ClickCease B502--WNY Air Monitoring & Hazardous Material… (36C24224Q0327) | Closed - MatchAwards

B502--WNY Air Monitoring & Hazardous Material Sampling IDIQ

Status
Closed, the response deadline passed on Mar 26, 2024
Agency
United States Department of Veterans Affairs
Office
ALBANY, USA
Notice type
Combined Synopsis/Solicitation
Solicitation number
36C24224Q0327
NAICS
562910 - Remediation Services
PSC
B502 - SPECIAL STUDIES/ANALYSIS- AIR QUALITY
Category
Management Advisory Services (2.3)
Set-aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Posted
2024-03-12
Deadline
2024-03-26
Place of performance
Buffalo, New York 14215, UNITED STATES

Description

Page 6 of 8 COMBINED SYNOPSIS/SOLICITATION Indefinite Delivery Contract for Asbestos Air Monitoring and Material Sampling Services at the Buffalo and Batavia VA Medical Centers (i) This is a combined synopsis/solicitation for a commercial item prepared in accordance with the format in FAR Subpart 12.6 and FAR 13 Simplified Acquisition Procedures, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued. (ii) This solicitation is issued as a request for quote (RFQ). Request for Quote will be submitted through email on RFQ reference number 36C24224Q0327. (iii) This solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2024-03 (eff. 02/23/2024). (iv) This procurement is being issued as a SDVOSB set-aside solicitation. The North American Industry Classification System (NAICS) code is 562910, Remediation Services, with a small business size standard of $25 Million. (v) The Contractor shall provide line item pricing for asbestos air monitoring and material sampling services at the Buffalo and Batavia VA Medical CentersApricing to 3-year electrical testing and inspection of electrical distribution system at the Bath VA Medical Center. See table below for instrumentation and time frame of pricing periods: B.2 PRICE/COST SCHEDULE ITEM INFORMATION ITEM NUMBER DESCRIPTION OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE 0001 1.00 HR ________________ Provide services of a Certified Industrial Hygienist (CIH) during the asbestos air quality monitoring and sampling activities. Contract Period: Base POP Begin: 04-15-2024 POP End: 03-31-2025 0002 1.00 HR _______________ Provide services of a Certified Air Sampling Technician during the asbestos air quality monitoring and sampling activities. Contract Period: Base POP Begin: 04-15-2024 POP End: 03-31-2025 0003 1.00 HR _______________ Provide services of a Certified Inspector during the asbestos air quality monitoring and sampling activities. Contract Period: Base POP Begin: 04-15-2024 POP End: 03-31-2025 0004 1.00 HR _______________ Provide services of a Certified Project Monitor during the asbestos air quality monitoring and sampling activities. Contract Period: Base POP Begin: 04-15-2024 POP End: 03-31-2025 0005 1.00 HR _______________ Provide services of a Certified Project Designer during the asbestos air quality monitoring and sampling activities. Contract Period: Base POP Begin: 04-15-2024 POP End: 03-31-2025 0006 1.00 EA ______________ Provide air sample collection and Phase Contrast Microscopy (PCM) analysis, the NIOSH Method 7402 (Issue 2, Fourth Edition) of the sample with a 24-hour turnaround time. Contract Period: Base POP Begin: 04-15-2024 POP End: 03-31-2025 0007 1.00 EA ______________ Provide air sample collection and AHERA TEM analysis of the sample with a 24-hour turnaround time. Contract Period: Base POP Begin: 04-15-2024 POP End: 03-31-2025 0008 1.00 EA ______________ Provide air sample collection and Phase Contrast Microscopy (PCM) analysis, the NIOSH Method 7402 (Issue 2, Fourth Edition) of the sample with a 1 week turnaround time. Contract Period: Base POP Begin: 04-15-2024 POP End: 03-31-2025 0009 1.00 EA ______________ Provide air sample collection and AHERA TEM analysis of the sample with a 1 week turnaround time. Contract Period: Base POP Begin: 04-15-2024 POP End: 03-31-2025 0010 1.00 EA ______________ Provide hazardous material collection and NY ELAP Method 198.4 (TEM) testing for requested non-friable organically bound material with a 24-hour turnaround time. Materials can include, VAT, resilient floor tiles, mastic, asphalt shingles, roofing materials, paint chips, caulking, glazing and other NOB materials. Contract Period: Base POP Begin: 04-15-2024 POP End: 03-31-2025 0011 1.00 EA ______________ Provide hazardous material collection and NY ELAP Method 198.4 (TEM) testing for requested non-friable organically bound material with a 24-hour turnaround time. Materials can include, VAT, resilient floor tiles, mastic, asphalt shingles, roofing materials, paint chips, caulking, glazing and other NOB materials. Contract Period: Base POP Begin: 04-15-2024 POP End: 03-31-2025 0012 1.00 EA ______________ Provide hazardous material collection and NY ELAP Method 198.6 (PLM) testing for requested non-friable organically bound building materials with a 24-hour turnaround time. Materials can include Floor tiles (vinyl and asphalt), roofing Materials, mastics, caulking and other NOB materials. Contract Period: Base POP Begin: 04-15-2024 POP End: 03-31-2025 0013 1.00 EA ______________ Provide hazardous material collection and NY ELAP Method 198.1 (PLM) testing for requested friable material with a 1-week turnaround time. Materials can include, but are not limited to ceiling tile, textiles, insulation and other friable materials. Contract Period: Base POP Begin: 04-15-2024 POP End: 03-31-2025 0014 1.00 EA ______________ Provide hazardous material collection and NY ELAP Method 198.4 (TEM) testing for requested non-friable organically bound material with a 1-week turnaround time. Materials can include, VAT, resilient floor tiles, mastic, asphalt shingles, roofing materials, paint chips, caulking, glazing and other NOB materials. Contract Period: Base POP Begin: 04-15-2024 POP End: 03-31-2025 0015 1.00 EA ______________ Provide hazardous material collection and NY ELAP Method 198.6 (PLM) testing for requested non-friable organically bound building materials with a 1-week turnaround time. Materials can include Floor tiles (vinyl and asphalt), roofing Materials, mastics, caulking, and other NOB materials. Contract Period: Base POP Begin: 04-15-2024 POP End: 03-31-2025 0016 1.00 JB ______________ 4 hour response time premium to any of the above items. Contract Period: Base POP Begin: 04-15-2024 POP End: 03-31-2025 1001 1.00 HR ______________ Provide services of a Certified Industrial Hygienist (CIH) during the asbestos air quality monitoring and sampling activities. Contract Period: Option 1 POP Begin: 04-01-2025 POP End: 03-31-2026 1002 1.00 HR ______________ Provide services of a Certified Air Sampling Technician during the asbestos air quality monitoring and sampling activities. Contract Period: Option 1 POP Begin: 04-01-2025 POP End: 03-31-2026 1003 1.00 HR ______________ Provide services of a Certified Inspector during the asbestos air quality monitoring and sampling activities. Contract Period: Option 1 POP Begin: 04-01-2025 POP End: 03-31-2026 1004 1.00 HR ______________ Provide services of a Certified Project Monitor during the asbestos air quality monitoring and sampling activities. Contract Period: Option 1 POP Begin: 04-01-2025 POP End: 03-31-2026 1005 1.00 HR _____________ Provide services of a Certified Project Designer during the asbestos air quality monitoring and sampling activities. Contract Period: Option 1 POP Begin: 04-01-2025 POP End: 03-31-2026 1006 1.00 EA _____________ Provide air sample collection and Phase Contrast Microscopy (PCM) analysis, the NIOSH Method 7402 (Issue 2, Fourth Edition) of the sample with a 24-hour turnaround time. Contract Period: Option 1 POP Begin: 04-01-2025 POP End: 03-31-2026 1007 1.00 EA _____________ Provide air sample collection and AHERA TEM analysis of the sample with a 24-hour turnaround time. Contract Period: Option 1 POP Begin: 04-01-2025 POP End: 03-31-2026 1008 1.00 EA _____________ Provide air sample collection and Phase Contrast Microscopy (PCM) analysis, the NIOSH Method 7402 (Issue 2, Fourth Edition) of the sample with a 1 week turnaround time. Contract Period: Option 1 POP Begin: 04-01-2025 POP End: 03-31-2026 1009 1.00 EA _____________ Provide air sample collection and AHERA TEM analysis of the sample with a 1 week turnaround time. Contract Period: Option 1 POP Begin: 04-01-2025 POP End: 03-31-2026 1010 1.00 EA _____________ Provide hazardous material collection and NY ELAP Method 198.4 (TEM) testing for requested non-friable organically bound material with a 24-hour turnaround time. Materials can include, VAT, resilient floor tiles, mastic, asphalt shingles, roofing materials, paint chips, caulking, glazing and other NOB materials. Contract Period: Option 1 POP Begin: 04-01-2025 POP End: 03-31-2026 1011 1.00 EA _____________ Provide hazardous material collection and NY ELAP Method 198.4 (TEM) testing for requested non-friable organically bound material with a 24-hour turnaround time. Materials can include, VAT, resilient floor tiles, mastic, asphalt shingles, roofing materials, paint chips, caulking, glazing and other NOB materials. Contract Period: Option 1 POP Begin: 04-01-2025 POP End: 03-31-2026 1012 1.00 EA _____________ Provide hazardous material collection and NY ELAP Method 198.6 (PLM) testing for requested non-friable organically bound building materials with a 24-hour turnaround time. Materials can include Floor tiles (vinyl and asphalt), roofing Materials, mastics, caulking and other NOB materials. Contract Period: Option 1 POP Begin: 04-01-2025 POP End: 03-31-2026 1013 1.00 EA _____________ Provide hazardous material collection and NY ELAP Method 198.1 (PLM) testing for requested friable material with a 1-week turnaround time. Materials can include, but are not limited to ceiling tile, textiles, insulation and other friable materials. Contract Period: Option 1 POP Begin: 04-01-2025 POP End: 03-31-2026 1014 1.00 EA _____________ Provide hazardous material collection and NY ELAP Method 198.4 (TEM) testing for requested non-friable organically bound material with a 1-week turnaround time. Materials can include, VAT, resilient floor tiles, mastic, asphalt shingles, roofing materials, paint chips, caulking, glazing and other NOB materials. Contract Period: Option 1 POP Begin: 04-01-2025 POP End: 03-31-2026 1015 1.00 EA _____________ Provide hazardous material collection and NY ELAP Method 198.6 (PLM) testing for requested non-friable organically bound building materials with a 1-week turnaround time. Materials can include Floor tiles (vinyl and asphalt), roofing Materials, mastics, caulking, and other NOB materials. Contract Period: Option 1 POP Begin: 04-01-2025 POP End: 03-31-2026 1016 1.00 JB _____________ 4 hour response time premium to any of the above items. Contract Period: Option 1 POP Begin: 04-01-2025 POP End: 03-31-2026 2001 1.00 HR _____________ Provide services of a Certified Industrial Hygienist (CIH) during the asbestos air quality monitoring and sampling activities. Contract Period: Option 2 POP Begin: 04-01-2026 POP End: 03-31-2027 2002 1.00 HR _____________ Provide services of a Certified Air Sampling Technician during the asbestos air quality monitoring and sampling activities. Contract Period: Option 2 POP Begin: 04-01-2026 POP End: 03-31-2027 2003 1.00 HR _____________ Provide services of a Certified Inspector during the asbestos air quality monitoring and sampling activities. Contract Period: Option 2 POP Begin: 04-01-2026 POP End: 03-31-2027 2004 1.00 HR _____________ Provide services of a Certified Project Monitor during the asbestos air quality monitoring and sampling activities. Contract Period: Option 2 POP Begin: 04-01-2026 POP End: 03-31-2027 2005 1.00 HR _____________ Provide services of a Certified Project Designer during the asbestos air quality monitoring and sampling activities. Contract Period: Option 2 POP Begin: 04-01-2026 POP End: 03-31-2027 2006 1.00 EA _____________ Provide air sample collection and Phase Contrast Microscopy (PCM) analysis, the NIOSH Method 7402 (Issue 2, Fourth Edition) of the sample with a 24-hour turnaround time. Contract Period: Option 2 POP Begin: 04-01-2026 POP End: 03-31-2027 2007 1.00 EA _____________ Provide air sample collection and AHERA TEM analysis of the sample with a 24-hour turnaround time. Contract Period: Option 2 POP Begin: 04-01-2026 POP End: 03-31-2027 2008 1.00 EA _____________ Provide air sample collection and Phase Contrast Microscopy (PCM) analysis, the NIOSH Method 7402 (Issue 2, Fourth Edition) of the sample with a 1 week turnaround time. Contract Period: Option 2 POP Begin: 04-01-2026 POP End: 03-31-2027 2009 1.00 EA ____________ Provide air sample collection and AHERA TEM analysis of the sample with a 1 week turnaround time. Contract Period: Option 2 POP Begin: 04-01-2026 POP End: 03-31-2027 2010 1.00 EA ____________ Provide hazardous material collection and NY ELAP Method 198.4 (TEM) testing for requested non-friable organically bound material with a 24-hour turnaround time. Materials can include, VAT, resilient floor tiles, mastic, asphalt shingles, roofing materials, paint chips, caulking, glazing and other NOB materials. Contract Period: Option 2 POP Begin: 04-01-2026 POP End: 03-31-2027 2011 1.00 EA ____________ Provide hazardous material collection and NY ELAP Method 198.4 (TEM) testing for requested non-friable organically bound material with a 24-hour turnaround time. Materials can include, VAT, resilient floor tiles, mastic, asphalt shingles, roofing materials, paint chips, caulking, glazing and other NOB materials. Contract Period: Option 2 POP Begin: 04-01-2026 POP End: 03-31-2027 2012 1.00 EA ____________ Provide hazardous material collection and NY ELAP Method 198.6 (PLM) testing for requested non-friable organically bound building materials with a 24-hour turnaround time. Materials can include Floor tiles (vinyl and asphalt), roofing Materials, mastics, caulking and other NOB materials. Contract Period: Option 2 POP Begin: 04-01-2026 POP End: 03-31-2027 2013 1.00 EA ____________ Provide hazardous material collection and NY ELAP Method 198.1 (PLM) testing for requested friable material with a 1-week turnaround time. Materials can include, but are not limited to ceiling tile, textiles, insulation and other friable materials. Contract Period: Option 2 POP Begin: 04-01-2026 POP End: 03-31-2027 2014 1.00 EA ____________ Provide hazardous material collection and NY ELAP Method 198.4 (TEM) testing for requested non-friable organically bound material with a 1-week turnaround time. Materials can include, VAT, resilient floor tiles, mastic, asphalt shingles, roofing materials, paint chips, caulking, glazing and other NOB materials. Contract Period: Option 2 POP Begin: 04-01-2026 POP End: 03-31-2027 2015 1.00 EA ____________ Provide hazardous material collection and NY ELAP Method 198.6 (PLM) testing for requested non-friable organically bound building materials with a 1-week turnaround time. Materials can include Floor tiles (vinyl and asphalt), roofing Materials, mastics, caulking, and other NOB materials. Contract Period: Option 2 POP Begin: 04-01-2026 POP End: 03-31-2027 2016 1.00 JB ____________ 4 hour response time premium to any of the above items. Contract Period: Option 2 POP Begin: 04-01-2026 POP End: 03-31-2027 3001 1.00 HR ____________ Provide services of a Certified Industrial Hygienist (CIH) during the asbestos air quality monitoring and sampling activities. Contract Period: Option 3 POP Begin: 04-01-2027 POP End: 03-31-2028 3002 1.00 HR ____________ Provide services of a Certified Air Sampling Technician during the asbestos air quality monitoring and sampling activities. Contract Period: Option 3 POP Begin: 04-01-2027 POP End: 03-31-2028 3003 1.00 HR ____________ Provide services of a Certified Inspector during the asbestos air quality monitoring and sampling activities. Contract Period: Option 3 POP Begin: 04-01-2027 POP End: 03-31-2028 3004 1.00 HR ____________ Provide services of a Certified Project Monitor during the asbestos air quality monitoring and sampling activities. Contract Period: Option 3 POP Begin: 04-01-2027 POP End: 03-31-2028 3005 1.00 HR ____________ Provide services of a Certified Project Designer during the asbestos air quality monitoring and sampling activities. Contract Period: Option 3 POP Begin: 04-01-2027 POP End: 03-31-2028 3006 1.00 EA ____________ Provide air sample collection and Phase Contrast Microscopy (PCM) analysis, the NIOSH Method 7402 (Issue 2, Fourth Edition) of the sample with a 24-hour turnaround time. Contract Period: Option 3 POP Begin: 04-01-2027 POP End: 03-31-2028 3007 1.00 EA ____________ Provide air sample collection and AHERA TEM analysis of the sample with a 24-hour turnaround time. Contract Period: Option 3 POP Begin: 04-01-2027 POP End: 03-31-2028 3008 1.00 EA ____________ Provide air sample collection and Phase Contrast Microscopy (PCM) analysis, the NIOSH Method 7402 (Issue 2, Fourth Edition) of the sample with a 1 week turnaround time. Contract Period: Option 3 POP Begin: 04-01-2027 POP End: 03-31-2028 3009 1.00 EA ____________ Provide air sample collection and AHERA TEM analysis of the sample with a 1 week turnaround time. Contract Period: Option 3 POP Begin: 04-01-2027 POP End: 03-31-2028 3010 1.00 EA ___________ Provide hazardous material collection and NY ELAP Method 198.4 (TEM) testing for requested non-friable organically bound material with a 24-hour turnaround time. Materials can include, VAT, resilient floor tiles, mastic, asphalt shingles, roofing materials, paint chips, caulking, glazing and other NOB materials. Contract Period: Option 3 POP Begin: 04-01-2027 POP End: 03-31-2028 3011 1.00 EA __________ Provide hazardous material collection and NY ELAP Method 198.4 (TEM) testing for requested non-friable organically bound material with a 24-hour turnaround time. Materials can include, VAT, resilient floor tiles, mastic, asphalt shingles, roofing materials, paint chips, caulking, glazing and other NOB materials. Contract Period: Option 3 POP Begin: 04-01-2027 POP End: 03-31-2028 3012 1.00 EA __________ Provide hazardous material collection and NY ELAP Method 198.6 (PLM) testing for requested non-friable organically bound building materials with a 24-hour turnaround time. Materials can include Floor tiles (vinyl and asphalt), roofing Materials, mastics, caulking and other NOB materials. Contract Period: Option 3 POP Begin: 04-01-2027 POP End: 03-31-2028 3013 1.00 EA __________ Provide hazardous material collection and NY ELAP Method 198.1 (PLM) testing for requested friable material with a 1-week turnaround time. Materials can include, but are not limited to ceiling tile, textiles, insulation and other friable materials. Contract Period: Option 3 POP Begin: 04-01-2027 POP End: 03-31-2028 3014 1.00 EA __________ Provide hazardous material collection and NY ELAP Method 198.4 (TEM) testing for requested non-friable organically bound material with a 1-week turnaround time. Materials can include, VAT, resilient floor tiles, mastic, asphalt shingles, roofing materials, paint chips, caulking, glazing and other NOB materials. Contract Period: Option 3 POP Begin: 04-01-2027 POP End: 03-31-2028 3015 1.00 EA __________ Provide hazardous material collection and NY ELAP Method 198.6 (PLM) testing for requested non-friable organically bound building materials with a 1-week turnaround time. Materials can include Floor tiles (vinyl and asphalt), roofing Materials, mastics, caulking, and other NOB materials. Contract Period: Option 3 POP Begin: 04-01-2027 POP End: 03-31-2028 3016 1.00 JB ___________ 4 hour response time premium to any of the above items. Contract Period: Option 3 POP Begin: 04-01-2027 POP End: 03-31-2028 4001 1.00 HR ___________ Provide services of a Certified Industrial Hygienist (CIH) during the asbestos air quality monitoring and sampling activities. Contract Period: Option 4 POP Begin: 04-01-2028 POP End: 03-31-2029 4002 1.00 HR ___________ Provide services of a Certified Air Sampling Technician during the asbestos air qu

Source notice

More from United States Department of Veterans Affairs posted in March 2024

More lists