<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/department_of_veterans_affairs/posts/113963868104071323" -->

---
title: J091--SOURCES SOUGHT NOTICE - ENGINEERING… (36C24525Q0295) | Closed - MatchAwards
description: J091--SOURCES SOUGHT NOTICE - ENGINEERING SERVICES  AST TANK - ICP REGULATORY - TRAINING - TANK CLOSURES SUPPORT  512-25-2-637-0059. United States Department of Veterans Affairs. Solicitation 36C24525Q0295. NAICS 541330 - Engineering Services. Deadline 2025-02-25. 8 Page 8 of 57 Page 8 of 57...
canonical: https://matchawards.com/department_of_veterans_affairs/posts/113963868104071323
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: J091--SOURCES SOUGHT NOTICE - ENGINEERING… (36C24525Q0295) | Closed
og:url: https://matchawards.com/department_of_veterans_affairs/posts/113963868104071323
og:description: J091--SOURCES SOUGHT NOTICE - ENGINEERING SERVICES  AST TANK - ICP REGULATORY - TRAINING - TANK CLOSURES SUPPORT  512-25-2-637-0059. United States Department of Veterans Affairs. Solicitation 36C24525Q0295. NAICS 541330 - Engineering Services. Deadline 2025-02-25. 8 Page 8 of 57 Page 8 of 57...
og:image: https://matchawards.com/system/accounts/avatars/000/000/015/original/f59915e906ee2b19.png?1638825904
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# J091--SOURCES SOUGHT NOTICE - ENGINEERING SERVICES AST TANK - ICP REGULATORY - TRAINING - TANK CLOSURES SUPPORT 512-25-2-637-0059

Status

Closed, the response deadline passed on Feb 25, 2025

Agency

[United States Department of Veterans Affairs](/department%5Fof%5Fveterans%5Faffairs)

Office

LINTHICUM, USA

Notice type

Sources Sought

Solicitation number

36C24525Q0295

NAICS

[541330 - Engineering Services](/groups/897)

PSC

J091 - MAINT/REPAIR/REBUILD OF EQUIPMENT- FUELS, LUBRICANTS, OILS, AND WAXES

Category

[Industrial Products Install / Maintenance / Repair (5.5)](/categories/industrial-products-and-services/industrial-products-install-maintenance-repair)

Posted

2025-02-07

Deadline

2025-02-25

Place of performance

Baltimore, Maryland 21201, UNITED STATES

## Description

8 Page 8 of 57 Page 8 of 57 SUMMARY: Department of Veterans Affairs, Veterans Health Administration, Network Contracting Office 5, is issuing this request for sources sought notice in order to identify vendors that are interested in and capable of providing contractor services. For a contractor that can provide a licensed MD Professional Engineer (P.E.) and STI SP001 Inspector(s). For Tank and ICP Regulatory; Training; and Tank Closure Support. To comply with The Joint Commission Emergency Power Systems requirements in EC.02.0.07 and the Joint Commission Emergency Management requirement, EM.02.01.01, the VAMHCS currently has 43 aboveground fuel sources for emergency power systems (Aboveground Storage Tanks, ASTs). There is also other oil-filled equipment such as wet transformers and elevator hydraulic reservoirs. For the Baltimore VA Medical Center, Loch Raven VA Medical Center, and the Perry Point VA Medical Center. For response details see Interested & Capable Responses last two pages. SCOPE OF WORK: Locations: Baltimore VA Medical Center Perry Point VA Medical Center 10 North Greene Street 361 Boiler House Rd. Baltimore, MD 21201 Perry Point, MD 21902 Loch Raven VA Medical Center 3900 Loch Raven Blvd Baltimore, MD 21218 Tank and ICP Regulatory; Training; and Tank Closure Support for Baltimore VAMC; Loch Raven VAMC and Perry Point VAMC Integrated Contingency Plans (ICPs) 512-25-2-637-0059 I. INTRODUCTION To comply with The Joint Commission Emergency Power Systems requirements in EC.02.0.07 and the Joint Commission Emergency Management requirement, EM.02.01.01, the VAMHCS currently has 43 aboveground fuel sources for emergency power systems (Aboveground Storage Tanks, ASTs) Please see Attachment A for a list of VAMHCS ASTs and USTs. This list will change as tanks are added and removed. . There is also other oil-filled equipment such as wet transformers and elevator hydraulic reservoirs. ASTs and USTs fall under several environmental regulatory requirements: Section 112.7(e) of the Clean Water Act and Maryland Department of the Environment Oil Operations Permit, Code of Maryland Regulations (COMAR) 26.10.01-.18 and all associated standards and references within the regulations such as NFPA 30; PEI RP 1700; STI SP001; etc; as well as the latest COMAR regulations that pertain to ASTs. This base plus four-year best value contract will provide AST subject matter expert support to accomplish the following for the Baltimore; Loch Raven; and Perry Point VAMCs: CLIN 1.0 Update Integrated Contingency Plans (ICPs) CLIN 2.0 Modify/Update and present ICP training to VAMHCS Personnel CLIN 3.0 Update VAMHCS AST/UST policies; fuel system SOPs and other tank-related documentation based on latest MDE AST/UST regulations and all associated standards and references within the regulations such as those from NFPA; PEI; STI SP001; etc. CLIN 4.0 AST Closure support for VAMHCS tanks based on latest MDE AST/UST regulations and all associated standards and references within the regulations such as NFPA 30; PEI RP 1700; STI SP001, etc. as well as with the Resource Conservation and Recovery Act (RCRA) All updates, support, and training shall be conducted in accordance with the following regulations: 40 CFR 112 (Clean Water Act SPCC requirements) 40 CFR 262.34 and 40 CFR 265.52 (RCRA Contingency Plan) Code of Maryland Regulations (COMAR) 26.13.05.04 (Maryland Contingency Plan Requirements) COMAR 26.10.01-.18 (MDE Oil Pollution Control and Storage Tank Management) and all associated standards and references within the regulations such as those from NFPA; PEI; STI; etc. COMAR 26.10.17.13 (Closure of shop-fabricated aboveground storage tank (AST) systems COMAR 26.10.18.12 (Closure of field-erected AST systems) National Fire Protection Association sections NFPA 30, Flammable and Combustible Liquids Code; Petroleum Equipment Institute (PEI) RP 1700; All applicable state and local regulations, Executive Orders, VA Directives, and Facility Policies. II. DESCRIPTION OF WORK 1.0 CLIN 1.0 ICP UPDATES The contractor shall update the Baltimore; Loch Raven; and Perry Point VAMC ICPs as identified below and as needed each year due to technical changes from construction contracts. VISN Facility RCRA LQG Required Plan Update Date of last update 5 Baltimore VAMC Yes ICP 2020 5 Perry Point VAMC Yes ICP 2021 5 Loch Raven VAMC Yes ICP 2020 At a minimum the creation, updates and revisions for ICPs shall: Describe the actions facility personnel must take to response to fires, explosions, or any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents to air, soil, or surface water at the facility. Describe arrangements agreed to by local police departments, fire departments, hospitals, contractors, and State and local emergency response teams to coordinate emergency services. List names, addresses, and phone numbers (office and home) of all persons qualified to act as emergency coordinator, and this list must be kept up to date. Where more than one person is listed, one must be named as primary emergency coordinator, and others must be listed in the order in which they will assume responsibility as alternates. Include a list of all emergency equipment at the facility (such as fire extinguishing systems, spill control equipment, communications and alarm systems (internal and external), and decontamination equipment), where this equipment is required. This list must be kept up to date. In addition, the plan must include the location and a physical description of each item on the list, and a brief outline of its capabilities. Include an evacuation plan for facility personnel where there is a possibility that evacuation could be necessary. This plan must describe signal(s) to be used to begin evacuation, evacuation routes, and alternate evacuation routes (in cases where the primary routes could be blocked by releases of hazardous waste or fires). Describe the physical layout of the facility and include a facility diagram, which must mark the location and contents of each fixed oil storage container and the storage area where mobile or portable containers are located. Including: Type of oil in each fixed container and its storage capacity for all containers over 55 gallons. For mobile or portable containers, either provide the type of oil and storage capacity for each container or provide an estimate of the potential number of mobile or portable containers, the types of oil, and anticipated storage capacities; Discharge prevention measures including procedures for routine handling of products (loading, unloading, and facility transfers, etc.); Discharge or drainage controls such as secondary containment around containers and other structures, equipment, and procedures for the control of a discharge; Countermeasures for discharge discovery, response, and cleanup (both the facility's capability and those that might be required of a contractor); Methods of disposal of recovered materials in accordance with applicable legal requirements; and Contact list and phone numbers for the facility response coordinator, National Response Center, cleanup contractors with whom you have an agreement for response, and all appropriate Federal, State, and local agencies who must be contacted in case of a discharge. Provide information and procedures to enable a person reporting a discharge to relate information on the exact address or location and phone number of the facility; the date and time of the discharge, the type of material discharged; estimates of the total quantity discharged; the source of the discharge; a description of all affected media; the cause of the discharge; any damages or injuries caused by the discharge; actions being used to stop, remove, and mitigate the effects of the discharge; whether an evacuation may be needed; and, the names of individuals and/or organizations who have also been contacted. Include a prediction of the direction, rate of flow, and total quantity of oil which could be discharged from the facility as a result of each type of major equipment failure using AutoCAD or approved software. Recommend, if needed, appropriate containment and/or diversionary structures or equipment to prevent a discharge. Be certified by a Professional Engineer licensed in the state of Maryland Identify written procedures for inspection, tests, and record keeping requirements. Include requirements for personnel, training, and discharge prevention procedures related to: Operation and maintenance of equipment to prevent discharges; discharge procedure protocols; applicable pollution control laws, rules, and regulations; general facility operations; and, the contents of the facility ICP. Key personnel who are accountable for discharge prevention. Describe how the facility will secure and control access to the oil handling, processing and storage areas; secure master flow and drain valves; prevent unauthorized access to starter controls on oil pumps; secure out-of-service and loading/unloading connections of oil pipelines; and address the appropriateness of security lighting to both prevent acts of vandalism and assist in the discovery of oil discharges. Describe procedures for filling and dispensing oil at the facility and recommend methods for preventing releases. Include a complete discussion of conformance with the applicable requirements and other effective discharge prevention and containment procedures required by federal, state and local guidelines. Include a Quick Reference Guide (QRG). 1.1 CLIN 1.0 Milestones, Time Lines and Project Submittals CLIN 1.0 Milestone CLIN 1.0 Time Line Site visits and investigations for all sites Completed within 60 days of Notice to Proceed (NTP) and within 60 days of each Option Year start date Draft submission of ICPs for all sites 90 Days after NTP and within 90 days of each Option Year start date COR review period 3 weeks after receiving drafts Final Submission 2 weeks after receiving COR comments CLIN 1.0 PROJECT SUBMITTALS: 1\. Draft ICP: One electronic copy should be sent to the COR. The COR will then review and provide comments to both the contractor and the site staff. Estimate two rounds of comment resolution for each draft. 2\. Final ICP: Six hardcopies (with electronic deliverable) will be delivered to the COR and VAMHCS Point of Contact for each VAMHCS facility (Perry Point, Baltimore, and Loch Raven VAMCs). 3\. ICP Documents: The contractor shall provide electronic access to all ICP documents. 2.0 CLIN 2.0 Training To comply with the requirements under the Clean Water Act and the Resource Conservation and Recovery Act, the VAMHCS Facilities of Baltimore, Perry Point, and Loch Raven will also require initial training on all new and updated ICPs. After the first ICP update, he contractor must provide two-hour, facility-specific, initial training to each individually identified VAMHCS facility for up to 50 employees per site (Maximum of 200 total, total 8 hours and can be done virtually, in-person or a combination of both). Contractor shall provide updates to ICP training each year following the base year. The training should provide detailed requirements related to the entire ICP; not just specific to the most recent revisions. This training will include monthly inspections; spill response and instruction on completion of documentation and recordkeeping requirements of the plan. The training shall include the submission of an electronic copy of the training for future facility training use. 2.1 CLIN 2.0 Milestones, Time Lines and Project Submittals CLIN 2.0 Milestone CLIN 2.0 Time Line Draft submission of ICP Training for each of the three sites 90 Days after NTP and within 90 days of each Option Year start date COR review period 2 weeks after receiving draft training slide deck Final Submission 2 weeks after receiving COR comments Provide Annual Training (Can be virtual via platform such as MS Teams) Within 30 days after final submission CLIN 2.0 PROJECT SUBMITTALS: 1\. Draft ICP Training: One electronic copy should be sent to the COR for each VAMHCS facility. The COR will then review and provide comments to both the contractor and the site staff. Estimate two rounds of comment resolution for each draft. 2\. Final ICP Training: Electronic file will be delivered to the COR and point of contact for each VAMHCS facility (Perry Point, Baltimore, and Loch Raven VAMCs) 3\. ICP Training: The contractor shall provide ICP training either in-person or via MS Teams (or other compatible virtual platform) for real-time training to each VAMHCS facility (Perry Point, Baltimore, and Loch Raven VAMCs). 4\. All Training Documents: The contractor shall provide electronic access to all training documents. CLIN 3.0 VAMHCS AST/UST Document Reviews and Updates Review all VAMHCS AST/UST policies; fuel system SOPs and other related documentation such as Technical Information Library tank-related specifications and update all documentation based on latest MDE AST/UST regulations and all associated standards and references within the regulations such as those from NFPA; PEI; STI SP001; etc. 3.1 CLIN 3.0 Milestones, Time Lines and Project Submittals CLIN 3.0 Milestone CLIN 3.0 Time Line Review of all VAMHCS AST and UST-related Documentation (Including related policies; SOPs; ICPs; Inspection Checklists; reports etc.) Assume review of 4-6 documents each year of the contract with most extensive review the first year of the contract. Concurrently with ICP Updates and within 90 days of each Option Year start date Track Change updates to all documents reviewed with suggestions for improvement, efficiencies, etc. Please note, the latest VAMHCS document templates must be utilized. Please refer to VAMHCS COR for latest document templates. Within 180 days of Base year start date and within 180 days of each Option year start date COR review period 2 weeks after receiving draft changes Final Submission - Two versions delivered electronically to COR: 1)Version with all track changes in the document 2)Version with all track changes accepted. 2 weeks after receiving final COR comments CLIN 3.0 PROJECT SUBMITTALS: 1\. Track Change Updates: One electronic copy should be sent to the COR for each VAMHCS document reviewed. The COR will then review and provide comments to the contractor. Estimate two rounds of comment resolution for each document reviewed. 2\. Final Documentation Updates (Track Change and Clean Versions): Electronic files of Final Track changes version and final clean versions will be delivered to the COR for each document reviewed. CLIN 4.0 Tank Closure Support: The contractor shall also complete and/or oversee and review tank closure activities at the VAMHCS sites as needed, to include any tank closures as required by the following to ensure all regulatory items are completed. This will include documentation; sampling; and testing as well as removal and disposal of tank and tank contents. For estimating purposes, assume the following (however, may be subject to change): Six AST closures in the base year of contract: 1 x 75-300 gal diesel tank (shop-fabricated) 3x 500-700 gal diesel tanks (shop-fabricated) 2 x 15,000 gal diesel tanks (shop-fabricated) Three AST closures in Year one of contract: 1 x 75-300 gal diesel tank (shop-fabricated) 1 x 500-700 gal diesel tank (shop-fabricated) 1 x 150,000 gal #2 Fuel Oil tank (Field-erected) Two AST closures in Year tow of contract: 1x 1000-4000gal diesel tank (shop-fabricated) with underground piping and two subsurface sumps 1 x 75-300 gal diesel tank (shop-fabricated) MDE does not prescribe a set number of samples per tank type or size. Assume number of samples based on worst case scenarios. For example 5-10 soil samples/AST for sizes 55 gallons to 700 gallons; 6-10 soil samples/AST for each of the 15,000-gallon tanks; and 12 shallow soil samples for the 150,000-gallon AST. Sample analyses include VOCs, MTBE, TBA, naphthalene, TPH-GRO, and TPH-DRO. Please note, this could be increased depending upon MDE requirements. Closures per COMAR 26.10 (or most recent version of MDE regulations) and COMAR 26.10.17.13 (Closure of shop-fabricated aboveground storage tank (AST) systems COMAR 26.10.18.12 (Closure of field-erected AST systems) Petroleum Equipment Institute (PEI) RP 1700 STI SP001 Resource Conservation and Recovery Act (RCRA) All Closure documentation; Sampling and testing; Removal and disposal of tank and tank contents in accordance with all EPA; MDE; and local laws; submittal to MDE and any related onsite support will be required by the Contractor AST Closure for VAMHCS tanks shall be based on latest MDE AST/UST regulations and all associated standards and references within the regulations such as NFPA 30; PEI RP 1700; STI SP001, etc. This will include permanent and temporary closure per the following or latest COMAR regulations and MDE fact sheet (this one or latest version): https://mde.maryland.gov/programs/land/OilControl/Documents/AST\_Closure\_Fact\_Sheet\_6.9.23\_6pgs.pdf: (1). At least 30 days before beginning the permanent closure of the AST system: (a) Notify MDE Oil AST & Permits Section, Oil Control Program Land and Materials Administration in writing of the planned AST system permanent closure; and (b) Submit to the Department for approval a proposed sampling plan for a site assessment to determine if there is evidence of a spill, release, or discharge where contamination is most likely to be present, which includes the sampling of, at a minimum, the following areas of the AST site: (i) Within and immediately outside of the secondary containment dike, if present; (ii) Within the footprint of the removed AST; and (iii) Beneath underground piping associated with the removed AST (if applicable); (2). Place the AST system out-of-service in accordance with Â§B of this regulation: B. Out-of-Service. An owner, an operator, and a person in charge of an AST system with a shop-fabricated AST shall complete each of the following steps to place the AST system out-of-service: (1) Remove all oil from the AST system; (2) Isolate all piping connected to the AST; (3) Remove all waste materials from the AST system, including storage tank- bottom sludge, and dispose of these materials in compliance with applicable federal, State, and local laws; (4) Purge all petroleum vapors and maintain the AST system vapor free; (5) Secure the AST system to prevent unauthorized entrance or tampering; (6) Protect the AST system from flotation; (7) Continue the operation and maintenance of corrosion protection on the AST system in accordance with Regulation .10 of this chapter; (8) Lock the fill port; (9) Label the AST using lettering at least 3 inches high, in a readily visible location on the AST, with the following information: (a) Date the AST was placed out-of-service; (b) Name of product last stored; and (c) The words "OUT-OF-SERVICE" or "EMPTY"; and (10) Notify the Department in writing 30 days before placing the AST system out-of-service. (3) Comply with PEI RP 1700 "Recommended Practices for the Closure of Underground Storage Tank and Shop-Fabricated Aboveground Storage Tank Systems"; (4) Disconnect and remove all aboveground piping associated with the AST system; (5) Disconnect and remove all underground piping associated with the AST system: (a) Under the continuous on-site presence and direction of a certified UST system technician or remover; and (b) In accordance with the UST system permanent closure procedures inÂ COMAR 26.10.10.02D; (6) Remove the AST and associated piping from the site; and (7) Within 45 days of completing the permanent closure and approved site assessment, submit a closure report to the Department detailing: (a) The AST closure activities; and (b) The results of the sampling event, including a map identifying sample locations, laboratory 

<!-- mobian-agent-ad sponsored="true" id="3ff145aa-1aa7-4f1f-95a2-c251a8751943" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories/industrial-products-and-services/industrial-products-install-maintenance-repair?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup
- Pursuit brief for this NAICS code (award history, who buys, past awardees): https://matchawards.com/naics/541330/brief?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=brief

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


## Attachments

* [Attachment 1](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/027d4e062eac4cd9a55c02d9f73410c4/download)
* [Attachment 2](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/280b741a7f00416dbb8cf41fb7561a32/download)
* [Attachment 3](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/afe3c5a30e0b42fc95827697341c8bac/download)
* [Attachment 4](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c331e493ec3b41508fc205391909b203/download)

[Source notice](https://sam.gov/opp/3f59c586da5a49e0a4657969c0938bd0/view)

[More from United States Department of Veterans Affairs posted in February 2025](/department%5Fof%5Fveterans%5Faffairs/archive/2025-02)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Professional Services Government Contracts Available Now](/contracts/professional-services)
* [Pursuit brief for NAICS 541330](/naics/541330/brief)

```json
{"@context":"https://schema.org","@type":"Demand","name":"J091--SOURCES SOUGHT NOTICE - ENGINEERING SERVICES  AST TANK - ICP REGULATORY - TRAINING - TANK CLOSURES SUPPORT  512-25-2-637-0059","description":"8 Page 8 of 57 Page 8 of 57 SUMMARY: Department of Veterans Affairs, Veterans Health Administration, Network Contracting Office 5, is issuing this request for sources sought notice in order to identify vendors that are interested in and capable of providing contractor services. For a contractor that can provide a licensed MD Professional Engineer (P.E.) and STI SP001 Inspector(s). For Tank and ICP Regulatory; Training; and Tank Closure Support. To comply with The Joint Commission Emergency Power Systems requirements in EC.02.0.07 and the Joint Commission Emergency Management requirement, EM.02.01.01, the VAMHCS currently has 43 aboveground fuel sources for emergency power systems (Aboveground Storage Tanks, ASTs). There is also other oil-filled equipment such as wet transformers and elevator hydraulic reservoirs. For the Baltimore VA Medical Center, Loch Raven VA Medical Center, and the Perry Point VA Medical Center. For response details see Interested \u0026 Capable Responses last two pages. SCOPE OF WORK: Locations: Baltimore VA Medical Center Perry Point VA Medical Center 10 North Greene Street 361 Boiler House Rd. Baltimore, MD 21201 Perry Point, MD 21902 Loch Raven VA Medical Center 3900 Loch Raven Blvd Baltimore, MD 21218 Tank and ICP Regulatory; Training; and Tank Closure Support for Baltimore VAMC; Loch Raven VAMC and Perry Point VAMC Integrated Contingency Plans (ICPs) 512-25-2-637-0059 I. INTRODUCTION To comply with The Joint Commission Emergency Power Systems requirements in EC.02.0.07 and the Joint Commission Emergency Management requirement, EM.02.01.01, the VAMHCS currently has 43 aboveground fuel sources for emergency power systems (Aboveground Storage Tanks, ASTs) Please see Attachment A for a list of VAMHCS ASTs and USTs. This list will change as tanks are added and removed. . There is also other oil-filled equipment such as wet transformers and elevator hydraulic reservoirs. ASTs and USTs fall under several environmental regulatory requirements: Section 112.7(e) of the Clean Water Act and Maryland Department of the Environment Oil Operations Permit, Code of Maryland Regulations (COMAR) 26.10.01-.18 and all associated standards and references within the regulations such as NFPA 30; PEI RP 1700; STI SP001; etc; as well as the latest COMAR regulations that pertain to ASTs. This base plus four-year best value contract will provide AST subject matter expert support to accomplish the following for the Baltimore; Loch Raven; and Perry Point VAMCs: CLIN 1.0 Update Integrated Contingency Plans (ICPs) CLIN 2.0 Modify/Update and present ICP training to VAMHCS Personnel CLIN 3.0 Update VAMHCS AST/UST policies; fuel system SOPs and other tank-related documentation based on latest MDE AST/UST regulations and all associated standards and references within the regulations such as those from NFPA; PEI; STI SP001; etc. CLIN 4.0 AST Closure support for VAMHCS tanks based on latest MDE AST/UST regulations and all associated standards and references within the regulations such as NFPA 30; PEI RP 1700; STI SP001, etc. as well as with the Resource Conservation and Recovery Act (RCRA) All updates, support, and training shall be conducted in accordance with the following regulations: 40 CFR 112 (Clean Water Act SPCC requirements) 40 CFR 262.34 and 40 CFR 265.52 (RCRA Contingency Plan) Code of Maryland Regulations (COMAR) 26.13.05.04 (Maryland Contingency Plan Requirements) COMAR 26.10.01-.18 (MDE Oil Pollution Control and Storage Tank Management) and all associated standards and references within the regulations such as those from NFPA; PEI; STI; etc. COMAR 26.10.17.13 (Closure of shop-fabricated aboveground storage tank (AST) systems COMAR 26.10.18.12 (Closure of field-erected AST systems) National Fire Protection Association sections NFPA 30, Flammable and Combustible Liquids Code; Petroleum Equipment Institute (PEI) RP 1700; All applicable state and local regulations, Executive Orders, VA Directives, and Facility Policies. II. DESCRIPTION OF WORK 1.0 CLIN 1.0 ICP UPDATES The contractor shall update the Baltimore; Loch Raven; and Perry Point VAMC ICPs as identified below and as needed each year due to technical changes from construction contracts. VISN Facility RCRA LQG Required Plan Update Date of last update 5 Baltimore VAMC Yes ICP 2020 5 Perry Point VAMC Yes ICP 2021 5 Loch Raven VAMC Yes ICP 2020 At a minimum the creation, updates and revisions for ICPs shall: Describe the actions facility personnel must take to response to fires, explosions, or any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents to air, soil, or surface water at the facility. Describe arrangements agreed to by local police departments, fire departments, hospitals, contractors, and State and local emergency response teams to coordinate emergency services. List names, addresses, and phone numbers (office and home) of all persons qualified to act as emergency coordinator, and this list must be kept up...","url":"https://matchawards.com/department_of_veterans_affairs/posts/113963868104071323","identifier":"36C24525Q0295","category":"541330 - Engineering Services","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"J091 - MAINT/REPAIR/REBUILD OF EQUIPMENT- FUELS, LUBRICANTS, OILS, AND WAXES"},{"@type":"PropertyValue","propertyID":"CM category","name":"Category Management category","value":"5.5 Industrial Products Install / Maintenance / Repair","url":"https://matchawards.com/categories/industrial-products-and-services/industrial-products-install-maintenance-repair"}],"availabilityStarts":"2025-02-07","availabilityEnds":"2025-02-25","validThrough":"2025-02-25T23:59:59-05:00","areaServed":"Baltimore, Maryland 21201, UNITED STATES","sameAs":"https://sam.gov/opp/3f59c586da5a49e0a4657969c0938bd0/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Professional services","item":"https://matchawards.com/contracts/professional-services"}]}
```

