<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/department_of_veterans_affairs/posts/112953327467512810" -->

---
title: C1DA--NRM-AE 632-24-112 Complete Sprinklers… (36C24224R0089) | Closed - MatchAwards
description: C1DA--NRM-AE 632-24-112 Complete Sprinklers Buildings 63,64,65. United States Department of Veterans Affairs. Solicitation 36C24224R0089. NAICS 541330 - Engineering Services. SDVOSB set-aside. Deadline 2024-08-27. SYNOPSIS THIS ANNOUNCEMENT IS NOT A REQUEST FOR PROPOSAL. THE GOVERNMENT WILL NOT...
canonical: https://matchawards.com/department_of_veterans_affairs/posts/112953327467512810
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: C1DA--NRM-AE 632-24-112 Complete Sprinklers… (36C24224R0089) | Closed
og:url: https://matchawards.com/department_of_veterans_affairs/posts/112953327467512810
og:description: C1DA--NRM-AE 632-24-112 Complete Sprinklers Buildings 63,64,65. United States Department of Veterans Affairs. Solicitation 36C24224R0089. NAICS 541330 - Engineering Services. SDVOSB set-aside. Deadline 2024-08-27. SYNOPSIS THIS ANNOUNCEMENT IS NOT A REQUEST FOR PROPOSAL. THE GOVERNMENT WILL NOT...
og:image: https://matchawards.com/system/accounts/avatars/000/000/015/original/f59915e906ee2b19.png?1638825904
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# C1DA--NRM-AE 632-24-112 Complete Sprinklers Buildings 63,64,65

Status

Closed, the response deadline passed on Aug 27, 2024

Agency

[United States Department of Veterans Affairs](/department%5Fof%5Fveterans%5Faffairs)

Office

ALBANY, USA

Notice type

Sources Sought

Solicitation number

36C24224R0089

NAICS

[541330 - Engineering Services](/groups/897)

PSC

C1DA - ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES

Category

[Construction Related Services (4.2)](/categories/facilities-and-construction/construction-related-services)

Set-aside

[Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)](/contracts/veteran-owned)

Posted

2024-08-12

Deadline

2024-08-27

Place of performance

Northport, New York 11768, UNITED STATES

## Description

SYNOPSIS THIS ANNOUNCEMENT IS NOT A REQUEST FOR PROPOSAL. THE GOVERNMENT WILL NOT PAY NOR REIMBURSE ANY COSTS ASSOCIATED WITH RESPONDING TO THIS REQUEST. THE GOVERNMENT IS UNDER NO OBLIGATION TO AWARD A CONTRACT AS A RESULT OF THIS ANNOUNCEMENT. The Department of Veterans Affairs is seeking a qualified Architect-Engineering (AE) firm to provide Schematics, Design Development, Construction Documents, Technical Specifications, Construction Period Services, Site Visits, Cost Estimates, As-Built Documentation, and all other related information for Project 632-24-112, Complete Sprinklers Buildings 63,64,65 at Northport VA Medical Center, 79 Middleville Road, Northport, NY 11768\. This requirement is being procured in accordance with the Brooks Act as implemented in FAR Subpart 36.6\. Applicable NAICS code is 541330 and small business size standard of $25.5 Million. Magnitude of Construction is between $250,000 and $500,000\. This is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) Set Aside. The anticipated award date of the proposed Architectural and Engineering Contract is on or before October 30, 2024\. Potential contractors must be registered in SAM (www.sam.gov) and visible/certified in VetCert (https://veterans.certify.sba.gov/) at time of submission of their qualifications in order to be considered for an award. As a prospective offeror or bidder for this Service-Disabled Veteran-Owned Small Business (SDVOSB) set aside, you are verifying your company meets the status requirements of a SDVOSB concern as established by VAAR 852.219-10\. NOTE - Offerors are referred to 852.219-11 (d)(1) Services. In the case of a contract for services (except construction), it will not pay more than 50% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs. In order to assure compliance with this clause, all firms submitting a SF330 for this Sources Sought Notice are required to indicate what percentage of the cost of contract performance will be expended by the concerns employees and in which discipline(s) and percentage of cost of contract performance to be expended (and in what disciplines) by any other subcontracted or otherwise used small or large business entity(s). Any subcontracted or otherwise business entity(s) used must be identified by name, office location and size/type of business (i.e. SDVOSB, VOSB, 8(a), large, etc). The scope of this project is to review the existing fire protection system (sprinkler, standpipe, and fire alarm) that had been previously designed and built, however the installation had not been completed. Due to the length of time that project has remained in its current unfinished state, the A/E will need to perform a complete review of the drawings and a detailed survey of the existing system to identify the accuracy of installation as compared to the existing drawings, as well as for code compliance. The A/E shall submit a design narrative to describe the accuracy of the existing drawings (to be provided by the VA), a description of the work that will be performed by the A/E, including the design modifications needed for system functionality and code compliance, including proposed dates of submissions. The A/E shall submit completed signed and sealed design drawings (accurately depicting the system in its current state) of the standpipe/sprinkler (wet & dry) systems with the incorporated changes (as needed) including the design modifications needed for system functionality and code compliance. The drawings shall include integration of all applicable electrical components (i.e. tamper/flow switches, etc) into the existing fire alarm system. Upon completion of the design, the construction work will be performed through a solicited contract, outside of this solicitation. The A/E shall provide Construction Administration support during the construction period & upon finalization of construction, the A/E shall submit accurate signed and sealed drawings of the as-built standpipe and sprinkler systems with the incorporated changes (as needed) to conform to the latest codes and integration of all applicable electrical components into the existing fire alarm system. Additionally, A/E shall include a construction cost estimate. The A/E drawings shall include sprinkler/standpipe plans & riser diagram(s), electrical/ fire alarm plan(s) and one-line diagrams. All sensing devices that are applicable to the sprinkler and standpipe systems (i.e. tamper switch, flow switch, etc) shall be shown on the drawings. The drawings must include location of; fire hose valves, sprinkler floor control valves (SFCV), risers, spare sprinkler cabinet, main fire alarm panel, Fire department connections and all required components as stated in the VA TIL. The final drawings shall include but not limited to; Hydraulic calculations, pipe size and label (i.e, SP, FPS, etc) and all associated components labeled/ identified, hose travel, code adoption information, equipment/material schedules, details and notes. The A/E shall perform a hydrostatic flow test (valid for one year) with assistance from the VA Fire Department to include the system flow and pressure in the hydraulic calculation(s). A/E shall submit hydraulic calculation report and the A/E drawings shall include hydraulic calculation information (area of calc., node numbers, etc) that show a fully functioning system design that meets all requirements. The final signed and sealed drawings shall be from a Licensed Professional Engineer in the State of New York. The drawings are to be delivered in phases as listed below. Each milestone/submission will be reviewed by the VA Engineers and a VA contracted third party A/E Firm. The delivery method for each submission shall be one (1) set of paper drawings per trade, at half-size scale, and licensed AutoCAD 2020 drawings (bonded with no external references). The A/E shall review and respond to the collective comments within 14 calendar business days. The period of performance is 196 calendar days. Milestones Description Percent of Completion AE Time Allotment (calendar days) VA Time Allotment (calendar days) 1 Design Narrative 15 56 14 2 35% CD 25 28 14 3 65% CD 25 28 14 4 100% CD 25 28 14 5 CA Service during construction 10 TBD TBD The Project shall comply with the latest VA-adopted codes and standards including, but not limited to the National Fire Protection Association (NFPA), VA Directives, VA Design Manuals, VA Master Specifications, VA Design Criteria and other documents found on the Technical Information Library website (https://www.cfm.va.gov/til). I. SCHEMATICS. General Scope. The Architect-Engineer (A/E) shall review the program materials furnished by VA to ascertain the requirements of this phase of work, perform a detailed site survey and subsurface investigation, soil borings (as required) and shall prepare Schematic Documents for review and approval of VA as further described in the A/E Submission Instructions, which details the minimum requirements for various A/E submissions. Services under this phase shall include, but not be limited to the following: (1) Site Design; (2) Fire standpipe, sprinkler and fire alarm plans, elevations, preliminary selection of building systems and materials; (3) Project Specifications; (4) construction Phasing Plans (5) Design Narrative, Hydrant flow info, Required Calculations and any other support information; (6) Cost Estimating and other work as necessary and outlined in A/E Submission Instructions. II. DESIGN DEVELOPMENT DOCUMENTS. General Scope. The A/E shall review the program materials furnished by VA and all prior submissions to ascertain the requirements of this phase of the work and shall prepare Design Development Documents illustrating the scale and relationship of project components for review and approval of VA as further described in A/E Submission Instructions. Services under this phase shall include, but not be limited to the following: (1) Site Design; (2) Fire standpipe, sprinkler and fire alarm plans, sections, elevations, preliminary selection of building systems and materials; (3) Project Specifications; (4) construction Phasing Plans; (5) Design Narrative, Reports, Required Calculations and any other support information; (6) Cost Estimating and other work as necessary and outlined in A/E Submission Instructions. III. CONSTRUCTION DOCUMENTS. General Scope. Based upon the approved Schematics and Design Development Documents, other program materials furnished by VA, and any further adjustments in the design scope or quality of the Project, the A/E shall ascertain the requirements of this phase of the work and shall prepare, for approval by VA, Construction Documents and Final signed and sealed documents (by NYS PE). Services under this phase shall include (1) Site Design; (2) Fire standpipe, sprinkler and fire alarm plans, sections, elevations, preliminary selection of building systems and materials; (3) Project Specifications; (4) construction Phasing Plans; (5) Design Narrative, Reports, Required Calculations and any other support information including hydraulic calculations; (6) Cost Estimating and other work as necessary and outlined in A/E Submission Instructions. IV. SITE SURVEYS, SUBSURFACE AND OTHER INVESTIGATIONS. The A/E shall obtain the services of subcontractors as necessary to conduct any architectural surveys, hydrostatic flow testing survey, subsurface utility survey and other such investigations as required for the proper design of the Project. The reports from these investigations shall be included in the Design Narratives along with a technical report summarizing the deficiency findings proposed recommendations. All the above is included in the scope of work. V. PROJECT INDUSTRIAL HYGIENIST. (Not used.) VI. BID ALTERNATES (Not used.) VII. SERVICES DURING BIDDING PERIOD. The A/E shall attend authorized conferences, including Pre-Bid Walk-thru and Pre-Construction Conference, as requested by the Contracting Officer or the COR. The A/E shall at a minimum provide representatives of the following professional registered disciplines for each conference: Professional Engineer (Fire Protection), Architect, Electrical Engineer. VIII. SERVICES DURING THE CONSTRUCTION PERIOD. The A/E shall act in an advisory and consultant capacity to the Contracting Officer. The A/E, when requested, shall assist the Contracting Officer and the Resident Engineer to interpret the construction documents and shall: (1) recommend any action(s) he deems suitable for the satisfactory prosecution of the construction work; (2) prepare any supplemental drawings, specifications or other documents that may be required to clarify or supplement the construction documents; and (3) assess the preparation of Construction Contract Modifications initiated by or through VA to be executed in accordance with the Construction Documents. The A/E shall review all Government initiated and/or the Construction Contractor's cost proposals for construction modifications when requested by the COR/Resident Engineer. The A/E's reply regarding his/her review of cost proposals and recommendations shall include an independent breakdown of costs in detail with quantities and unit prices and shall cover both additions and deductions of labor, materials and equipment. The A/E shall review the Construction Contractor's shop drawings, product cut sheet submittals, schedules, manufacturer s product literature and samples, testing laboratory reports, field test data and review the materials for compliance with the construction documents (drawings and specifications). The A/E shall recommend approval, disapproval, or recommend to revise and resubmit based on comments provided in the review. The AE shall perform the review and return the submittal to the COR in a timely manner (10 business days). The A/E shall notify the Resident Engineer in writing of any deviations from the requirements of the construction documents that he has found in the Construction Contractor's submittals. The A/E shall visit the construction site when requested to do so by the COR. The A/E shall perform periodic inspections when requested by the COR, advising the COR/Resident Engineer of any deviations or deficiencies in a Field Report to be submitted in a timely fashion following the visit. The AE shall respond to RFI s submitted by the contractor in a timely manner. The AE shall submit As-Builts at the completion of the project which will be based on red-line drawings received from the contractor as well as a site survey at the completion of work. The A/E shall provide registered architects and professional engineers who are familiar with the project design work to act as advisers to the VA team conducting intermediate inspections, partial final and/or final inspection(s) and Punch List inspections of the Project. IX. POST-CONSTRUCTION SERVICES. For a period of one (1) year after final payment, the A/E shall be obligated to furnish advisory or consulting services which are normal to such a professional contract and necessary to assure the proper functioning of elements of the A/E design. The Construction Contractor shall furnish to the A/E a marked-up set of prints showing all changes made during the construction period. The A/E shall incorporate into the drawings all significant changes marked-up by the Construction Contractor and, any significant changes made by solicitation amendments and construction contract modifications. The A/E shall prepare record drawings (As-Builts) by making changes on the original contract drawings. Submission shall be subject to the approval of the Contracting Officer as to quality and completeness. X. CONTRACT SECURITY. This contract does not involve VA sensitive information and contractor personnel do not require access to VA systems. Information made available to the contractor or subcontractor by VA for the performance or administration of this contract or information developed by the contractor/subcontractor in performance or administration of the contract shall be used only for those purposes and shall not be used in any other way without the prior written agreement of VA. This contract does not involve VA sensitive information/data. XI. INFORMATION SECURITY PRIVACY. Information made available to the Contractor or subcontractor by VA for the performance or administration of this contract or information developed by the Contractor/subcontractor in performance or administration of the contract shall be used only for those purposes and shall not be used in any other way without the prior written agreement of the VA. This clause expressly limits the Contractor/subcontractor's rights to use data as described in Rights in Data - General, FAR 52.227-14(d) (1). The term security incident means an event that has, or could have, resulted in unauthorized access to, loss or damage to VA assets, or sensitive information, or an action that breaches VA security procedures. The Contractor/subcontractor shall immediately notify the COTR and simultaneously, the designated ISO and Privacy Officer for the contract of any known or suspected security/privacy incidents, or any unauthorized disclosure of sensitive information, including that contained in system(s) to which the Contractor/subcontractor has access. The C&A requirements do not apply, and a Security Accreditation Package is not required. VA Privacy Training for Personnel without Access to VA Computer Systems or Direct Access to or the Use of VA Sensitive Information: The Department of Veterans Affairs, VA must comply with all applicable privacy and confidentiality statutes and regulations. One of the requirements in VA is to have all personnel trained annually on privacy requirements. Privacy represents what must be protected by VA in the collection, use, and disclosure of personal information whether the medium is electronic, paper or verbal. This document satisfies the basic privacy training requirement for a contractor, volunteer, or other personnel only if the individual does not use VA sensitive information or protected health information (PHI) in any form such as electronic or paper or have access to any VA computer system. The COTR/ Project Manager is responsible to obtain this training from the contractor and to maintain according to the Records Control Schedule (RCS 10-1). XII. National Archives and Records Administration (NARA) Records Management 1\. Contractor shall comply with all applicable records management laws and regulations, as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. chs. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a). These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion. 2\. In accordance with 36 CFR 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of 44 U.S.C. chapters 21, 29, 31, and 33, the Freedom of Information Act (FOIA) (5 U.S.C. 552), as amended, and the Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation. 3\. In accordance with 36 CFR 1222.32, Contractor shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law. Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data. 4\. The Department of Veterans Affairs Northport Medical Center and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of The Department of Veterans Affairs Northport Medical Center or destroyed except for in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701\. In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, Contractor must report to \[FACILITY\]. The agency must report promptly to NARA in accordance with 36 CFR 1230\. 5\. The Contractor shall immediately notify the appropriate Contracting Officer upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the \[contract vehicle\]. The Contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records and/or equipment is properly protected. The Contractor shall not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government s behalf, without the express written permission of the Head of the Contracting Activity. When information, data, documentary material, records and/or equipment is no longer required, it shall be returned to The Department of Veterans Affairs Northport Medical Center control or the Contractor must hold it until otherwise directed. Items returned to the Government shall be hand carried, mailed, emailed, or securely electronically tr 

<!-- mobian-agent-ad sponsored="true" id="973f0819-987d-4f04-a7c8-f2b444df27bf" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories/facilities-and-construction/construction-related-services?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup
- Pursuit brief for this NAICS code (award history, who buys, past awardees): https://matchawards.com/naics/541330/brief?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=brief

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


## Attachments

* [Attachment 1](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/161b84195fbd4bd6ae423d3fe55a72c2/download)
* [Attachment 2](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/74f820cdd8dd449f818c24b107137f7b/download)

[Source notice](https://sam.gov/opp/cc257c4fc39946f28106957d34c808bb/view)

[More from United States Department of Veterans Affairs posted in August 2024](/department%5Fof%5Fveterans%5Faffairs/archive/2024-08)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Veteran-Owned Small Business Set-Aside Contracts (SDVOSB and VOSB) Available Now](/contracts/veteran-owned)
* [Professional Services Government Contracts Available Now](/contracts/professional-services)
* [Pursuit brief for NAICS 541330](/naics/541330/brief)

```json
{"@context":"https://schema.org","@type":"Demand","name":"C1DA--NRM-AE 632-24-112 Complete Sprinklers Buildings 63,64,65","description":"SYNOPSIS THIS ANNOUNCEMENT IS NOT A REQUEST FOR PROPOSAL. THE GOVERNMENT WILL NOT PAY NOR REIMBURSE ANY COSTS ASSOCIATED WITH RESPONDING TO THIS REQUEST. THE GOVERNMENT IS UNDER NO OBLIGATION TO AWARD A CONTRACT AS A RESULT OF THIS ANNOUNCEMENT. The Department of Veterans Affairs is seeking a qualified Architect-Engineering (AE) firm to provide Schematics, Design Development, Construction Documents, Technical Specifications, Construction Period Services, Site Visits, Cost Estimates, As-Built Documentation, and all other related information for Project 632-24-112, Complete Sprinklers Buildings 63,64,65 at Northport VA Medical Center, 79 Middleville Road, Northport, NY 11768. This requirement is being procured in accordance with the Brooks Act as implemented in FAR Subpart 36.6. Applicable NAICS code is 541330 and small business size standard of $25.5 Million. Magnitude of Construction is between $250,000 and $500,000. This is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) Set Aside. The anticipated award date of the proposed Architectural and Engineering Contract is on or before October 30, 2024. Potential contractors must be registered in SAM (www.sam.gov) and visible/certified in VetCert (https://veterans.certify.sba.gov/) at time of submission of their qualifications in order to be considered for an award. As a prospective offeror or bidder for this Service-Disabled Veteran-Owned Small Business (SDVOSB) set aside, you are verifying your company meets the status requirements of a SDVOSB concern as established by VAAR 852.219-10. NOTE - Offerors are referred to 852.219-11 (d)(1) Services. In the case of a contract for services (except construction), it will not pay more than 50% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs. In order to assure compliance with this clause, all firms submitting a SF330 for this Sources Sought Notice are required to indicate what percentage of the cost of contract performance will be expended by the concerns employees and in which discipline(s) and percentage of cost of contract performance to be expended (and in what disciplines) by any other subcontracted or otherwise used small or large business entity(s). Any subcontracted or otherwise business entity(s) used must be identified by name, office location and size/type of business (i.e. SDVOSB, VOSB, 8(a), large, etc). The scope of this project is to review the existing fire protection system (sprinkler, standpipe, and fire alarm) that had been previously designed and built, however the installation had not been completed. Due to the length of time that project has remained in its current unfinished state, the A/E will need to perform a complete review of the drawings and a detailed survey of the existing system to identify the accuracy of installation as compared to the existing drawings, as well as for code compliance. The A/E shall submit a design narrative to describe the accuracy of the existing drawings (to be provided by the VA), a description of the work that will be performed by the A/E, including the design modifications needed for system functionality and code compliance, including proposed dates of submissions. The A/E shall submit completed signed and sealed design drawings (accurately depicting the system in its current state) of the standpipe/sprinkler (wet \u0026 dry) systems with the incorporated changes (as needed) including the design modifications needed for system functionality and code compliance. The drawings shall include integration of all applicable electrical components (i.e. tamper/flow switches, etc) into the existing fire alarm system. Upon completion of the design, the construction work will be performed through a solicited contract, outside of this solicitation. The A/E shall provide Construction Administration support during the construction period \u0026 upon finalization of construction, the A/E shall submit accurate signed and sealed drawings of the as-built standpipe and sprinkler systems with the incorporated changes (as needed) to conform to the latest codes and integration of all applicable electrical components into the existing fire alarm system. Additionally, A/E shall include a construction cost estimate. The A/E drawings shall include sprinkler/standpipe plans \u0026 riser diagram(s), electrical/ fire alarm plan(s) and one-line diagrams. All sensing devices that are applicable to the sprinkler and standpipe systems (i.e. tamper switch, flow switch, etc) shall be shown on the drawings. The drawings must include location of; fire hose valves, sprinkler floor control valves (SFCV), risers, spare sprinkler cabinet, main fire alarm panel, Fire department connections and all required components as stated in the VA TIL. The final drawings shall include but not limited to; Hydraulic calculations, pipe size and label (i.e, SP, FPS, etc) and all associated components labeled/ identified, hose travel, code adoption information, equipment/material...","url":"https://matchawards.com/department_of_veterans_affairs/posts/112953327467512810","identifier":"36C24224R0089","category":"541330 - Engineering Services","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"C1DA - ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES"},{"@type":"PropertyValue","propertyID":"CM category","name":"Category Management category","value":"4.2 Construction Related Services","url":"https://matchawards.com/categories/facilities-and-construction/construction-related-services"}],"availabilityStarts":"2024-08-12","availabilityEnds":"2024-08-27","validThrough":"2024-08-27T23:59:59-04:00","areaServed":"Northport, New York 11768, UNITED STATES","sameAs":"https://sam.gov/opp/cc257c4fc39946f28106957d34c808bb/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Veteran-owned","item":"https://matchawards.com/contracts/veteran-owned"}]}
```

