596-21-104 - AJP – Replace Deteriorated Underground Utilities - Water, Sanitary & Storm Drain Distribution (SD)
- Status
- Closed, the response deadline passed on Mar 28, 2025
- Agency
- United States Department of Veterans Affairs
- Office
- MURFREESBORO, USA
- Notice type
- Presolicitation
- Solicitation number
- 36C24925R0003
- NAICS
- 236220 - Commercial and Institutional Building Construction
- PSC
- Z1DA - MAINTENANCE OF HOSPITALS AND INFIRMARIES
- Category
- Facility Related Services (4.4)
- Set-aside
- Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
- Posted
- 2025-03-26
- Deadline
- 2025-03-28
- Place of performance
- Lexington, Kentucky 40511, UNITED STATES
Description
The Lexington VA Healthcare System has a requirement for a contractor to provide construction services for Project # 596-21-104, Replace Deteriorated Underground Utilities Water, Sanitary & Storm Drain Distribution (SD) in accordance with the Statement of Work, Project Specifications and Drawings. The project work will take place in a medical environment and the proposed contractor shall take into consideration infection control, demolition noise, environmental dust control, and specialized facility requirements as necessary in working in a medical/hospital centered setting. NAICS Code 236220 is applicable to this requirement. The Small Business size standard is $45M. The estimate range of construction is between $5,000,000.00 and $10,000,000.00 This requirement will be procured by way of FAR Part 15, as a Lowest Price Technically Acceptable (LPTA) source selection process. The evaluation factors and sub-factors under consideration for this requirement will be available upon the solicitation release, which is anticipated to be on or by February 17, 2025. This requirement is a 100% set-aside for Service-Disabled Veteran Owned Small Business (SDVOSB) concerns under the authority of 38 U.S.C §8127 (d). To be considered for award, Contractors must be registered, and CVE verified in SBA VetCert at https://veterans.certify.sba.gov. In addition to the requirements as set forth in the solicitation notice (to be issued), the proposed contractor must also be determined responsible in accordance with FAR Part 9. The Contracting Officer will determine responsibility prior to award any award being made. Questions related to this requirement will only be addressed in writing by way of email to the Contract Specialist at Robert.glenn@va.gov. The Project number, Project Name and Solicitation Number must be included in the subject line of all questions related to this requirement. No questions will be considered until the actual solicitation is released, on or by February 17, 2025. END OF PRESOLICITATION NOTICEAttachments
- Attachment 1
- Attachment 2
- Attachment 3
- Attachment 4
- Attachment 5
- Attachment 6
- Attachment 7
- Attachment 8
- Attachment 9
- Attachment 10
- Attachment 11
- Attachment 12
- Attachment 13
- Attachment 14
- Attachment 15
- Attachment 16
- Attachment 17
- Attachment 18
- Attachment 19
- Attachment 20
- Attachment 21
- Attachment 22
- Attachment 23
More from United States Department of Veterans Affairs posted in January 2025