ClickCease S201--Housekeeping for Residential… (36C24524Q0554) | Closed - MatchAwards

S201--Housekeeping for Residential Rehabilitation Treatment Program (RRTP) - Hershel "Woody" Williams VAMC

Status
Closed, the response deadline passed on Jun 14, 2024
Agency
United States Department of Veterans Affairs
Office
LINTHICUM, USA
Notice type
Presolicitation
Solicitation number
36C24524Q0554
NAICS
561720 - Janitorial Services
PSC
S201 - HOUSEKEEPING- CUSTODIAL JANITORIAL
Category
Facility Related Services (4.4)
Posted
2024-05-24
Deadline
2024-06-14
Place of performance
Huntington, West Virginia 25704, UNITED STATES

Description

PERFORMANCE WORK STATEMENT (PWS) Housekeeping Services for the Residential Rehabilitation Treatment Program (RRTP) Hershel Woody Williams VAMC SCOPE: Establish a Contract (Base Period + Four One Year Option Periods) to provide housekeeping services for the Hershel Woody Williams VAMC newly constructed Residential Rehabilitation Treatment Program (RRTP) Building. The RRTP will provide a residential level of care for Veterans with issues related to medical, mental health, substance use disorders, Post-Traumatic Stress Disorders, and homelessness. These programs are larger residential programs with multiple units serving various Veteran populations based on need. The RRTP is located at 1540 Spring Valley Drive, Huntington, WV 25704. The contracting office is anticipating a Fixed Price Requirement Contract that allows for housekeeping coverage during non-scheduled hours when emergencies arise, and a Housekeeper is needed. Period of Performance: Base Year: October 1, 2024 September 30, 2025 Option Year 1: October 1, 2025 September 30, 2026 Option Year 2: October 1, 2026 September 30, 2027 Option Year 3: October 1, 2027 September 30, 2028 Option Year 4: October 1, 2028 September 30, 2029 The contractor shall provide housekeeping services as well as all supervision, labor, equipment, material, supplies and other items required to provide this service at the RRTP Building in a manner that will maintain a satisfactory facility condition and shall ensure that all employees present a clean, neat and professional appearance. The RRTP Building consists of 1 private bedroom and 7 semi- private Bedrooms with a total of 15 Beds. The structure also contains common areas that include a kitchen, Lounge, Dining Room, Lobby and laundry room. The facility is approximately 10,144 square feet. (1st Floor = 5,802 Sq Ft and 2nd Floor = 4,342 Sq. Flooring consists of a combination of LVT, Carpet and Ceramic Tile. The 2 Fire Staircases are bare. Downstairs hallways have runners. Kitchen and laundry room counters are quartz, and all bathrooms are granite. Service shall include all common areas, guest/patient rooms, offices, storage rooms, porches and patios. Cleaning shall be performed at established frequencies (included in this statement of work in paragraph J) and after each guest/patient departure. NOTE: RRTP Building guests/patients are responsible for cleaning their own bedrooms during their stay, and therefore occupied guest rooms will only require cleaning by the contractor once per week to refresh the room and each time a guest/patient checks out of the RRTP Building. The contractor will be responsible for cleaning all 12 Bathrooms every day. The contractor shall be responsible for collecting all linens to be sent out for cleaning, which shall include bath towels, washcloths, hand towels, shower curtains, sheets, pillowcases, duvet covers, pillow shams, blankets, comforters, mattress pads, pillows and kitchen towels. The Contractor shall provide all the necessary supplies needed to perform the terms of the contract to include all cleaning supplies, equipment, transportation, and chemicals. In addition, the contractor will be responsible for providing stock supplies for the RRTP Building as listed below. This is not a comprehensive list, and the Vendor is required to provide any needed cleaning chemical or supply needed to meet the requirements of this Performance Work Statement. Cleaning Supplies Cleaning Chemicals Cleaning Equipment Floor Wax Window Cleaner Spot Remover Typical work shall include, but not be limited to vacuuming, mopping, bathroom cleaning, kitchen cleaning, window cleaning, dusting, changing light bulbs, etc. (see frequency chart below). Each worker providing services shall be required to log in and out at the RRTP Building for the beginning and end of their scheduled shifts, provide date and time, respectively, in a log provided by VAMC. The contractor shall perform these services in accordance with the Occupational Safety and Health Administration (OSHA) and the American National Standards Institute (ANSI) safety guidelines. Any storage area will be maintained in a neat, clean, and orderly manner. GENERAL REQUIREMENTS: All work shall be performed by skilled and trained personnel who are able to read, write, speak and understand English. Service shall be required seven (7) days a week. The contractor shall provide a minimum of two (2) Housekeepers each day, Monday - Friday in staggered shifts and 1 Housekeeper on Saturdays and Sundays. Monday through Friday, 1 Housekeeper from 8:00 AM EST - 4:30 PM EST Monday through Friday, 1 Housekeeper from 12:00 PM EST- 8:30 PM EST Saturday and Sunday, 1 Housekeeper from 8:00 AM EST - 4:30 PM EST NOTE: Housekeeping Service must be available during non-scheduled hours / on call (contingency hours) to address emergency issues that might arise. Billing for these on call services shall be added to the normal monthly invoice. Contract Manager: The contractor shall provide a contract manager who shall be responsible for the performance of the contract. The contract manager shall have full authority to act on behalf of the contractor on all contract matters relating to the daily operation of this contract. The contract manager or alternate(s) shall be available during normal business hours and be able to meet, either in-person or telephonically, with VA personnel designated by the Contracting Officer within 24 hours to discuss deficiencies. Contractor Employees: Contractor personnel shall present a neat appearance and be easily recognized as contract employees. This may be accomplished by wearing distinctive clothing provided by the RRTP Building, or by clothing bearing the company name and/or by wearing appropriate badges that prominently display the contractor s company name and the employee s name. Jeans, shorts, tight fitting clothing (i.e. leggings/spandex), sleeveless shirts, and sandals are not considered appropriate or safe attire for this setting. All Contractor Employees must display their government issued security (PIV) Badge at all times. The contractor shall not employ persons for work on this contract if such an employee is identified to the contractor by VA Police or Contracting Officer as a potential threat to the health, safety, security, general well-being, or mission of the medical center and the VA. The contactor shall not employ any person who is presently an employee of the U.S. Government when and if the employment of that person would create either a conflict of interest or the perception of such a conflict. The contractor shall be fully responsible for any repairs and all damage to VA property, which results from the activities, negligence, or carelessness of its employees or subcontractors. All damages shall be immediately brought to the attention of the COR by the end of the workday of occurrences. If damage is not discovered on the day the work is performed, it shall be repaired within 72 hours of notification of the contractor by the VA. In cases of disputes between the COR and the contractor, the contractor shall notify the Contracting Officer, in writing as soon as possible, to avoid any delay in conflict resolution. If the Contracting Officer is not notified in writing within thirty (30) days of the date of the incident, the incident shall be considered to have been resolved to the satisfaction of the contractor. MORNING CHECK-IN: Contractor employees shall report to the RRTP Building Manager or designee at the beginning of each workday to coordinate the areas to be completed that day. When the manager or designee is unavailable, the work details will be provided in writing. Contractor employees will report their absences directly to the contractor who will then be required to notify the RRTP Building Manager or available staff. The contractor will be required to provide back-up staffing. Log in/out is required when entering or leaving the building. Normal Duty Hours: Work required in the performance of the contract shall be performed during the hours of 8:00 AM EST to 8:30 PM EST, Monday through Friday, and Saturday-Sunday 8:00 AM EST to 4:30 PM. The contractor will be required to work on Federal Holidays. Non-Normal Duty Hours: Non-normal duty hours are defined as any other hours outside of those defined above. The Following Federal legal holidays are observed by this facility: Any holidays falling on Saturday will be observed on the preceding Friday; holidays falling on Sunday will be observed on the following Monday. New Year s Day 1 January Martin Luther King s birthday 3rd Monday in January President s Day 3rd Monday in February Memorial Day Last Monday in May Independence Day 4 August Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veteran s Day 11 November Thanksgiving Day 4th Thursday in November Christmas Day 25 December NOT MEETING PERFORMANCE EXPECTATIONS Exceeding the maximum number of performance threshold violations for the performance objectives listed in the Service Summary (SS) in any one-month period shall result in a warning, letter of concern, or other administrative action necessary from the Contracting Officer. Additional remedies are available to the government to include Termination of the Contract. TRAINING AND RECORDS MAINTENANCE: Orientation and initial training of all personnel shall be accomplished within the first fourteen (14) days of employment with written documentation furnished to the COR. All training shall be documented, and written copies of signed attendance sheet provided to COR within ten (10) days of completion of training. DOCUMENTATION OF SERVICES PERFORMED: Contractor shall maintain documented log of all listed actions to include the date, time and frequency of each of the following actions. This log shall be easily available to the COR when needed to review and maintain proper record keeping. Carpet & Tile maintenance-spot cleaning and shampooing Deep cleaning of restrooms Wall washing Stripping and refinishing of floors Upholstery cleaning REQUIREMENTS FOR SPECIFIC TASKS/SERVICE SUMMARY: All Floors: All floors, except carpeted areas, shall be swept, dust mopped, damp mopped, wet mopped, dry buffed, and spray buffed to ensure they have a uniform, glossy appearance and are free from dirt, debris, dust, scuff marks, stains and discoloration, and other foreign matter. Baseboards, corners and wall/floor edges shall also be clean. All floor maintenance solutions shall be removed from baseboards, furniture, trash receptacles, etc. Chairs, trash receptacles and other moveable items (including long curtains- to avoid soiling on bottom of curtains) shall be moved to maintain floors underneath these items. All moved items shall be returned to their original and proper position. Trash Removal: All trash containers shall be emptied and returned to their initial location. Boxes, cans, and papers placed near a trash receptacle and marked Trash shall be removed. All liners should be replaced each time trash is removed. The trash shall be deposited in the nearest outside trash collection container. Trash receptacles shall be left clean, free of foreign matter, and free of odors. The contractor is responsible for providing and stocking all required trash receptacle bags with durable products and appropriate size for container. Clean Interior & Exterior Door Glass/Mirrors: Clean all interior and exterior glass, including glass in doors, partitions, walls, display cases, etc. After glass cleaning, there shall be no traces of film, dirt, smudges, water or other foreign matter. Clean Stairways: All floor surfaces shall be cleaned as appropriate for floor type. Dust, grease and grime shall be removed from stair guards, handrails and baseboards. Contractor shall remove all marks, dirt, smudges, scuffs, and other foreign matter from adjoining stairwell walls to provide or maintain a clean, uniform appearance. Vacuum Carpets/Area Rugs: Vacuum carpeted areas. After vacuuming, the carpeted area shall be free of all visible dirt, debris, litter and other foreign matter. Any spots shall be removed by carpet manufacturer s approved methods as soon as noticed. All tears, burns, and raveling shall be brought to the attention of the government representative. Area and throw rugs (if any) are also included under this section. Clean Carpets/Area Rugs: Spot clean or shampoo dirty carpets. Spots must be removed immediately. Vacuum and Clean Floor Mats: Vacuum and clean interior and exterior floor mats. After vacuuming or cleaning, mats shall be free of all visible lint, litter, soil and other foreign matter. Soil and moisture underneath mats shall be removed, and mats returned to their normal location. General Spot Cleaning: Perform spot cleaning on a continual basis. Spot cleaning includes, but is not limited to removing or cleaning smudges, fingerprints, marks, streaks, spills, etc., from washable surfaces of all walls, partitions, vents, grillwork, doors, door guards, door handles, push bars, kick plates, light switches, upholstered furniture (per manufacturer guidelines), temperature controls and fixtures. After spot cleaning, the surfaces shall have a clean, uniform appearance, free of streaks, spots, and other evidence of soil. General Dusting: All horizontal surfaces must be dusted or cleaned to eliminate dust collection. Basic Restroom Cleaning: The contractor shall accomplish all cleaning tasks to meet the requirements of this Statement of work and the Service Delivery Summary (SDS). Sweep and Mop Floor: After sweeping and mopping, the entire floor surface, including grout, shall be free from litter, dirt, dust and debris. Grout on wall and floor tiles shall be free of dirt, scum, mildew, residue, etc. Floors shall have a uniform appearance without streaks, swirl marks, detergent residue, or any evidence of soil, stain, film or standing water. Moveable items shall be tilted or moved to sweep and damp mop underneath. Floors shall be stripped, scrubbed, waxed, etc. as necessary to maintain sanitary conditions and a clean, uniform appearance. Stock Restroom Supplies: Contractor shall ensure all restrooms are stocked at all times, sufficiently so that supplies including liquid soap for dispensers, toilet tissue, paper towels and hand tissue (facial tissue) do not run out. Supplies shall be stored in designated areas. No overstocking shall be allowed. The contractor shall be responsible for providing all required restroom supplies, i.e. hand soap, paper towels, hand tissue (facial tissue), and toilet tissue, for all restrooms (16 bathrooms (located in bedrooms), office bathroom and powder room guest bathroom. Supplies will be of the quality appropriate to a fine hotel. General Cleaning Supplies: All cleaning supplies and tools necessary to complete required tasks to be supplied by contractor. Contractor should prioritize the use of Green cleaning supplies whenever possible, careful not to compromise disinfecting and cleaning capabilities. A RRTP Building is a home not a hospital setting, cleaning supplies that have non-chemical smell (but are high quality for cleanliness) are encouraged. Patients will make their own Beds, sweep Bedroom Floors, empty Bedroom trash and dust in their own Bedrooms. Housekeeping Staff will make unoccupied Beds and provide all other Housekeeping Service necessary in occupied or unoccupied Patient Rooms as some Patients may not clean their Rooms in a manner that meets VA cleanliness standards. Contractor Housekeeping Staff must have a Drug Test Quarterly or upon request of the COR. The test must be performed by a certified drug testing facility. A copy of the original results shall be provided to the COR. The cost of this test will be the responsibility of the Contractor. PERIODIC CLEANING SERVICES: Strip, Scrub, Seal and Wax Floors: Strip, scrub, seal and wax floors as necessary to maintain a uniform glossy appearance. A non-skid wax is required. A uniform glossy appearance is free of scuffmarks, heel marks, wax build-up, and other stains and discolorations. Clean Interior Windows: Clean interior window glass surfaces. After surfaces have been cleaned, all traces of film, dirt, smudges, water and other foreign matter shall be removed from frames, casings, sills and glass. Clean Exterior Windows: Windows are the glass surfaces that are an integral part of the outer wall of the building. Window screens shall be removed, cleaned and replaced as needed. After windows have been cleaned, exterior frames, casings, sills and glass shall be free of all traces of film, dirt, smudges, water and other foreign matter. Remove Curtains for cleaning and re-hang Curtains after cleaning. VAMC Laundry Staff will launder/clean the Curtains. Clean/Shampoo Carpet/Area Rugs: All carpets shall be cleaned in accordance with standard commercial practices. A heavy-duty spot remover may be required in heavily soiled areas. After shampooing, the carpeted area will be uniform in appearance and free of stains and discoloration. All cleaning solutions shall be removed from baseboards, furniture, trash receptacles, chairs and other similar items. Chairs, trash receptacles, and other items shall be moved to clean carpet underneath and returned to their original location. Furniture cleaning throughout rooms, as needed/requested basis. After a room has been treated for bed bugs, housekeeping staff will thoroughly / terminally clean the room. REQUIREMENTS FOR SPECIFIC TASKS LAUNDRY SERVICE SUMMARY: Linen Laundry: Hershel Woody Williams VAMC Laundry Department will be responsible to provide Laundry Service to the RRTP. The RRTP Building will be supplied with an initial inventory of linens by the Medical Center. On an as-needed basis, the Hershel Woody Williams VAMC will replace these linens. The Housekeeping contractor will not be required to provide or replace linens, except in the case where linens are lost and/or damaged through the negligence of the housekeeping contractor. The Contractor will be responsible for gathering soiled/dirty linen and placing in soiled /dirty Linen Containers provided by the Medical Center. The Contractor will also be responsible for the proper distribution of clean linen. The contractor shall also inventory the outgoing soiled linens; re-inventory the incoming clean linens and then restock the linen closet with the clean items. Contaminated Laundry: The contractor shall ensure articles identified as contaminated with potentially infectious material (material soaked in blood, other body fluids, feces, or human tissue) shall be separated from other soiled articles for scouring them before laundering. (The contractor is not required to launder any items, they will only be removing and bagging the linens and placing in the pick-up receptacles). Articles identified as contaminated with potentially infectious material shall be collected in such a manner as to prevent the spread of microorganisms to the environment, or personnel who may be required to handle such items during transportation, cleaning or scouring in the performance of the contract. The contractor shall ensure double bagging of all soiled potentially contaminated linens to prevent any instance where the outside of a bag used in the carrying of such linen may become contaminated. The linen carts shall protect the linen from spreading microorganisms when soiled and from the environment (rain, dust, contamination) and all lids shall be closed. Before the linen carts (clean or soiled) are moved from; the storage location, linen facility, or mode of transportation, the lid shall be closed to protect the linen. CLEANING FREQUENCY CHART: AREA / ITEM DAILY WEEKLY MONTHLY AS NEEDED KITCHEN (1 each) Appliances wipe down (inside & outside) X X Cabinets wipe down X X Floor wet mop X X Lights - check & contact manager X Refrigerators/Freez

Attachments

Source notice

More from United States Department of Veterans Affairs posted in May 2024

More lists