ClickCease 6530--Ceiling Mounted Patient Lifts 5-North &… (36C24825Q0622) | Closed - MatchAwards

6530--Ceiling Mounted Patient Lifts 5-North & 5-West

Status
Closed, the response deadline passed on Apr 23, 2025
Agency
United States Department of Veterans Affairs
Office
TAMPA, USA
Notice type
Combined Synopsis/Solicitation
Solicitation number
36C24825Q0622
NAICS
339113 - Surgical Appliance and Supplies Manufacturing
PSC
6530 - HOSPITAL FURNITURE, EQUIPMENT, UTENSILS, AND SUPPLIES
Category
Medical Equipment and Accessories and Supplies (10.2)
Set-aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Posted
2025-04-17
Deadline
2025-04-23
Place of performance
Tampa, FL 33612

Description

Ceiling-Mounted Patient Lifts Replacement for 5-North and 5-West Inpatient Units GENERAL: James A. Haley Veterans Hospital, 13000 Bruce B. Downs Blvd, Tampa, Florida 33612, has a requirement for ceiling-mounted patient lifts in two inpatient units to replace outdated patient lifts. The patient lifts will be used for patient transfers and repositioning in bed and will be installed in existing rail systems. BACKGROUND: James A. Haley VA Hospital is soliciting a contractor to furnish all design, site evaluation, labor, materials, equipment, and installation of ceiling-mounted patient care lifts in the existing inpatient units: 5-North and 5-West. Numerous utility systems occupy this space and must be considered when installing new equipment above the ceiling and in the existing patient lift support rails. It is strongly recommended that the contractor perform a thorough site evaluation prior to submitting a proposal. SCOPE: The Contractor shall provide a technical and cost proposal for turn-key services to install ceiling-mounted patient lifts in accordance with this scope of work. This cost proposal shall be for providing installation of all new and removal/de-installation of all patient lift units including but not limited to: lift devices, support material, gate transition pieces and all other associated components required for complete, functional installation for ceiling lift in with scale and hand-control based charged ceiling lift systems. This proposal shall also be for installation of the lift systems including but not limited to any required plans, engineering details and documents, tools, labor, testing, training, cleaning supplies, etc. All new lift systems must have a lifting capacity of no less than 507 lbs. Operation of the system must be smooth with no fast or jerky starts and stops. Operation of the system must allow for adequate lifting height allowing for transfer of patient from bed. All lift systems must have the availability to weigh a patient in kilograms and pounds. Existing hangers, Unistrut, or other support components shall not be utilized to support the lift tracks. If additional supports are needed, new supports must be connected directly to building structural components.

Attachments

Contacts

Email and phone are in the source notice.

Source notice

More from United States Department of Veterans Affairs posted in April 2025

More lists