ClickCease J044--Boiler Feedwater Chemical Treatment (36C24125Q0373) | Closed - MatchAwards

J044--Boiler Feedwater Chemical Treatment

Status
Closed, the response deadline passed on Apr 18, 2025
Agency
United States Department of Veterans Affairs
Office
TOGUS, USA
Notice type
Combined Synopsis/Solicitation
Solicitation number
36C24125Q0373
NAICS
238220 - Plumbing, Heating, and Air-Conditioning Contractors
PSC
J044 - MAINT/REPAIR/REBUILD OF EQUIPMENT- FURNACE, STEAM PLANT, AND DRYING EQUIPMENT; NUCLEAR REACTORS
Category
Facility Related Services (4.4)
Set-aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Posted
2025-04-08
Deadline
2025-04-18
Place of performance
West Haven, Connecticut 06516, UNITED STATES

Description

Combined Synopsis-Solicitation for Commercial Products and Commercial Services Revision 01 Effective: 05/30/2023 Description This is a combined synopsis/solicitation for commercial products and services prepared in accordance with the format in Federal Acquisition Regulation (FAR) subpart 12.6, Streamlined Procedures for Evaluation and Solicitation for Commercial Products and Services, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation document will not be issued. This solicitation is issued as RFQ 36C24125Q0373. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2025-06. The associated North American Industrial Classification System (NAICS) code for this procurement is NAICS 238220 (Plumbing, Heating, and Air-Conditioning Contractors) SBA size standard $19 Million. This is being posted as a SDVOSB set-aside. This is a solicitation for VA Connecticut Healthcare Systems (VACHS). They require periodic testing and treatment of boiler feed water supply. VACHS, requires the vendor to provide services for all labor, transportation, equipment, materials, and the expertise necessary for the periodic evaluation of and maintenance of feed water supply to 5 boilers in West Haven, and 3 boilers in Newington. The full SOW will be attached below, any technical questions will be directed at Chris Metner 203-932-5711 x3817. All interested companies shall provide quotations for the following: STATEMENT OF WORK Boiler Plant Water Treatment & Testing BACKGROUND VA Connecticut Healthcare Systems (VACHS) requires the periodic testing and treatment of boiler feed water supply. VACHS, requires the vendor to provide services for all labor, transportation, equipment, materials, and the expertise necessary for the periodic evaluation of and maintenance of feed water supply to 5 boilers in West Haven, and 3 boilers in Newington. JUSTIFICATION Chemical water treatment of boilers is necessary for longevity of equipment and efficiency of performance. Boiler maintenance is critical to maintaining a functional clinical operating environment. LOCATIONS OF SERVICES VA Medical Center West Haven 950 Campbell Ave West Haven, CT 06516 Newington VA Medical Center 555 Willard Ave Newington, CT 06111 QUALIFICATIONS The vendor shall have been in business at least five years providing chemical treatment of boiler plant and steam distribution systems similar in design and annual steam production rates to that of the VA facility. One water treatment specialist shall be assigned to this contract. The water treatment specialist shall have at minimum five years experience with boiler water treatment programs. The water treatment specialist assigned must be located within 100 miles of the site to enable reasonable response times to request for site visits. The contractor shall operate (or continuously maintain a contract with) a state certified laboratory to perform complete scientific analyses of water chemistry, deposits, metallic materials affected by corrosion and provide recommendations for correction of problems related to the chemical and mechanical water treatment program. A Professional Chemist shall supervise the laboratory. SCOPE OF WORK The vendor shall provide all labor, materials, specialized services, and travel necessary for evaluation and treatment of boiler feed water. The vendor shall include an additional line item for a total of $5,000 per period of performance to account for any additional chemicals and labor associated with boiler feedwater treatments, and emergency responses. The vendor shall include charges for new feedwater chemical treatment equipment on the base year quote, and each year following shall include the estimate for chemicals, and labor associated with the objectives outlined below. Work shall occur during regular business hours between 7:00 a.m. 4:30 p.m. or as coordinated with the COR and/or appropriate FMS POC. Vendor to provide full report detailing the products used as well as the results of feedwater testing and any adjustments made to the treatment plan as a result of feedwater water analysis. Vendor shall Provide emergency response, including a site visit if requested, within 4 hours of request, 24 hours a day, and 365 days per year. Maintain a toll-free (800) telephone number and email and pager system for 24-hour access. OBJECTIVES 1. The feedwater treatment plan shall be in conformance with the following standards/codes/specifications to include but not limited to: a. VHA Boiler Directive 1810. b. Dept. of Veterans Affairs Master Construction Specification Division 23 HVAC Water Treatment Section 23 25 00, Para 2.2: Chemical Treatment for Closed Loop Systems. c. Federal Department of Agriculture (FDA): CFR 21, 173.310, Boiler Water Additives Permitted in Plants Where Steam Contacts Food. 2. The contractor will be responsible for coordinating, scheduling, and reporting all work-related activities. The responsibilities shall include but are not limited to the following: a. Chemicals and Testing Supplies i. The vendor shall provide all chemicals, test kits, test reagents, corrosion coupons, and instructional materials as necessary to comply with all contract requirements. Deliver to the boiler plant supervisor or his/her designate. ii. Chelating chemicals are NOT permitted. iii. All chemicals utilized shall conform to FDA guidelines; in addition, in addition, the chemicals shall conform to all local, state, and federal government regulations on water pollution and have appropriate EPA registration. The VACTMC utilizes boiler steam for food preparation and for humidification. iv. Furnish on site chemical storage containers with secondary containment when needed. Provide bulk delivery service, which delivers the chemicals directly into the onsite storage containers with no assistance necessary from VA employees other than to provide access, all spills, shall be reported to VA employees, All personal shall have and use Personal Protective Equipment (PPE) when transferring or handling chemicals. v. All existing chemicals, which are suitable for the contract program, shall be utilized prior to the use of any new chemicals, tanks shall be pumped down empty, and cleaned before new chemicals are introduced to the tank or system. vi. Submit MSDS, SDS sheets for all chemicals, test kits or replacements utilized during the performance of services under this contract. The MSDS, SDS sheets shall accompany all delivery of the chemicals, in place at the holding tanks; copies shall be given to both boiler plant supervisors and to the Contracting Officer Representative (COR). vii. All chemical containers shall be labeled with complete information on contents and shall be returnable. Containers with missing labels shall be removed from the site. All containers remain the property of the contractor and shall be immediately removed from; the site when they are no longer needed at the site. b. Performance Requirements: i. Total hardness in feed water shall be less than one {1} part per million (ppm). Advise VA personnel on proper softener monitoring and operation. ii. Dissolved oxygen in the feed water shall be seven {7} parts per billion (ppb) maximum with oxygen scavenger treatment temporarily suspended. If it exceeds twelve {12} ppb, provide recommendation to boiler plant supervisor that deaerator shall be inspected and repaired. iii. Prevent embrittlement of boiler pressure vessels. iv. Condition the boiler sludge to obtain effective bottom blow off. v. Boiler residual of sodium sulfite, 30-60 ppm. vi. Boiler phosphate residual, 20-40 ppm. vii. Total dissolved solids (TDS) in boilers as high as possible, but not to exceed 4000 ppm. viii. Total alkalinity in boilers 800 ppm maximum (1/5 x solids TDS). ix. Maximum suspended solids in boilers 350 ppm, maximum silica 250 ppm. x. Boiler polymer dispersant residual as recommended by supplier. xi. There shall be no pitting corrosion. xii. There shall be no scale and deposit formation in the boilers. xiii. Moisture content of the steam shall not exceed one percent. Perform condensate conductivity tests at a steam trap near the boiler steam outlet (at a point with no amines) to evaluate the moisture content of the steam. If necessary, utilize an antifoam agent to limit solids carryover in the steam from the boilers and to control boiler priming, foaming, and misting. xiv. Control boiler water chemistry to minimize blowdown and thus improve efficiency. xv. Provide steam amine treatment to provide condensate pH of 8.0 8.5 at each condensate receiver throughout the facility and in the condensate storage tank in the boiler plant. Feed the amines into the boilers instead of the steam header to achieve even dispersal throughout the distribution system. xvi. Control corrosion rates. Steel corrosion rates shall be less than 2.0 mils per year. Copper corrosion rates shall be less than 0.2 mils per year. xvii. Establish layer of magnetic iron oxide (black or dark gray in color) on all steel surfaces as a corrosion barrier. c. On-Site Services: i. Provide complete written instructions, supplemented by oral instructions and demonstrations, to all boiler plant personnel for their performance of routine water tests and for feeding the chemicals into the systems. The instructions shall cover all aspects of safe chemical handling and safe and accurate testing, and proper chemical feed quantities, and methods to suit the plant operating parameters, and water treatment performance requirements, and that all testing materiel reflect the new product, copies shall be given to boiler plant supervisors and COR. ii. Provide three two-hour training sessions within two months of the start of a new contract. The first session shall be within one week of the start of the contract. Provide one two- hour training session every six months after the contract has been in force for six months, to ensure all boiler plant operators have been instructed and a training log kept. All training courses shall take place at the VA facility and at a date and time mutually acceptable to the vendor and VA. iii. Perform the following tests monthly, provide complete written reports with all test results and or recommendations, chemical usage and or reorders, test kits ordered or changes made, and review reports with plant supervisor, copy s shall be sent to COR for records. 1. Condensate return systems: pH, hardness, dissolved iron and copper, total dissolved solids (conductivity), amine. Condensate conductivity at a steam trap near the boiler steam outlet. Test the condensate for pH at representative samples of condensate receivers throughout the facility at least twice per year. Vary the sample sites every year. 2. Make-up water including soft water, pH, alkalinity, and hardness, total dissolved solids, suspended solids, and silica. 3. Boiler feed water: Dissolved oxygen, pH, alkalinity, hardness, total dissolved solids, suspended solids, and silica. Feed water dissolved oxygen shall be tested twice per year with oxygen scavenger chemical treatment temporarily suspended so that feed water deaerator performance can be evaluated. 4. Boiler water: Total dissolved solids, suspended solids, sulfite, phosphate, and alkalinity. 5. Continuous blowdown systems: Check calibration and settings monthly. 6. Chemical feed systems: Advise plant personals and supervisor on adjustments to maintain proper chemical dosage and feed rates and blowdown rates. iv. Visit the plant weekly during the first two months of the contract. After two months, visit the plant monthly, perform tests listed above, and review daily logs of tests performed by boiler plant personnel. Discuss the test results with the plant supervisor. Provide recommendations on treatment methods and consult on boiler plant, steam, and condensate distribution systems problems as requested. Send water samples to the laboratory as necessary to resolve problems and questions. Make additional visits at the request of the plant supervisor to address potential problems. v. Conduct waterside inspection of boilers, feed water deaerator, and condensate storage tank at least once per year. Boiler and feed water deaerator inspection to coincide with the inspection by the Qualified Professional Inspector (boiler inspector). Coordinate inspection with COR and/or Boiler Plant Supervisor. VA personnel shall prepare equipment for inspection. vi. Provide recommendations on wet and dry boiler lay-up procedures, including monitoring, of boilers not in service. vii. Provide recommendations on proper operation of continuous boiler blowdown systems and boiler bottom blow off procedures. viii. Test corrosion coupons from condensate lines once per year and provide report. VA personnel shall install, remove, and deliver the coupons to the water treatment specialist. ix. Any deficiencies or problems noted with VA test results or with the water treatment specialist s test, results are to be reported immediately to the boiler plant supervisor and the COR. If problems are found, corrective actions shall be recommended immediately, chemicals provided as necessary, and tests performed as necessary to confirm that desired results are achieved. d. VA Boiler Plant Staff Responsibilities: i. The plant personnel shall perform routine testing for chemical residuals, conductivity, hardness, alkalinity, pH, chloride, silica, iron and copper, and other tests as recommended by the water treatment specialist. e. Administrative Requirements: i. All on site work is to be coordinated with the boiler plant supervisor at least seven (7) days prior to performance of services. ii. Situations requiring more frequent analysis and/or special testing other than the specified requirements may arise. Do not perform any extra cost work without written authorization from the COR. A separate purchase order will be issued to cover the costs associated with these extra tests upon request and justification from the contractor. iii. Provide information on the normal time delivery time for chemicals. Provide method for emergency chemical deliveries. iv. A laboratory certified by the State shall perform laboratory work. v. A written report of each analysis and inspection shall be submitted immediately upon completion of each analysis and/or inspection to include a summary report of treatment recommendations based on the analysis report. Reports shall be submitted in duplicate to the boiler plant supervisor and to the COR. vi. Failure to achieve required performance goals shall be justification for termination of contract. vii. Immediately prior to commencing the chemical treatment contract, VACTMC shall arrange for an internal inspection of each boiler by the boiler plant supervisor and the contractor s (chemical supplier) field representative. A visual and written record of the condition of each of the boilers shall be signed by the contractor and the VACTMC representative. Upon termination of the contract, a similar inspection shall be conducted. Any deterioration in the boiler conditions attributable to the contractor s program shall be corrected by the contractor at no additional cost to VA. 5. Coordinate all placement and removal of Lockout Tagout devices for any energy sources with FMS VA COR/Maintenance & Operations. 6. Coordinate all confined space entry with VA Safety Department and FMS VA COR/Maintenance & Operations. 7. Protect all equipment in place during work activities. 8. Contractor shall provide a full report detailing all maintenance activities performed for each visit, the names of individuals performing the maintenance, and a summary of any notable concerns that can otherwise impair the functionality of the equipment. 9. Work hours for service and corrective maintenance shall be as follows, unless otherwise requested/approved by the COR or appropriate VA representative: a. 7:00 a.m. to 5:00 p.m., Monday through Friday. SUBMITTALS/DELIVERABLES 1. Prior to the start of work, the specifications shall require the contractor to develop and submit such plans as required by the VA relating to Safety and Environmental Issues. These may include but are not limited to: a. Job Hazard Analysis (JHA) / Activity Hazard Analysis (AHA) b. Acknowledgement of VA LOTO requirements (Attachment C) and contractor LOTO policy. 2. The contractor shall submit any waste manifest documents as applicable with final reports. 3. Subcontracting of any ensuing award of this solicitation shall not be allowed without written permission of the Contracting Officer. Service response on calls from unauthorized personnel could result in non-payment. SPECIAL INSTRUCTIONS 1. Subcontracting of any ensuing award of this solicitation shall not be allowed without written permission of the Contracting Officer. Service response on calls from unauthorized personnel could result in non-payment. 2. Federal Holidays observed by the department of Veterans Affairs are as follows: New Years Labor Day MLK Day Columbus Day Presidents Day Veterans Day Memorial Day Thanksgiving Day Juneteenth Christmas Day Independence Day 3. Contractor Check-in: All employees of the service provider shall comply with VA Security Management Program and obtain permission of the VA Police and restricted from unauthorized access. Upon arrival, the contractor shall sign-in at Building 15, FMS office in West Haven, or Building 3, 3rd Floor, FMS office in Newington, and/or receive a temporary identification badge prior to performing services at VA Connecticut Healthcare System. The contractor shall wear visible identification always displaying the name and company ID while on site. All site visits shall be coordinated with the VA COR. a. The Contracting Officer (CO), Contracting Officer s Representative (COR), and/or Project Manager (PM) specifically reserve the right to reject any of the Contractor s personnel and refuse them permission to work on the equipment outlined herein, based upon credentials provided. 4. Per VA Directive 1805, smoking vaping, and smokeless tobacco are prohibited on the grounds of VA facilities, including in vehicles. This Directive applies to all Service providers and their employees. 5. No photography of VA premises is allowed without written permission of the contracting officer. Patients and staff are not to be photographed at any time. 6. VA reserves the right to close down or shut down the facilities and order Service provider employees off the premises in the event of a national emergency. The Service provider may return to the site only with the written approval of the VA Contracting Officer. 7. Prior to commencing work onsite, all Service providers and provider personnel shall furnish proof of receipt of required COVID vaccinations and boosters in compliance with current VHA Directives. 8. Prior to commencing work onsite, all Service providers and provider personnel shall furnish proof of receipt of required Tuberculosis testing in compliance with VHA Directive 1131(5), dated June 04, 2021. 9. Parking for Service provider and its employees shall be in designated areas only. Service provider to coordinate with COR. 10. The Service provider shall confine all operations (including storage of materials) on government premises to areas authorized or approved by the VA Contracting Officer. The Service provider shall hold and save the government, its officers, and agents, free and harmless from liability of any nature occasioned by the Service provider s performance. Working space and space available for storing materials shall be as determined by the COR. Workers are subject to the rules of the Medical Center applicable to their con

Attachments

Contacts

Email and phone are in the source notice.

Source notice

More from United States Department of Veterans Affairs posted in April 2025

More lists