J045 Cast Iron Survey - NWI
- Status
- Closed, the response deadline passed on Mar 28, 2025
- Agency
- United States Department of Veterans Affairs
- Office
- Saint Paul, USA
- Notice type
- Sources Sought
- Solicitation number
- 36C26325Q0572
- NAICS
- 238220 - Plumbing, Heating, and Air-Conditioning Contractors
- PSC
- J045 - MAINT/REPAIR/REBUILD OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT
- Category
- Facility Related Services (4.4)
- Set-aside
- Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
- Posted
- 2025-03-14
- Deadline
- 2025-03-28
- Place of performance
- Omaha, 68105
Description
Project Name: Cast Iron, Malleable Fitting, A307 Steam & HW Survey - NWI 2025 Location of Services Omaha VAMC, 4101 Woolworth Ave, Omaha, NE 68105 Facility Size: 813,984 sq. ft Grand Island VAMC, 2201 N Broadwell Ave, Grand Island, NE 68803 Facility Size: 253,358 sq. ft Period of Performance Award +180 Days Contract Vehicle This performance work statement (PWS) is a firm fixed contract. As stated in FAR 16.202-1, a firm-fixed-price contract provides for a price that is not subject to any adjustment on the basis of the contractors cost experience in performing the contract. This contract type places upon the contractor maximum risk and full responsibility for all costs and resulting profit or loss. It provides maximum incentive for the contractor to control costs and perform effectively and imposes a minimum administrative burden upon the contracting parties. Any questions regarding the PWS shall be provided to the contracting officer (CO) during the solicitation phase prior to award to prevent ambiguity and potential contractor loss due to misinterpretation of the PWS requirements. Evaluation Factors Note that each nonprice factor below when combined is slightly more than price. Understanding the requirement: the degree to which the proposal demonstrates that the offeror has a sound and thorough understanding of the problems involved in the work to avoid future requests of modifications or equitable adjustments. Technical approach to performing the work: the technical merit, appropriateness of the techniques, processes, and tests that the offeror plans to use to deliver a high-quality solution to the VA. Management Capability: general contractor provides evidence in an emergency that they can mobilize within 4 hours and sufficient general contractor staffing will be onsite to supervise subcontractor delays or similar problems. Experience in performing similar work (go/no go factor): contractor provides 3 years of contracts of similar size and scope. Qualifications of technical personnel (go/no go factor): the contractor provides qualifications meeting or exceeding that listed in the certification section. Performance Work Statement Scope This performance work statement is a service as defined in FAR 37.1. Contractor shall perform thorough investigation above ceiling, behind walls (no modifications to real property are permitted) utilizing necessary instrumentation to verify requirements in difficult to reach or tight locations. Survey will include drawings and a report (excel table preferred) including pictures of existing conditions, reasons for noncompliance or deficiency, methods for testing including instrumentation used, equipment listing (unique identifier), location, and pressure. Any insulation or associated equipment that is removed shall be replaced for like. Equipment Labeling At each valve, expansion joint, and area identified as a deficiency (cast, malleable or A307) the contractor shall provide heavy duty labels that can endure chemicals, high temperatures, moisture, and abrasion. The labels shall include the equipment identified (linked to the drawings), and for valves and expansion joints, the spaces downstream that they feed in typed format. Cast Iron, Malleable Fittings Contractor shall conduct a steam distribution system survey to document the locations and type of any cast iron and malleable iron fittings and components for systems operating at a pressure of 15 pounds per square inch gauge (psig) or greater. Also included are distributions systems for hot water or other liquids at a temperature of greater than 257 degrees Fahrenheit. ASTM A307 Bolt Survey Contractor shall perform a survey of existing steam and hot water piping systems and identify if A307 bolts (all grades) are utilized. Drawings Drawings shall be downloadable in .dwg or. dwf format and pdf. These drawings shall also be published on 12 laminated half size drawing sets (12x18) with 4 to be delivered to the Grand Island site and 8 to be delivered to the Omaha site. Prior to publishing drawing sets on laminated sheets, approval to proceed forward shall be given by the COR and include all VA recommendations. These drawings will be utilized by HVAC technicians, pipefitters, boiler plant operators and other maintenance personnel and should be clearly labeled. Should the contractor have concerns that details of the drawing are congested and full-size drawing sets are warranted, they should reach out to the VA COR for acknowledgement and approval. The total dollar value of the 12 laminated sheets will be considered with any reduction of half size sets to compensate for full size with the ultimate pricing staying consistent. Contractor shall conduct a steam survey, trace each line, and provide drawings at both sites to include low pressure steam (LPS) which is up to 15 psig, medium pressure steam (MPS) which is between 15 psig and 60 psig as well as high pressure steam (HPS) steam systems. These drawings shall be complete to include flow sheets with instruments, flow/capacity/pressure, direction of flow. Instruments and equipment shall have unique tag numbers that are correlated to an instrument and equipment index. Tag numbers shall be coordinated with the shops to ensure standard nomenclature is aligned with local facility. Pipe size and material of construction shall be indicated for all piping. Equipment shall be listed and scheduled in conformance with VA National CAD Standard details: https://www.cfm.va.gov/til/sDetail.asp#23 Expansion Joint Contractor shall identify expansion joints at the facility and list the manufacturer, the allowable movement, flow direction, design pressure, location and temperature, date of manufacture, and identifying the expansion joint by the identification number in the drawings. Contractor shall also verify existing condition and any deficiencies with the stated joint. In the contractors report, it should be identified the operating pressure of the service and whether the expansion joint conforms to the below. Pressure Containment: Steam Service 35-200 kPa (5-29 psig): Rated 345 kPa (50 psig) at 148 degrees C (298 degrees F). Steam Service 214-850 kPa (31-123 psig): Rated 1035 kPa (150 psig) at 186 degrees C (366 degrees F). Steam Service 869-1035 kPa (126-150 psig): Rated 1380 kPa (200 psig) at 194 degrees C (381 degrees F). Condensate Service: Rated 690 kPa (100 psig) at 154 degrees C (309 degrees F). Valves Contractor shall verify functionality of all valves greater than 15psig. Contractor shall check physical condition of valve for corrosion, mineral deposits, leaks, or associated components. Corrective Action Replacement Plan / Recommendations Include the detailed site survey report complete with pictures and findings of the existing conditions in the report deliverable and describe chronic problems and shortcomings that may impact the project scope of work for future replacement. These conditions may be technical, or scope or budget related. The narrative shall not only state the issue, but shall discuss possible solutions and ramifications if the issue cannot be addressed. The contractor shall include any equipment to include insulation that is verified during the survey for recommendations. Contractor shall develop a replacement plan, prioritizing high and medium pressure steam and hot water piping systems operating over 50 pounds per square inch for A307 bolts, of any cast iron and malleable iron fittings and components. All deficiencies shall accompany a cost estimate, pictures of existing conditions, reasons for noncompliance or deficiency, methods for testing including instrumentation used, equipment listing, location, and pressure. Start Up / Shutdown / Water Hammer Response Contractor shall review existing procedures (where available) at both sites for start-up/shutdown procedures of all boilers operating above 15psig. Contractor shall interview boiler plant and pipefitter staff and formulate each procedure utilizing industry best practice to prevent safety concerns and ensure repeatability. Each procedure shall include pictures for future new hires and veteran staff to follow. The procedure must also address action to be taken in response to any reported or observed water hammer. The purpose of the procedure is to mitigate the risk of effects of water hammer and shock loading on the piping system. Interim Safety Measures Systems identified with A307 bolts shall have a contractor provided Interim Safety Measure to ensure the safety of staff and the facility until replacement is complete. The contractor shall develop a risk assessment and interim safety measures pending replacements of all cast iron or malleable fittings with forged or cast steel fittings over time. The standard format for all contractor provided interim safety measures is included as reference. Any questions on contractor requirements shall be asked and answered during the project kickoff meeting. References VHA 1810 Steam, Heating Hot Water, and Outside Distribution Systems Design Manual Correct Mechanical Deficiencies Steam Survey VHA Operational Alert and Guidance Document, Cast Iron Fittings / Valve housing use in High and medium Pressure Steam distribution systems. Requirements for Identification and Replacement of A307 Bolts Memo Signed Interim Safety Measure Template Contracting Officer Representative / Technical Representative Contact Information Primary: Jeremy Davis, Jeremy.davis@va.gov , 531-215-2942 Secondary: William Sis, William.sis@va.gov , 918-613-1621 Tertiary: Griffin Walsh, griffin.walsh@va.gov , 531-232-9231 Work Hours Expected The contractor shall limit all patient or staff impacts by phasing work during or after hours. Normal business hours are 0730-1600. Should services provided not impact patient or staff services work can be performed during normal business hours. If services provided will impact patient or staff services, the contractor shall schedule this work with the COR in order to minimize these disruptions. Questions on local facility impacts and work proposed by the contractor shall be directed to the contracting officer representative for approval of work to be performed during or after hours. Kickoff Meeting The general contractor shall schedule a kickoff meeting no later than 5 business days following notice to proceed. At a minimum the local site COR, and the contracting officer shall attend. The contractor shall provide an agenda in preparation of the meeting. The contractor shall take meeting minutes and shall email these notes to all parties included in the meeting invite. At a minimum the contractor shall provide the general contractor contact information that can be reached 24/7 as well as subcontractors, and any required onsite coordination for inspection, testing or deliveries during the duration of the period of performance, any hazards expected, preconstruction risk assessments where applicable and infection control risk assessments where applicable. At the discretion of the contracting officer (CO) in accordance with FAR 42.503-1 the action of establishing a time and place of the conference, agenda and summary may be delegated or taken on by the contracting officer who awarded such contract. Certifications It is the expectation that all contractors meet the below qualifications. If contracted employees change from the proposal provided in the solicitation the general contractor shall provide credentials for VA review and approval prior to work. General contractor shall provide one OSHA Competent Person (CP) to be physically present at all job sites. This individual shall be directly employed by the general contractor with authority to speak on behalf of the general contractor. This individual shall be capable of identifying existing and predictable hazards in the surroundings and working conditions which are unsanitary, hazardous, or dangerous to employees, and who has the authorization to take prompt corrective measures to eliminate them (see 29 CFR 1926.32(f)). The prime contractor(s) are responsible for informing their subcontractors of the safety provisions under the terms of the contract and the penalties for noncompliance, coordinating the work to prevent one craft from interfering with or creating hazardous working conditions for other crafts, and inspecting subcontractor operations to ensure that Mishap prevention responsibilities are being carried out. This individual shall have a current OSHA 30 certification and provide no less than 3 years worth of job-related experience similar to that being asked in this contract. General Requirements Shall contractors work involve any of the below the stated requirement shall be met. All work shall comply with the most recent edition of USACE EM 385-1-1, comply with 29 CFR 1926, comply with 29 CFR 1910 as incorporated by reference within 29 CFR 1926, comply with ASSP A10.34, and all applicable federal, state, and local laws, ordinances, criteria, rules and regulations. Submit matters of interpretation of standards for resolution before starting work. Where the requirements of this specification, applicable laws, criteria, ordinances, regulations, and referenced documents vary, the most stringent requirements govern except with specific approval and acceptance. All electrical work shall comply with VHA Directive 1028, NFPA 70 (NEC), NFPA 70B, NFPA 70E, 29 CFR Part 1910 Subpart J General Environmental Controls, 29 CFR Part 1910 Subpart S Electrical, and 29 CFR 1926 Subpart K. All installation, maintenance, and servicing of equipment or machinery shall comply with 29 CFR 1910.147 except for specifically referenced operations in 29 CFR 1926 All hot work shall be safeguarded in accordance with NFPA 241 and NFPA 51B. Hot work permits shall be issued daily for work in accordance with local policy. All confined space entry shall comply with 29 CFR 1926, Subpart AA except for specifically referenced operations in 29 CFR 1926. All floor and wall openings shall comply with 29 CFR 1926 Subpart M and EM 385-1-1. All crane work shall comply with 29 CFR 1926 Subpart CC and EM 385-1-1. Crane lift plans shall be reviewed and approved by the contracting officer representative prior to work The fall protection (FP) threshold height requirement is 4ft for ALL WORK in government occupied sites, unless the OSHA 29 CFR 1926 or EM 385-1-1 requirements are more stringent. All work at or above this threshold shall meet OSHA or EM 385-1-1 whichever is more stringent. Contractor shall maintain free and unobstructed access to facility emergency services and for fire, police and other emergency response forces in accordance with NFPA 241 Government Furnished Property or Space The contractor will not be provided government furnished property. Contractor equipment shall be removed or approved on a case by case basis by the contracting officer representative. The government is not liable for theft or security of such equipment if approved. The contractor will be responsible for keeping a reasonably clean (free of miscellaneous debris) working environment. Failure to do so on a continuous basis shall result in the contractor being back charged for cleaning services. Job Hazard Analysis Shall any of the below hazards be expected or present themselves during the work, an activity hazard analysis also known as a job hazard analyses, job safety analyses and activity safety analyses shall be performed meeting all of the requirements from the below. Deviations will be only be approved by the contracting officer. Job Site Risks associated with the below 1) Emergency response; 2) Contingency for severe weather; 3) Fire Prevention; 4) Medical Support; 5) Posting of emergency telephone numbers; 6) Prevention of alcohol and drug abuse; 7) Site sanitation (housekeeping, drinking water, toilets); 8) Night operations and lighting; 9) Hazard communication program; 10) Welding/Cutting Hot work; 11) Electrical Safe Work Practices (Electrical LOTO/NFPA 70E); 12) General Electrical Safety; 13) Hazardous energy control (LOTO); 14) Site-Specific Fall Protection & Prevention; 15) Excavation/trenching; 16) Asbestos abatement; 17) Lead abatement; 18) Crane Critical lift; 19) Respiratory protection; 20) Health hazard control program; 21) Radiation Safety Program; 22) Abrasive blasting; 23) Heat/Cold Stress Monitoring; 24) Crystalline Silica Monitoring (Assessment); 25) Demolition plan (to include engineering survey); 26) Formwork and shoring erection and removal; 27) Pre-Cast Concrete; 28) Public (Mandatory compliance with ANSI/ASSP A10.34-2012); 29) Sub-contractor or cross-trade coordination; Before beginning each work activity involving a type of work presenting hazards not experienced in previous project operations or where a new work crew or sub-contractor is to perform the work, the Contractor(s) performing that work activity shall prepare an AHA (Example electronic AHA forms can be found on the US Army Corps of Engineers web site) AHAs shall define the activities being performed and identify the work sequences, the specific anticipated hazards, site conditions, equipment, materials, and the control measures to be implemented to eliminate or reduce each hazard to an acceptable level of risk. Work shall not begin until the AHA for the work activity has been accepted by the Contracting Officer Representatives and discussed with all engaged in the activity, including the Contractor, subcontractor(s), and Government on-site representatives at preparatory and initial control phase meetings. The names of the Competent/Qualified Person(s) required for a particular activity (for example, excavations, scaffolding, fall protection, other activities as specified by OSHA, EM 385-1-1, or other State and Local agencies) shall be identified and included in the AHA. Certification of their competency/qualification shall be submitted to the contracting officer representative for acceptance prior to the start of that work activity. The AHA shall be reviewed and modified as necessary to address changing site conditions, operations, or change of competent/qualified person(s). If more than one Competent/Qualified Person is used on the AHA activity, a list of names shall be submitted as an attachment to the AHA. Those listed must be Competent/Qualified for the type of work involved in the AHA and familiar with current site safety issues. If a new Competent/Qualified Person (not on the original list) is added, the list shall be updated (an administrative action not requiring an updated AHA). The new person shall acknowledge in writing that he or she has reviewed the AHA and is familiar with current site safety issues. Submit AHAs to the contracting officer, primary contracting officer representative and alternate contracting officer representative. Preconstruction Risk Assessment / Infection Control Risk Assessment Contractor shall control all construction-associated hazards that affect VA medical facilities, their occupants, services and mission-essential functions and capabilities is critical in all medical center facilities. Contractor shall ensure interior construction activities causing disturbance of existing dust, or creating new dust, must be conducted within ventilation-controlled areas that minimize the flow of airborne particles into patient areas. Contractor shall ensure compliance VHA 7715 and post a copy of the latest PCRA and ICRA forms at all jobs sites found at VHA PCRA: http://vaww.hefp.va.gov/resources/vha-pre-construction-risk-assessment-pcra VHA ICRA: http://vaww.hefp.va.gov/resources/vha-infection-control-risk-assessment-icra VHA-PCRAs and ICRAs will be re-validated and updated as needed based on but not limited to changes from affected individuals, areas/locations, scope, contractor means and methods, safety requirements, phasing, contractor competencies and capabilities. The COR with concurrence from a VHA infection control specialist, VHA patient safety and VHA occupational hAttachments
Contacts
- Timothy Kimmel
- John Milroy
Email and phone are in the source notice.
More from United States Department of Veterans Affairs posted in March 2025