H244- Boiler Plant Testing and Inspections for Steam & Electric Boilers -Base Plus Four (4)
- Status
- Closed, the response deadline passed on Oct 25, 2024
- Agency
- United States Department of Veterans Affairs
- Office
- Gilbert, USA
- Notice type
- Combined Synopsis/Solicitation
- Solicitation number
- 36C26225Q0047
- NAICS
- 238290 - Other Building Equipment Contractors
- PSC
- H244 - EQUIPMENT AND MATERIALS TESTING- FURNACE, STEAM PLANT, AND DRYING EQUIPMENT; NUCLEAR REACTORS
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Posted
- 2024-12-10
- Deadline
- 2024-10-25
- Place of performance
- Prescott,, 86313
Description
Attachment 1: Combined Synopsis-Solicitation for Commercial Products and Commercial Services Effective Date: 03/15/2023 Revision: 01 Description This is a combined synopsis/solicitation for commercial products and commercial services prepared in accordance with the format in Federal Acquisition Regulation (FAR) subpart 12.6, Streamlined Procedures for Evaluation and Solicitation for Commercial Products and Commercial Services, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation document will not be issued. This solicitation is issued as an RFQ. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2024-05 Dated 05/22/2024. This solicitation is Service-Disabled Veteran Owned Small Business (SDVOSB) and Small Business. The associated North American Industrial Classification System (NAICS) code for this procurement is 238290, with a small business size standard of $22 Million. The FSC/PSC is H244. The VA Northern Arizona VA Medical Healthcare System 500 N. Hwy. 89, Bldg 111 and 162, Prescott, AZ 86313 is seeking for Boiler Plant Testing. Price and Other Factors: See Attachment 2, FAR 52.212-2 Evaluation FAR Clause 52.219-75 Certificate of Compliance for Services and Construction is REQUIRED to be submitted at time of quote submission. Statement of Work for Boiler Plant Testing and Inspections for Steam & Electric Boilers This Statement of Work (SOW) describes the requirements for boiler and feedwater deaerator inspections, the inspection, testing and calibration of the boiler plant burners, controls, and instruments by qualified technicians. This also covers the requirements for the electric boilers within the Sterile Processing Service department. Boiler Plant inspections, safety device testing and calibrations are required to maintain compliance in accordance with (IAW) VHA Directive 1810, VHA Boiler and Associated Plant Safety Device Testing Manual 8th Edition, NFPA 85 Boiler & Combustion Systems Hazards Code, and ASME Boiler & Pressure Vessel Code. General Overview The services described in this SOW are required to maintain compliance with the VHA Directive 1810 Boiler and Boiler Plant Operations, VHA Boiler and Associated Plant Safety Device Testing Manual 8th Edition, NFPA 85 Boiler and Combustion Systems Hazards Code, and ASME Boiler and Pressure Vessel Code. NAVAHCS have a central high-pressure boiler plant to provide steam for heating and air conditioning, domestic hot water, kitchens, and sterilization. NAVAHCS also has electric boilers (also known as sterilizers) in our SPS Department which are also to be in compliance and are required to be inspected and tested. Boiler plant safety, reliability, efficiency, and equipment longevity are paramount concerns of NAVAHCS management. Boilers and feedwater deaerators are pressurized devices containing steam and hot water. They can fail catastrophically causing injuries and death and massive property damage. Regular inspections by experts are an essential part of a program to address these concerns. Definitions and Acronyms ASME American Society of Mechanical Engineers IAW In Accordance With VHA Veterans Health Administration NFPA National Fire Protection Association ANSI American National Standards Institute ASNT American Society for Non-Destructive Testing BEI Boiler Efficiency Institute CSD Controls & Safety Devices NB National Board NEC National Electrical Code NOx Nitrogen Oxides UT Ultrasonic Testing WFMT Wet Fluorescent Magnetic Particle Testing LOTO Lockout & Tagout M&O Maintenance & Operations FMS Facilities Management Service VAMC VA Medical Center PSI Pounds per Square Inch PSIG Pounds per Square Inch Guage EPA Environmental Protection Agency OSHA Occupational Safety & Health Administration ADOSH Arizona Division of Occupational Safety & Health ADEQ Arizona Department of Environmental Quality kW Kilo Watt PM Preventative Maintenance VA Veterans Affairs NAVAHCS Northern Arizona VA Healthcare System SPS Sterile Processing Service HTM Healthcare Technology Management Bldg Building Rm Room LB Pound HR Hour HP - Horsepower S/N Serial Number NLT No Later Than 3. Place of Performance NAVAHCS, 500 N Hwy 89, Bldg 111 (Boiler Plant), Prescott, AZ 86313 NAVAHCS, 500 N Hwy 89, Bldg 162 (SPS 2nd Floor), Prescott, AZ 86313 4. Period of Performance and Schedule Contract period of performance dates: Base Period: 11/1/2024 to 10/31/2025 Option Period I: 11/1/2025 to 10/31/2026 Option Period II: 11/1/2026 to 10/31/2027 Option Period III: 11/1/2027 to 10/31/2028 Option Period IV: 11/1/2028 to 10/31/2029 When will the services be performed (i.e. during business hours, after-hours, weekends, etc.). Work is to be done between the hours of 8:00 a.m. and 4:00 p.m. Monday thru Fridays, Requests for weekend work must be submitted in writing. At what frequency will services be performed (i.e. annually, quarterly, monthly, weekly, etc.)? Steam Boiler Inspections & Testing will be performed or provided Semi-Annually (2 times per year). 1st service will be required by NLT June 30th and the 2nd service will be required NLT December 31st. During the 1st inspection, combustion tuning will be provided, internal inspections, and safety device testing of all boilers will be completed. During the 2nd inspection, combustion tuning will be provided, external inspections, and safety device testing of all boilers will be completed. Electric Boiler Inspections & Testing will be performed or provided Annually (once per year). These will be performed NLT January 31st. During the inspection, the internal chamber will be inspected, safety devices, and the boiler will be required to be place into operation and programmed to perform safety faults as part of the required safety inspections and testing. Will services be provided on Federal Holidays? No services will be performed during holidays. 5. Equipment List List the equipment to be serviced with the make, model, description, location, and serial numbers. Keeler, 350 hp Watertube Boiler with 12,000 lb/hr Faber Burner, Bldg 111 Rm 100, S/N: 16031-1 Keeler, 350 hp Watertube Boiler with 12,000 lb/hr Faber Burner, Bldg 111 Rm 100, S/N: 16031-2 Keeler, 350 hp Watertube Boiler with 12,000 lb/hr Faber Burner, Bldg 111 Rm 100, S/N: 16031-3 Belimed AG, MST-V 600 Series, 45kW Electric Boiler, Bldg 162 Rm 230A, S/N: 3027399 Belimed AG, MST-V 600 Series, 45kW Electric Boiler, Bldg 162 Rm 230A, S/N: 3027398 Ace Tank & Heater Co, HS54-8, 1100 Gallon DA Tank, Bldg 111 Rm 100, S/N: 44583 Penway, 700 Gallon Condensate Tank, Bldg 111 Rm 100, S/N: A25957 6. Contractor Requirements NAVAHCS requires inspection of electric and steam boilers, safety device testing and calibration of SPS boilers and boiler plant burners, controls, instruments, data management and feedwater deaerators to be performed on the facility site location in Prescott, AZ. Contractor will provide the following services for the inspection of electric and steam boilers, safety device testing and calibration of SPS boilers and boiler plant burners, controls, instruments, data management and feedwater deaerators. Inspection Requirements Inspection, Testing, and Calibration Requirements Inspection Process of the Electric Boilers Steam Boiler Inspections & Testing will be performed or provided Semi-Annually (2 times per year). 1st service will be required by NLT June 30th and the 2nd service will be required NLT December 31st. During the 1st inspection, combustion tuning will be provided, internal inspections, and safety device testing of all boilers will be completed. During the 2nd inspection, combustion tuning will be provided, external inspections, and safety device testing of all boilers will be completed. Electric Boiler Inspections & Testing will be performed or provided Annually (once per year). These will be performed NLT January 31st. During the inspection, the internal chamber will be inspected, safety devices, and the boiler will be required to be place into operation and programmed to perform safety faults as part of the required safety inspections and testing. Identify inspection criteria, if applicable. Inspection Requirements: Annual internal and external inspections are required for each boiler. Internal inspections of the feedwater deaerator pressure vessel are required every six years (or more frequently if welding repairs have been performed). At least two weeks notice to NAVAHCS is required prior to an inspection. Also, the inspection must be scheduled for periods when NAVAHCS determines that the boilers that will be inspected internally will not be needed for steam supply and when the Contracting Officer s Representative (COR) or his/her designate is available on site to monitor the inspections. To maintain steam service, typically only one boiler at a time will be scheduled for internal inspections per inspection visit. Thus, multiple visits per VAMC facility will be necessary every year to inspect all the boilers internally. Feedwater deaerator pressure vessel inspections must be scheduled during periods of low steam demand. Coordinate the inspection schedule with the COR so that NAVAHCS can prepare the boilers and feedwater deaerator for the inspections in advance and have personnel available to monitor the inspections. Boilers scheduled for internal inspection will be prepared for the inspection by NAVAHCS prior to the scheduled arrival of the inspector. This includes cooling the boilers to near ambient temperature and having all manways, handholes and furnace access doors open; the boilers cleaned of loose materials waterside and fireside; electrical lock-out, tag-out in place; connecting piping isolated; proper illumination provided; compliance with confined space access requirements including having safety personnel present in the boiler plant. Similar advance preparations will be made to the feedwater deaerator when it is scheduled for internal inspection. NAVAHCS will comply with any other requirements of the inspector that are considered reasonable by NAVAHCS and have been presented in writing at least two weeks prior to the scheduled inspection. The boiler and feedwater deaerator inspections shall comply with the guidelines in the current issue of the NATIONAL BOARD INSPECTION CODE, Part RB, Inservice Inspection of Pressure- Retaining Items, and ASME Boiler and Pressure Vessel Code, Section VI or VII as applicable. In addition to those guidelines, the inspections shall comply with all NAVAHCS requirements as listed in this document. The inspector must completely enter the internal spaces of the boiler or feedwater deaerator and visually inspect all internal surfaces that can be accessed. Methods for testing safety devices shall comply with VHA Boiler and Associated Plant Safety Device Testing Manual, 8th Edition. Summary of the minimum inspection requirements for boilers: Review the boiler history including: operating conditions, date of last inspection, current inspection certificate, ASME stamping on boiler, National Board registration number, history of repairs and modifications. Review boiler logs, water test reports, and reports on tests performed on the burner controls and interlocks. Assess the external parts of the boilers and boiler accessories and piping and valves for safety, accessibility, proper maintenance and operation, cleanliness, and compliance with codes. Inspect for evidence of leakage of combustion gases or fluids, externally and internally, including all gaskets. Inspect foundations for signs of stress such as cracking or movement. Inspect boilers externally and internally for defects including bulges, blisters, cracks, wasted or eroded material, warping, general corrosion, grooving and pitting, damaged insulation. Inspect all accessible internal surfaces for waterside and fireside deposits, including scaling, sediment, debris, carbon deposits. Examine all stays and stayed plates. Inspect gas side baffles. Inspect internal drum surfaces and steam separating internals. Inspect soot blowers and verify proper alignment. Inspect tubes, tube ends and tube alignment. Check for sagging tubes. Verify that all nozzles of internal piping such as feedwater admission and bottom blowoff collection are clear with no obstructions. Inspect seating surfaces of manways and handholes. Check that boiler structure is plumb and level with no excessive deformations. Check for missing items such as bolts and nuts. Examine all valve and pipe connections to the pressure vessel. Inspect refractory including burner throat, expansion joint, bull ring, furnace seals, furnace walls and floor. Verify proper alignment of boiler assembly. Inspect furnace for evidence of flame impingement. Perform mechanical and electrical inspection of disassembled low water cutouts (disassembly by VA). Inspect piping connected to the boilers for evidence of leakage, provision for expansion, provision of adequate support, proper alignment, evidence of detrimental conditions. Inspect piping to the water column, low water cutoffs and alarms, gage glass. Verify that interior of piping is clear of obstructions. Provide recommendations for non-destructive testing when the inspections indicate that this is necessary to assure continued safety and reliability under current operating conditions. Summary of the minimum inspection requirements for feedwater deaerators: Review the feedwater deaerator history including: operating conditions, date of last inspection, current inspection certificate, ASME stamping, National Board registration number, materials of construction, extent of postweld heat treatment, history of repairs and modifications. Assess the external parts of the feedwater deaerator and accessories and piping for safety, accessibility, cleanliness. proper operation, and compliance with codes. Inspect for evidence of leakage. Verify that non-condensable gas vent line is open and proper orifice is provided to permit venting of gases. Inspect support structures for proper integrity and allowance for thermal expansion. Internal inspections (6-year intervals unless otherwise recommended because of welding repairs): Visually inspect all visible pressure vessel surfaces for corrosion, material thinning, deposits, and weld cracking. Inspect spray nozzles and trays. Certified American Society for Non-Destructive Testing (ASNT) Level II technicians shall perform non-destructive tests using the wet fluorescent magnetic particle (WFMT), ultrasonic testing (UT), and any other necessary non-destructive tests. Completely examine all accessible welds utilizing the WFMT test method. Properly prepare the surfaces before testing. Determine pressure vessel material thickness by UT. Thickness measurement locations shall be selected by dividing the storage tank heads into quadrants and taking measurements at each quadrant on two imaginary rings in each head (eight measurements total) . Measurement locations on the shell shall be on each of the quadrants, on four to six locations along the length of the shell (16 to 24 measurements total). The technician may recommend fewer or more tests to the owner, providing justification. Typically, the pressure vessel section containing the deaerator trays and sprays is not accessible for non-destructive testing. The experience is that this section, which is mainly exposed to steam, is less vulnerable to weld failures and material thinning than the storage section which contains condensate and make-up water. Calculate maximum allowable working pressure rating of vessel based on thickness measurements. Calculate depletion rate of material thickness. Inspection, Testing, and Calibration Requirements: Technicians shall provide all tools and labor necessary to perform inspection, tuning, testing, calibrating, and adjustments of burners and boiler and boiler plant controls as specified below. This shall be done every 12 months in accordance with a schedule provided by VAMC. VAMC may extend the schedule for burners in limited service. Instrumentation, monitoring and data management systems as listed below shall be calibrated every 12 months. Provide at least two-weeks notice to the Contracting Officer s Representative (COR) prior to performing the work. Work cannot be scheduled during heavy steam load periods. Only one boiler at a time can be out of service for the inspection, testing and calibration procedures. Work must be conducted when the COR or his/her designate is available on site to monitor the work. VAMC will have the boilers that are to be serviced prepared for the technicians upon their scheduled arrival. This includes having the boilers clean of soot and loose scale; fully warmed and at normal steam pressure; steam exhaust silencer system operable; all boiler, burner and fuel train pressure gages and thermometers calibrated; fuel meters in accurate operation (pressure/temperature correction factors provided, if applicable; boiler steam flow, stack temperature and flue gas oxygen instruments operating. VAMC will comply with any other requirements of the test personnel that are considered reasonable by VAMC and have been presented in writing at least two weeks prior to the scheduled testing. The inspections, testing and calibrations shall comply with: The recommendations and requirements of VHA Boiler and Associated Plant Safety Devices Testing Manual, 8th Edition. The written recommendations of the equipment manufacturers. The requirements and recommendations of NFPA 85 Boiler and Combustion Systems Hazards Code including applicable appendices. Burner performance requirements in this document. A summary of the work is as follows: Review boiler plant log sheets and alarm and trouble reports. Review records that show combustion performance (flue gas oxygen and carbon monoxide). Perform overall visual inspection of systems. Verify that systems comply with referenced codes and VAMC requirements stated in this contract. Operate burner(s) on each fuel from low fire to high fire and back to low fire in at least six increments and record combustion performance (flue gas oxygen, carbon monoxide, NOx where applicable), fuel train pressures, atomizing train pressures, burner pressures, stack temperatures, boiler steam output. Compare the combustion performance data with VAMC requirements (see below) and previous readings. If necessary, adjust the fuel flow and combustion air controllers, control valves and dampers to obtain the required performance. Record the new performance data. Verify accuracy of instrumentation listed below. Verify that all devices are properly selected for the application in terms of type, size, set point range, performance, code approval. Calibrate all instruments that are not within manufacturer s specifications for accuracy. Immediately inform COR of any recommended repairs or modifications. All of interlocks and safety devices to be inspected and tested on each boiler/burner/equipment, are contained in the VHA Boiler and Associated Plant Safety Devices Testing Manual,8th Edition, along with testing procedures. Required burner performance (natural gas and fuel oil): Turndown (ratio of maximum and minimum firing rates): 10/1 8/1 5/1 4/1 (Refer to original burner specification). Achieve, but do not exceed, boiler maximum steam flow output rating. Measure fuel input at minimum and maximum firing rates. Maximum carbon monoxide: 200 parts per million (ppm). Maximum NOx: ______ (Refer to original burner specification). Flue gas oxygen: 2.5 4.2% (Up to 5.2% at loads below 40% of maximum steam output; no upper limit at minimum firing rate; oxygen can be one percentage point higher on oil firing on single-point positioning systems). Flue gas oxygen (low excess air burners): 1.0 2.0% (Up to 2.5% at loads below 40% of maximum steam output; no upper limit at minimum firing rate; oxyMore from United States Department of Veterans Affairs posted in December 2024