3630--Sources Sought for Calverton NC Grave Liners
- Status
- Closed, the response deadline passed on Jul 26, 2024
- Agency
- United States Department of Veterans Affairs
- Office
- QUANTICO, USA
- Notice type
- Sources Sought
- Solicitation number
- 36C78624Q0079
- NAICS
- 327390 - Other Concrete Product Manufacturing
- PSC
- 3630 - CLAY AND CONCRETE PRODUCTS INDUSTRIES MACHINERY
- Category
- Machinery & Components (5.1)
- Posted
- 2024-07-19
- Deadline
- 2024-07-26
- Place of performance
- Calverton, NY 11933
Description
SOURCES SOUGHT SYNOPSIS The National Cemetery Administration is issuing this synopsis as a means of conducting market research to identify parties having an interest in and the resources to support this requirement for supply and installation of concrete grave liners. Additional information regarding the requirement is available in the Statement of Work (SOW) in the Appendix accompanying this notice. The result of this market research will contribute to determining the method of acquisition. The applicable North American Industry Classification System (NAICS) code assigned to this acquisition is 327390. There is no solicitation at this time. This request for capability information does not constitute a request for proposals; submission of any information in response to this market survey is purely voluntary; the government assumes no financial responsibility for any costs incurred. If your organization has the potential capacity to perform these contract services, please provide the following information: organization name, address, email address, website address, telephone number, and size and type of ownership for the organization; and tailored capability statements addressing the particulars of this effort, with appropriate documentation supporting claims of organizational and staff capability, to include whether you can supply the grave liners and provide installation. If significant subcontracting or teaming is anticipated to deliver technical capability, address the administrative and management structure of such arrangements (i.e. will a subcontractor be used to provide installation services). The government will evaluate market information to ascertain potential market capacity to: provide services consistent in scope and scale with those described in this notice and otherwise anticipated; and determined what socio-economic categories can provide these services. Based on the responses to this Sources Sought Notice/Market Research, this requirement may be set aside for small business categories or procured through full and open competition. The government will not provide feedback or evaluations to companies regarding their submissions in response to this notice. Submission Instructions: Interested parties who consider themselves qualified to perform the above-listed services are invited to submit a response to this Sources Sought Notice by July 26, 2024 at 12:00 pm EST. All responses under this notice must be emailed to Sarah Poole at sarah.poole1@va.gov and use the following title in the Subject Line: 36C78624Q0079 Calverton National Cemetery Grave Liners. If you have any questions concerning this opportunity, please contact Sarah Poole, Contract Specialist at sarah.poole1@va.gov. APPENDIX 1: Purpose and Objectives STATEMENT OF WORK CONCRETE GRAVE LINERS: The Contractor shall furnish, deliver & install prefabricated concrete grave liners at the Calverton National Cemetery, 210 Princeton Blvd, Calverton, NY 11933. Grave liners will be fabricated in strict accordance with Attachment - A (GSA Commercial Item Description A-A-30194 (dated July 26, 1993) - LINER, GRAVE, CONCRETE which is attached and modified as follows: Liner dimensions to be as identified in the bid schedule. Liners are to be constructed to withstand a 20,000 pounds axle load. UNIT PRICE: The unit price indicated in the Schedule is all-inclusive and covers the fabrication, transportation, and installation of all concrete grave liners ordered. The installation & covering of concrete grave liners will be accomplished by the contractor and coordinated with the Contracting Officer s Representative (COR) or Alternate Contracting Officer s Representative (ACOR) by the provision of Calverton National Cemetery s daily interment schedule. DESCRIPTION / SPECIFICATIONS / WORK STATEMENT Contractor shall provide all labor, materials, and transportation necessary to furnish and install Concrete Grave liners at Calverton National Cemetery, 210 Princeton Blvd, Calverton, NY 11933, in accordance with the requirements of Commercial Item Description (CID), No. A-A-30194, dated July 26, 1993 (Attachment A). GENERAL REQUIREMENTS It is the contractor's responsibility to keep pace with the grave liner requirements of Calverton National Cemetery in the placement of grave liners and to remain in close proximity to excavation crews as directed and customarily required by VA National Cemetery policy and remain on station until grave covers are in place. Normally, two or more crews are used daily for excavation, which results in interments being made in more than one area (section). The contractor shall provide their employees suitable radio communication equipment to coordinate the interment operation. Calverton National Cemetery shall provide radio frequencies to assure compatibility with the cemetery s radio equipment. Caskets cannot be left unattended. If the contractor is not available to cover grave liners within the time specified; it will result in delays to the government operation. If these delays result in a necessity for government personnel to work overtime, the contractor shall reimburse the government (in the form of a payment deduction) for the overtime wages incurred. Calverton National Cemetery uses a gravesite measuring 6' x 10' and 4 x 8 in burial sections. This will require exact preciseness in placement of grave liners. Grave depths are generally 5 to 7 feet deep. Inscriptions: Date of manufacture shall be inscribed on both box & lid and shall be visible from the end of the box and lid. INSTALLATION Initial / Special Request Interments: For initial interments grave liner units are to be installed two days prior to interments. Grave liner lids shall be removed by 10:00 AM the day of scheduled interment. The removed Grave liner unit lids shall be relocated to a designated location or flatbed truck. Prior to removal each shall be and marked to identify the grave liner they shall be returned to. The grave liner unit lid shall be placed to close (secure) the grave liner unit no later than thirty (30) minutes after the casket has been lowered into the grave liner. On weekends and holidays grave liner unit lids shall be closed. Second Interments: For second interments grave liner units are to be installed in the gravesite within thirty (30) minutes of excavation. The grave liner unit lid shall be placed to close (secure) the grave liner immediately after the casket has been lowered into the grave liner. On weekends and holidays grave liner unit lids shall be closed. Superintendence by the Contractor: The contractor shall have a supervisor on station at all times during normal working hours, to include delivery, transport, and installation of grave liners. The supervisor is to serve as the single point of contact for the contractor with the COR/ACOR. The supervisor will perform 100 percent quality assurance of contractor work. At the close of business each day, the supervisor will provide a written verification in the form of a check list, verifying that all work assigned for the day has been completed and is in accordance with the contract specifications. This should accompany the manifest of liners installed that day. Safety Manager: The contractor shall provide a safety manager. The contractor safety manager must be on site at all times when work is being performed. The Superintendent may also serve as the Safety Manager. The Safety Manager must assure the contractor personnel follow all applicable VA and OSHA safety guidelines. Safety Equipment must be worn at all times. Rework and safety violations will result in Contractor Discrepancy Reports (CDR). Equipment and Manpower: Requirements will vary based on daily workload. The cemetery is active 6 days per week. The contractor must have the ability to bring personnel and equipment on and off the job as needed to meet contract requirements. (The cemetery occasionally has performed 65 internments on a single day.) Installation: All installation normally associated in the placement of grave liner units shall be the contractor's responsibility. Calverton National Cemetery shall not provide employees to assist with the installation of these units. The installation of the grave liners requires, at a minimum, a two-man crew, an operator of the boom and a spotter to guide the liner to assure precise placement and prevent cave-ins. If a cave-in occurs, the contractor shall be responsible for correcting the deficiencies. The grave liner units shall be visually spotted and placed as level as practical. Calverton National Cemetery reserves the right to determine what constitutes an acceptably placed unit. Removal, replacement or corrective work resulting from negligence by the contractor shall be corrected at no additional cost to the Government. Corrective work shall not result in delays for scheduled interments or result in Calverton National Cemetery personnel being required to work beyond the normal work hours of 8:00 am to 5:00 pm. Installation in Occupied Sections: When it is necessary to transport grave liners into established burial sections; a portable vault carrier (LOGAN) will be used. The contractor may contact the interment foreman to request the use of a contractor furnished boom truck equipped with specially modified flotation tires where appropriate. Equipment to be used in occupied sections shall not exceed 11,000-lbs. Gross axle weight with a footprint no heavier than 17 pounds per square inch when operating in established burial sections. The interment foreman shall be available to provide assistance in determining access points into burial sections. Damages Caused by Contractor's Neglect: In the event damages result to the units and/or gravesites (cave-in's) or surrounding areas, including damage to third parties due to neglect by the Contractor, repair and/or restoration will be accomplished at no cost to the agency. Corrective work because of damages will not result in delays or changes for scheduled interments, work assignments or delay daily operations. All damaged or rejected grave liner units shall be removed from the cemetery grounds by the end of each month. Storage: A minimum of three hundred (300) style 1, medium grave liners shall be stored in a designated area within the cemetery grounds at all times to assure accessibility of grave liners during inclement weather conditions and emergency situations. Protection of Lawns and Grounds: The contractor shall take positive measures to protect the finished grave from any form of damage including tire marks, ruts, etc. This may involve using contractor furnished materials such as plywood or some other material beneath all apparatus tires, specially crafted vehicles, balloon tires, etc. (The cemetery is permitted no more than 5 percent of annual interments resulting in damage to existing grades). This corrective action to repair damage must be initiated by close of business that same day. Contractor must consider soil and weather conditions at the cemetery to assure precautions are suitable for the existing conditions. DELIVERY Cemetery Access: Contractor equipment and delivery access to Calverton National Cemetery shall be through the maintenance entrance, NY Route 25 ONLY. The contractor shall be notified of requirements for grave liner units to be delivered to the Calverton National Cemetery a minimum of twenty-four (24) hours in advance. The requirements for the following day, to the extent possible, will be communicated to the contractor by 4:30pm - Monday thru Friday. Federal Holidays: The contractor will be required to work burials schedule during holidays and/or weekends within Calverton National Cemetery. The eleven holidays observed by the Federal Government are as follows: New Year's Day, Martin Luther King's Birthday, President's Day, Memorial Day, Juneteenth National Independence Day, 4th of July, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, Christmas Day, or any other day specifically declared by the President of the United States to be a National Holiday. Please note that when a holiday falls on Sunday, the following Monday will be observed as the legal holiday. When a holiday falls on Saturday, the preceding Friday is observed as a legal holiday. HOURS OF OPERATIONS: Normal hours of operation for installation of grave liner units are 8:00am through 4:30pm, Monday through Friday. The contractor shall be required to be available for work on holidays and Saturdays, as needed, when the interment section is operating; advance notice of 24 hours of holiday work shall be given except in emergency situations. The contractor agrees to phase all work in such a manner as not to impact on or interfere with cemetery operations. The contractor shall not operate equipment, machinery, or otherwise perform contract work within 250 feet of any ongoing committal service. The COR will inform the Contractor if there are specific areas of the cemetery that they need to avoid working in. CONTRACTOR RESPONSIBILITIES Appearance: Contractor personnel appearance and conduct shall be professional and unobtrusive at all times. Questions from cemetery visitors shall be politely referred or directed to cemetery personnel. Conduct: Contractor personnel shall not engage in loud or boisterous behavior, use profane or abusive language or use personal radios. Due to the sensitive mission of the Cemetery, contractor employees must exercise courtesy and respect while within the cemetery. If inquiries are received from visitors, they are to be referred to Calverton National Cemetery employees in the field or the administrative office. Dress: Contractor employees shall be fully clothed at all times, to include an upper garment to cover the body from the waist to neck and long pants. At no time are shorts allowed. Garments that have a message of slogan other than the contractor s business attire are prohibited. Other clothing in question shall require the written approval of the cemetery director or designee. The contractor shall observe traffic, parking, directional signs, and regulations when using the cemetery's roadways. Vehicles shall not be driven off the paved roadways onto non-paved areas without first securing permission from the COR/ACOR. The contractor shall leave all work areas free of debris and in the same condition as before the work commenced. The contractor agrees to take all necessary precautions to protect vegetation, as appropriate, in the immediate work area(s). Work Ethics: The Government will not tolerate a contractor influencing a family, concerned person, or funeral service persons to use or not use a Government-provided grave liner. CONTRACT MANAGEMENT Representatives of the Contracting Officer: The VA contracting officer will designate one (or more) representatives to serve as the COR/ACOR to act for him/her/they in furnishing technical guidance and advice or generally directing the work to be performed under the contract. Such designation will be in writing and will define the scope and limitations of the COR/ACOR s authority. A copy of the designation(s) shall be furnished to the contractor at time of award. Duties and responsibilities of the COR/ACOR include day-to-day monitoring of the contract as follows: Providing contract oversight and technical guidance to the contractor. Verification / certification of payments to the contractor for services rendered. Assuring that any changes effecting work involved, price, terms, and/or conditions under the contract are not implemented before written authorization is issued by the contracting officer. All administrative contract functions are the responsibility of the VA Contracting Officer. Any modifications to the contract, including those involving no-cost changes, increases, and decreases in cost or level of services provided, termination or extension of the contract (in part or in whole) and decisions concerning claims or disputes, must be authorized in writing by the government Contracting Officer. Superintendent/Site Manager: The Contractor shall provide a Superintendent/Site Manager who will be on-site at all times during contract performance. The site manager will be responsible for the following: Directing, overseeing, and coordinating the work involved. Staying abreast of all upcoming cemetery functions including special holiday events and interment activities. Ensuring that contract work does not cause any committal service, ceremony, procession, or visitation to be delayed, altered, or otherwise impacted in such a way that the dignity, security, or safety of the event or visit is compromised. The Superintendent/Site Manager will re-direct work throughout the rest of the cemetery so that productive use of labor and equipment is assured, and downtime is avoided. If the contractor fails to re-direct employees away from an event in a timely fashion, the COR/ACOR may then do so. Communication & Coordination of Work with COR/ACOR: Communication with the COR/ACOR (or designee) is strongly encouraged. Burial activities at NCA shall take precedence over contract work activities. Work activity and noise cannot disturb burial services. Trucks and workmen are prohibited from passing through the service area during this period. Notwithstanding the contractor s responsibility for total management during the performance of this contract, the administration of the contract will require maximum coordination between the Government and the contractor. The Government shall provide, at the time of contract award, a list of Government personnel authorized to act as COR/ACOR. The contractor shall possess and maintain all necessary insurance, licenses, and permits required for contract performance. Contractor is responsible for any injury to himself/herself/themself, his/her/they employees, as well as for any damage to personal or public property that occurs during the performance of this contract that is caused by his/her/they employees fault or negligence, and shall maintain personal liability and property damage insurance having coverage for a limit as required by the laws of the State of New York. Reporting "on-the-job" Injuries: The contractor is required to report all "on-the-job" injuries incurred by the contractor, its agents, or employees, resulting from performance of this contract. Contractor will notify the COR/ACOR (either orally or via telephone) within twenty-four (24) hours of the injury and provide details and exact location of the incident. This will be followed up by a written notice to the COR/ACOR. Any contractor (including its agents and employees) that knowingly files a false claim may be criminally prosecuted. (End of Statement of Work/Specifications) ATTACHMENT - A METRIC A-A-30194 July 26, 1993 COMMERCIAL ITEM DESCRIPTION LINER, GRAVE, CONCRETE The General Services Administration has authorized the use of this commercial item description as a replacement for VA Specification X1708G for concrete. This commercial item description describes concrete grave liners intended for use in National Cemetery to prevent the sinkage of soil in graves. Salient Characteristics. LINER, GRAVE, CONCRETE - Shall be constructed from reinforced concrete utilizing Portland cement. Cement will be of commercial quality using steel and/or polypropylene reinforcement. In addition the material(s) used in the production of concrete grave liners shall be impervious to any destructive action of the natural elements possibly contained in the cemetery soil which can range from extreme acidic to extreme alkaline conditions. Concrete grave liners must be properly cured for 28 days before delivery and the concrete must have a minimum compression strength of 31,027 kilopascal (kPa) or 4,500 pound-force/square inch (PSI). Style 1 - Box with separate lid Style 2 - Dome with a base Style 3 - Dome wAttachments
More from United States Department of Veterans Affairs posted in July 2024