CONTAINER SYSTEM FOR SURGICAL INSTRUMENTS
- Status
- Closed, the response deadline passed on Jun 11, 2024
- Agency
- United States Department of Veterans Affairs
- Office
- LEAVENWORTH, USA
- Notice type
- Sources Sought
- Solicitation number
- 36C25524Q0428
- NAICS
- 339113 - Surgical Appliance and Supplies Manufacturing
- PSC
- 6515 - MEDICAL AND SURGICAL INSTRUMENTS, EQUIPMENT, AND SUPPLIES
- Category
- Medical Equipment and Accessories and Supplies (10.2)
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Posted
- 2024-06-07
- Deadline
- 2024-06-11
- Place of performance
- Wichita, Kansas 67218, UNITED STATES
Description
STATEMENT OF REQUIREMENT
FOR
AESCULAP CONTAINERS
VETERANS HEALTH ADMINISTRATION
1. INTRODUCTION
This solicitation is to provide the Robert J. Dole VA Medical Center with new container system for surgical instrumentation.
2. BACKGROUND
Currently the Wichita VAMC uses the Case Medical container system to house all their instruments for sterilization purposes. The current container system can only provide one mode of sterilization which is steam sterilization. The Aesculap container system can accommodate multiple forms of sterilization (i.e., Pre-vac Steam, Gravity, Low-Temp).
3. SCOPE OF WORK
- The contractor shall provide all necessary materials, hardware, and attachments to ensure the container system is fully functional and operational for use.
- Contractor shall be responsible for cleaning all work areas after completion of tasks. This includes, but is not limited to, removal of packaging and a clean sweep/mop of the area as required by work type.
- Contractor on-site visits shall be coordinated with the COR (or designee) before being scheduled or conducted.
- Contractor staff shall always be professional and shall take all necessary precautions to maintain a safe environment for the occupants.
4. SECURITY REQUIREMENTS
The C&A requirements do not apply, and a Security Accreditation Package is not required.
5. HOURS OF WORK
Normal hours of operation are Monday through Friday, 8:00 a.m. to 4:30 p.m. Central Standard Time, excluding Federal holidays. The Government hereby provides notice and Contractor hereby acknowledges receipt that Government personnel observe the listed days as holidays:
New Year's Day January 1
Martin Luther King's Birthday Third Monday in January
President's Birthday Third Monday in February
Memorial Day Last Monday in May
Juneteenth June 19
Independence Day July 4
Labor Day First Monday in September
Columbus Day Second Monday in October
Veterans Day November 11
Thanksgiving Day Fourth Thursday in November
Christmas December 25th
6. SALIENT FEATURES
- Various sizes and lengths
- Color coded Face plates
- Color coded Tags
- Aluminum
7. TECHNICAL REQUIREMENTS
- Basket and Container Synchronization
- Space-saving basket design
- Basket flexibility
- Ergonomic basket handling
- Instrument security
- Quick set identification feature
- Enhanced drying system.
- Able to withstand multiple modes of sterilization settings
8. TRAINING
- The contractor shall provide any on-site training needed for SPS personnel.
- Contractor shall maintain records of training participants and whether training was completed or not, to be provided to the Supervisor or Nurse Manager upon request.
- Training for SPS personnel must provide SPS staff with the tools and knowledge to fully operate the devices and conduct checks per the manufacturer’s instructions and hospital regulations, as well as answer any questions personnel may have regarding the Container System.
- If applicable, Contractor shall include all travel, registration, and other associated costs to provide this training in their proposal.
9. SITE POINT-OF-CONTACT
- The point of contacts for this project will be Eutopia Brice (Contracting Office Representative), Cheri Hawk (RMD Coordinator /Nurse manager), or Shantay Davis (Supervisor).
- No changes shall be made to the contract without contacting the contracting officer’s representative who will then contact the contracting officer.
- The contracting officer is the only person authorized to approve contract changes.
10. WARRANTY/MAINTENANCE SERVICE
- The warranty shall include all manufacturer recommended Preventive Maintenance procedures for its duration.
- The contractor shall provide at minimum a 3-year warranty.
- The warranty shall include the following: all parts and all accessories shall be covered under the manufacturer’s warranty and shall include all parts and labor.
- The contractor shall provide documentation of all work completed (corrective maintenance, preventive maintenance, software updates, etc.) within 3 business days of completion to the contracting officer’s representative or designee.
- The warranty period shall not begin until after the Dole VAMC COR or designee has accepted the products delivery, installation, and functionality.
- The contractor shall provide documentation of all work completed (corrective maintenance, preventive maintenance, etc.) within 3 business days of completion to the contracting officer’s representative or designee.