C1DA--558-CS-400 Replace MRI 1.5T In Building 1
- Agency
- United States Department of Veterans Affairs
- Solicitation number
- 36C24624R0036
- NAICS
- 541310 - Architectural Services
- PSC
- C1DA - ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES
- Category
- Construction Related Services (4.2)
- Set-aside
- Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
- Budget
- 125,022.07
- Awardee
- WATSON ENGINEERING, PC
- Award date
- 2024-07-12
- Place of performance
- APALACHIN, 13732, NY
Description
Page 14 of 14 Page 1 of This request for A-E firm qualifications packages is 100% set-aside for Service-Disabled Veteran Owned Small Business (SDVOSB) concerns under VAAR 852.219-73, VA Notice of Total Set-Aside for Certified Service-Disabled Veteran-Owned Small Businesses (Jan 2023) (Deviation) THIS IS NOT A REQUEST FOR PROPOSAL. THIS IS A REQUEST FOR SF 330'S ARCHITECT- ENGINEER QUALIFICATION PACKAGES ONLY. PUBLIC ANNOUNCEMENT FOR PROCUREMENT OF ARCHITECT-ENGINEERING (A-E) SERVICES: This is a request for Standard Form 330, Architect-Engineer Qualifications only. A-E Services are being procured in accordance with the Selection of Architects and Engineers Statute (Public Law 92-582), formerly known as the Brooks Act, and implemented in Federal Acquisition Regulation (FAR) subpart 36.6. All submissions will be evaluated in accordance with the below selection criteria. The Government will not pay, nor reimburse, any costs associated with responding to this request. The Government is under no obligation to award a contract as a result of this announcement. Firms will be selected based on demonstrated competence and qualifications for the required work. Any resulting award for the proposed A-E services will be procured under a negotiated Firm-Fixed Price contract. GENERAL INFORMATION: The Department of Veterans Affairs, Durham Veterans Administration Health Care System, is seeking sources and intends to award a firm fixed-price contract for Architect-Engineering (A-E) firm to provide Schematics, Design Development, Construction Documents, Technical Specifications, Construction Period Services, Site Visits, Cost Estimates, As-Built Documentation, and all other related information for Project # 558-22-155, Replace MRI 1.5T In Building 1 located at 508 Fulton Street, Durham, North Carolina 27705. The A-E Services listed herein is being procured in accordance with the Federal Acquisition Regulation (FAR) 36.6 and VAAR 836.6. Potential contractors must be registered in SAM (www.sam.gov) and visible/certified in the SBA certification database at https://veterans.certify.sba.gov/ at time of submission of their qualifications in order to be considered for an award. As a prospective offeror for this Service-Disabled Veteran-Owned Small Business (SDVOSB) set aside, you are verifying your company meets the status requirements of a SDVOSB concern as established by VAAR 852.219-73. Pursuant to 38 U.S.C. 8127(l)(2), all interested firms are required to submit the certification at VAAR 852.219-75 VA Notice of Limitations on Subcontracting Certificate of Compliance for Services and Construction (Jan 2023) (Deviation) with their qualification package. The Government will not consider submissions from firms that do not provide the signed certification, and all such responses will be deemed ineligible for evaluation and award. Point of Contact: Vangie Miller, Contracting Officer Email: Vangie.Miller@va.gov PROJECT INFORMATION: Project No. 558-22-155 Project Title: A-E: Replace MRI 1.5T Durham VA Health Care System 508 Fulton Street Durham, NC 27705 The NAICS Code for this procurement is 541310, Architectural Services, and the applicable Small Business Size Standard is $12.5 million annual revenue. The projected award date for the anticipated A-E contract is on or about May 23, 2024. The NAICS code for the anticipated Construction project is projected to be 236220 and magnitude of construction is predicted to be between $500,000 and $1,000,000. The anticipated award date of the construction phase of the project is to be determined (TBD). An Architect & Engineer (A-E) contract will be negotiated for the development of complete construction documents which include working drawings, specifications, reports, and construction period services. The A-E will be given written information; participate in project planning meetings, pre-proposal meeting, and pre-construction meeting as required; communicate with VA personnel via telephone or e-mail; and is expected to coordinate so that the final documents include all requirements in accordance with industry standard practices, VA standards, VA design manuals, and review comments. STATEMENT OF TASK/SCOPE OF WORK: SCOPE OF WORK Provide professional engineering services to include phasing recommendations, investigative surveys and reports, planning, consultation and visits, design work, preparation of contract drawings and specifications, preparation of cost estimates and provision of construction period services as necessary for all demolition, construction, inspection, testing and certification for all mechanical, electrical, and plumbing components for project 558-22-155 Replace MRI 1.5T in MRI center of Building 1 at the Durham VA Health Care System, Durham, NC. The intent of this project is to provide a replacement for the MRI equipment while evaluating the space to ensure the Medical Center remains capable of providing efficient service to the Medical Center. Ensure shielding is adequate, and verify the structure is sound for removal of walls and provide preventative measures for floods. After modernization options are developed, the A/E shall work in conjunction with VAMC Staff and interested Agencies to determine the best options, then design and prepare construction documents for the mechanical, electrical, instrument & control, structural and other applicable components of this Project. The design shall include the desired future condition and allow for future construction of components without significant effect to the constructed components. The design process shall also provide a prioritization of the individual components. Location of Work: This project location is in building #1. Codes and Standards: This project will meet but is not limited to the following most recent codes and standards. All Federal and local codes including: NFPA 101, 92B, 92, 96, 72, 13, 241, and 90a National Electric Code (NEC) Life Safety Codes VA Design TIL Other applicable codes related to hospital MRI locations. VA Numbered Standards for Construction: PG-18-1 Master Construction Specifications PG-18-3 Design and Construction Procedures PG-18-4 Standard Details and CAD Standards PG-18-5 Equipment Guide List H-18-8 Seismic Design Handbook PG-18-9 Space Planning Criteria, and VA-Space & Equipment Planning System (VA-SEPS) PG-18-10 Design Manuals (by discipline) Architectural Asbestos Abatement Electrical Fire Protection HVAC systems Structural PG-18-12 Design Guides (graphical, by function) Imaging Services (with Site Visit Report) PG-18-13 Barrier Free Design Standard PG-18-14 Room Finishes, Door, and Hardware Schedule Change Summary PG-18-15 Minimum Requirements for A/E Submissions PG-18-17 Environmental Planning Guidance D-7545 Cultural Resource Management H-7545 Cultural Resource Management Procedures Office of Construction & Facilities Management - Architect/Engineer Information: National CAD Standard, VHA Application Guide VA BIM Standard v2.2 Drawing Deliverable Requirements (DDR) Architect-Engineering Services: The project design shall be completed in accordance with this A/E scope and all appropriate Department of Veterans Affairs (VA) standards, specifications, and other criteria otherwise required by the VA. The A/E shall retrieve all VA design information and standards from the VA Facilities Web Site Technical Information Library (TIL) - Office of Construction & Facilities Management (va.gov). These documents and all national, state, and local codes adopted and used by the VA shall be incorporated in the design of this project and reflected in the construction cost estimate. The A/E shall use as applicable, for planning and design purposes, the VA Numbered Standards for Construction listed under SCOPE OF WORK Codes and Standards above. Code Analysis - As part of the design the A/E will provide a detailed code analysis (per applicable codes) and comprehensive review of existing conditions for the MRI in building 1. This will include but is not limited to analysis of the building function and occupancy to determine a recommended ventilation requirement. Design Scope A full design will be created by the A/E based, in part, on the deficiencies found in the code analysis. The A/E will provide a design of a code compliant ventilation and cooling system which will include but is not limited to: Determination and calculation of the heating, ventilation and cooling loads. Full consideration of the sequence of operations of the existing refrigerant detection and ventilation systems. A NFPA 92 designed smoke control system with calculations and test procedures. Ensure coordination with existing building HVAC and BAS systems is provided per NFPA 90a and discussions with VA personnel. NESHAP and abatement plan for the affected locations for the MRI. Radiology Shielding requirements. Design: Provide design documents with working drawings, specifications, and cost estimate at 30%, 65%, 95%, and 100% design and Final stages Design Deliverables: Design Report (included in Part I submission): Prior to the initiation of any detailed design, the A/E shall, in conjunction with representatives of the Engineering Department, review documentation, conduct department interviews and tour project areas. Next the A/E will develop various alternatives, which will be presented to the Engineering Department for selection with Rough Order of Magnitude (ROM) construction estimates. Part I - 30% Submission: The requirements are working drawings at the 30% stage, marked-up specifications, and a detailed construction cost estimate showing a quantitative survey of all labor and material. Submit 3 full size set of drawings (22 x 34 ) on bond paper, 4 half size set of drawings (11 x 17 ) on bond paper, 2 copies of the marked-up specifications, 1 copy of the preliminary construction cost estimate, and an electronic copy of the drawings (.pdf and AutoCAD) and specifications (.docx and .pdf) on a CD ROM. Part II - 65% Submission: The requirements are working drawings at the 65% stage, marked-up specifications, and a detailed construction cost estimate showing a quantitative survey of all labor and material. Submit 2 full size set of drawings (22 x 34 ) on bond paper, 4 half size set of drawings (11 x 17 ) on bond paper, 4 copy of the marked-up specifications, 2 copy of the preliminary construction cost estimate, and an electronic copy of the drawings (.pdf and AutoCAD) and specifications on a CD-ROM. Part III - 95% Submission: The requirements are complete construction drawings showing all details and views, updated detailed cost estimate, and finalized specifications. Submit 3 full size set of drawings (22 x 34 ) on bond paper, 4 half size set of drawings (11 x 17 ) on bond paper, 4 copies of the marked-up specifications the updated construction cost estimate, the submittal register, Narrative for the Invitation for Bid (Provide the brief description of work for inclusion in the IFB, and an electronic copy of the drawings (.pdf and AutoCAD) and specifications on a CD-ROM. Part IV - 100% Submission: Provide 3 full size set of drawings (22 x 34 ) on bond paper, 4 sets of half size drawings (11 x 17 ) on bond paper, 2 bound sets of specifications, and an electronic copy of the drawings (.pdf and AutoCAD) and specifications on a CD-ROM. Part V - Final Submission: Provide 2 set of drawings (30 x42 ) on bond paper, 4 sets of half size drawings on bond paper, a bound set of specifications, a set of unbound specifications, and an electronic copy of the drawings (.pdf and AutoCAD) and specifications on a CD-ROM. Additionally provide: Narrative for the Invitation for Bid (IFB): Provide the brief description of work for inclusion in IFB. Provide 2 copies. Engineering Calculations: Provide analysis including Engineering Calculations. Provide 2 copies. Justifications: Provide justification statements for any sole source items and any Or-equal items included in the design. Provide 2 copies. The design deliverables must adhere to the following requirements: Specifications: The project specifications shall be prepared in Microsoft Word by the A/E from the VA Master Specifications. The general format shall include Part 1-General, Part 2-Products, and Part 3-Execution. Part 1 verbiage shall include the general requirements, identify applicable standards, and identify submittals required for a particular specification. This information should be directly related and correspond to a specific submittal number enumerated in the Submittal Register as identified below. Part 2 shall include description of the salient characteristics of the products. Part 3 shall include a description of the methods used to install items of construction. The A/E shall identify all VA Master Specification sections applicable to the project and edit them accordingly to fit the scope of work. If additional specification sections are needed that are not listed in the VA Master Specs, the A/E is responsible to write and edit an appropriate CSI format specification section. Specifications shall be printed on 8 ½ x 11 bond paper using 12pt Times-New-Roman fonts. The A/E shall incorporate into the specifications and its construction site inspection procedures the applicable Infection Control and Dust Control provisions. Construction Cost Estimates: The A/E shall prepare Construction Cost Estimates in Microsoft Excel using the CSI 34-division format. The Cost Estimates shall include a copy of the quantity take-offs, breakdown of individual line items that accurately reflect the quantity take-off of the various categories of work involved, unit of measure, quantities, unit cost, overhead, and profit. All cost data shall be taken from the most current version of a recognized industry standard, e.g., Means Estimating Guides. For items that are not in the industry standards, vendor quotes and justification for labor hours shall be provided. Construction Cost Estimates shall be submitted with 65%, 95% and 100% design reviews and for the Final submission. Provide 2 copies with each submission. As part of the cost estimating effort, the A/E shall provide a Schedule of Values such that discrete elements of the Specifications are identified and may be used in negotiations with a proposal bidder. Submittal Register: The A/E shall develop a list of all uniquely identified submittals required by the specifications in Section 1 of each individual specification. This submittal register should be submitted to the COR for approval in Microsoft Excel using the CSI 34-division format. The register should include specification reference, and item to be reviewed/approved and correspond to the Submittal Requirements as identified in the Specification Section addressed in paragraph above. Submittal Register shall be submitted with 95% and 100% design reviews and for the Final submission. Provide 2 copies with each submission. Narratives: Written narratives shall be included as part of each design submission. The narrative should be used to elaborate on and provide an explanation of key design decisions by A/E and/or the VA, objectives, obstacles, alternatives and resolutions, design issues or decisions relating to constructability, and in general to communicate all information relevant to the design submission. Provide 2 copies with each submission. Reproduction: The A/E shall be responsible for all reproduction during design; however, only materials which are submitted to the VA for design reviews shall be reimbursable. All other reproduction for in-house reviews, consultants, etc. shall not be reimbursed. Note that all bid administration activities will be performed by the VA Contracting office. Submission Due Dates: Part I - 30% Submission Due: 30 Days from NTP VA Review 15 Days from NTP Part II - 65% Submission Due: 60 Days from NTP VA Review 75 Days from NTP Part III - 95% Submission Due: 100 Days from NTP VA Review 115 Days from NTP Part IV - 100% Documents Due: 130 Days from NTP VA Review 145 Days from NTP Part V - Final Documents due: 150 Days from NTP VA Review 165 Days from NTP Note: The VA will have 15 calendar days to review each submission 30%, 65%, 95%, 100% and Final. Construction - Provide construction period services which shall include submittal review and as-built preparation. Bidder Site Visit: Participate and facilitate this site visit in conjunction with the Contracting Officer and COR, contractors, and representatives of the Building Committee as needed. At this meeting, potential contractors will walk the site limits to discuss the scope of work. The AE shall also be required to evaluate RFI s resulting from the Bidder Site Visit, in order to clarify project requirements. Pre-Construction Meeting: Participate and facilitate this meeting in conjunction with the Contracting Officer and COR, contractor, and representatives of the Building Committee as needed. At this meeting the staging area and work site rules shall be discussed again with the contractor (these should already be included in the specifications). Contract specifications should require a construction schedule submitted within 14 calendar days from the Notice to Proceed. Submittal Review and Logs: Designer shall prepare and maintain a log of key submittals and of RFIs and provide the same to the Contracting Officer and COR. Reviewed submittals are to be returned within 5 working days to the COR. Designer is fully responsible for review of all submittals, retaining a record copy of submittals for turn over to the owner upon project completion, and communication with the contractor regarding any deficiencies or changes required to the submittals. Response to RFI s: The A/E shall be responsible for evaluating RFI s to determine if a change will be required. The A/E shall then provide recommendations to the Contracting Officer. Within 48 hours, the A/E shall provide in writing the information, clarification or revision material needed to properly answer the RFI and to resolve the issue. The A/E shall include a cost/credit estimate for RFI s which result in a change to contract cost. Construction Change Orders: Designer shall prepare the Statement of Work and Cost estimates (returned within 10 calendar days) and track the total cost and changes to the project. Monthly Site Inspections: Designer shall meet monthly with the contractor, COR and others needed to inspect the progress of the construction and report any deficiencies to the same. Monthly Progress Meetings: In conjunction with the monthly site inspection, the designer shall hold formal progress meetings with contractor, contracting officer, and COR. At these meetings the agenda shall contain a narrative of work completed the previous month, work upcoming, submittals or RFIs outstanding, schedule update, any special coordination items requiring actions, and discussion of change orders or time extension requests. Minutes of this meeting shall be issued within 3 working days of the meeting. Final Acceptance Testing: The design team shall provide an engineer that will conduct final acceptance testing of the ventilation and cooling systems that were designed and installed during this project. The engineer will provide a detailed acceptance test report upon project completion. The engineer will coordinate all testing with the Durham VAMC and the AHJ. Project Close Out: Designer shall receive notice of intent for final inspection from the COR, and contractor shall propose a time and place for this to occur in conjunction with the Contracting Officer and the COR. Following the final inspection, the designer shall issue a punch list. Contract documents shall specify that the contractor has 15 calendar days to complete the punch list and notify the designer for re-inspection. Following re-inspection and project acceptance the closeout phase will occur. Record Drawing Submission: Provide 2 updated sets of drawings (22 x34 ) on bond marked as As-built Drawings that include the contractorMore from United States Department of Veterans Affairs posted in July 2024