roof scuttle. 9) The stairs will have steel pipe guardrails and handrails suitable for non-public use. 10) The addition will have (RES-2) Stonhard epoxy flooring, rubber base, and painted concrete masonry walls. The ceiling will be exposed structure with spray fireproofing. Column enclosures will be gypsum board over metal studs to achieve the required fire rating. 11) Wall mounted fire extinguishers will be provided by the VA in locations indicated on the drawings. Similar to the existing, fire extinguisher cabinets will not be needed. FIRE SUPPRESSION AND FIRE ALARM 1) Modify the existing Simplex fire alarm system and install new notification and initiation devices in accordance with the project codes and VA TIL. 2) Provide extension of the existing wet-pipe system for the main switchgear room including drip pans below sprinkler piping and head guards. Piping will be located in equipment corridors (not above electrical equipment). FIRE SUPPRESSION SYSTEM 1) The existing fire suppression system will be modified based upon the project scope of work. The existing wet pipe system will be modified to provide code compliant protection of the existing project scope areas and will be extended to provide protection in the new switchgear room addition. 2) The required fire flows and pressures for buildings provided with automatic sprinkler protection shall comply with NFPA 13 and other applicable NFPA standards. A minimum hose stream allowance for total combined inside and outside firefighting to be provided to comply with NFPA 13\. 3) The local responding fire department will provide the necessary flow and pressure for manual firefighting operations. VA occupied buildings are required to have sprinkler protection. A wet pipe automatic sprinkler system in accordance with NFPA 13, except as indicated in the VA Fire Protection Design Manual, will be provided to protect all areas of the building. Sprinkler protection shall be provided in all spaces including, but not limited to, elevator machine rooms, walk-in freezers and cold rooms, computer rooms, telephone switch rooms, radiology and MRI suites, loading docks, electrical rooms, plumbing or utility closets, audiometric booths, paint spray booths, dry type lint collectors, dust collectors, and generator rooms. Sprinklers are not required where specifically exempted by NFPA 13 and the VA Fire Protection Design Manual. A flow switch, isolation valve, tamper switch, and pressure gage shall be provided for each zone. System status will be annunciated on the fire alarm control panel with signaling to the fire alarm reporting system. Drainpipes for each sprinkler riser and test connection shall be routed to the building exterior to facilitate testing. Drains shall not terminate at service sinks. Drain piping shall be 2-inch minimum to accommodate discharge from full flow tests at maximum system pressure. Sprinkler systems shall be hydraulically calculated by any design approach allowed by NFPA 13, except that the Special Design Approach shall not be used in health care. Pipe schedule systems may be used for extension of existing pipe schedule systems where the water supply is adequate. A safety factor of 10% for each sprinkler demand including required hose streams shall be included. Sprinkler densities shall comply with NFPA 13 and the VAFPDM except in rooms containing moveable/mobile shelving (high density storage) where the density shall be Ordinary Hazard (Group 2). Quick response sprinkler shall be installed in all areas, except where specifically prohibited or noted elsewhere in the VA Fire Protection Design Manual. Sprinklers shall be Factory Mutual (FM) approved as quick response except as identified below: (i) Concealed sprinklers that are UL listed quick response and FM approved standard response are permitted in clean rooms provided that the rooms are not designed under negative pressure. (ii) Concealed sprinklers that are UL Listed quick response and FM approved standard response may be used with the approval of the VHA Central Office Fire Protection Engineer. (iii) FM approved standard response sprinklers shall be permitted where quick response sprinklers are prohibited. FIRE ALARM SYSTEM The existing fire alarm system will be modified for the project scope of work. New manual pull stations will be provided near the exits in the new switchgear room. New alarm devices will be provided throughout the project scope area to comply with NFPA 72 and the VA Fire Protection Design Manual. General Evacuation 1) Provide audible notification appliances to be heard in all locations throughout the project scope area. Provide visible notification appliances in all publicly accessible areas of the building such as corridors, auditoriums, cafeterias, open assembly rooms 750 SF, canteens, retail stores, etc. Flash rate shall not exceed one flash per second for visible appliances. Strobes that operate on adjacent zones on each floor shall be synchronized with one another as required by NFPA 72\. Visible notification appliances are not required in the following spaces which are not considered to be public accessible: (i) Individual office spaces unless the space is known to have a hearing-impaired person stationed there (ii) Closets (janitors clothes, etc.) (iii) Utility shafts (iv) Crawl spaces (v) Normally unoccupied rooms 100 SF (vi) Normally unoccupied storage spaces where no regular activities take place other than placement and retrieval of storage (vii) Stairway enclosures and elevators (viii) Patient exam/treatment rooms F. Special Requirements 1) Where smoke detectors are required, they shall be photoelectric type only. Duct detectors are to be installed only where required by NFPA 101 or NFPA 90A. Where a duct smoke detector is located above a ceiling or in a difficult to reach location, provide a remote indicating lamp and test key switch on nearby wall at 7-feet AFF to facilitate testing. G. Carbon Monoxide Detection 1) Carbon monoxide detection shall be provided as required by NFPA 101\. PLUMBING 1) Remove all the existing restroom plumbing fixtures and associated appurtenances including water closet, lavatory, shower, and emergency shower. 2) Remove existing roof drains. 3) Remove existing water heater and ass 

<!-- mobian-agent-ad sponsored="true" id="f7f27760-f2e0-48d8-939d-19fd88c3f064" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


## Attachments

* [Attachment 1](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/096745ac013d46569140d7a3ea97da1d/download)
* [Attachment 2](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/0d0ab6f342ea4f50be10a3333dc13f11/download)
* [Attachment 3](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/131c702a82b24f84b6334a546cb0b383/download)
* [Attachment 4](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/5572c76329ef4b75b7771f86740491a1/download)
* [Attachment 5](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/61f0e8f2543c4dc0b5f891367ea6c97e/download)
* [Attachment 6](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/6de9ae747de74af2b8a9f757c0b2f679/download)
* [Attachment 7](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/7f18f81f8dfa427eb4d292b2bc2a08f1/download)
* [Attachment 8](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/933447d6aa8f4f8584b19dcca9413235/download)
* [Attachment 9](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/9785c522c11b4652a46e4a899ac83de1/download)
* [Attachment 10](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/9c103524ce8d444d98a68af091a55a6d/download)
* [Attachment 11](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a2f4793ecc2342de8223833dcfe0ebe4/download)
* [Attachment 12](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ab4822dcf1204d7e9590c20cf02b0918/download)
* [Attachment 13](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/bc872a6a462b4fbfa453b5a64f6d637e/download)
* [Attachment 14](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/e88c2d9355004cc1b9926d4c46073842/download)
* [Attachment 15](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ec47fa868192473986e95c2b54c33fdf/download)
* [Attachment 16](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ecfae43f60ed4476b25bef1651c5a7cf/download)

[Source notice](https://sam.gov/opp/21a44a5996344b6f92b6632203381254/view)

[More from United States Department of Veterans Affairs posted in June 2025](/department%5Fof%5Fveterans%5Faffairs/archive/2025-06)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Veteran-Owned Small Business Set-Aside Contracts (SDVOSB and VOSB) Available Now](/contracts/veteran-owned)
* [Construction Government Contracts Available Now](/contracts/construction)

```json
{"@context":"https://schema.org","@type":"Demand","name":"6115--526-26-102 Replace Main EMD Generators and Cooling Towers","description":"Page 4 of 4 THIS IS A PRE-SOLICITATION NOTICE ONLY Project No. 526-26-102; Replace Main EMD Generators and Cooling Towers at the James J. Peters VA Medical Center, Bronx, New York. CONSTRUCTION SERVICES GENERAL SCOPE/Statement of Work. The Contractor must furnish all labor, materials, tools and supervision to complete the following: The department of Veterans Affairs is soliciting offers/bids from qualified SDVOSB firms for Construction services to provide labor, material and supervision for the Replace Main EMD Generators and Cooling Towers project located at the James J Peters VA Medical Center, 130 West Kingsbridge Road, Bronx, New York 10468 and as specified on the plans, specifications, and contract documents. General Scope: . The purpose of this project is to The primary project objective is to replace the Main EMD Generators at the Bronx, NY VAMC. This includes renovations to the existing Motor Pool Building. As part of this effort, the tasks include evaluating locations for a new Load Bank and ensuring the project meets VA Physical Security and Resiliency Design Manual (PSRDM) mitigation measures. As part of the overall project, modifications to the site area around the Motor Pool Building and other new project features will be necessary to achieve the overall project goal. We are explicitly noting that it is the General Contractor s responsibility to complete all required work related to: Final relay settings Field testing and commissioning Coordination with the neutral grounding resistors All Protective Relays and PLCs are to be replaced with NEW equipment It is the General Contractor's responsibility to complete all required work related to all aspects of this contract. The VA has completed prior Market Research to identify acceptable sub-contractors for specific specialized work tasks. The coordination with all subcontractors is the FULL responsibility of the General Contractor. The pre-approved subcontractors and the related specific specialized work tasks are included within Drawing E-604. It is the Contractor s responsibility to ensure that the new configuration of the circuit breakers, controls, protective replaying, PT s, CT s, Test Switches, etc provide the specified emergency system operation scheme. The project entails design for replacement of existing EMD generators and their associated cooling towers. Modification of the existing Motor Pool Building to house new electrical switchgear serving the EMD Generators. Compliance with the PSRDM is required. The Motor Pool building has offices, work areas and a storage areas. The office and work areas are to remain. Existing storage room will be demolished. A new addition will be constructed to house the new electrical switchgear. Two means of egress are required, not through the Motor Pool Building. Addition must be constructed in accordance with the VA PSRDM. Two new dry coolers will replace the existing cooling towers and will be located on the roof of the new addition. The existing building is currently protected with a fire sprinkler system. The sprinkler system will be modified as necessary for this project. Piping will be extended from the existing system and designed to provide protection for the new switchgear room. The fire alarm system will be extended to provide notification and initiation devices for the new switchgear room. The existing building fire alarm site-wide panel is located on the first floor in the Graphic Control Room. All work shall be completed as specified on the plans, specifications, and contract documents. REPLACE EMD GENERATORS: CIVIL 1) Per PSRDM mitigation measures, bollards are needed near the building southwest corners and new exterior door locations. 2) Sidewalks, ramps and elevated pad are needed to accommodate new building exterior doors. 3) All exterior grades around the Motor Pool Building will be adjusted as necessary to accommodate the renovated building. 4) Curbing shall be replaced where necessary due to utility trenching. 5) The new load bank will be placed on a slope requiring a retaining wall to create a level pad area for the structure. The load bank is proposed to be best situated to conform to the existing slope and to avoid impact to the nearby existing sanitary sewer line. All grades shall be adjusted as necessary to accommodate the load bank pad and wall. A sidewalk/access will be needed to the load bank. 6) The building is proposed to expand over an existing sanitary manhole. The sanitary manhole collects sewage from Building 101, stormwater from the parking area north of the Motor Pool Building and overflow from a sand trap manhole to the south. The stormwater is currently piped under the Motor Pool Building. All existing stormwater connections to this manhole are proposed to be rerouted around the building. The manhole shall be removed, and the sanitary line extended to a new manhole outside of the new building expansion where it shall be routed back to the existing downstream...","url":"https://matchawards.com/department_of_veterans_affairs/posts/114669444943769490","identifier":"36C24225B0038","category":"238210 - Electrical Contractors and Other Wiring Installation Contractors","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"6115 - GENERATORS AND GENERATOR SETS, ELECTRICAL"}],"availabilityStarts":"2025-09-10","availabilityEnds":"2025-09-22","validThrough":"2025-09-22T23:59:59-04:00","areaServed":"New York 10468, UNITED STATES","sameAs":"https://sam.gov/opp/21a44a5996344b6f92b6632203381254/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Veteran-owned","item":"https://matchawards.com/contracts/veteran-owned"}]}
```