<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/department_of_veterans_affairs/posts/112528563139536037" -->

---
title: J061--Tri-Annual Breaker Test Service (36C24624Q0829) | Closed - MatchAwards
description: J061--Tri-Annual Breaker Test Service. United States Department of Veterans Affairs. Solicitation 36C24624Q0829. NAICS 238210 - Electrical Contractors and Other Wiring Installation Contractors. Deadline 2024-06-04. This Sources Sought Notice is for the Asheville VAMC to determine sources for...
canonical: https://matchawards.com/department_of_veterans_affairs/posts/112528563139536037
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: J061--Tri-Annual Breaker Test Service (36C24624Q0829) | Closed
og:url: https://matchawards.com/department_of_veterans_affairs/posts/112528563139536037
og:description: J061--Tri-Annual Breaker Test Service. United States Department of Veterans Affairs. Solicitation 36C24624Q0829. NAICS 238210 - Electrical Contractors and Other Wiring Installation Contractors. Deadline 2024-06-04. This Sources Sought Notice is for the Asheville VAMC to determine sources for...
og:image: https://matchawards.com/system/accounts/avatars/000/000/015/original/f59915e906ee2b19.png?1638825904
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# J061--Tri-Annual Breaker Test Service

Status

Closed, the response deadline passed on Jun 4, 2024

Agency

[United States Department of Veterans Affairs](/department%5Fof%5Fveterans%5Faffairs)

Office

HAMPTON, USA

Notice type

Solicitation

Solicitation number

36C24624Q0829

NAICS

[238210 - Electrical Contractors and Other Wiring Installation Contractors](/groups/227)

PSC

J061 - MAINT/REPAIR/REBUILD OF EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT

Posted

2024-05-29

Deadline

2024-06-04

## Description

This Sources Sought Notice is for the Asheville VAMC to determine sources for Consultant Services for Electrical Power Distribution Systems. This is a SOURCES SOUGHT announcement only. The purpose of this notice is to conduct market research and obtain information from qualified businesses. This is not a request for bids, quotes, or proposals. All responsible sources must submit a capability statement addressing its capabilities, capacity, and location which shall be considered by the agency. The responses to this announcement will assist in determining the socio-economic set aside if feasible. The Veteran s Administration is required by Public Law 109-461 to give priority to SDVOSB and VOSB concerns if there should be sufficient firms available to compete under a set aside. If insufficient veteran owned and small business response is received to establish the basis for setting this action aside for other than large business participation then the action will be advertised as full and open competition, in which case, all interested parties responding shall be eligible to bid. This notice shall not be construed as a commitment by the Government to ultimately award a contract, nor does it restrict the Government to a particular acquisition approach. All information submitted in response to this announcement is voluntary; the Government will not pay for information requested nor will it compensate any respondent for any cost incurred in developing information provided to the Government. Interested parties submitting a response to this inquiry must include the following information: name and address of company; business size (large, small, VOSB, or SDVOSB); identify applicable socioeconomic categories and any pertinent information which demonstrates the firm s ability to meet the above requirement. All responses shall be submitted no later than May 10, 2024, at 10:00am EST. Responses shall be emailed to: cleveland.wynne@va.gov. SPECIFICATION FOR CONSULTANT SERVICES FOR ELECTRICAL POWER DISTRIBUTION SYSTEMS, MEDIUM AND LOW VOLTAGE MAINTENANCE, REPAIR AND TESTING PART 1 GENERAL The work described in this specification will be performed by an independent electrical power distribution systems maintenance, repair, and testing consultant (TC.) whose primary business is in medium and low voltage. Any contractor bidding on this contract must perform a site visit prior to any bid submissions. Contractor shall schedule a minimum of one week in advance with FMS engineering staff. This project shall provide the required specialized cleaning, repair, adjustment, calibration, maintenance and testing of all existing and new primary and secondary components of the electrical distribution system, as specified herein. This includes all incoming primary apparatus, switchgear, transformers, instrumentation, controls, distribution cabling systems, and all building service equipment, i.e.: primary switches, transformers, instrumentation and the secondary main building services. Any item found to be out of tolerance, or in any other way defective as a result of the required testing, shall be reported to the Facilities representative immediately. Procedure for repair and/or replacement will be outlined. After appropriate corrective action is completed the item shall be retested. All new and existing equipment, apparatus and work shall be tested to insure its proper and safe operation in accordance with these specifications, and manufacturer's standards. All work required by this contract shall be performed during a one or two week period, all work will be performed at night and on weekends, Contractor must schedule four weeks prior to commencement, all outages shall be scheduled and approved in writing. The additional cost for premium time, if any, shall be included in the bid price. Normal operating hours are 7:00 am to 4:30 pm Monday through Friday. VA Engineering Electricians will de-energize and reenergize circuits in accordance with the approved schedule. The VA will neither furnish personnel to assist the contractor in accomplishing his work nor furnish tools or equipment for the inspections. The contractor may be requested to perform emergency repair work on a continuous basis in the event that a circuit cannot be energized after inspection and maintenance have been accomplished in accordance with the contact. Additional payment for subsequent charges will be arranged by the VA via change order or separate purchase order. All equipment shall be tested and inspected in accordance with the latest applicable codes, standards, and manufactures instructions. National Electrical Testing Association-NETA American National Standards Institute-ANSI C2: National Electrical Safety Code Occupational Safety and Health Administration-OSHA National Fire Protection Association-NFPA ANSI/NFPA 70: National Electrical Code ANSI/NFPA 70B: Electrical Equipment Maintenance ANSI/NFPA 70E: Electrical Safety Requirements for Employee Workplaces VA Standard Operating Procedure NO. 108: Procedures for Performing Electrical Work On Energized Equipment. (Attached) LIST OF EQUIPMENT TO BE CLEANED, ADJUSTED, REPAIRED AND TESTED: General Inspection and Cleaning of all Electrical Equipment Thermal Imaging Medium Voltage Air Circuit Breakers, Cubicles, and Sub-Station Instrument Transformers Protective Relays Automatic Transfer Switches Metering and Instrumentation Mechanical and Electrical Interlock Systems Liquid (Oil) Filled Transformers Ground Fault Systems Switchboards (Low Voltage) Network Protectors (4) (See attachment-A for detailed list) TESTING CONSULTANT QUALIFICATIONS All testing shall be by an independent TC who is engaged in electrical testing as a major portion of his/her business. Contractors shall be certified by the InterNational Electrical Testing Association (NETA) as NETA Certified Technician, and completed the Occupational Safety & Health Administration (OSHA) approved 30-hour construction safety training. Doble membership is preferred and ensures the following benefits. Doble Services Agreement for engineering assistance Documentation Technical problem solving. Doble provides testing equipment The TC shall have field personnel who are qualified / trained, and have successfully demonstrated their knowledge and experience with electrical power distribution systems medium voltage and low voltage testing, inspection, and maintenance. The TC shall have technical trainings, and track records of working experience in maintenance, inspection, and testing of the Electrical Power Distribution System and its components in healthcare, industrial, educational, and commercial facilities for a minimum of five (5) continuous years. TC shall provide documentation on service personnel verifying qualifications. The TC shall have safety trainings either on-the-job or class-room type - in electrical safety outlined in the OSHA Standard 29 Code of Federal Regulations (CFR) 1910 Subpart S Electrical, and the NFPA 70E Standard for Electrical Safety in the Workplace. Training certifications shall be submitted to the VA Contracting Officer prior to work. The General Contractor shall identify the onsite superintendant (required to be a GC employee) and submit name, address and phone number along with 30-hour OSHA training certificate to the VA Contracting Officer prior to any work. Contractors shall have ready access to the latest versions of the following references: NFPA 70, National Electrical Code. NFPA 70B, Recommended Practice for Electrical Equipment Maintenance. NFPA 70E, Standard for Electrical Safety for the Workplace. NFPA 110, Standard for Emergency and Standby Power System. OSHA Standard 29 CFR 1910, Subparts I & S. InterNational Electrical Testing Association, Inc. (NETA) Maintenance and Testing Specifications. Operating/Maintenance manuals, and specifications of the electrical equipment to be maintained and tested. These documents may be obtained from the VHA Medical Center, or the equipment manufacturers. Contractors shall be equipped with all necessary labor, tools, equipment, and Personal Protective Equipment (PPE) to perform the work safely, effectively, and timely. Tools, equipment, and PPE shall comply with the requirements of OSHA Standard 29 CFR 1910, Subpart I, and NFPA 70E. The TC shall be capable of: Testing, assessing, evaluating, servicing, and reconditioning components. Assuring that the equipment on which work has been performed is safe, reliable and acceptable for its intended purpose. Identifying defective equipment and potential safety problems, environmental hazards, or code violations. Proving a minimum of five (5) years of experience on similar major testing projects. TEST INSTRUMENT TRACEABILITY The TC shall have a calibration program which maintains all applicable test instrumentation within rated accuracy. The accuracy shall be traceable to the National Bureau of Standards in an unbroken chain. Instruments shall be calibrated in accordance with the following frequency schedule. Field Instruments: 6 months maximum. Laboratory Instruments: 12 months. Dated calibration labels shall be visible on all test equipment. Records must be kept up-to-date which show date and results of all instruments calibrated or tested. An up-to-date instrument calibration instruction and procedure will be maintained for each test instrument. TEST REPORT The test report shall include the following: Summary of project. Description of equipment tested. Description of test. Test results. Conclusions and recommendations. Appendix, including appropriate test forms. List of test equipment used and calibration date. Submit four (4) hard and (1) electronic copy of all test reports on N.E.T.A. or similar printed forms to the Project Engineer no later than thirty (30) days after completion of the project, unless directed otherwise. All individual components of an assembly (except cable) shall be tested with the component in its final connected stage in order to confirm the actual intended operation of the device. PART 2 EXECUTION GENERAL INSPECTION AND CLEANING OF ALL ELECTRICAL EQUIPMENT Inspect for physical damage and abnormal mechanical and electrical conditions. Verify proper auxiliary device operation and indicators. Make a close examination of equipment for shipping brackets, insulation, packing, etc. that may not have been removed during original installation. Make a close examination for a collection of dirt or other forms of debris that may have collected in equipment during normal operation. Clean All Equipment: Vacuum inside of case and floor. Loosen attached particles and vacuum them away. Wipe all porcelain and other insulating materials with a clean, dry, lint free rag. Clean grooves. Re-vacuum inside surfaces Inspect equipment anchorage. Inspect equipment alignment. Check all heater elements for operation and control. Lubricate equipment per manufacturer's recommendations. THERMAL IMAGINING Inspect the electrical equipment for physical, electrical and mechanical condition. Visually inspect for proper bus alignment. Remove all necessary covers prior to scanning. This work item must be done while the Electrical Power Distribution System is energized. Appropriate safety precautions must be taken before, during and after scanning: Scan the following equipment: Switches, bus duct, switchgear, transformers, terminations, cables, Automatic Transfer Switches, Network Protectors, cable connections, circuit breakers, outdoor bus structure (15Kv Metal Clad Switchgear) and switches, etc. This includes all equipment through the secondary switchboard or service. Provide a report indicating the following: Problem area(s) (location of the hot spot(s)). Indicate the temperature rise between the "hot spot(s)" and the normal or reference area. Indicate cause of heat rise. Indicate phase unbalance, if present. Index of areas scanned. Report any problem areas to the Project Engineer immediately so corrective work may be initiated in a minimum of time. MEDIUM VOLTAGE AIR CIRCUIT BREAKERS (AND CUBICLES) Inspect for physical damage and cleanliness. Inspect anchorage. Mechanical operator and contact alignment tests shall be performed on both the breaker and its operating mechanism in accordance with the manufacturer's instructions. Check the tightness of the bolted bus joints by calibrated torque wrench method. Refer to manufacturer's instructions for proper torque foot-pound levels. Check the cell fit and the element alignment, including the circuit breaker and bus stabs. Check the lowering and raising mechanism if the breaker is of this type, or the horizontal levering-in mechanism. Verify the primary and secondary contact wipe and other dimensions which are vital to satisfactory operation of the circuit breaker using the manufacturer's instruction book. Install contact lubricant on all mating electrical contacts. Verify the availability of all maintenance devices for servicing and operating the equipment. Check all heater elements for operation and control. Completely clean the interior of all cubicle sections including all bus work and insulators using the following methods: Vacuum the inside / outside of the switchgear and enclosure. (Accessing the outside requires removing bolted covers). Loosen attached particles and vacuum them away. Wipe all porcelain and all other insulating materials with a clean, dry lint free rag. Clean all groves. Re-vacuum inside of switchgear enclosure Remove, strip down, inspect, clean, and re-lubricate the circuit breaker units. Recommend in the report which breaker, if any, needs repair or rebuilt. Check all arcing contacts and recommend in the report which arcing contact, if any, needs replaced. Check and clean all arc chutes and recommend in the report which arc chute, if any, needs replaced. Inspect and correct the on-off indicators, spring charge indicators, the mechanical/electrical interlocks and operation counters for proper operation. Inspect and correct the operation of the safety shutters. Measure the contact resistance. Perform minimum pickup voltage tests on the trip and close coils. Measure the insulation resistance. With contacts open, test between line and load side of each phase. With contacts closed, test each pole to other poles and each pole to ground. Perform a D.C. over-potential test at 3X rated voltage with breaker in the closed position. Tests shall be made on each pole for a five (5) minute duration with all other poles grounded. Perform an insulation resistance test at 1,000 volts D.C. on all control wiring. (Do not perform this test on wiring connected to solid-state relays.) If charging motors are used. Check condition and operation of brushes and limit switches. With the breaker in the test position, make the following tests. Trip and close the breaker with the control switch. Trip each breaker by operating manually each of its protective relays. INSTRUMENT TRANSFORMERS Inspect for physical damage. Verify the transformers' connections with the system requirements. Verify tightness of all bolted connections and assure adequate clearances exist from primary circuits to secondary circuit wiring and to grounds. Verify that all required grounding and shorting connections exist and that those connections have good contact; i.e. sufficient surface area, good cleanliness, and proper pressure. Test the proper operation of transformer withdrawal mechanism (tip out) and the grounding operation when applicable. Verify proper primary and secondary fuses and required sizes. CURRENT TRANSFORMER: An insulation resistance test of the current transformer and the current transformer wiring shall be performed to ground at 500 volts D.C. for 30 seconds. Disconnect the ground connection at the ground connection point in the circuit for this test. Perform a polarity test of each current transformer to verify polarity by D.C. injection method. Perform a ratio verification test of each current transformer. This shall be performed using the voltage method or current method in accordance with ANSI C53.13.1\. Transformers used for relaying applications shall receive an excitation test. This test shall be performed in accordance with ANSI C53.13.1\. Relaying circuit burdens shall be measured at the current transformer terminals and the total burden determined in OHMS at 60 hertz. VOLTAGE (POTENTIAL) TRANSFORMERS Insulation resistance tests on voltage transformers shall be performed on each winding with the other windings connected to ground. Value of the test voltage on the secondary wiring shall be 500 volts D.C. for one minute. Value of the test voltage on the primary wiring shall be 1000 volts D.C. minimum for one minute. Perform a polarity test on each transformer to verify the polarity marks or H1-X1 relationship as applicable. The test may be performed with a TTR type ratio test set or inductive kick method in accordance with ANSI C-57-1.1978 or latest revision. Perform a ratio test using a transformer turns-ratio test set or by the voltage comparison method. Perform a D.C. dielectric withstand ability test on the primary windings with the secondary windings connected to ground. PROTECTIVE RELAYS All relays shall be inspected for physical damage. Inspect cover gaskets and cover glass for presence of foreign material and moisture and then clean. Inspect spiral spring, disc, and contacts for condition and rust. Check disc for clearance. Check mechanically for freedom of movement, proper travel and alignment, and tightness of mounting hardware and tap screws. Apply prescribed settings. Perform insulation resistance test on each circuit branch to frame. Do not perform this test on solid-state relays. Test and adjust the parameters on each operating element. Timing tests shall be made at two points on each time dial curve. Test the target trip current and seal-in units. Perform instantaneous tests corresponding to the timing test values. Test the tripping circuit by itself and with the circuit breaker. Perform special tests as required to check operation of directional restraint and other elements per manufacturer's instruction manuals. Perform phase angle and magnitude contribution tests on all differential and directional type relays after energization to vectorially prove proper polarity and connections. Provide as found and as left test reports for all equipment. AUTOMATIC TRANSFER SWITCHES Perform extended maintenance on all Automatic Transfer Switches (ATS). Perform all work by skilled personnel in accordance with manufacturer s requirements and recommendations and the latest NETA Guidelines. Perform visual inspections, lubrication, tighten all fittings, intense cleaning, and verify that all transfer switches operate as they are intended. Make sure all moving parts are working properly. Provide explanation of all required repairs that are not able to be taken care of by those performing the testing. All power will be removed from the 15 Automatic Transfer Switches. This will allow complete and thorough cleaning and testing. Any A.T.S. with a built in Bypass System must have the Bypass tested. Perform contact resistance testing on all contacts and visual inspections. METERING AND INSTRUMENTATION Examine all devices for broken parts, damage and wire connection tightness. Verify meter connections in accordance with single line meter and relay diagrams. Calibrate all meters at 5 points using full-scale test instruments. Calibrate watt-hour meters to one-half percent (0.5%). Verify and/or correct all instrument multipliers. After the meters are calibrated, a calibration curve should be generated which shows the accuracy of the meter throughout the full range. (0 to full-scale reading.) Meter selector switches shall be inspected for proper application and operation. MECHANICAL AND ELECTRICAL INTERLOCK SYSTEMS: Physically test each system to insure 

<!-- mobian-agent-ad sponsored="true" id="0db191cb-74b1-42c4-902c-bb0ed00e208f" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


## Attachments

* [Attachment 1](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/64ab51ae027c4e6295ef2e6066bdf2d3/download?api%5Fkey=null&token=)
* [Attachment 2](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/d4a43633b3a04a3f97ddfe937bd98460/download?api%5Fkey=null&token=)

[Source notice](https://sam.gov/opp/519217f0f6de40069dbc1ab3af20f8d1/view)

[More from United States Department of Veterans Affairs posted in May 2024](/department%5Fof%5Fveterans%5Faffairs/archive/2024-05)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Construction Government Contracts Available Now](/contracts/construction)

```json
{"@context":"https://schema.org","@type":"Demand","name":"J061--Tri-Annual Breaker Test Service","description":"This Sources Sought Notice is for the Asheville VAMC to determine sources for Consultant Services for Electrical Power Distribution Systems. This is a SOURCES SOUGHT announcement only. The purpose of this notice is to conduct market research and obtain information from qualified businesses. This is not a request for bids, quotes, or proposals. All responsible sources must submit a capability statement addressing its capabilities, capacity, and location which shall be considered by the agency. The responses to this announcement will assist in determining the socio-economic set aside if feasible. The Veteran s Administration is required by Public Law 109-461 to give priority to SDVOSB and VOSB concerns if there should be sufficient firms available to compete under a set aside. If insufficient veteran owned and small business response is received to establish the basis for setting this action aside for other than large business participation then the action will be advertised as full and open competition, in which case, all interested parties responding shall be eligible to bid. This notice shall not be construed as a commitment by the Government to ultimately award a contract, nor does it restrict the Government to a particular acquisition approach. All information submitted in response to this announcement is voluntary; the Government will not pay for information requested nor will it compensate any respondent for any cost incurred in developing information provided to the Government. Interested parties submitting a response to this inquiry must include the following information: name and address of company; business size (large, small, VOSB, or SDVOSB); identify applicable socioeconomic categories and any pertinent information which demonstrates the firm s ability to meet the above requirement. All responses shall be submitted no later than May 10, 2024, at 10:00am EST. Responses shall be emailed to: cleveland.wynne@va.gov. SPECIFICATION FOR CONSULTANT SERVICES FOR ELECTRICAL POWER DISTRIBUTION SYSTEMS, MEDIUM AND LOW VOLTAGE MAINTENANCE, REPAIR AND TESTING PART 1 GENERAL The work described in this specification will be performed by an independent electrical power distribution systems maintenance, repair, and testing consultant (TC.) whose primary business is in medium and low voltage. Any contractor bidding on this contract must perform a site visit prior to any bid submissions. Contractor shall schedule a minimum of one week in advance with FMS engineering staff. This project shall provide the required specialized cleaning, repair, adjustment, calibration, maintenance and testing of all existing and new primary and secondary components of the electrical distribution system, as specified herein. This includes all incoming primary apparatus, switchgear, transformers, instrumentation, controls, distribution cabling systems, and all building service equipment, i.e.: primary switches, transformers, instrumentation and the secondary main building services. Any item found to be out of tolerance, or in any other way defective as a result of the required testing, shall be reported to the Facilities representative immediately. Procedure for repair and/or replacement will be outlined. After appropriate corrective action is completed the item shall be retested. All new and existing equipment, apparatus and work shall be tested to insure its proper and safe operation in accordance with these specifications, and manufacturer's standards. All work required by this contract shall be performed during a one or two week period, all work will be performed at night and on weekends, Contractor must schedule four weeks prior to commencement, all outages shall be scheduled and approved in writing. The additional cost for premium time, if any, shall be included in the bid price. Normal operating hours are 7:00 am to 4:30 pm Monday through Friday. VA Engineering Electricians will de-energize and reenergize circuits in accordance with the approved schedule. The VA will neither furnish personnel to assist the contractor in accomplishing his work nor furnish tools or equipment for the inspections. The contractor may be requested to perform emergency repair work on a continuous basis in the event that a circuit cannot be energized after inspection and maintenance have been accomplished in accordance with the contact. Additional payment for subsequent charges will be arranged by the VA via change order or separate purchase order. All equipment shall be tested and inspected in accordance with the latest applicable codes, standards, and manufactures instructions. National Electrical Testing Association-NETA American National Standards Institute-ANSI C2: National Electrical Safety Code Occupational Safety and Health Administration-OSHA National Fire Protection Association-NFPA ANSI/NFPA 70: National Electrical Code ANSI/NFPA 70B: Electrical Equipment Maintenance ANSI/NFPA 70E: Electrical Safety Requirements for Employee Workplaces VA...","url":"https://matchawards.com/department_of_veterans_affairs/posts/112528563139536037","identifier":"36C24624Q0829","category":"238210 - Electrical Contractors and Other Wiring Installation Contractors","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"J061 - MAINT/REPAIR/REBUILD OF EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT"}],"availabilityStarts":"2024-05-29","availabilityEnds":"2024-06-04","validThrough":"2024-06-04T23:59:59-04:00","sameAs":"https://sam.gov/opp/519217f0f6de40069dbc1ab3af20f8d1/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Construction","item":"https://matchawards.com/contracts/construction"}]}
```

