<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/department_of_veterans_affairs/posts/114134679880082661" -->

---
title: Y1PZ-- 871CM3033: Design-Build RFP , Section K… (36C78625R0009) | Closed - MatchAwards
description: Y1PZ-- 871CM3033: Design-Build RFP , Section K Drainage  Improvements, Puerto Rico NC (VA-24-00091761). United States Department of Veterans Affairs. Solicitation 36C78625R0009. NAICS 237990 - Other Heavy and Civil Engineering Construction. SDVOSB set-aside. Deadline 2025-03-21. Sources Sought...
canonical: https://matchawards.com/department_of_veterans_affairs/posts/114134679880082661
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: Y1PZ-- 871CM3033: Design-Build RFP , Section K… (36C78625R0009) | Closed
og:url: https://matchawards.com/department_of_veterans_affairs/posts/114134679880082661
og:description: Y1PZ-- 871CM3033: Design-Build RFP , Section K Drainage  Improvements, Puerto Rico NC (VA-24-00091761). United States Department of Veterans Affairs. Solicitation 36C78625R0009. NAICS 237990 - Other Heavy and Civil Engineering Construction. SDVOSB set-aside. Deadline 2025-03-21. Sources Sought...
og:image: https://matchawards.com/system/accounts/avatars/000/000/015/original/f59915e906ee2b19.png?1638825904
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# Y1PZ-- 871CM3033: Design-Build RFP , Section K Drainage Improvements, Puerto Rico NC (VA-24-00091761)

Status

Closed, the response deadline passed on Mar 21, 2025

Agency

[United States Department of Veterans Affairs](/department%5Fof%5Fveterans%5Faffairs)

Office

QUANTICO, USA

Notice type

Sources Sought

Solicitation number

36C78625R0009

NAICS

[237990 - Other Heavy and Civil Engineering Construction](/groups/218)

PSC

Y1PZ - CONSTRUCTION OF OTHER NON-BUILDING FACILITIES

Category

[Construction Related Services (4.2)](/categories/facilities-and-construction/construction-related-services)

Set-aside

[Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)](/contracts/veteran-owned)

Posted

2025-03-09

Deadline

2025-03-21

## Description

Sources Sought The National Cemetery Administration (NCA) Southeast District is currently seeking firms with the ability to provide a Design-build Project Section K Drainage Improvements - Puerto Rico at the National Cemetery, 50 Avenida Cementerio Nacional, Bayamon, Puerto Rico, 00961\. Please Read the Scope of work below in its entirety and respond with LOS information. Businesses responding shall indicate their socio-economic status for example: Veteran owned small business, service-disabled veteran owned small business, HUB Zone, 8A, Woman Owned etc.Â The Small Business Administration website has the small business defined: http://dsbs.sba.gov/dsbs/search/dsp\_dsbs.cfm.Â Respondents shall indicate their status as a foreign-owned or foreign-controlled firm and any contemplated use of foreign national employees on this requirement. All Vendors must be registered in the System for Award Management (SAM) and VIP Vendor Information Portal Â under the correct NAICS code. https://www.sam.gov/portal/SAM/#1 Vendors Claiming Service Disable Veterans Own Small Business (SDVOSB) or Veteran Own Small Business (VOSB) must be certified in the VETBIZ database.Â http://www.vetbiz.gov/ The NAICS code for this source sought is NAICS Code 237990 Other Heavy and Civil Engineering Construction Â Â Size standard 45K and/or the government reserves the right to consider a SDVOSB, VOSB or small business set-aside based on responses to this source sought. All information submitted by respondents to this source sought synopsis is voluntary.Â This source sought notice is not to be construed as a commitment by the Government, nor will the Government reimburse any costs associated with the submission of information and Quotes in response to this notice.Â Respondents will not individually be notified of the results of any Government assessments.Â The Government s evaluation of the capability documentation received will factor into any possible forthcoming solicitation. Please fill out the below LOSÂ Â and submit with the Sources Sought response.: VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION) (a) Pursuant to 38 U.S.C. 8127(l)(2), the offeror certifies that (1) If awarded a contract (see FAR 2.101 definition), it will comply with the limitations on subcontracting requirement as provided in the solicitation and the resultant contract, as follows: (i) \[\] Services. In the case of a contract for services (except construction), the contractor will not pay more than 50% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219 73 or certified VOSBs listed in the SBA certification database as set forth in 852.219 74\. Any work that a similarly situated certified SDVOSB/VOSB subcontractor further subcontracts will count towards the 50% subcontract amount that cannot be exceeded. Other direct costs may be excluded to the extent they are not the principal purpose of the acquisition and small business concerns do not provide the service as set forth in 13 CFR 125.6\. (ii) \[X\] General construction. In the case of a contract for general construction, the contractor will not pay more than 85% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219 73 or certified VOSBs listed in the SBA certification database as set forth in 852.219 74\. Any work that a similarly situated certified SDVOSB/VOSB subcontractor further subcontracts will count towards the 85% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted. (iii) \[\] Special trade construction contractors. In the case of a contract for special trade contractors, the contractor will not pay more than 75% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219 73 or certified VOSBs listed in the SBA certification database as set forth in 852.219 74\. Any work that a similarly situated certified SDVOSB/VOSB subcontractor further subcontracts will count towards the 75% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted. (2) The offeror acknowledges that this certification concerns a matter within the jurisdiction of an Agency of the United States. The offeror further acknowledges that this certification is subject to Title 18, United States Code, Section 1001, and, as such, a false, fictitious, or fraudulent certification may render the offeror subject to criminal, civil, or administrative penalties, including prosecution. (3) If VA determines that an SDVOSB/ VOSB awarded a contract pursuant to 38 U.S.C. 8127 did not act in good faith, such SDVOSB/VOSB shall be subject to any or all of the following: (i) Referral to the VA Suspension and Debarment Committee; (ii) A fine under section 16(g)(1) of the Small Business Act (15 U.S.C. 645(g)(1)); and (iii) Prosecution for violating 18 U.S.C. 1001\. (b) The offeror represents and understands that by submission of its offer and award of a contract it may be required to provide copies of documents or records to VA that VA may review to determine whether the offeror complied with the limitations on subcontracting requirement specified in the contract. Contracting officers may, at their discretion, require the contractor to demonstrate its compliance with the limitations on subcontracting at any time during performance and upon completion of a contract if the information regarding such compliance is not already available to the contracting officer. Evidence of compliance includes, but is not limited to, invoices, copies of subcontracts, or a list of the value of tasks performed. (c) The offeror further agrees to cooperate fully and make available any documents or records as may be required to enable VA to determine compliance with the limitations on subcontracting requirement. The offeror understands that failure to provide documents as requested by VA may result in remedial action as the Government deems appropriate. (d) Offeror completed certification/fill-in required. The formal certification must be completed, signed and returned with the offeror s bid, quotation, or proposal. The Government will not consider offers for award from offerors that do not provide the certification, and all such responses will be deemed ineligible for evaluation and award. Certification I hereby certify that if awarded the contract, \[insert name of offeror\] will comply with the limitations on subcontracting specified in this clause and in the resultant contract. I further certify that I am authorized to execute this certification on behalf of \[insert name of offeror\]. Printed Name of Signee: \_\_\_\_\_\_\_\_\_\_\_ Printed Title of Signee: \_\_\_\_\_\_\_\_\_\_\_\_\_ Signature: \_\_\_\_\_\_\_\_\_\_\_\_ Date: \_\_\_\_\_\_\_\_\_\_\_\_\_\_ Company Name and Address: \_\_\_\_\_\_\_\_\_\_\_\_\_\_\_ Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â WARNING:Â Severe Penalties for Contractors that violate the Limitations on Subcontracting Rule:Â If caught during the performance violating the FAR government subcontracting rules or limitations on subcontracting clause under the Code of Federal Regulations 13 C.F.R. 125.6(g), there can be stiff penalties: Whoever violates the requirements set forth in paragraph (a) of this section shall be subject to the penalties prescribed in 15 U.S.C. 645(d), except that the fine shall be treated as the greater of $500,000 or the dollar amount spent, in excess of permitted levels, by the entity on subcontractors. A party's failure to comply with the spirit and intent of a subcontract with a similarly situated entity may be considered a basis for debarment on the grounds, including but not limited to, that the parties have violated the terms of a Government contract or subcontract pursuant to FAR 9.406-2(b)(1)(i) (48 CFR 9.406-2(b)(1)(i)). Â Contracting Officers may require the contractor to demonstrate its compliance with the limitations on subcontracting at any time during the performance of the contract by having the Contractor provide invoices, copies of subcontracts, or a list of the value of tasks performed. Capability statement as it pertain to the Performance Scope of work Â are Highly encouraged. Responses are encouraged as they will assist on set aside for social economic group. Interested individuals shall provide a capability statement, to include complete address, phone & fax number of contacts.Â All emails from interested parties must be received by Friday , 02/21/2021 NLT 10:00 am EST. Interested parties must submit an answer to the Limitation of Subcontracting (LOS) Â incorporated In this Sources Sought. Interested parties submitting quotes must be certified and active in the Vendor Information Portal (VIP) system at the time of the RFQ submission. https://vip.vetbiz.va.gov/government-home/ Interested parties must be registered under the applicable NAICS code for this requirement in System for Award Management (SAMS) at the time of the RFQ submission. https://beta.sam.gov/content/home Scope of Work Overview General Intent This scope of work is for a design-build project. The prime contractor, otherwise known herein as the Contractor, will be responsible for professional services for delivering the project design as well as construction of the agreed upon construction project. All work must meet NCA Design guide standards, VA Construction and Safety Requirements, OSHA, EPA, and Puerto Rico Department of Environmental Protection standards. Project Scope Provide all labor, materials, tools and equipment, design, and construction services necessary for design and construction of a project described herein and other specific tasks as further defined by this request for proposal (RFP). Contractor to review existing conceptual design, geotechnical report, and specifications, fully investigate, obtain reports, and survey elevations/headstones/storm lines/systems/etc., as required, to eliminate water ponding within the existing cemetery section. Work entails precise removal, identification / tagging, and replacement of existing flat headstones. Due to space constraints and required headstone storage, Contractor shall phase construction. After award, but prior to the start of any work, the Contractor shall contact the Contracting Officer Representative (COR)/Project Manager to review proposed methods, plans, and design for completion of work and to review project staging, and project phasing, and safety and health requirements. Field work may not commence until these plans have been approved as detailed below. Work within existing burial sections and specifically removal of headstones requires notification to the next-of-kin family member by Cemetery staff. Project phasing should consider a 30-day notification process. The Contractor shall obtain all environmental and other necessary permits that would be required prior to construction commencing. Material and product submittals as well as shop drawings to be submitted to VA for review prior to starting any work. General Requirements General Requirements See Specification Section 01 00 02 GENERAL REQUIREMENTS (MINOR NCA PROJECTS) General Scope Items The following is a list of general scope requirements: 1\. Meet with NCA Cemetery staff, review conceptual drawings and specifications, and perform field work necessary to determine required final design, labor, materials, and equipment. 2\. When conflict exist between documents the order of precedence shall be specifications then drawings. Any conflicts shall be identified to the COR and be resolved using the RFI process to allow for proper documentation and correction as necessary. 3\. Permitting (external to VA): a. All construction permits and waivers are the responsibility of the Contractor. This includes, but not limited to all applicable environmental, National Pollutant Discharge Elimination System (NPDES) Permit - EPA Region 2 Construction General Permit (CGP), and local permits. b. Coordinate and obtain State Historic Preservation Office (SHPO) concurrence prior to the start of construction. NCA Historic Architect shall initiate consultation with the SHPO, tribal organizations, and any other stakeholders identified as having interest in the project. The Contractor s Architect / Engineering (A/E) professional shall prepare project cover memo, description, maps, project elements, concept drawings, Puerto Rico Section 106 Project Review consultation form, and other initial documents to support the NCA Historic Architect for notification of intent without adverse action to the Puerto Rico SHPO. 4\. All field work shall be scheduled at least 72 hours in advance with NCA Cemetery management. 5\. Design and construction to meet latest edition of all applicable building codes, NCA specifications, NCA Design Guide, and VA Design Manuals. 6\. Host and provide agenda for milestone design reviews and weekly construction coordination meetings. Meeting minutes shall be distributed within two (2) business days after the meeting. 7\. Contractor shall utilize an electronic review and correction tracking system to review design comments and respond. 8\. Utilize a project management software for meeting minutes and all contractor record keeping such as Procore Â© or approved equivalent. Outlook, Excel and other manual management systems are NOT acceptable. 9\. All work shall be performed in accordance with OSHA regulations. 10\. Submit baseline schedule, schedule of values (cost schedule), bonding, insurance, and resume and certification(s) of key personnel 10 days following award. 11\. Submit monthly schedule updates along with progress payment request. 12\. Submit monthly waste disposal and diversion form along with progress payment request. Management Requirements The Contractor shall be solely responsible for the management, including all associated labor, equipment, materials, mailing costs, and inspection, to meet the requirements of the project. The following are identified as Key Personnel: Overall Project Manager Design Project Manager Construction Project Manager Project Site Superintendent OSHA Competent Person / Site Safety Officer, may be additional duty Quality Control Manager, may be additional duty A/E Designer of Record A/E Field Representative Project Management The Contractor must have a Program/Project manager to provide project communications and monitor progress of design, construction, and overall quality of deliverables. Supervision The Contractor must have a superintendent fluent in English and Spanish on the job site during working hours. The Superintendent must have a minimum of 5 years of experience as a Superintendent on previous projects of similar size and complexity. The Superintendent may serve as the Site Safety and Health Officer. Provide a Superintendent Resume for the proposed on-site Project Superintendent describing experience with references and qualifications to the Contracting Officer for approval. The Contracting Officer reserves the right to interview the proposed on-site Project Superintendent at any time in order to verify the submitted qualifications. Work Location and Restrictions The work site location is at the Puerto Rico National Cemetery, 50 Avenida Cementerio Nacional, Bayamon, Puerto Rico, 00961\. Office operating hours are Monday through Friday, 8:00 am 4:00 pm. Office is closed Federal Holidays except Memorial Day and Veterans Day. Cemetery visitation hours are daily 7:30 am 5:00 pm. Work shall not be performed on Memorial Day or Veterans Day and should be reduced in the days preceding due event preparation and high cemetery visitation. Work outside the cemetery s operating hours require 72-hour notice and approval by the COR. See General Requirements Specification Section 01 00 02 and Dignity Standards contract clause. List of Attachments The following list of documents are attached to this SOW for Contractor use and incorporation into the project documents: 1\. Project Milestone outline 2\. 871CM3033 Storm System Design Conceptual Drawings 3\. 871CM3033 Storm System Design Project Manual / Specifications / Geotechnical Report 4\. Puerto Rico National Cemetery GIS data files 5\. 871CM3033 AutoCAD Design data files 6\. Sample Forms Transmittal Form (4025) Submittal Register (4288) Quality Control Reports (4296) Contractor Production Report Contractor Quality Control Report Government Quality Assurance (QA) Report Initial Phase Checklist Preparatory Phase Checklist Rework Items List Testing Plan and Log RFI Form (6108) Activity Hazard Analysis (6206) Accident Prevention Plan (6293) Solid Waste Disposal and Diversion Note above is not an exhaustive list of required and/or available forms. Contractor s Architect/Engineer (A/E) Requirements Required Disciplines and Expertise The Contractor shall engage the services of all A/E consultants in each discipline deemed to be necessary to fulfill the requirements of the project plan, permitting, and regulatory compliance. Each discipline shall document and investigate the relevant existing conditions, review available information, and verify all essential elements pertinent to their discipline. Site investigations shall measure, photograph, and document the conditions of areas to be renovated and/or impacted. The A/E shall visit the project site to investigate the information shown on the Government Furnished drawings, record (as-built) drawings and other planning documents which are part of this contract. This information is the best available, but the Government does not guarantee its accuracy or completeness. The A/E's investigation of field conditions shall be performed in a competent professional manner in accordance with the NCA Design Manual and other applicable NCA/VA requirements. It is the A/E's responsibility to research the existing Government documents, determine those that are applicable to the project and request copies from the Government; the Government will not perform a search of Government documents to determine the information that the A/E may need during design. General Design Considerations Site Investigation In the design build process, site investigation will be divided into review of existing concept design data and additional Contractor obtained testing. The testing and the required milestones to reach them can be found in milestone outline in Attachment 1\. The milestones are defined by the Design percent complete and approval of the required submittals for the activity. Design Within Funding Limitations The design shall be prepared by the Contractor s A/E. It is anticipated that the design and some construction activities may be occurring simultaneously throughout the period of performance. All of the design and construction requirement of the project shall not exceed the project s e

<!-- mobian-agent-ad sponsored="true" id="79497ffd-7257-448a-b440-6e8f86cf0d21" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories/facilities-and-construction/construction-related-services?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


## Attachments

* [Attachment 1](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/28d96f1850dc4c0e8f2aed38d95f1919/download)

## Contacts

* Clarelle Sylvain, Contracting Officer

Email and phone are in the source notice.

[Source notice](https://sam.gov/opp/65f86f61443c4708b25dc89979cc11b1/view)

[More from United States Department of Veterans Affairs posted in March 2025](/department%5Fof%5Fveterans%5Faffairs/archive/2025-03)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Veteran-Owned Small Business Set-Aside Contracts (SDVOSB and VOSB) Available Now](/contracts/veteran-owned)
* [Construction Government Contracts Available Now](/contracts/construction)

```json
{"@context":"https://schema.org","@type":"Demand","name":"Y1PZ-- 871CM3033: Design-Build RFP , Section K Drainage  Improvements, Puerto Rico NC (VA-24-00091761)","description":"Sources Sought The National Cemetery Administration (NCA) Southeast District is currently seeking firms with the ability to provide a Design-build Project Section K Drainage Improvements - Puerto Rico at the National Cemetery, 50 Avenida Cementerio Nacional, Bayamon, Puerto Rico, 00961. Please Read the Scope of work below in its entirety and respond with LOS information. Businesses responding shall indicate their socio-economic status for example: Veteran owned small business, service-disabled veteran owned small business, HUB Zone, 8A, Woman Owned etc.Â The Small Business Administration website has the small business defined: http://dsbs.sba.gov/dsbs/search/dsp_dsbs.cfm.Â Respondents shall indicate their status as a foreign-owned or foreign-controlled firm and any contemplated use of foreign national employees on this requirement. All Vendors must be registered in the System for Award Management (SAM) and VIP Vendor Information Portal Â under the correct NAICS code. https://www.sam.gov/portal/SAM/#1 Vendors Claiming Service Disable Veterans Own Small Business (SDVOSB) or Veteran Own Small Business (VOSB) must be certified in the VETBIZ database.Â http://www.vetbiz.gov/ The NAICS code for this source sought is NAICS Code 237990 Other Heavy and Civil Engineering Construction Â Â Size standard 45K and/or the government reserves the right to consider a SDVOSB, VOSB or small business set-aside based on responses to this source sought. All information submitted by respondents to this source sought synopsis is voluntary.Â This source sought notice is not to be construed as a commitment by the Government, nor will the Government reimburse any costs associated with the submission of information and Quotes in response to this notice.Â Respondents will not individually be notified of the results of any Government assessments.Â The Government s evaluation of the capability documentation received will factor into any possible forthcoming solicitation. Please fill out the below LOSÂ Â and submit with the Sources Sought response.: VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION) (a) Pursuant to 38 U.S.C. 8127(l)(2), the offeror certifies that (1) If awarded a contract (see FAR 2.101 definition), it will comply with the limitations on subcontracting requirement as provided in the solicitation and the resultant contract, as follows: (i) [] Services. In the case of a contract for services (except construction), the contractor will not pay more than 50% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219 73 or certified VOSBs listed in the SBA certification database as set forth in 852.219 74. Any work that a similarly situated certified SDVOSB/VOSB subcontractor further subcontracts will count towards the 50% subcontract amount that cannot be exceeded. Other direct costs may be excluded to the extent they are not the principal purpose of the acquisition and small business concerns do not provide the service as set forth in 13 CFR 125.6. (ii) [X] General construction. In the case of a contract for general construction, the contractor will not pay more than 85% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219 73 or certified VOSBs listed in the SBA certification database as set forth in 852.219 74. Any work that a similarly situated certified SDVOSB/VOSB subcontractor further subcontracts will count towards the 85% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted. (iii) [] Special trade construction contractors. In the case of a contract for special trade contractors, the contractor will not pay more than 75% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219 73 or certified VOSBs listed in the SBA certification database as set forth in 852.219 74. Any work that a similarly situated certified SDVOSB/VOSB subcontractor further subcontracts will count towards the 75% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted. (2) The offeror acknowledges that this certification concerns a matter within the jurisdiction of an Agency of the United States. The offeror further acknowledges that this certification is subject to Title 18, United States Code, Section 1001, and, as such, a false, fictitious, or fraudulent certification may render the offeror subject to criminal, civil, or administrative penalties, including prosecution. (3) If VA determines that an SDVOSB/ VOSB awarded a contract pursuant to 38 U.S.C. 8127 did not act in good faith, such SDVOSB/VOSB shall be subject to any or all of the following: (i) Referral to the VA...","url":"https://matchawards.com/department_of_veterans_affairs/posts/114134679880082661","identifier":"36C78625R0009","category":"237990 - Other Heavy and Civil Engineering Construction","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"Y1PZ - CONSTRUCTION OF OTHER NON-BUILDING FACILITIES"},{"@type":"PropertyValue","propertyID":"CM category","name":"Category Management category","value":"4.2 Construction Related Services","url":"https://matchawards.com/categories/facilities-and-construction/construction-related-services"}],"availabilityStarts":"2025-03-09","availabilityEnds":"2025-03-21","validThrough":"2025-03-21T23:59:59-04:00","sameAs":"https://sam.gov/opp/65f86f61443c4708b25dc89979cc11b1/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Veteran-owned","item":"https://matchawards.com/contracts/veteran-owned"}]}
```

