J059--ARC Flash Analysis Updating Service Amendment 0003
- Status
- Closed, the response deadline passed on Aug 21, 2024
- Agency
- United States Department of Veterans Affairs
- Office
- Gilbert, USA
- Notice type
- Solicitation
- Solicitation number
- 36C26224Q0824_1
- NAICS
- 238210 - Electrical Contractors and Other Wiring Installation Contractors
- PSC
- J059 - MAINT/REPAIR/REBUILD OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS
- Category
- Facility Related Services (4.4)
- Set-aside
- Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
- Posted
- 2024-08-08
- Deadline
- 2024-08-21
- Place of performance
- Loma Linda, California 92357, UNITED STATES
Description
The VA Loma Linda Healthcare System (VALLHS) Facility Maintenance Services require immediate award of ARC Flash Analysis Updating to be in compliance with required electrical inspections, of the electrical distribution system. As per the NFPA99, NFPA 70E, IEEE, and the Join Commission, the VA is required to perform inspections of all switchgears, switchboards, distribution panels, motor control centers and all related components every 5 years. The services shall comply with this Performance Work Statement (PWS), all VA, local, state, and Federal policies, and regulations. The arc flash analysis shall be updated when a major modification or renovation takes place. It shall be reviewed periodically, not to exceed 5 years, to account for changes in the electrical distribution system that could affect the results of the arc flash analysis.
Attachments
More from United States Department of Veterans Affairs posted in August 2024