ClickCease C1NB--Construct New Boiler Plant (36C24525R0041) | Closed - MatchAwards

C1NB--Construct New Boiler Plant

Status
Closed, the response deadline passed on May 23, 2025
Agency
United States Department of Veterans Affairs
Office
LINTHICUM, USA
Notice type
Sources Sought
Solicitation number
36C24525R0041
NAICS
541330 - Engineering Services
PSC
C1NB - ARCHITECT AND ENGINEERING- CONSTRUCTION: HEATING AND COOLING PLANTS
Category
Construction Related Services (4.2)
Set-aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Posted
2025-04-22
Deadline
2025-05-23
Place of performance
Beckley, West Virginia 25801, UNITED STATES

Description

All INFORMATION NEEDED FOR INTERESTED PARTIES TO SUBMIT. THERE IS NO SEPARATE RFP PACKAGE TO DOWNLOAD. NAICS Code: 541- Professional, Scientific, and Technical Services; 541330- Architectural. PSC C1NB Architect and Engineering Heating and Cooling Plants. The Department of Veterans Affairs Medical Center (VAMC); VISN 5 Contracting, 200 Veterans Drive, Beckley, WV 25801 is advertising for Architectural/Engineering Services to provide Schematic Design, LCCA, Design Development, Construction/Bid Documents, Specifications, Construction Cost Estimates, and Construction period services for the Construct Boiler Plant 36C245-25-R-0041 at the VAMC, 200 Veterans Drive, Beckley, WV 25801. This acquisition is a 100% Service-Disabled Veteran Owned Small Business (SDVOSB) Set-Aside. Any subsequent award will require firms to be registered in System for Award Management (SAM) (www.sam.gov) as well as https://veterans.certify.sba.gov/ VETS 4212 and https://web.sba.gov/pro-net/search/dsp_dsbs.cfm registered/verified Service Disabled Veteran Owned Business. THIS IS NOT A REQUEST FOR PROPOSAL. This is a request for SF 330's Architect/Engineer Qualifications packages only. Submission Requirements: This acquisition is for A/E Services and is procured in accordance with the Brooks Act as implemented in Subpart 36.6 of the Federal Acquisition Regulation. Firms registering for consideration for future Federal AE projects are encouraged to electronically submit SF 330 Part I. Part II, General Qualifications, and to update at least annually. To be considered for this contract, firms shall submit SF330s electronically. SF330s to include Parts I & II are to be emailed to millard.adkins@va.gov, adobe pdf format, single file, no larger than 10MB, and no zipped files. Receipt must be confirmed. SF 330 are due no later than 3:00 pm Eastern Standard Time on May 23, 2025. YOUR RESPONSE SHALL BE IN ACCORDANCE WITH AND IN THE SAME ORDER OF THE EVALUATION FACTORS LISTED BELOW. FAILURE TO FOLLOW THIS SAME FORMAT IN THE SUBMISSION WILL RESULT IN REJECTION OF SF330. The SF330 can be found on the GSA forms website www.gsa.gov. All questions are to be sent to the attention of Millard.Adkins@va.gov. no later than 2:00 pm Eastern Standard Time on May 6,2025. Potential contractors must be registered in SAM (www.sam.gov) and visible and certified in https://veterans.certify.sba.gov/ and https://web.sba.gov/pro-net/search/dsp_dsbs.cfm (www.va.gov/osdbu) and Vets 4212 at time of submission, and at time of award, of their qualifications in order to be considered for an award. Additionally, the submission must include an insert detailing the following information: SAMS UEI, Tax ID Number, the email address and phone number of the primary point of contact, CVE, and a printed copy of the firms SDVOSB Registry. Offerors shall provide all documents listed and comply with all proposal instructions for their proposal to be considered responsive to this notice. This review may eliminate offerors that fail to provide all the required information and documents in the format and detail specified. An unverified SDVOSBs will be considered non-responsive as it is deficient and therefore will not be evaluated. This is a Service-Disabled Veteran Owned Small business set aside. NAICS Codes: 541330, Size standard is $25.5 million. This is not a request for proposal, nor will a solicitation package or bidder/plan holder list be issued. There are no solicitation documents available. This procurement is subject to the availability of funds. The Government is under no obligation to award a contract because of this announcement. The selected A/E firm shall be in accordance with FAR Part 2.101 definition of Architect-engineer services as defined in 40 U.S.C. 1102 and FAR Part 36.6 to provide professional A/E services for the project as required. The SDVOSB Architectural firm must employ the principal Architect responsible for design of this project, i.e. and be involved heavily in all aspects of the design, stamping drawings along with the other team disciplines. A/E(s) signing drawings must be licensed. The license(s) are required at the time of an award to prospective A/E(s). The following A/E disciplines are expected to be required for this design effort: architecture, structural, civil, mechanical, plumbing, electrical, fire protection, industrial hygiene, interior design, surveyors, cost estimators, certified physical security specialist or other types of A/E services as defined by FAR Part 36.6 that may be necessary. Upon award, the scope may include, but is not limited to: Architect & Engineer (AE) Statement of Work Project #517-21-806 Construct New Boiler Plant TABLE OF CONTENTS Part 1 Project Description A. General B. Background C. Scope D. Schedule E. Design Within Funding Limitation F. Basis of Design Part 2 Design Period A. General B. Schematic Design (SD) C. Design Development (DD) D. Construction Documents (CD) E. Bid Documents F. Cost Estimates Part 3 Design and Construction Standards A. General B. Access to VA Standards C. Special Provisions for Construction Documents D. Drawings E. Specifications Part 4 Construction Contract Award Period Part 5 Construction Period Part 6 AE Contract Close-out Part 7 Certified Independent Third-Party Design Reviews (CITP) Specific Mandatory Tasks and Associated Deliverables Schedule for Deliverables Changes to Statement of Work Reporting Requirements Travel Confidentiality and Nondisclosure PART 1 PROJECT DESCRIPTION A. GENERAL This project (NRM) will engage an engineering firm to provide a complete design for a new renovation/expansion of the BECVAMC Boiler Plant. The design of this project will address, but not be limited to, the following items: 1. Provide a professional survey and site assessment to identify feasible options for a new boiler plant facility that will integrate into the existing steam piping infrastructure and campus while providing adequate room around the building for tractor-trailer deliveries, employee parking, and occasional crane work. Engineering investigative work should include, but not limited to soil studies, vibration studies, electrical load testing, and any other test or study deemed applicable to create a complete and accurate design. The A/E shall present three possible boiler plant options (one option shall be for renovation/expansion of existing facility; two options will be for an entirely new boiler plant at a selected location on site) listing the pros and cons of each option that VA engineering personnel will use to make a final decision. The new boiler plant shall be approximately 8,000 square feet. 2. Design a new N+1 boiler plant facility that can support a peak steam demand during the coldest time period of the year. The new boilers must be capable of operating on #2 fuel oil and natural gas. Peripheral equipment and utilities, such as but not limited to, pumps and other vessels, electrical, water, and natural gas will require replacement or modifications to meet the new demands. This project will provide all services required for planning and design related to installation, electrical, mechanical work, and architectural modifications to meet the service requirements. 3. Design of a complete boiler blow-down heat recovery system, steam blanketing, and a simplified control system. All steam materials (valves, fittings, traps, etc) specified in all A/E plumbing designs shall be forged steel, not cast. 4. Design shall include a study of the current steam system, consider future steam capacity, and system pressure increase needs as well. The review shall include the recommendations for any replacement, repairs and/or upgrades required for the existing heat exchanger and steam piping layout in order to support the new boilers. This report shall be included in the contract documents. The A/E shall coordinate and collaborate with contract holders involved in the steam line replacement project to ensure seamless integration and execution of project requirements. 5. The A/E team members shall have previous experience in the design of boiler plant facilities for a VA medical center. A/E must provide documentation of at least three boiler plant facility designs with references, names, and phone numbers. 6. Design must provide all necessary Structural, Civil, Architectural, Mechanical, Electrical, and Plumbing trades with estimates and drawings that include demolition activities. Provide documentation, design, drafting and quantity calculations for the commissioning of the entire steam-generation system, not just the new boilers. Commissioning of all components of new or existing will be accomplished under a separate contract. 7. Design shall include asbestos/lead survey report and include a remediation plan in the contract documents. In the development of a remediation plan, the A/E shall retain the services of a Certified Industrial Hygienist (CIH) to provide expertise in all aspects of identifying, assessing, and making recommendations concerning the management of asbestos and/or lead. 8. A phasing plan is critical and should be prepared early to assure no negative impact to the boiler plant operation. Downtime of systems should be kept at a minimum. The plan shall address provisions for continuation of service during outages. 9. The A/E shall take into account design requirements to reduce operations and maintenance costs and limit operational downtime. 10. The A/E shall incorporate field-verified utility locations as part of their design submittal. 11. Design shall be governed by the applicable VA and national codes and standards. This includes, but not limited to, the VA Steam Generation Systems Design Manual and VA specification section 23 21 11 Boiler Plant Piping Systems , 23 52 39 Fire-Tube Boilers , including start-up and testing requirements, and current EHRM requirements as it pertains to the inclusion of IT equipment and space. 12. The design Architect/Engineering (A/E) will hire a Certified Independent Third-Party (CITP) Safety Professional or Professional Credential to provide the necessary design reviews for compliance with national and local codes, VA regulations and standards, and federal and state regulations (refer to Part 7). 13. Attend all necessary project meetings and field inspections. 14. Make recommendations on the construction phasing to minimize the impact in regular operations near the area including impact in utility shutdowns. A phasing plan is critical and should be prepared early to assure no negative impact to the boiler plant operation. Downtime of systems should be kept at a minimum. The plan shall address provisions for continuation of service during outages. 15. The A/E shall coordinate with the Veterans Administration Central Office (VACO) to obtain approval and certification of boiler design before each submittal. 16. Design shall include the demolition of all steam equipment, including peripherals, and piping deemed obsolete as part of this project. Other utility components, such as but not limited to, electrical, air, and natural gas deemed obsolete shall also be included in the demolition design. 17. Design shall install facilities that eliminate a two-boiler shutdown due to a single point of failure (SPOF). If a SPOF is noted and cannot be avoided due to feasibility, safety, cost, etc., the Engineering firm shall formally notify the VA CO/COR of the details and provide a description of the risk associated with the item. VA CO/COR will evaluate the risk, with input from VA national program offices, and provide approval for SPOF if risk is deemed acceptable. 18. Engineering firm is required to provide space and necessary utility tie-ins for an emergency rental boiler as part of this design. 19. Boiler plant and its peripheral equipment and buildings is required to have limited access, requiring badging for doors and automatic gates. 20. Design for Operability - The design shall allow operating tasks to be conducted in a safe, ergonomic, and efficient manner. Considerations include, but are not limited to: Provide access for mobile lifting equipment to handle heavy equipment, machinery, etc. Valves frequently operated, critical to plant operations, or needed to be accessed quickly during emergency situations shall be accessible from grade or platform. Valves located more than 7 feet above grade or platform level shall be provided with remote operating devices, such as chain operators. Note: Chain operators should not be used on screwed valves or valves smaller than 2 . Sample stations shall be accessible from grade or platform. Supply lines to sample stations shall have a block-bleed-block valve arrangement. All bleeds shall discharge to a safe location. Gauges, etc., shall be oriented to be visible from grade, platform, or stairway, without observer having to assume an awkward or other hazardous position. Lifting lugs shall be provided to lift equipment which have weights exceeding safe ergonomic limits. Lugs should be designed to support the required weight. In general, facility shall be ergonomically designed such that is can be operated and maintained without personnel working in awkward or strained positions. A minimum headroom of 7 ½ feet shall be provided below all piping, cable tray, conduit, etc., in normal access areas. Rotating equipment shall be provided with guards to prevent personnel from contacting rotating surfaces. Where insulation is not required on hot surfaces, both equipment and piping, for energy conservation, those surfaces shall be insulated for personnel protection if they are within reach of normal access or maintenance areas to an elevation of 7 ½ feet. 21. Design for Maintainability - Engineering firm shall be responsible for designing the facilities in a manner which allows maintenance/repair tasks to be conducted in a safe, ergonomic, and efficient manner. Considerations include, but are not limited to: Provide tool air supply stations located strategically through the facility. Provide electrical outlets strategically located throughout the facility. Provide welding receptacles near the ends of the boilers. Allow space for removal and replacement of equipment, motors, etc. Provide permanent lifting davits, hoists, etc., or handling of heavy equipment. Lifting devices must be capable of adequately supporting the required loads. Provide access for preventative/routine maintenance activities, such as lubrication, sampling, thickness checks, inspections, etc. Bypass lines to be located sufficiently away from the bypassed device (control valve, instrument, etc.) to permit maintenance activities. Removable panels or roll-up doors (preferred) should be provided on the building to facilitate the installation/removal of boiler units. 22. Other Considerations (include but are not limited to) Boiler turndown should be considered, the boiler plant must be able to operate during pandemic 100% outside air modes, meet winter demands, and efficiently provide for summer loads. VA s preference, unless the boiler plant is relocated, is for the new control room to provide space for chiller plant monitoring in the future. Pipe stress analysis shall be completed where required and reports/calculations submitted to the VA for record. Copies of all relief valve sizing records shall be submitted to the VA for record. All piping, equipment, instruments, valves, etc., shall be labelled in the field; numbers shall match those shown on project drawings and lists. Engineering firm is to provide a plan for temporary steam supply to the hospital during construction if needed for selected design. Steam supply shall meet all applicable VA guidelines. The engineering firm shall verify and detail all utility moves and upgrades to support the renovation. 23. Planning must include a total of 10% deductive bid alternates that will need to be identified and incorporated as part of the bidding documents. 24. Project shall be designed and constructed to meet all VHA requirements including VA sustainability and green energy initiatives. See Department of Veterans Affairs Sustainable Design Manual (latest version) located at http://www.cfm.va.gov/TIL/. All designs shall incorporate all architectural and engineering disciplines necessary to provide for a complete and functional design. Designs shall be in accordance with all applicable requirements of NFPA, EPA, ANSI, OSHA, National Plumbing Code, National Electric Code, ASHRAE, National Safety Code, VA Specifications, VA Construction Standards, VA Design Handbooks, etc. and all applicable local, state, and Federal regulations and standards. The VA will provide the A/E with copies of site and system drawings per their request; however, the accuracy of these drawings shall be field verified by the A/E and all consulting firms as part of investigative services. It is the A/E s responsibility to determine existing conditions and to base the design on this information. The accuracy of the drawings is not guaranteed and shall be used only for general information. Actual conditions must be field verified by the A/E and all consulting firms. All VA standards, specifications, Space Planning Criteria, Equipment & Design Guides List and design submission guidelines can be obtained by accessing the World Wide Web at the following address: http://www.cfm.va.gov/TIL/ B. BACKGROUND As the Beckley VAMC continues to expand and grow, and VA guidelines are updated or established, the steam demand on our boiler plant keeps increasing. While the current boiler plant is still functional, the capacity and space are undersized according to current industry standards. A new/renovated modern boiler plant is needed that will meet current demands of today and be capable of handling the steam requirements of our expanding medical center. C. GENERAL SCOPE 1. Design a new boiler plant facility that complies with the N+1 requirement. The engineering firm shall review capacity needs at Beckley VAMC, including but not limited to, future growth and current steam demand requirements, to assist in determining boiler plant and utility sizing. The new building/renovation will be located on an area of the campus that allows the new piping to effectively integrate into the existing steam distribution system while providing ample room for tractor trailer traffic and occasional crane work. Possible locations will be identified by the A/E through a professional site survey and investigative engineering work. 2. Steam distribution and condensate piping shall be evaluated on the BECVAMC campus for integrity and sizing and replaced as required. The steam distribution layout through the facility should also be reviewed and remediated as necessary. A plan for future boiler plant expansion, such as the addition of a new boiler, will need to be provided to the VA as part of the design package. 2. Detail the demolition work required to remove the steam generating equipment in the existing boiler plant. D. SCHEDULE: Interim dates are negotiable to agreement with AE and VA and documented prior to award. A timeline based on AE contract award of approximately 480 calendar days is offered below. During the process of the work the Contracting Officer (CO) and Contracting Officer Representative will conduct periodic reviews with AE to review progress. AE shall perform the work required within the limits of the following schedule: Predesign Meeting with VA staff: Day 0 Preliminary Study, Survey Mapping and Geotech (SD or 15%): +80 Days, Day 80 VA Review: +50 Days, Day 130 Submit 30% Design Development (DD) Review Package: +60 Days, Day 190 VA review: + 50 Days, Day 240 Submit 60% Design Development (DD) Review Package: +60 days, Day 300 VA review: + 50 Days, Day 350 Submit 95% Construction Document (CD) Review Pac

Attachments

Contacts

Email and phone are in the source notice.

Source notice

More from United States Department of Veterans Affairs posted in April 2025

More lists