<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/department_of_veterans_affairs/posts/112879580050625941" -->

---
title: J059--Lock Out Tag Out System Evaluations… (36C26224Q0819_2) | Closed - MatchAwards
description: J059--Lock Out Tag Out System Evaluations, Training, Procedures -  FY24  Loma Linda VA Health Care System, California USA. United States Department of Veterans Affairs. Solicitation 36C26224Q0819_2. NAICS 541330 - Engineering Services. SDVOSB set-aside. Deadline 2024-08-09. Contract Title...
canonical: https://matchawards.com/department_of_veterans_affairs/posts/112879580050625941
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: J059--Lock Out Tag Out System Evaluations… (36C26224Q0819_2) | Closed
og:url: https://matchawards.com/department_of_veterans_affairs/posts/112879580050625941
og:description: J059--Lock Out Tag Out System Evaluations, Training, Procedures -  FY24  Loma Linda VA Health Care System, California USA. United States Department of Veterans Affairs. Solicitation 36C26224Q0819_2. NAICS 541330 - Engineering Services. SDVOSB set-aside. Deadline 2024-08-09. Contract Title...
og:image: https://matchawards.com/system/accounts/avatars/000/000/015/original/f59915e906ee2b19.png?1638825904
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# J059--Lock Out Tag Out System Evaluations, Training, Procedures - FY24 Loma Linda VA Health Care System, California USA

Status

Closed, the response deadline passed on Aug 9, 2024

Agency

[United States Department of Veterans Affairs](/department%5Fof%5Fveterans%5Faffairs)

Office

Gilbert, USA

Notice type

Solicitation

Solicitation number

36C26224Q0819\_2

NAICS

[541330 - Engineering Services](/groups/897)

PSC

J059 - MAINT/REPAIR/REBUILD OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS

Category

[Facility Related Services (4.4)](/categories/facilities-and-construction/facility-related-services)

Set-aside

[Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)](/contracts/veteran-owned)

Posted

2024-07-30

Deadline

2024-08-09

Place of performance

Loma Linda, California 92357, UNITED STATES

## Description

1. ****Contract Title**

Lock-out Tag-out (LOTO) System Evaluation Training and Procedures.

1. ****Background**

The VA Loma Linda Healthcare System (VALLHCS) requires a contractor to provide periodic evaluations of each LOTO system based on the medical center’s LOTO SOP and Policy, and applicable sections of 29 CFR 1910 and 1926; compliant LOTO training; and LOTO procedures writing services, at the Jerry L. Pettis VA Medical Center (VAMC). The services shall comply with this Performance Work Statement (PWS), all VA, local, state, and Federal policies, and regulations.

<!-- mobian-agent-ad sponsored="true" id="221f6f29-b653-41ff-85d9-c289ffe91af7" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories/facilities-and-construction/facility-related-services?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup
- Pursuit brief for this NAICS code (award history, who buys, past awardees): https://matchawards.com/naics/541330/brief?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=brief

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


1. ****Objective**

The objective of this service contract is to have a contractor to Provide all labor, materials, supplies, tools, equipment, parts, software (needed for the general operation of the equipment), travel, ICRA Barriers, supervisors, and qualified personnel to perform the evaluations, training, develop written LOTO procedures and identify and report effective techniques and procedures not standardized in this SOP or policy and report non-compliant patterns not covered by this SOW, as per below scope.

1. ****Scope**

1. 1. ****Summary of Tasks**: The firm shall provide all tools, supplies, materials, labor, supervision, transportation, and project management to perform:  
    1. Periodic LOTO system evaluations at VALLHS either biennially or annually (base plus four) which will be determined by the medical center at the task order level. The evaluation will consist of 5 parts:  
      1. a review of all policies and standard operating procedures (SOP) (VISN, medical center, facilities management service (FMS),
      2. a review of the inventory of written LOTO procedures,
      3. an evaluation of a sampling of the facility’s LOTO system,
      4. an assessment of the authorized employees’ LOTO system knowledge, skills, and abilities (KSA).
      5. an audit LOTO system training program.
    2. LOTO system training on an as-needed basis. Training frequency will be determined at the Task Order level.
    3. Develop written LOTO procedures as needed for designated equipment. The frequency will be determined at the Task Order level.
    4. Additionally, the firm is requested to identify and report effective techniques and procedures which are not standardized in the SOP or Policy and identify and report non-compliant patterns which are not specifically covered by this PWS.
1. 1. ****Definitions**:  
    1. The firm: refers to the company which performs the tasks within this PWS.
    2. Technical coordinator: a VA employee designated by the medical center to order and coordinate the services as listed in this PWS, also referred to as the Contracting Officer’s Representative (COR).
1. 1. ****LOTO System Evaluation Tasks**
1. 1. 1. ****Medical Center LOTO Policy (MCP) and SOP Review**:  
      1. Examine the most current MCP and SOP and make note of:
      2. deficiencies from or omissions of regulatory and standards requirements.
      3. recently published changes to regulations or standards which have not been incorporated.
1. 1. 1. ****LOTO Written Procedures and Inventory Management**:  
      1. Review the LOTO procedures inventory spreadsheet and the network folder which contains all the LOTO procedure documents. Identify and not deviations from the following:  
        1. There should be only one protected and current master LOTO procedure for each piece of equipment.
        2. Superseded (expired) written procedure files should be deleted or overwritten with updated procedures.
        3. Written LOTO procedure files should be linked to the digital inventory spreadsheet.

Note: In order to accomplish this task, the firm’s employee(s) must use a VA employee as a proxy to access the LOTO files located in the VA network. The firm’s employees shall never have direct, unsupervised access to any information in the VA’s network. 

1. 1. 1. 1. Throughout the evaluation, identify any unauthorized or superseded copies of the LOTO procedures.

Note: Copies will exist but those must be copies of the protected and current master LOTO procedure. 

1. 1. 1. ****Procedures Evaluation**:  
      1. Determine if written procedures meet the minimum requirements by evaluating a sampling of the written procedures. Request assistance from applicable Shop Supervisors to assign authorized employees for the following tasks:  
        1. Select the following written Lockout/Tagout procedures:  
          1. All high-pressure boilers as defined by VHA DIRECTIVE 1810.
          2. Two (2) different types of steam powered devices (heater) or steam control devices (PRV, isolation valves, steam traps).
          3. Two (2) different types of equipment using 480 VAC or more.
          4. One (1) piece of equipment using 50 VDC or more.
          5. Two (2) different types of air handlers.
          6. Two (2) heavy equipment vehicles which use hydraulics.
          7. One (1) overhead power rolling vehicle bay door.
          8. One (1) vehicle lift (motor pool).
          9. All Tagout procedures.
          10. Any equipment which has had a near miss over the past 12-months.
          11. Two (2) random Lockout procedures from each of the following shops: electrical, HVAC, plumbing, carpentry, masons, and the motor pool.

Note: If a shop has no procedures assigned to them, simply skip those shops.

Note: if the facility does not service, maintain, or repair any items in (1) to (11) above then skip those items, e.g., if all vehicle lifts are serviced by a contractor, then skip those procedures. 

1. 1. 1. 1. 1. For each of the selected Lockout/Tagout procedures, perform the following:  
          1. Verify that it substantially meets the VISN format and/or FMS SOP.
          2. Verify that the procedure contains all required information per regulations, standards, and policies.
          3. Validate information about each of the energy sources to include:  
            1. stored energy,
            2. energy magnitudes,
            3. lockout/isolation points,
            4. required lockout devices for each,
            5. methods to verify it is completely deenergized.
        2. Determine if the facility conducts periodic inspections of the procedures:
        3. If the procedure requires Tagout, then determine the modifications needed to allow Lockout, e.g., equipment replacement, a manufacturer’s retrofit device, an approved aftermarket retrofit device, a new and/or different lockout device.
1. 1. 1. ****Assessment of Authorized Employees’ LOTO KSAs**: Request assistance from the facility’s technical coordinator to assign an authorized employee from each shop/section for the following tasks.  
      1. Observe authorized employees perform each of the written procedures on equipment listed in Section II C.
      2. The authorized employees may perform an actual shutdown and reenergization of the equipment or simulate it by walking around the equipment, pointing out actual devices, stating the action(s) they would perform.
      3. If simulation is chosen, have the authorized person verbalize how they would accomplish a requirement which is not associated with the equipment, e.g., how will they notify affected employees, how to check for procedure expiration, or who to notify if errors in the procedure need to be corrected.
      4. Evaluate the abilities of the authorized employees to perform the required tasks to include:  
        1. Obtaining a valid and current copy of the written procedure.
        2. Making required notifications using effective communication modes.
        3. Obtaining the correct LOTO devices and locks.
        4. Obtaining the correct PPE and energy verification equipment.
        5. Following the procedural steps to shut down, completely deenergize, lockout the equipment, and properly verify a zero-energy state as written LOTO procedure.
        6. Verbally demonstrating an understanding of maintaining effective and positive control of the padlock keys.
        7. Removing the LOTO devices and reenergizing the equipment.
        8. Making the correct notifications and replacing the LOTO devices to the proper storage area.
        9. Completing required documentation.
        10. Verbally describing how to perform a ganged Lockout.
        11. Verbally describing who is allowed to forcibly remove a Lockout padlock.
        12. Verbally describing how to turn over a locked-out device during a shift change.
        13. Verbally confirming that all authorized employees working on a piece of equipment must all install Lockout devices, padlocks, and ID tags on each Lockout point, including work conducted by VA employees and all contractors’ employees.
      5. Document items that the authorized employee performed exceptionally well (best practices), errors made, and deficiencies in the written procedure.
1. 1. 1. ****LOTO Training Audit**:  
      1. Obtain lists of all authorized employees and affected employees and their LOTO training records.
      2. Examine training records along with other LOTO program records to determine compliance with the requirements of 29 CFR 1910.147(c)(7).
1. 1. 1. ****Written Report**:  
      1. Prepare a written report which:  
        1. identifies all deficiencies and gaps along with clarifying information.
        2. describes errors made by employees. For each error listed, state if corrective recommendations were provided and if the error is expected to be made again by any facility employees.
        3. provides recommendations to improve the facility’s LOTO system.
        4. documents techniques the facility performed exceptionally well (best practices).
      2. Provide copies of the written report to the facility’s technical representative, and the VALLHS Safety Manager.
1. 1. 1. ****Timeline**:  
      1. It is required that the LOTO evaluation:  
        1. will begin no more than 30 calendar days from the date the firm was awarded a task order.
        2. onsite portion will take no more than five business days.
        3. onsite portion will be conducted on consecutive business days.
      2. the final evaluation report will be provided to the facility’s technical representative and the VALLHS Safety Manager within 14 calendar days of the completion of the on-site portion.
1. 1. ****Training**  
    1. The firm will provide LOTO training compliant with OSHA requirements in general and focus on the requirements of the VALLHS LOTO policy and SOP.
    2. Training will be provided for authorized employees (initial and refresher) and affected employees:  
      1. Initial authorized employee (new or reassigned) training which will consist of a classroom instruction period and a practical, hands-on guided learning period which will require the instructors to be onsite at the designated learning facility.
      2. Refresher authorized employee training which will consist of a classroom instruction period and may be provided onsite or via a live and interactive virtual venue such as Teams or Zoom.
      3. Initial and refresher affected employee training will consist of a classroom instruction period and may be provided onsite or via a live and interactive virtual venue such as Teams or Zoom.
1. 1. 1. The firm will:  
      1. develop training objectives and syllabi for the different training courses, ensuring they meet OSHA and VALLHS SOP requirements.
      2. provide a syllabus for each type of training session to the facility’s technical coordinator for review,
      3. communicate and coordinate activities, requirements, equipment, and support with the technical coordinator.
1. 1. 1. The technical coordinator will ensure the following tasks are accomplished:  
      1. Organize lists of employees who need LOTO training and specify which training they need (provided by applicable supervisors).
      2. Schedule the training sessions which meet the firm’s and employees’ availability (coordinate with supervisors).
      3. Review and approve the firm’s training curriculum (refer to the VISN 22 LOTO SOP and/or FMS SOP and 1910.147).
      4. Coordinate training venues and associated items including classrooms, practical training sites and equipment, and virtual sessions,
      5. Provide a list of trainee names and associated jobs/specialties to the firm,
      6. Ensure attendance is taken,
      7. Provide training completion verification to each trainee’s supervisor,
1. 1. 1. Timeline  
      1. It is required that:  
        1. Virtual training will start no more than 30 calendar days after the task order is provided to the firm,
        2. Onsite evaluations will start within 45 days after the task order is provided to the firm,
      2. This timeline may be extended if the firm and the VA Contracting Officer mutually agree in writing on an alternative timeline. Changes in timelines will not commit the VA to additional charges for the service.
1. 1. ****Develop Written LOTO Procedures**  
    1. Evaluate equipment for which any department within VALLHS requests newly developed written procedures.  
      1. Complicated equipment or procedures will require onsite evaluation.
      2. The medical center’s technical coordinator and the firm will determine if an onsite evaluation is required.
      3. Otherwise, a virtual evaluation may be performed.
    2. Ensure the procedures conform to the current VALLHS LOTO procedures format and comply with the VALLHS SOP and OSHA requirements.
    3. Provide draft written procedures to the medical center’s technical coordinator for verification.
    4. Final versions of the written procedures will be provided electronically to the technical coordinator for inclusion into the medical center’s LOTO procedures inventory.
    5. Timeline  
      1. It is required that:  
        1. virtual evaluations will start no more than 21 calendar days after the task order is provided to the firm, and onsite evaluations will start within 30 days.
        2. Draft written procedures will be provided to the technical coordinator no more than 14 calendar days after the conclusion of the evaluation.
        3. Final written procedures will be provided to the technical coordinator no more than seven calendar days after the medical center returns the draft copy with comments and corrections.
      2. This timeline may be extended if the medical center orders more than 10 new written procedures or if the firm and the VA Contracting Officer mutually agree in writing on an alternative timeline. Changes in timelines will not commit the VA to additional charges for the service.
1. 1. ****General PWS Information**  
    1. Regulations and Standards:  
      1. 29 CFR 1910.147
      2. 29 CFR 1910 Subpart I
      3. 29 CFR 1910.333
      4. 29 CFR 1910.335
      5. 29 CFR 1926.417
      6. 29 CFR 1926.417
      7. 29 CFR 1926.600(a)(3)(i),
      8. 29 CFR 1926.702(j), NFPA 70E (most recent edition),
      9. SOP FMS 090 Lockout Tag Out Program
      10. NFPA 70 (most recent edition)
      11. NFPA 70E (most recent edition)
      12. NFPA 99 (most recent edition)
      13. ANSI/ASSE Z244.1
      14. ANSI/ASSE Z117.1
      15. ANSI A10.44-2006
      16. Respective manufacturers’ directions and instructions
1. 1. ****Special Qualifications**: The firm shall demonstrate that all lead employees assigned to this project possess expert knowledge of federal regulations, ANSI standards, and NFPA 70E as listed in section L of this document regarding control of hazardous energy, a.k.a. Lockout Tag Out (LOTO).  
    1. Demonstration of expert knowledge shall contain two or more of the following:  
      1. Certified Safety Professional (CSP),
      2. Certified Industrial Hygienist (CIH),
      3. Five or more years of documented experience instructing safety courses based on NFPA 70E and/or LOTO portions of 29 CFR 1910 and 1926 for accredited institutions,
      4. A Master Tradesperson (or equivalent) with experience working in industrial or healthcare facilities and using LOTO procedures.
      5. Five or more years as a Journeyman Tradesperson (or equivalent) working in industrial healthcare facilities and using LOTO procedures.
      6. Documented experience, training, or certifications which demonstrate equivalent levels of knowledge, skills, professionalism, and aptitude.
    2. The firm shall ensure all employees possess working knowledge of:  
      1. utility systems on large, multi-building campuses, healthcare-related machinery, and eq

## Attachments

* [Attachment 1](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/d79e33617a73465499b9419c8fbb3c03/download)

[Source notice](https://sam.gov/opp/9294cf061814426ba6f1465e56708540/view)

[More from United States Department of Veterans Affairs posted in July 2024](/department%5Fof%5Fveterans%5Faffairs/archive/2024-07)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Veteran-Owned Small Business Set-Aside Contracts (SDVOSB and VOSB) Available Now](/contracts/veteran-owned)
* [Professional Services Government Contracts Available Now](/contracts/professional-services)
* [Pursuit brief for NAICS 541330](/naics/541330/brief)

```json
{"@context":"https://schema.org","@type":"Demand","name":"J059--Lock Out Tag Out System Evaluations, Training, Procedures -  FY24  Loma Linda VA Health Care System, California USA","description":"Contract Title Lock-out Tag-out (LOTO) System Evaluation Training and Procedures. Background The VA Loma Linda Healthcare System (VALLHCS) requires a contractor to provide periodic evaluations of each LOTO system based on the medical center’s LOTO SOP and Policy, and applicable sections of 29 CFR 1910 and 1926; compliant LOTO training; and LOTO procedures writing services, at the Jerry L. Pettis VA Medical Center (VAMC). The services shall comply with this Performance Work Statement (PWS), all VA, local, state, and Federal policies, and regulations. Objective The objective of this service contract is to have a contractor to Provide all labor, materials, supplies, tools, equipment, parts, software (needed for the general operation of the equipment), travel, ICRA Barriers, supervisors, and qualified personnel to perform the evaluations, training, develop written LOTO procedures and identify and report effective techniques and procedures not standardized in this SOP or policy and report non-compliant patterns not covered by this SOW, as per below scope. Scope Summary of Tasks : The firm shall provide all tools, supplies, materials, labor, supervision, transportation, and project management to perform: Periodic LOTO system evaluations at VALLHS either biennially or annually (base plus four) which will be determined by the medical center at the task order level. The evaluation will consist of 5 parts: a review of all policies and standard operating procedures (SOP) (VISN, medical center, facilities management service (FMS), a review of the inventory of written LOTO procedures, an evaluation of a sampling of the facility’s LOTO system, an assessment of the authorized employees’ LOTO system knowledge, skills, and abilities (KSA). an audit LOTO system training program. LOTO system training on an as-needed basis. Training frequency will be determined at the Task Order level. Develop written LOTO procedures as needed for designated equipment. The frequency will be determined at the Task Order level. Additionally, the firm is requested to identify and report effective techniques and procedures which are not standardized in the SOP or Policy and identify and report non-compliant patterns which are not specifically covered by this PWS. Definitions : The firm: refers to the company which performs the tasks within this PWS. Technical coordinator: a VA employee designated by the medical center to order and coordinate the services as listed in this PWS, also referred to as the Contracting Officer’s Representative (COR). LOTO System Evaluation Tasks Medical Center LOTO Policy (MCP) and SOP Review : Examine the most current MCP and SOP and make note of: deficiencies from or omissions of regulatory and standards requirements. recently published changes to regulations or standards which have not been incorporated. LOTO Written Procedures and Inventory Management : Review the LOTO procedures inventory spreadsheet and the network folder which contains all the LOTO procedure documents. Identify and not deviations from the following: There should be only one protected and current master LOTO procedure for each piece of equipment. Superseded (expired) written procedure files should be deleted or overwritten with updated procedures. Written LOTO procedure files should be linked to the digital inventory spreadsheet. Note: In order to accomplish this task, the firm’s employee(s) must use a VA employee as a proxy to access the LOTO files located in the VA network. The firm’s employees shall never have direct, unsupervised access to any information in the VA’s network. Throughout the evaluation, identify any unauthorized or superseded copies of the LOTO procedures. Note: Copies will exist but those must be copies of the protected and current master LOTO procedure. Procedures Evaluation : Determine if written procedures meet the minimum requirements by evaluating a sampling of the written procedures. Request assistance from applicable Shop Supervisors to assign authorized employees for the following tasks: Select the following written Lockout/Tagout procedures: All high-pressure boilers as defined by VHA DIRECTIVE 1810. Two (2) different types of steam powered devices (heater) or steam control devices (PRV, isolation valves, steam traps). Two (2) different types of equipment using 480 VAC or more. One (1) piece of equipment using 50 VDC or more. Two (2) different types of air handlers. Two (2) heavy equipment vehicles which use hydraulics. One (1) overhead power rolling vehicle bay door. One (1) vehicle lift (motor pool). All Tagout procedures. Any equipment which has had a near miss over the past 12-months. Two (2) random Lockout procedures from each of the following shops: electrical, HVAC, plumbing, carpentry, masons, and the motor pool. Note: If a shop has no procedures assigned to them, simply skip those shops. Note: if the facility does not service, maintain, or repair any items in (1) to (11) above then skip those items, e.g.,...","url":"https://matchawards.com/department_of_veterans_affairs/posts/112879580050625941","identifier":"36C26224Q0819_2","category":"541330 - Engineering Services","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"J059 - MAINT/REPAIR/REBUILD OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS"},{"@type":"PropertyValue","propertyID":"CM category","name":"Category Management category","value":"4.4 Facility Related Services","url":"https://matchawards.com/categories/facilities-and-construction/facility-related-services"}],"availabilityStarts":"2024-07-30","availabilityEnds":"2024-08-09","validThrough":"2024-08-09T23:59:59-04:00","areaServed":"Loma Linda, California 92357, UNITED STATES","sameAs":"https://sam.gov/opp/9294cf061814426ba6f1465e56708540/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Veteran-owned","item":"https://matchawards.com/contracts/veteran-owned"}]}
```

