ClickCease C222--Replace Nurse Call System 558-23-154 | Award to Miller-Remick, LLC - MatchAwards

C222--Replace Nurse Call System 558-23-154

Agency
United States Department of Veterans Affairs
Solicitation number
36C24624R0028
NAICS
541330 - Engineering Services
PSC
C222 - ARCHITECT AND ENGINEERING- GENERAL: ELECTRICAL SYSTEMS
Category
Construction Related Services (4.2)
Set-aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Budget
528,708.00
Awardee
Miller-Remick, LLC
Award date
2024-07-09
Place of performance
CHERRY HILL, 08034, NJUNI

Description

This request for A-E firm qualifications packages is 100% set-aside for Service-Disabled Veteran Owned Small Business (SDVOSB) concerns under VAAR 852.219-73, VA Notice of Total Set-Aside for Certified Service-Disabled Veteran-Owned Small Businesses (Jan 2023) (Deviation) THIS IS NOT A REQUEST FOR PROPOSAL. THIS IS A REQUEST FOR SF 330'S ARCHITECT- ENGINEER QUALIFICATION PACKAGES ONLY. PUBLIC ANNOUNCEMENT FOR PROCUREMENT OF ARCHITECT-ENGINEERING (A-E) SERVICES: This is a request for Standard Form 330, Architect-Engineer Qualifications only. A-E Services are being procured in accordance with the Selection of Architects and Engineers Statute (Public Law 92-582), formerly known as the Brooks Act, and implemented in Federal Acquisition Regulation (FAR) subpart 36.6. All submissions will be evaluated in accordance with the below selection criteria. The Government will not pay, nor reimburse, any costs associated with responding to this request. The Government is under no obligation to award a contract as a result of this announcement. Firms will be selected based on demonstrated competence and qualifications for the required work. Any resulting award for the proposed A-E services will be procured under a negotiated Firm-Fixed Price contract. GENERAL INFORMATION: The Department of Veterans Affairs, Durham Veterans Administration Health Care System, is seeking sources and intends to award a firm fixed-price contract for Architect-Engineering (A-E) firm to provide Schematics, Design Development, Construction Documents, Technical Specifications, Construction Period Services, Site Visits, Cost Estimates, As-Built Documentation, and all other related information for Project # 558-23-154, Replace Nurse Call System located at 508 Fulton Street, Durham, North Carolina 27705. The A-E Services listed herein is being procured in accordance with the Federal Acquisition Regulation (FAR) 36.6 and VAAR 836.6. Potential contractors must be registered in SAM (www.sam.gov) and visible/certified in the SBA certification database at https://veterans.certify.sba.gov/ at time of submission of their qualifications in order to be considered for an award. As a prospective offeror for this Service-Disabled Veteran-Owned Small Business (SDVOSB) set aside, you are verifying your company meets the status requirements of a SDVOSB concern as established by VAAR 852.219-73. Pursuant to 38 U.S.C. 8127(l)(2), all interested firms are required to submit the certification at VAAR 852.219-75 VA Notice of Limitations on Subcontracting Certificate of Compliance for Services and Construction (Jan 2023) (Deviation) with their qualification package. The Government will not consider submissions from firms that do not provide the signed certification, and all such responses will be deemed ineligible for evaluation and award. The Durham VA Health Care System is a working facility and phasing plans for minimizing downtime, and provisions for continuation of service during outages is critical to this project. Point of Contact: Vangie Miller, Contracting Officer Email: Vangie.Miller@va.gov PROJECT INFORMATION: Project No. 558-23-154 Project Title: A-E: Replace Nurse Call System Durham VA Health Care System 508 Fulton Street Durham, NC 27705 The NAICS Code for this procurement is 541330, Engineering Services, and the applicable Small Business Size Standard is $25.5 million annual revenue. The projected award date for the anticipated A-E contract is on or before May 14, 2024. The NAICS code for the anticipated Construction project is projected to be 236220 and magnitude of construction is predicted to be between $5,000,000 and $10,000,000. The anticipated award date of the construction phase of the project is to be determined (TBD). An Architect & Engineer (A-E) contract will be negotiated for the development of complete construction documents which include working drawings, specifications, reports, and construction period services. The A-E will be given written information; participate in project planning meetings, pre-proposal meeting, and pre-construction meeting as required; communicate with VA personnel via telephone or e-mail; and is expected to coordinate so that the final documents include all requirements in accordance with industry standard practices, VA standards, VA design manuals, and review comments. STATEMENT OF TASK/SCOPE OF WORK: PART A SCOPE OF WORK Architect-Engineer (A/E) Services shall include: Provide a design narrative, drawings, specifications, and a cost estimate at 30%, 60%, 95%, and 100% design stages for project # 558-23-154. The 100% submission shall be stamped by a licensed engineer to include, but not limited to, drawings, specifications, estimate and calculations. This project will design and engineer a facility-wide replacement for the current Nurse Call System (Rauland Responder IV). The construction to be designed for this project will include, but is not limited to, removal of existing equipment (servers, cabinets, etc ), provision and installation of new equipment, removal of old conduit and wire, and installation of new conduit and wire compatible with new system. Design shall comply with VA guidelines and specifications. Design manuals and specifications can be found at https://www.cfm.va.gov/til/index.asp . The design shall include but is not limited to the following: Comprehensive review of the existing conditions required to complete the design or cost estimate, and of other projects in-progress that will impact this scope, including projects that are in planning at the time of design. Interviews with VA engineers, medical staff, and support staff. These interviews shall be documented and presented in the design report and with each submission. Detailed calculations to determine current and projected future demand for the conditioned spaces. Consider any existing and future plans for these spaces and the potential to expand the footprint of the zone served. Summary of findings from the review of building records, reports, plans, and interviews with station personnel. Provide construction period services, which shall include but are not limited to submittal review, RFI response, periodic and final site inspections, and as-built preparation. Construction Amount: The project will provide information for the VA to determine the scope and cost requirements of this construction work project. The project is to be designed within an estimated base construction cost between $5,000,000 and $10,000,000. Provide all necessary site visits for design and construction in addition to the visits listed under construction period services. All work to be performed for this project must meet all Safety of Life codes, National Fire Protection (NFPA); National Electric Code (NEC); National Electrical Manufacturers Association (NEMA); Energy Independence and Security Act of 2007 (EISA 2007); Building Industries Communications Services Installation (BICSI); American Society of Mechanical Engineers (ASME); American National Standards Institute/Electronic Industries Association/Telecommunications Industry Association (ANSI/EIA/TIA); Underwriters Laboratory, Inc. (UL); Institute of Electrical and Electronics Engineers (IEEE); Federal, State, and Local regulations and codes; VA design standards and specifications; and the Joint Commission on Accreditation of Hospitals Organization (JCAHO) standards and guidelines. The following parameters shall be used for performing the analysis: 20-year life-cycle period for system comparisons Factor in system upgrades (e.g. 5-year cycles) 7% Discount Factor Neither includes taxes, nor insurance while computing cost. Design is to be accomplished using AutoCAD 2016 or compatible format. Design and cost estimates to be in compliance with the A/E submission requirements listed on the VA website (https://www.cfm.va.gov/til/aeDesSubReq.asp). Deliverables: Design Scope: Once alternatives/options are selected, A/E shall develop and provide a complete set of drawings and specifications for bidding and construction purposes which encompass the previously selected options. The package shall contain Architectural, and MEP drawings of sufficient detail that the construction contractor can accomplish the modifications with a minimum of additional guidance. Additionally, the A/E shall provide a detailed cost estimate of the project construction costs, and a constructability analysis identifying the most efficient, cost-effective ways to accomplish the construction while allowing for the least disruption of hospital operations. The A/E shall provide detailed drawings and instructions for isolating zones that will be used for maintenance, repair, and new construction. The following A/E design submissions shall be in accordance with the A/E requirements listed on the VA website. Part I: Feasibility Study/Options: Prior to the initiation of any detailed design, the A/E shall, in conjunction with representatives of the Engineering Department, conduct inspections of the existing facilities, document code compliance issues, develop various alternatives, and conduct feasibility analyses of these alternatives. NOTE: Specifications are not required with the Preliminary and Schematic Design submissions. Investigation shall include following. Investigate with Engineering Service Project Engineer staff the existing construction record documents, equipment work orders, etc. Identify the range of systems available for installation and their advantages and disadvantages to the Government. Consult with hospital staff to propose construction phasing plans that maintain patient care services at maximum feasible levels while facilitating efficient and expeditious construction activity. Part II: 30% Submission: The requirements are working drawings at the 30% stage, isolation schematic, marked-up specifications, and a preliminary construction cost estimate. Submit 1 full size set of drawings (30 x42 ) on bond paper, 6 half size set of drawings (22 x 34 ) on bond paper, 1 copy of the marked-up specifications, and 1 copy of the preliminary construction cost estimate. Part III: 60% Submission: The requirements are working drawings at the 60% stage, isolation schematic, marked-up specifications, and a detailed construction cost estimate showing a quantitative survey of all labor and material, drafted Durham PCRA and NEPA Environmental Compliance form. Submit 1 full size set of drawings (30 x42 ) on bond paper, 6 half size set of drawings (22 x 34 ) on bond paper, 2 copies of the marked-up specifications, 1 copy of the detailed construction cost estimate, and an electronic copy of the drawings (.pdf and AutoCAD) and specifications on a DVD. Part IV: 95% Submission: The requirements are complete construction drawings showing all details and views, updated and detailed isolation schematic, updated detailed cost estimate, finalized specifications, and finalized PCRA and NEPA forms. Submit 1 full size set of drawings (30 x42 ) on bond paper, 6 half size set of drawings (22 x 34 ) on bond paper, 4 copies of the marked-up specifications, 1 copy of the detailed construction cost estimate, and an electronic copy of the drawings (.pdf and AutoCAD) and specifications on a DVD. Part V: 100% Submission: Provide 2 sets (one set being unbound) of drawings and new isolation zone maps (30 x42 ) on bond paper, 8 sets of half size drawings and new isolation zone maps on bond paper, 2 sets of unbound specifications, 4 sets of bound isolation zone instructions, and an electronic copy of the drawings and isolation zone maps (.pdf and AutoCAD); and specifications and isolation zone instructions (.docx and .pdf) on a DVD. Drawings, specifications, estimate and calculation shall be stamped by a licensed engineer. The design deliverables must adhere to the following requirements: Specifications: The project specifications shall be prepared in Microsoft Word by the A/E from the VA Master Specifications. The general format shall include; Part 1-General, Part 2-Products, and Part 3-Execution. Part 1 verbiage shall include the general requirements, identify applicable standards, and identify submittals required for a particular specification. This information should be directly related and correspond to a specific submittal number enumerated in the Submittal Register as identified in Para. 11 below. Part 2 shall include description of the salient characteristics of the products. Part 3 shall include a description of the methods used to install items of construction. The A/E shall identify all VA Master Specification sections applicable to the project and edit them accordingly to fit the scope of work. If additional specification sections are needed that are not listed in the VA Master Specs, the A/E is responsible to write and edit an appropriate CSI format specification section. Specifications shall be printed on 8 ½ x 11 bond paper using 12pt Times-New-Roman fonts. The A/E shall incorporate into the specifications and its construction site inspection procedures the applicable Infection Control and Dust Control provisions. Construction Cost Estimates: The A/E shall prepare a Construction Cost Estimate in Microsoft Excel using the CSI 34-division format. The Cost Estimates shall include a copy of the quantity take-offs, breakdown of individual line items that accurately reflect the quantity take-off of the various categories of work involved, unit of measure, quantities, unit cost, 10% overhead, and 10% profit. All cost data shall be taken from the most current version of a recognized industry standard, e.g. Means Estimating Guides. For items that are not in the industry standards, vendor quotes and justification for labor hours shall be provided. Construction Cost Estimates shall be submitted with 30%, 60%, 95%, and 100% design reviews. As part of the cost estimating effort, the A/E shall provide a Schedule of Values such that discrete elements of the Specifications are identified and may be used in negotiations with a proposal bidder. Submittal Register: The A/E shall develop a list of all uniquely identified submittals required by the specifications in Section 1 of each individual specification. The register should include specification reference, and item to be reviewed/approved and correspond to the Submittal Requirements as identified in the Specification Section addressed in paragraph above. A/E shall use Primavera Submittal Exchange. Narratives: Written narratives shall be used as part of each design submission. The narrative should be used to elaborate on and provide an explanation of key design decisions by A/E and/or the VA, objectives, obstacles, alternatives and resolutions, design issues or decisions relating to constructability, and in general to communicate all information relevant to the design submission. Reproduction: The A/E shall be responsible for all reproduction during design; however, only materials which are submitted to the VA for design reviews shall be reimbursable. All other reproduction for in-house reviews, consultants, etc. shall not be reimbursed. At the completion of design, the A/E shall be required to print up to fifty (50) construction document bid sets on a reimbursable basis (to be supported by invoice). Note that all bid administration activities will be performed by the VA Contracting office. Submission Due Dates: Part I - Feasibility Study 30 Days from NTP VA Review 51 Days from NTP Part II - 30% Submission Due: 81 Days from NTP VA Review 102 Days from NTP Part III - 60% Submission Due: 132 Days from NTP VA Review 153 Days from NTP Part IV - 95% Submission Due: 183 Days from NTP VA Review 204 Days from NTP Part V - 100% Submission Due: 219 Days from NTP Note: The VA will have 21 days to review each submission Provide construction period services which shall include the following: Pre-Construction Meeting: Participate and facilitate this meeting in conjunction with the Contracting Officer and COR, contractor, and representatives of the Building Committee as needed. At this meeting the staging area and work site rules shall be discussed again with the contractor (these should already be included in the specifications). Contract specifications should require a construction schedule submitted within 10 working days from the Notice to Proceed. Submittal Review and Logs: Designer shall prepare and maintain a log of key submittals and also of RFIs and provide the same to the Contracting Officer and COR. Reviewed submittals are to be returned within 10 working days to the COR. Designer is fully responsible for review of all submittals, retaining a record copy of submittals for turn over to the owner upon project completion, and communication with the contractor regarding any deficiencies or changes required to the submittals. Response to RFIs: The A/E shall be responsible for evaluating RFIs to determine if a change will be required. The A/E shall then provide recommendations to the Contracting Officer. Within 2 business days, the A/E shall provide in writing the information, clarification or revision material needed to properly answer the RFI and to resolve the issue. The A/E shall include a cost/credit estimate for RFIs which result in a change to contract cost. Construction Change Orders: Designer shall prepare the Statement of Work and Cost estimates (returned within 10 working days) as needed. Monthly Site Inspections: Designer shall meet monthly with the contractor, COR and others needed to inspect the progress of the construction and report any deficiencies to the same. Monthly Progress Meetings: In conjunction with the monthly site inspection, the designer shall hold formal progress meetings with contractor, contracting officer, and COR. At these meetings the agenda shall contain a narrative of work completed the previous month, work upcoming, submittals or RFIs outstanding, schedule update, any special coordination items requiring actions, and discussion of change orders or time extension requests. Minutes of this meeting shall be issued within 3 working days of the meeting. Project Close Out: Designer shall receive notice of intent for final inspection from the contractor, and contractor shall propose a time and place for this to occur in conjunction with the Contracting Officer and the COR. Following the final inspection, the designer shall issue a punch list. Contract documents shall specify that the contractor has 15 working days to complete the punch list and notify the designer for re-inspection. Following re- inspection and project acceptance the closeout phase will occur. Record Drawing Submission: Provide 2 updated set of drawings (30 x42 ) on bond marked as As-built Drawings that include the contractor s mark-ups and also an electronic copy of these updated drawings on DVD. Period of Performance Design completion: 219 calendar days; includes VA design reviews Procurement timeframe: 180 days from the time Engineering submits package to contracting. Designer shall answer pre-bid RFIs and provide updated construction documents to capture any changes made through the procurement process Construction period services: 730 calendar days from construction award date Total contract period: 1,129 calendar days PART B - Supplement B Government Supplied: The facility record drawings and AutoCAD files are available for the A/E s use. NOTE: Not all record drawings are available on AutoCAD. Additionally, it is emphasized that the accuracy of facility record drawings must be field verified by the A/E. Prints of any current as-built drawings shall be made available to the A/E during any of his site visits if requested. The VA Engineering Department drawing files, large size copier and paper will be made available for use by the A/E for this purpose. The project design shall be completed in accordance with this A/E scope and all appropriate Department of Veterans Affairs (VA) standards, specifications, and other criteria otherwise required by the VA.