<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/department_of_veterans_affairs/posts/114497542574817395" -->

---
title: C222--Amendment to cancel before solicitation… (36C24625R0042) | Closed - MatchAwards
description: C222--Amendment to cancel before solicitation    Provide Emergency Power  3rd Floor Labs. United States Department of Veterans Affairs. Solicitation 36C24625R0042. NAICS 541330 - Engineering Services. SDVOSB set-aside. Deadline 2025-07-10. Sources Sought Notice DEPARTMENT OF VETERANS AFFAIRS...
canonical: https://matchawards.com/department_of_veterans_affairs/posts/114497542574817395
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: C222--Amendment to cancel before solicitation… (36C24625R0042) | Closed
og:url: https://matchawards.com/department_of_veterans_affairs/posts/114497542574817395
og:description: C222--Amendment to cancel before solicitation    Provide Emergency Power  3rd Floor Labs. United States Department of Veterans Affairs. Solicitation 36C24625R0042. NAICS 541330 - Engineering Services. SDVOSB set-aside. Deadline 2025-07-10. Sources Sought Notice DEPARTMENT OF VETERANS AFFAIRS...
og:image: https://matchawards.com/system/accounts/avatars/000/000/015/original/f59915e906ee2b19.png?1638825904
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# C222--Amendment to cancel before solicitation Provide Emergency Power 3rd Floor Labs

Status

Closed, the response deadline passed on Jul 10, 2025

Agency

[United States Department of Veterans Affairs](/department%5Fof%5Fveterans%5Faffairs)

Office

HAMPTON, USA

Notice type

Sources Sought

Solicitation number

36C24625R0042

NAICS

[541330 - Engineering Services](/groups/897)

PSC

C222 - ARCHITECT AND ENGINEERING- GENERAL: ELECTRICAL SYSTEMS

Category

[Construction Related Services (4.2)](/categories/facilities-and-construction/construction-related-services)

Set-aside

[Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)](/contracts/veteran-owned)

Posted

2025-09-29

Deadline

2025-07-10

Place of performance

Salisbury, North Carolina 28144, UNITED STATES

## Description

Sources Sought Notice DEPARTMENT OF VETERANS AFFAIRS Network Contracting Office 6 (NCO 6) Sources Sought 36C24625R0042 In accordance with FAR 15.201(e), responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. Additionally, the Government reserves the right to revise specifications, and refine contract requirements, before the release of any associated solicitation. This is not a Request for Proposals (RFP). OVERVIEW The Department of Veterans Affairs, Network Contracting Office 6 is conducting market research to identify potential sources for Architect-Engineer services to complete the below scope of work. The place of performance will be the hospital campus of the Durham VA Medical Center in Durham, North Carolina, located at 508 Fulton Street Durham NC 27705\. Forward all questions to the point of contact identified below. The magnitude of construction for this project is currently between $25,000 to $100,000 but is subject to revision prior to release of a solicitation. The anticipated Period of Performance is 243 calendar days from the Notice to Proceed. BACKGROUND The VAMC in Durham, NC is located on over 17 acres and has multiple buildings. The intent of this project is to fix the below deficiencies: Provide emergency power to Air Handling Unit-65, which is located on the F-Wing roof. Provide emergency power to 3rd floor lab equipment in F-Wing. Provide emergency power to 3rd floor radiology equipment in F-Wing. Evaluate existing emergency lighting in the 3rd floor F-Wing labs, 3rd floor radiology equipment rooms and supporting rooms and design Emergency Power solution to allow for continuous operation during a power outage. SCOPE OF WORK Location of Work: This project location is in Building 1\. This work will require appropriate personal protective equipment and proper infection control measures. Work will be phased to minimize disruption to medical center operations. Codes and Standards: This project will meet but is not limited to the following most recent codes and standards. All applicable VA TIL All applicable electrical codes Architect-Engineering Services: Code Analysis - As part of the design the A/E will provide a detailed code analysis (per applicable codes) and comprehensive review of the existing site and determine any required solutions for the following items. A/E is required to provide the design for the scope below even if it is not required by the code. Design Scope A full design will be created by the A/E based the project s goals to provide emergency power to the described areas. The A/E will provide a design to improve the F-Wing 3rd floor found on the Durham VA Medical Campus: Upgrade the electrical system to allow AHU-65 to be powered by the existing emergency power system. A/E shall investigate and determine the power requirement for the unit and its associated equipment such as controls, lighting, etc. Upgrade the electrical system to allow additional Laboratory equipment to be powered by the emergency power system. Upgrade the electrical system to allow 3rd floor radiology equipment to be powered by the emergency power system. Evaluate existing emergency lighting in the 3rd floor labs, 3rd floor radiology equipment and exam rooms, and supporting rooms to be upgraded to allow continuous operation during a power outage by using the emergency power system. A/E shall be responsible for any load study and metering to validate power usage required by the design. Design: Design Deliverables: Part 0 15% Submission, Narrative Report. Prior to the initiation of any detailed design, the A/E shall in conjunction with representatives of the Engineering Department, review documentation, conduct department interviews and tour project areas. Document equipment to be transferred to Emergency Power via project s scope. Provide any options to staff for consideration. Provide cost estimate. Part I - 35% Submission, Schematic Design: The requirements are working drawings at the 35% stage, marked-up specifications, and a detailed construction cost estimate showing a quantitative survey of all labor and material. Submit 4 half size set of drawings (22 x 34 ) on bond paper, 2 copies of the marked-up specifications, 1 copy of the preliminary construction cost estimate, and an electronic copy of the drawings(.pdf and AutoCAD) and specifications (.docx and .pdf) on a CD-ROM. Part II - 65% Submission, Design Development: The requirements are working drawings at the 65% stage, marked-up specifications, and a detailed construction cost estimate showing a quantitative survey of all labor and material. Submit 1 full size set of drawings (30 x42 ) on bond paper, 4 half size set of drawings (22 x 34 ) on bond paper, 4 copy of the marked-up specifications, 1 copy of the preliminary construction cost estimate, and an electronic copy of the drawings (.pdf and AutoCAD) and specifications on a CD-ROM. Part III - 95% Submission, Pre-Final Documents: The requirements are complete construction drawings showing all details and views, updated detailed cost estimate, and finalized specifications. Submit 1 full size set of drawings (30 x42 ) on bond paper, 4 half size set of drawings (22 x 34 ) on bond paper, 4 copy of the marked-up specifications, 1 copy of the preliminary construction cost estimate, and an electronic copy of the drawings (.pdf and AutoCAD) and specifications on a CD-ROM. Part IV - Final 100% Submission: Provide 1 set of drawings (30 x42 ) on bond paper, 2 sets of half size drawings on bond paper, a set of unbound specifications, and an electronic copy of the drawings (.pdf and AutoCAD) and specifications on a CD-ROM. Part V Construction Documents: Provide 1 set of Sealed drawings (30 x42 ) on bond paper, 2 sets of half size drawings on bond paper, a set of unbound specifications, and an electronic copy of the drawings (.pdf and AutoCAD) and specifications on a CD-ROM. The design deliverables must adhere to the following requirements: Specifications: The project specifications shall be prepared in Microsoft Word by the A/E from the VA Master Specifications. The general format shall include Part 1-General, Part 2-Products, and Part 3-Execution. Part 1 verbiage shall include the general requirements, identify applicable standards, and identify submittals required for a particular specification. This information should be directly related and correspond to a specific submittal number enumerated in the Submittal Register as identified below. Part 2 shall include description of the salient characteristics of the products. Part 3 shall include a description of the methods used to install items of construction. The A/E shall identify all VA Master Specification sections applicable to the project and edit them accordingly to fit the scope of work. If additional specification sections are needed that are not listed in the VA Master Specs, the A/E is responsible to write and edit an appropriate CSI format specification section. Specifications shall be printed on 8 Â½ x 11 bond paper using 12pt Times-New-Roman fonts. The A/E shall incorporate into the specifications and its construction site inspection procedures the applicable Infection Control and Dust Control provisions. All other PG-18-15 AE Submission Requirements per the manual. Construction Cost Estimates: The A/E shall prepare Construction Cost Estimates in Microsoft Excel using the CSI 34-division format. The Cost Estimates shall include a copy of the quantity take-offs, breakdown of individual line items that accurately reflect the quantity take-off of the various categories of work involved, unit of measure, quantities, unit cost, overhead, and profit. All cost data shall be taken from the most current version of a recognized industry standard, e.g. Means Estimating Guides. For items that are not in the industry standards, vendor quotes and justification for labor hours shall be provided. Construction Cost Estimates shall be submitted with all design packages and reviewed with the other design drawings and specifications. As part of the cost estimating effort, the A/E shall provide a Schedule of Values such that discrete elements of the Specifications are identified and may be used in negotiations with a proposal bidder. Submittal Register: The A/E shall develop a list of all uniquely identified submittals required by the specifications in Section 1 of each individual specification. This submittal register should be submitted to the COR for approval in Microsoft Excel using the CSI 34-division format. The register should include specification reference, and item to be reviewed/approved and correspond to the Submittal Requirements as identified in the Specification Section addressed in paragraph above. Narratives: Written narratives shall be used as part of each design submission. The narrative should be used to elaborate on and provide an explanation of key design decisions by A/E and/or the VA, objectives, obstacles, alternatives and resolutions, design issues or decisions relating to constructability, and in general to communicate all information relevant to the design submission. Reproduction: The A/E shall be responsible for all reproduction during design. Note that all bid administration activities will be performed by the VA Contracting office. Design Review of each package will not start until a complete package, including hard copies, are received by the VA Engineering Service. Submission Due Dates: Part 0: 15% Narrative Report due: (35 days) 35 Days from NTP VA review (14 days) 49 Days from NTP Part 2: 35% Design Submission due: (35 days) 84 Days from NTP VA Review (21 days) 105 Days from NTP Part 2 - 65% Design Submission due: (45 days) 150 Days from NTP VA Review (28 days) 178 Days from NTP Part III - 95% Design Submission due: (30 days) 208 Days from NTP VA Review (14 days) 222 Days from NTP Part IV - Final 100% Design Documents due: (14 days) 236 Days from NTP Part V Issued For Construction Documents due: (7 days) work243 days from NTP Construction - Provide construction period services which shall include submittal review and as-built preparation. Bidder Site Visit: Participate and facilitate this site visit in conjunction with the Contracting Officer and COR, contractors, and representatives of the Building Committee as needed. At this meeting, potential contractors will walk the site limits to discuss the scope of work. The AE shall also be required to evaluate RFI s resulting from the Bidder Site Visit, in order to clarify project requirements. Pre-Construction Meeting: Participate and facilitate this meeting in conjunction with the Contracting Officer and COR, contractor, and representatives of the Building Committee as needed. At this meeting the staging area and work site rules shall be discussed again with the contractor (these should already be included in the specifications). Contract specifications should require a construction schedule submitted within 14 calendar days from the Notice to Proceed. Submittal Review and Logs: Designer shall prepare and maintain a log of key submittals and of RFIs and provide the same to the Contracting Officer and COR. Reviewed submittals are to be returned within 10 working days to the COR. Designer is fully responsible for review of all submittals, retaining a record copy of submittals for turn over to the owner upon project completion, and communication with the contractor regarding any deficiencies or changes required to the submittals. Response to RFI s: The A/E shall be responsible for evaluating RFI s to determine if a change will be required. The A/E shall then provide recommendations to the Contracting Officer. Within 48 hours, the A/E shall provide in writing the information, clarification or revision material needed to properly answer the RFI and to resolve the issue. The A/E shall include a cost/credit estimate for RFI s which result in a change to contract cost. Construction Change Orders: Designer shall prepare the Statement of Work and Cost estimates (returned within 10 calendar days) as needed. Project Site Visits: The Designer shall be available to meet with the contractor to resolve site issues. The A/E should budget 8 miscellaneous site visits to resolve unforeseen issues. Monthly Progress Meetings: In conjunction with the monthly site inspection, the designer shall hold formal progress meetings with contractor, contracting officer, and COR. At these meetings the agenda shall contain a narrative of work completed the previous month, work upcoming, submittals or RFIs outstanding, schedule update, any special coordination items requiring actions, and discussion of change orders or time extension requests. Minutes of this meeting shall be issued within 3 working days of the meeting. Final Acceptance Testing: The design team shall provide support for final inspection by all licensed engineers involved with the project for the final walk. Project Close Out: Designer shall receive notice of intent for final inspection from the COR, and contractor shall propose a time and place for this to occur in conjunction with the Contracting Officer and the COR. Following the final inspection, the designer shall issue a punch list. Contract documents shall specify that the contractor has 15 calendar days to complete the punch list and notify the designer for re-inspection. Following re-inspection and project acceptance the closeout phase will occur. Record Drawing Submission: Provide 2 updated sets of drawings (30 x42 ) on bond marked as As-built Drawings that include the contractor s mark-ups and also an electronic copy of these updated drawings on CD in DWG and PDF formats. Contractor Evaluation Standards: General: Specialized experience and technical competence in the design of emergency electrical power distribution. Contractor shall meet the requirement of having (5) years of experience with working on similar projects. Professional qualifications necessary for satisfactory performance of required service. The architects and engineers on the firm's staff representing the project or signing/stamping drawings in each discipline must possess a minimum of five (5) years of experience and are required to be licensed, registered, or certified by a US state, the District of Columbia or a US territory. Provide professional license jurisdiction of issue and license numbers and/or proof of licensure. Offer must include the following statement of SDVOSB compliance when submitting the personnel proposed to perform the work under this requirement: I \[signatory authority\]\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_, \[company\] \_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_ certify that the team proposed to perform under this requirements demonstrates the capability of 50% SDVOSB performance in compliance of 48 CFR 852.219-10\. Capacity to accomplish work in the required time. The evaluation will consider the firm s plan and ability to meet the schedule of the overall project, as well as the available capacity of personnel in key disciplines. Past performance on contracts with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules. CPARS data or PPQs (if no CPARS data is available) must be provided for projects submitted under Factor 1 (Specialized Experience). Knowledge of the locality to include specific knowledge of certain local conditions or project site features. Experience in construction period services for projects similar in scope to include professional field inspections during the construction period, review of construction submittals, support in answering requests for information during the construction period, and support of construction contract changes to include drafting statements of work, and cost estimates. Secondary Selection Criterion\*: Geographic location. Location of the firm, as measured by the driving distance (miles) between the Offeror s principal business location and Durham North Carolina VA Health Care System 508 Fulton St. Durham, NC 27705 Determination of the mileage will be based on Google Maps (https://www.google.com/maps/dir/). Construction Amount: The project is to be designed within a range between $500,000.00 and $750,000.00\. If the base bid cost exceeds budget, the A/E shall redesign or take steps necessary to reduce cost, so the budget limitations are not exceeded. Storage: No storage of any material will be allowed on VA property unless approved by the COR. Payment of stored materials is not permitted. All pay applications will be paid based on competed installations. Period of Performance: Vendor shall complete this project NLT than 243 days after issue of notice to proceed (NTP). Hours of Operation: Services shall be performed during VA working 1st shift and after hours when necessary for site investigation. The 3rd Floor Labs area is a 24hr, 7-day a week operation, and any outages must be coordinated closely with the end-user. For working outside the above-mentioned shifts, the vendor shall give 3-day notice to the Contracting Officer so that arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later. Utility and System or Service Outages: No utility service such as water, gas, steam sewers or electricity, parking, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without the Medical Center Director s prior knowledge and written approval. The vendor shall submit a request to interrupt any such services to COR, in writing, 5 weeks in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption. Warranty: The Contractor agrees to supply parts which are warranted by the manufacturer to be free from defects in materials and workmanship for one year from the date of installation. In certain cases, parts may become obsolete and replacement parts can only be purchased through after-market suppliers that do not provide a year warranty. In certain cases, the Contractor will extend the same warranty to the Durham VA Medical Center as supplied by the after-market supplier to the contractor. Warranty shall be limited to the replacement of the part(s) found to be defective. Safety and Regulations: Contractor will be responsible to have technicians trained to meet Durham VA Medical Center specifications. Contractor will also be responsible to work with Durham VA Health Care System, Engineering Department on Safety and Infection Control standards. Contractor will always keep all tools and parts in a safe manner and under control. Contractor will meet all OSHA standards for Employee safety. The contractor shall not be allotted any parking permits for onsite parking. If work is needed to be performed outside of normal working hours, the contractor shall be responsible to checking in with the VA Police to request permission to park on site as designated by the VA Police. General Requirements All work shall be in accordance with the VA master specification (01 00 00). Vendor shall meet the requirements for quality control construction projects per spec section 01 45 00\. All safety requirements from spec 01 35 26 must be met. The vendor s employees shall not enter the work site without appropriate badges issue through the safety office. They may also be subject to inspection of their personal effects when entering or leaving the project site. Execute work to interfere as little as possible with normal functioning of Medical Center as a whole, incl 

<!-- mobian-agent-ad sponsored="true" id="dad5ddd7-6b39-4144-a754-26ebcdcada5c" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories/facilities-and-construction/construction-related-services?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup
- Pursuit brief for this NAICS code (award history, who buys, past awardees): https://matchawards.com/naics/541330/brief?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=brief

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


## Attachments

* [Attachment 1](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/1ca3f0af8bc34ea89f8f6744b33ac974/download)
* [Attachment 2](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/32479d884ba84252b7f5fddcb8a75c84/download)
* [Attachment 3](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/3a77ec5ae2e24fef9bf02b2f44b86c38/download)
* [Attachment 4](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/aac5d5ea7cb94b909fef683ccb4776ac/download)
* [Attachment 5](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/de522176d536411b801229b68ebef3de/download)

## Contacts

* Mark Griffin, Construction Team 1 Contract Specialist

Email and phone are in the source notice.

[Source notice](https://sam.gov/workspace/contract/opp/7800f040f4d84f7ea61724ece08c7740/view)

[More from United States Department of Veterans Affairs posted in May 2025](/department%5Fof%5Fveterans%5Faffairs/archive/2025-05)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Veteran-Owned Small Business Set-Aside Contracts (SDVOSB and VOSB) Available Now](/contracts/veteran-owned)
* [Professional Services Government Contracts Available Now](/contracts/professional-services)
* [Pursuit brief for NAICS 541330](/naics/541330/brief)

```json
{"@context":"https://schema.org","@type":"Demand","name":"C222--Amendment to cancel before solicitation    Provide Emergency Power  3rd Floor Labs","description":"Sources Sought Notice DEPARTMENT OF VETERANS AFFAIRS Network Contracting Office 6 (NCO 6) Sources Sought 36C24625R0042 In accordance with FAR 15.201(e), responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. Additionally, the Government reserves the right to revise specifications, and refine contract requirements, before the release of any associated solicitation. This is not a Request for Proposals (RFP). OVERVIEW The Department of Veterans Affairs, Network Contracting Office 6 is conducting market research to identify potential sources for Architect-Engineer services to complete the below scope of work. The place of performance will be the hospital campus of the Durham VA Medical Center in Durham, North Carolina, located at 508 Fulton Street Durham NC 27705. Forward all questions to the point of contact identified below. The magnitude of construction for this project is currently between $25,000 to $100,000 but is subject to revision prior to release of a solicitation. The anticipated Period of Performance is 243 calendar days from the Notice to Proceed. BACKGROUND The VAMC in Durham, NC is located on over 17 acres and has multiple buildings. The intent of this project is to fix the below deficiencies: Provide emergency power to Air Handling Unit-65, which is located on the F-Wing roof. Provide emergency power to 3rd floor lab equipment in F-Wing. Provide emergency power to 3rd floor radiology equipment in F-Wing. Evaluate existing emergency lighting in the 3rd floor F-Wing labs, 3rd floor radiology equipment rooms and supporting rooms and design Emergency Power solution to allow for continuous operation during a power outage. SCOPE OF WORK Location of Work: This project location is in Building 1. This work will require appropriate personal protective equipment and proper infection control measures. Work will be phased to minimize disruption to medical center operations. Codes and Standards: This project will meet but is not limited to the following most recent codes and standards. All applicable VA TIL All applicable electrical codes Architect-Engineering Services: Code Analysis - As part of the design the A/E will provide a detailed code analysis (per applicable codes) and comprehensive review of the existing site and determine any required solutions for the following items. A/E is required to provide the design for the scope below even if it is not required by the code. Design Scope A full design will be created by the A/E based the project s goals to provide emergency power to the described areas. The A/E will provide a design to improve the F-Wing 3rd floor found on the Durham VA Medical Campus: Upgrade the electrical system to allow AHU-65 to be powered by the existing emergency power system. A/E shall investigate and determine the power requirement for the unit and its associated equipment such as controls, lighting, etc. Upgrade the electrical system to allow additional Laboratory equipment to be powered by the emergency power system. Upgrade the electrical system to allow 3rd floor radiology equipment to be powered by the emergency power system. Evaluate existing emergency lighting in the 3rd floor labs, 3rd floor radiology equipment and exam rooms, and supporting rooms to be upgraded to allow continuous operation during a power outage by using the emergency power system. A/E shall be responsible for any load study and metering to validate power usage required by the design. Design: Design Deliverables: Part 0 15% Submission, Narrative Report. Prior to the initiation of any detailed design, the A/E shall in conjunction with representatives of the Engineering Department, review documentation, conduct department interviews and tour project areas. Document equipment to be transferred to Emergency Power via project s scope. Provide any options to staff for consideration. Provide cost estimate. Part I - 35% Submission, Schematic Design: The requirements are working drawings at the 35% stage, marked-up specifications, and a detailed construction cost estimate showing a quantitative survey of all labor and material. Submit 4 half size set of drawings (22 x 34 ) on bond paper, 2 copies of the marked-up specifications, 1 copy of the preliminary construction cost estimate, and an electronic copy of the drawings(.pdf and AutoCAD) and specifications (.docx and .pdf) on a CD-ROM. Part II - 65% Submission, Design Development: The requirements are working drawings at the 65% stage, marked-up specifications, and a detailed construction cost estimate showing a quantitative survey of all labor and material. Submit 1 full size set of drawings (30 x42 ) on bond paper, 4 half size set of drawings (22 x 34 ) on bond paper, 4 copy of the marked-up specifications, 1 copy of the preliminary construction cost estimate, and an electronic copy of the drawings (.pdf and AutoCAD) and specifications on a CD-ROM. Part III - 95% Submission, Pre-Final Documents: The...","url":"https://matchawards.com/department_of_veterans_affairs/posts/114497542574817395","identifier":"36C24625R0042","category":"541330 - Engineering Services","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"C222 - ARCHITECT AND ENGINEERING- GENERAL: ELECTRICAL SYSTEMS"},{"@type":"PropertyValue","propertyID":"CM category","name":"Category Management category","value":"4.2 Construction Related Services","url":"https://matchawards.com/categories/facilities-and-construction/construction-related-services"}],"availabilityStarts":"2025-09-29","availabilityEnds":"2025-07-10","validThrough":"2025-07-10T23:59:59-04:00","areaServed":"Salisbury, North Carolina 28144, UNITED STATES","sameAs":"https://sam.gov/workspace/contract/opp/7800f040f4d84f7ea61724ece08c7740/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Veteran-owned","item":"https://matchawards.com/contracts/veteran-owned"}]}
```