J045--Blanket Purchase Agreement (BPA) for Plumbing /Pipefitting
- Status
- Closed, the response deadline passed on Sep 9, 2024
- Agency
- United States Department of Veterans Affairs
- Office
- TOGUS, USA
- Notice type
- Solicitation
- Solicitation number
- 36C24124Q0270
- NAICS
- 238330 - Flooring Contractors
- PSC
- J045 - MAINT/REPAIR/REBUILD OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT
- Category
- Facility Related Services (4.4)
- Posted
- 2024-09-04
- Deadline
- 2024-09-09
Description
This is a Sources Sought notice only. This is not a request for quotes and no contract will be awarded from this announcement. The Government will not provide any reimbursement for responses submitted in response to this Source Sought notice. Respondents will not be notified of the results of the evaluation. If a solicitation is issued it shall be announced at a later date, and all interest parties must respond to that solicitation announcement separately. Responses to this notice are not a request to be added to a prospective bidders list or to receive a copy of the solicitation. The purpose of this announcement is to perform market research to gain knowledge of potential qualified sources and their size classification relative to NAICS 238220, (J045) with a size standard $19M. The Department of Veterans Affairs (VA), Network Contracting Office 1 (NCO 1) is seeking to identify any vendor capable of providing Plumbing and Pipefitting services per the Statement of Work below. This Sources Sought notice provides an opportunity for respondents to submit their capability and availability to provide the requirement described below. Vendors are encouraged to submit information relative to their capabilities to fulfill this requirement, in the form of a statement that addresses the specific requirement identified in this Sources Sought. Information received from this Sources Sought shall be utilized to facilitate the Contracting Officer s review of the market base, for acquisition planning, size determination, and procurement strategy. Submission Instructions: Interested parties who consider themselves qualified to perform the services are invited to submit a response to this Sources Sought Notice by 5PM EST, Monday, April 15, 2024. All responses under this Sources Sought Notice must be emailed to Rosangela.Pereira@va.gov with RFQ # 36C24124Q0326 in the subject line. Telephone inquiries will not be accepted or acknowledged, and no feedback or evaluations will be provided to companies regarding their submissions. Interested parties should complete the attached Sources Sought Worksheet. Parties may submit additional information related to their capabilities, provided it contains all the requirements contained in the Sources Sought Worksheet. Responses to this Sources Sought shall not exceed 8 pages. In addition, all submissions should be provided electronically in a Microsoft Word or Adobe PDF format. Attachment 1 Sources Sought Worksheet QUALIFICATION INFORMATION: Company / Institute Name: _______________________________________________________ Address: ______________________________________________________________________ Phone Number: ________________________________________________________________ Point of Contact: _______________________________________________________________ E-mail Address: ________________________________________________________________ Unique Entity Identifier (UEI) #: ___________________________________________________ CAGE Code: __________________________________________________________________ SAM Registered: (Y / N) Other available contract vehicles applicable to this sources sought (GSA/FSS/NASA SEWP/ETC): __________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ SOCIO-ECONOMIC STATUS: VIP Verified SDVOSB: (Y / N) VIP Verified VOSB: (Y / N) 8(a): (Y / N) HUBZone: (Y / N) Economically Disadvantaged Women-Owned Small Business: (Y / N) Women-Owned Small Business: (Y / N) Small Business: (Y / N) NOTE: Respondent claiming SDVOSB and VOSB status shall be registered and Center for Veterans Enterprise (CVE) verified in VetBiz Registry www.vetbiz.gov. BASED ON THE RESPONSES TO THIS SOURCES SOUGHT NOTICE/MARKET RESEARCH, THIS REQUIREMENT MAY BE SET-ASIDE FOR SDVOSB, VOSB, SMALL BUSINESSES OR PROCURED THROUGH FULL AND OPEN COMPETITION. CAPABILITY STATEMENT: Provide a brief capability and interest in providing the service as listed in Attachment 2 STATEMENT OF WORK with enough information to determine if your company can meet the requirement. The capabilities statement for this Sources Sought is not a Request for Quotation, Request for Proposal, or Invitation for Bid, nor does it restrict the Government to an ultimate acquisition approach, but rather the Government is requesting a short statement regarding the company s ability to provide the services outlined in the SOW. Any commercial brochures or currently existing marketing material may also be submitted with the capabilities statement. This synopsis is for information and planning purposes only and is not to be construed as a commitment by the Government. The Government will not pay for information solicited. Respondents will not be notified of the results of the evaluation. _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ Attachment 2 Statement of Work Plumbing and Pipefitting Provide all labor, transportation, materials, apparatus, tools, equipment and permits necessary for the following work. The general limit of the specified work area will be located at the VAMC, 830 Chalkstone Ave., Providence, RI 02908 and other properties either owned or leased by the VAMC. The work will entail the miscellaneous electrical maintenance, repair and installation projects as well 24-hour electrical emergency service call response. Place of Performance Department of Veterans Affairs VAMC Providence 830 Chalkstone Avenue Providence, RI, 02908 Period of Performance Five (5) years from date of issuance. A. Pipefitter maintenance, repair, installation & fabrication projects The contractor will be tasked to do the following types of pipefitting work: Install and repair high, medium and low pressure steam systems. Install, repair and test fire sprinkler systems. Install and repair domestic hot/cold water systems. Install and repair hot water boilers and the associated hot water distribution systems. Install and repair sanitary and storm water sewer systems. Install and repair sinks, toilets, faucets and the related domestic water system piping & valves. Install and repair medical and natural gas systems. Repair pipe and valve insulation that is damaged during the course of a repair project. Provide miscellaneous metal fabrication and repair projects. Parts may be purchased by the VA. Emergency & Repair Service Work The contractor will be required to provide 24/7 response to pipefitting, water system, fire sprinkler system, steam system, medical and natural gas system piping problems. Response time will be with-in 2 hours time frame. Qualifications The contractor must be a licensed plumber & pipefitter in the State of Rhode Island and Massachusetts. The contractor must provide a copy of their license to be considered for award. The contractor must be licensed to install and repair fire sprinkler systems in the State of Rhode Island and Massachusetts. Tthe contractor must provide a copy of their license to be considered for award. The contractor must be an A.S.M.E. certified welder. The contractor must provide a copy of their license to be considered for award. The contractor must have a minimum of 5 years experience working in the hospital environment. B. Infection Control Contractor shall conform to the infection control measures as specified in Attachment A. Infection Control Procedures C. Work Hours and Project Sequence Routine project work can start as early as 7:00 am and work past 4:30pm week days. Weekend work needs to be approved by the FMS Supervisor. If the Contractor desires to work during periods other than above, he must notify the Contracting Officer three (3) working days in advance of his desire to work during other periods to allow determination of availability of additional inspection forces, determination of impact on existing health care and facility operations, and for notification of fire, security and safety personnel. When the Contracting Officer determines that there are no adverse impacts to health care and facility operations and that inspection forces are reasonably available, he/she may authorize the Contractor to perform work during periods other than normal duty hours/days. However, if inspectors are required to perform in excess of their normal duty hours/days solely for the benefit of the Contractor, the actual cost of the inspection, at overtime rates, will be charged to the Contractor and will be deducted from the final payment of the Contract amount. (Note: If applicable, at time of award this paragraph will be modified to the negotiated schedule for this project). Work in the Operating Room Suite shall be performed outside normal work hours. Other critical care areas may also require work to be done outside the normal work hours. These critical care areas include the Intensive Care Unit, the Emergency Room, specialty Clinics and exam rooms. Emergency service work will occur as conditions dictate. The following Federal legal Holidays are observed: Date Holiday January 01 New Year s Day Third Monday of January Birthday of Martin Luther King, Jr. Third Monday of February Washington s Birthday Last Monday of May Memorial Day June 19 Juneteenth National Independence Day July 04 Independence Day First Monday in September Labor Day Second Monday in October Columbus Day November 11 Veterans Day Fourth Thursday in November Thanksgiving Day December 25 Christmas Day NOTE: Any of the above holidays falling on a Saturday will be observed the preceding Friday, holidays falling on a Sunday will be observed on the following Monday. Prior to commencing work on the job initially, resumption of work after prolonged interruption (7 calendar days or more), commencement of any warranty work, and upon completion of warranty work, the Contractor must notify the Contracting Officer (or his/her Contracting Officer s Representative). When relocating to new sites, returning to sites for follow-up work on a phased work plan, notification to the Contracting Officer s Representative is sufficient. Notification should be by personal contact; however, advance notification may be by telephone, or in writing, and should be accomplished sufficiently in advance to allow scheduling of inspection forces. The purpose of the above precautions is to ensure construction inspection and recording of work proceedings. D. Ordering Individual Task Orders (TO) will be issued on an as needed basis during the period of performance specified. The TOs will be issued based on proposals from the contractor that are developed from scopes of work provided by the PVAMC COR. Any services to be furnished under this contract will be ordered by issuance of TOs by the individuals or activities designated in this contract. Any Federal Contracting Officer, at the locations specified in the solicitation, or as approved in writing by the issuing office Contracting Officer, is authorized to issue orders under the BPA contract within the individual s warrant levels. Orders may be issued from date of contract award until the last day of the BPA period of performance. The Government reserves the right to unilaterally modify the contract to incorporate any future statutory changes. All TOs are subject to the terms and conditions of this contract. In the event of conflict between a TO and this contract, the contract will govern. The Government reserves the right to incorporate additional clauses, as appropriate, into individual TO solicitations and awards. E. Task Order Limitations Minimum Order: When the Government requires services covered by this contract in an amount less than $2,500 the Government will issue a credit card purchase order and not a Task Order. Maximum Order: The typical maximum Task Order limitation is $150,000 excluding subsequent in-scope modifications. The Government may combine several projects, as indicated by separate Statements of Work and individual line items, in one Task Order, as required. The maximum value of the contract will not exceed $1 million over the life of the contract. The Government at its option may in a rare case include projects exceeding $150,000. However, contractors will not be obligated to compete nor required to accept such task orders under the general terms of the contract. This is not a requirements contract. Transportation, Handling, and Storage The contractor shall coordinate with suppliers and shippers to ensure that incoming materials are properly identified with the contractor s name, contract number and project title. The contractor shall designate an authorized individual to be available to receive shipment. The Government warehouse facilities are not the shipping point and are not available for Contractor s use. The Government will not provide storage other than that available at the project site. Storage of supplies, materials and equipment on the project site shall be accomplished in such a manner so as to prevent mechanical and climatic damage and loss due to vandalism or theft. Equipment temporarily removed in the performance of work and stored on the job site shall be stored and protected in accordance with previous paragraphs, and shall be replaced in a condition compatible with its original state. Security for equipment and material removed from the job site for temporary storage until reuse shall be the responsibility of the contractor. F. Cleanup and Disposal of Debris and Fill Materials At the end of each workday, the contractor shall clean up the work and storage areas and stack all materials in a manner approved by the Contracting Officer or his/her designated representative. Upon completion of a project, the contractor shall ensure that all dirt, trash, and debris resulting from the construction operations are removed from the work area. Unless directed otherwise in the contract or by the Contracting Officer, disposal of debris shall be made at the contractor s expense and shall be delivered to a state approved disposal site located off the VA grounds and/or CBOC locations. Debris shall not be left in such a manner that wind or other weather conditions can cause the debris to be scattered outside the work area or inside the facilities via local foot traffic. G. Infection Control Procedures ATTACHMENT A INFECTION CONTROL PROCEDURES PART 1 GENERAL DEFINITIONS Construction Type A - Inspection and Non-Invasive Activities. Includes, but is not limited to: removal of ceiling tiles for visual inspection limited to 1 tile per 50 square feet; painting (but not sanding); wall covering; electrical trim work; minor plumbing; and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection. Construction Type B - Small scale, short duration activities that create minimal dust. Includes, but is not limited to: installation of telephone or computer cabling; access to pipe chase spaces; cutting of walls or ceilings where dust migration can be controlled. Construction Type C - Any work, which generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies. Includes, but is not limited to: sanding of walls for painting or wall covering; removal of floor coverings, ceiling tiles and casework; new wall construction; minor ductwork or electrical work above ceilings; major cabling activities; and any activity which cannot be completed within a single work shift. Construction Type D - Major demolition and construction projects. Includes, but is not limited to: activities that require consecutive work shifts; require heavy demolition or removal of a complete ceiling system; and new construction. Group 1 Lowest Risk Patient Risk Group - Office areas Group 2 Medium Risk Patient Risk Group - Cardiology, Echocardiography, Laboratories, Nuclear Medicine, Physical Therapy, Radiology/MRI, Respiratory Therapy Group 3 Medium-High Risk Patient Risk Group - Emergency Room, Day Surgery, Pharmacy, Endoscopy Group 4 Highest Risk Patient Risk Group - Dialysis Unit; Oncology Unit; Operating Rooms; Sterile Processing, Cardiac Catheterization & Angiography Areas, Intensive Care Unit(s); Medical/Surgical Nursing Units, Post-Anesthesia Care Units. HEPA - High Efficiency Particulate Air HEPA Filtered Equipment that uses a HEPA filter that complies with MIL-STD-282 method 102.9.1 and captures a minimum of 99.97% of particulate matter that is 0.3 micron in diameter. Level of Infection Control - Class I, II, III or IV, as determined from the Infection Control risk assessment matrix. DESCRIPTION The purpose of the infection control procedures are to minimize the risk of infection during construction by maintaining the integrity of the environment, and controlling the spread of dust. The following Infection Control Matrix defines the matrix of precautions to be implemented for construction, demolition and renovation. Matching the planned construction type with the patient risk group on the matrix defines the minimum level of infection control required (Class I, II, III or IV). Risk Level Type A Construction Activity Type B Type C Type D Group 1 Lowest Risk Class I Class II Class II Class III/IV Group 2 Medium Risk Class I Class II Class III Class IV Group 3 High Risk Class II Class II Class III/IV Class IV Group 4 Highest Risk Class I: Class II Class III/IV Class III/IV Class IV Execute work by methods to minimize raising dust and fumes from interior and exterior construction operations. Water mist work surfaces to control dust Immediately replace a ceiling tile displaced for visual inspection Use travel routes that minimize exposure of patients to construction workers, materials, tools, and equipment. Schedule utility interruptions during periods of low hospital activity. Class II: In addition to precautions for Class I: Provide temporary ICRA barrier around construction area to prevent airborne dust from dispersing into atmosphere using fire resistive polyethylene secured by poles, clips and tape with zipper door access OR use approved self-contained ICRA cart with telescoping ICRA barrier at every opening in ceiling. HEPA vacuum upper surfaces of ceiling tiles prior to removal, after removal of first tile. Seal unused doors with tape OR cover doors with fire resistive polyethylene and seal all 4 edges. Block off and seal air vents in work area, OR isolate HVAC system in areas where work is being performed to prevent contamination of ducted systems. Place adhesive walk-off mats at entrance and exit of work areas. Tightly cover waste containers before removing from the work area. HEPA vacuum work surfaces and waste containers before removing from the work area. HEPA vacuum worker clothing, tools, materials, and equipment before leaving the work area. Class III: In addition to the precautions for Class I and II: Maintain negative air pressure within work area 24 hours per day, 7 days per week by utilizing HEPA equipped air filtration units, preferably with exhaust to exAttachments
More from United States Department of Veterans Affairs posted in September 2024