<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/department_of_veterans_affairs/posts/112494541843257557" -->

---
title: J045--Perry Pt VAMC Deaeration Tank Remove and… (36C24524Q0552) | Closed - MatchAwards
description: J045--Perry Pt VAMC Deaeration Tank Remove and Replace  Sources Sought Notice  512-24-4-444-0163. United States Department of Veterans Affairs. Solicitation 36C24524Q0552. NAICS 238220 - Plumbing, Heating, and Air-Conditioning Contractors. Deadline 2024-06-07. SCOPE OF WORK PROJECT DATA: TITLE:...
canonical: https://matchawards.com/department_of_veterans_affairs/posts/112494541843257557
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: J045--Perry Pt VAMC Deaeration Tank Remove and… (36C24524Q0552) | Closed
og:url: https://matchawards.com/department_of_veterans_affairs/posts/112494541843257557
og:description: J045--Perry Pt VAMC Deaeration Tank Remove and Replace  Sources Sought Notice  512-24-4-444-0163. United States Department of Veterans Affairs. Solicitation 36C24524Q0552. NAICS 238220 - Plumbing, Heating, and Air-Conditioning Contractors. Deadline 2024-06-07. SCOPE OF WORK PROJECT DATA: TITLE:...
og:image: https://matchawards.com/system/accounts/avatars/000/000/015/original/f59915e906ee2b19.png?1638825904
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# J045--Perry Pt VAMC Deaeration Tank Remove and Replace Sources Sought Notice 512-24-4-444-0163

Status

Closed, the response deadline passed on Jun 7, 2024

Agency

[United States Department of Veterans Affairs](/department%5Fof%5Fveterans%5Faffairs)

Office

LINTHICUM, USA

Notice type

Sources Sought

Solicitation number

36C24524Q0552

NAICS

[238220 - Plumbing, Heating, and Air-Conditioning Contractors](/groups/228)

PSC

J045 - MAINT/REPAIR/REBUILD OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT

Category

[Facility Related Services (4.4)](/categories/facilities-and-construction/facility-related-services)

Posted

2024-05-23

Deadline

2024-06-07

Place of performance

Perry Pt, Maryland 21902, UNITED STATES

## Description

SCOPE OF WORK PROJECT DATA: TITLE: Deaeration Tank Replacement PROJECT No: 512A5-24-009 FACILITY: Perry Point VA Campus COR: Matt Hargrove P.E., Facilities & Engineering DURATION: 120 days (estimated) GENERAL SCOPE: The Contractor shall provide all supervision, labor, materials and equipment to remove and replace the existing deaeration tank in kind. Provide deaeration (DA) tank capable of producing 70,000 lb/hr of de-oxygenated feedwater at 7-9 psi saturated steam pressure. Connections to existing piping shall be made at the nearest available flanged connection, reconfiguration of piping to accommodate new tank system is permissible with approved shop drawing. Remove existing cast iron DA tank feedwater piping and replace with forged steel fittings and cast steel valves. 2.5 and above, welded or flanged. 2 and below threaded sch 80\. During demolition segregate waste streams, all recyclable materials shall be recycled to the extend practical. Provide waste manifest tickets for waste to landfill and recycled waste. Match construction and certification of tank in every aspect. The construction certification report has been provided for bidder s information. Include optional pricing for Belzona or approved equal lining Provide U-1A Manufacturers Data Report for Pressure Vessels Replace existing safety devices matching existing. Rebuild and recertify existing safety valves and return to the VA. Provide third party insurance inspection of installed tank with field inspection report and certification to operate. Materials All piping shall be sch 80 steel, 150 psi or 300 psi class fittings. All valves shall be forged or cast steel 150 psi class or higher. No cast iron fittings or valves of any pressure rating are permitted Page 1 of 3 All gaskets shall be spiral round metal, flexitallic or approved equal. Piping Insulation, 2.5 Fiberglass ASJ Tank Insulation, 3 Calcium silicate. Canvas wrapped. DEFINITIONS: VAMHCS: Veterans Affairs Maryland Health Care System. VA: Veterans Affairs. CO: V.A. employee of the VA Contracting Service officially assigned to act as Contract Officer in the behalf Veterans Health Administration. The services performed are that of general supervision, direction, control and approval of the contract. COR: Contracting Officer s Representative. V.A. employee of VAMC Facilities and Engineering Service officially assigned to act as Project Manager and Inspector on behalf of VAMC and Contracting Officer. ICRA: Infection Control Risk Assessment. An ICRA form must be filled out and signed by Infection Control personnel prior to any work coordinate with COTR. ILSM: Interim Life Safety Measures: Any series of Operational Actions taken to temporarily reduce Hazards posed by Life Safety deficiencies which have been created by demolition, renovation, or construction works, and which are to remain in place and in effect for duration of Contract work. NFPA NFC: National Fire Protection Association National Fire Codes. NEC: National Electrical Code, NFPA NFC Standard 70\. SAFETY PRECAUTIONS: The Contractor shall comply with all applicable Federal, State and local legal requirements regarding workers health and safety. The requirements include but are not limited to, those found in Federal and State Occupational Safety and Health Act (OSHA and MOSHA) statutes and regulations, such as applicable provisions of Title 29, Code of Federal Regulations (CFR) Parts 1910 and 1926\. Contractor is solely responsible for determining the legal requirements that apply to activities and shall ensure safe and healthful working conditions for its employees. Contractor shall assume the responsibility to guard against causing of fires and/or explosions and to protect Government Property, reference NFPA 241 and 29 CFR 1926\. The Contractor shall perform the work in a manner consistent with the area security and fire Page 2 of 3 safety regulations especially with regard to exits and exit way access. Utility shutdowns shall not compromise security, communication or fire safety for occupants. No flammable liquids shall be stored or used in the medical center. The necessary number and appropriate types of portable fire extinguishers are required per National Fire Protection Association (NFPA) 10 and NFPA 241\. The Contractor shall request, from the COR a permit for all cutting, welding, and soldering daily. All permits shall be prominently displayed during all construction. All necessary precautions shall be taken by the contractor to prevent accidental activation of any existing smoke detectors or sprinkler heads. HAZARDOUS MATERIAL REPORTING: The existing boiler plant siding is known to be asbestos containing. Sampling records of other materials in the plant have been provided to the bidder for informational purposes. In the event a material does not appear to be represented by sampling data or is shown to be asbestos containing, do not disturb the material and notify the COR for sampling and further instructions. The Contractor shall maintain hazardous material inventories and material safety data sheets (MSDS) for all hazardous materials (as defined in CFR 1910.120, 40 CFR s 355, 370, & 372) to be stored and used on this Medical Center. Hazardous materials must be inventoried when received and at the project s completion. The amounts used shall be maintained for the project duration. Hazardous Materials Inventories, Material Safety Data Sheets and material quantities used shall be submitted to the Contracting Officer for approval and copies furnished to the Contracting Officers Technical Representative. In the event of a spill, Contractor shall immediately notify the Contracting Officer s Technical Representative as well as the Contracting Officer. The Contractor shall be solely responsible for the expense of any cleanup and / or damage resulting of such spill, and the cleanup shall be in accordance with the applicable provisions of 40 CFR Part 761\. ENVIRONMENTAL PROTECTION: In order to provide for abatement and control of all environmentally hazardous materials arising from demolition and/or construction activities, the Contractor shall comply with all applicable environmentally hazardous material control and abatement and all applicable provisions of the Corps of Engineers Manual EM 385-1-1, General Safety Requirements as well as the specific requirements stated elsewhere in the Contract Documents. END OF SCOPE OF WORK Page 3 of 3 

<!-- mobian-agent-ad sponsored="true" id="69ebc94f-18ad-4d77-87a4-9fd06f60222a" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories/facilities-and-construction/facility-related-services?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


## Attachments

* [Attachment 1](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/eb49b43257664594910843f0568ba6d1/download?api%5Fkey=null&token=)

[Source notice](https://sam.gov/opp/3ed91e697b2d4f51ba21d30320a7d9bf/view)

[More from United States Department of Veterans Affairs posted in May 2024](/department%5Fof%5Fveterans%5Faffairs/archive/2024-05)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Construction Government Contracts Available Now](/contracts/construction)

```json
{"@context":"https://schema.org","@type":"Demand","name":"J045--Perry Pt VAMC Deaeration Tank Remove and Replace  Sources Sought Notice  512-24-4-444-0163","description":"SCOPE OF WORK PROJECT DATA: TITLE: Deaeration Tank Replacement PROJECT No: 512A5-24-009 FACILITY: Perry Point VA Campus COR: Matt Hargrove P.E., Facilities \u0026 Engineering DURATION: 120 days (estimated) GENERAL SCOPE: The Contractor shall provide all supervision, labor, materials and equipment to remove and replace the existing deaeration tank in kind. Provide deaeration (DA) tank capable of producing 70,000 lb/hr of de-oxygenated feedwater at 7-9 psi saturated steam pressure. Connections to existing piping shall be made at the nearest available flanged connection, reconfiguration of piping to accommodate new tank system is permissible with approved shop drawing. Remove existing cast iron DA tank feedwater piping and replace with forged steel fittings and cast steel valves. 2.5 and above, welded or flanged. 2 and below threaded sch 80. During demolition segregate waste streams, all recyclable materials shall be recycled to the extend practical. Provide waste manifest tickets for waste to landfill and recycled waste. Match construction and certification of tank in every aspect. The construction certification report has been provided for bidder s information. Include optional pricing for Belzona or approved equal lining Provide U-1A Manufacturers Data Report for Pressure Vessels Replace existing safety devices matching existing. Rebuild and recertify existing safety valves and return to the VA. Provide third party insurance inspection of installed tank with field inspection report and certification to operate. Materials All piping shall be sch 80 steel, 150 psi or 300 psi class fittings. All valves shall be forged or cast steel 150 psi class or higher. No cast iron fittings or valves of any pressure rating are permitted Page 1 of 3 All gaskets shall be spiral round metal, flexitallic or approved equal. Piping Insulation, 2.5 Fiberglass ASJ Tank Insulation, 3 Calcium silicate. Canvas wrapped. DEFINITIONS: VAMHCS: Veterans Affairs Maryland Health Care System. VA: Veterans Affairs. CO: V.A. employee of the VA Contracting Service officially assigned to act as Contract Officer in the behalf Veterans Health Administration. The services performed are that of general supervision, direction, control and approval of the contract. COR: Contracting Officer s Representative. V.A. employee of VAMC Facilities and Engineering Service officially assigned to act as Project Manager and Inspector on behalf of VAMC and Contracting Officer. ICRA: Infection Control Risk Assessment. An ICRA form must be filled out and signed by Infection Control personnel prior to any work coordinate with COTR. ILSM: Interim Life Safety Measures: Any series of Operational Actions taken to temporarily reduce Hazards posed by Life Safety deficiencies which have been created by demolition, renovation, or construction works, and which are to remain in place and in effect for duration of Contract work. NFPA NFC: National Fire Protection Association National Fire Codes. NEC: National Electrical Code, NFPA NFC Standard 70. SAFETY PRECAUTIONS: The Contractor shall comply with all applicable Federal, State and local legal requirements regarding workers health and safety. The requirements include but are not limited to, those found in Federal and State Occupational Safety and Health Act (OSHA and MOSHA) statutes and regulations, such as applicable provisions of Title 29, Code of Federal Regulations (CFR) Parts 1910 and 1926. Contractor is solely responsible for determining the legal requirements that apply to activities and shall ensure safe and healthful working conditions for its employees. Contractor shall assume the responsibility to guard against causing of fires and/or explosions and to protect Government Property, reference NFPA 241 and 29 CFR 1926. The Contractor shall perform the work in a manner consistent with the area security and fire Page 2 of 3 safety regulations especially with regard to exits and exit way access. Utility shutdowns shall not compromise security, communication or fire safety for occupants. No flammable liquids shall be stored or used in the medical center. The necessary number and appropriate types of portable fire extinguishers are required per National Fire Protection Association (NFPA) 10 and NFPA 241. The Contractor shall request, from the COR a permit for all cutting, welding, and soldering daily. All permits shall be prominently displayed during all construction. All necessary precautions shall be taken by the contractor to prevent accidental activation of any existing smoke detectors or sprinkler heads. HAZARDOUS MATERIAL REPORTING: The existing boiler plant siding is known to be asbestos containing. Sampling records of other materials in the plant have been provided to the bidder for informational purposes. In the event a material does not appear to be represented by sampling data or is shown to be asbestos containing, do not disturb the material and notify the COR for sampling and further instructions. The Contractor...","url":"https://matchawards.com/department_of_veterans_affairs/posts/112494541843257557","identifier":"36C24524Q0552","category":"238220 - Plumbing, Heating, and Air-Conditioning Contractors","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"J045 - MAINT/REPAIR/REBUILD OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT"},{"@type":"PropertyValue","propertyID":"CM category","name":"Category Management category","value":"4.4 Facility Related Services","url":"https://matchawards.com/categories/facilities-and-construction/facility-related-services"}],"availabilityStarts":"2024-05-23","availabilityEnds":"2024-06-07","validThrough":"2024-06-07T23:59:59-04:00","areaServed":"Perry Pt, Maryland 21902, UNITED STATES","sameAs":"https://sam.gov/opp/3ed91e697b2d4f51ba21d30320a7d9bf/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Construction","item":"https://matchawards.com/contracts/construction"}]}
```

