Y1DA--632-24-1-2314-0001|632-21-120 Install Hazard Shower & Eyewash Stations
- Status
- Closed, the response deadline passed on Feb 7, 2024
- Agency
- United States Department of Veterans Affairs
- Office
- ALBANY, USA
- Notice type
- Solicitation
- Solicitation number
- 36C24223B0040
- NAICS
- 236220 - Commercial and Institutional Building Construction
- PSC
- Y1DA - CONSTRUCTION OF HOSPITALS AND INFIRMARIES
- Category
- Construction Related Services (4.2)
- Posted
- 2023-12-22
- Deadline
- 2024-02-07
Description
VISN 2: NEW YORK/ NEW JERSEY VA HEATHCARE NETWORK 632-21-120: Install Hazard Shower & Eyewash Stations Statement of Work (SOW) July 12, 2023 TABLE OF CONTENT: Section Description 1.0 Scope 1.1 NARA Records Management 1.2 Information Security Privacy 1.3 Contractor Confined Space Entry Requirements 1.4 Infection Control Risk Assessments (ICRA) General Notes 2.0 Tasks 3.0 Implementation of Work 4.0 Period of Performance (PoP) 5.0 Additional Notes 1.0 SCOPE The Contractor shall provide all manpower as required, including all technical and logistical resources, and perform all operations necessary to provide the following services and develop the deliverables as described in this document. Note that the terms Contracting Officer Representative (COR) and Contracting Officer Technical Representative (COTR) may be used interchangeably and refer to the same entity. This project is located at the Veteran Affairs (VA) Northport NY campus at 79 Middleville Road, Northport NY 11768. The campus contains approximately 268 acres, approximately 107 of those acres have been declared a Historic District. The Northport VA campus was opened in 1928 as a neuropsychiatric veteran s hospital and consists of numerous facilities providing physical infrastructure for patient care, research, education and administration. Due to modifications that were done to the structures over the years, the existing emergency eyewash and shower stations may not be adequate for the current space program or may not be required at all. Emergency eyewashes and showers are first aid rather than preventive measures and must be readily available in spaces where occupants may be exposed to hazardous chemicals. Emergency eyewash and shower stations are not to be used in lieu of appropriate personal protective equipment (PPE). Evaluation of areas for emergency eyewashes and showers was conducted as if PPE were not used. The scope of this project is to provide new emergency eyewash and drench shower stations to the required spaces and upgrade or remove existing stations. The Contractor shall furnish labor and materials and perform work for installations, upgrades, or removal of emergency eyewash and shower stations as shown on contract documents (E.G. SOW, drawings, schedules, specifications). Work may include general demolition, construction, alterations, mechanical, electrical, & plumbing work, necessary for the successful execution and completion of the project. This document adheres to the requirements of: The Joint Commission Perspectives (March 2021) VHA Directive 7704: Emergency Eyewash and Shower Program (October 12, 2021) ANSI Z358.1- 2014 Specification 22 40 00 section 2.4: Emergency Fixtures VA Plumbing Design Manual (https://www.cfm.va.gov/til/dManual/dmPlbg.pdf) VA Plumbing Specifications (https://www.cfm.va.gov/TIL/spec.asp#22) The contract completion time is 300 calendar days from receipt of Notice to Proceed. Work shall be governed by: This Statement of Work (SOW), Attachment 1: Equipment Schedule Attachment 2: Building Floor Plans Attachment 3: Project Specifications Hazard Assessments: Veterans Affairs Medical Center Northport (VAMC) Safety Office has performed hazard assessments, including a review of the chemicals used, across the facility to determine where emergency drench showers and eyewashes are needed for immediate use when exposure to corrosive materials occurs. Assessments were completed as a prelude to the development of this Procurement Package whenever a change in chemicals, processes, or controls could result in changes warranting the addition or removal of emergency drench showers and eyewashes. This work may require after-hours or weekend work implementation due to ongoing Service location processes, and/ or requirements for water supply shutdowns following lockout-and tagout procedures in coordination with VA COR and Plumbing Shop. Identification of deficiencies are to be itemized before implementation of work during walkthroughs, however, when additional issues are identified during work processes, notifications will be provided to the Project COR for resolution. Contractors and subcontractors are responsible to confirm conditions before the initiation of work. Accessibility Criteria: Emergency flushing equipment should be located: In accessible locations that require no more than 10-seconds (or 55ft) unobstructed travel (no latching doors) and on the same level as the hazard. This distance may need to be reduced at areas where extremely corrosive chemicals are used. In a well-lit area. Water flow is established between 33-inches and 53-inches from the standing grade, and minimum 6-inches from a wall, free of obstructions. The eyewash station must have hands-free, stay-open valves (single action operation so that, after actuation, water continues to flow). In an area clear of any obstruction that may impede employee access. Employees will not be required to pass through a locked or latched doorway. Worker must be able to flush both eyes simultaneously for at least 15 minutes. In a location marked by highly visible signage. Placement and design must meet accessibility requirements of the Architectural Barriers Act (when applicable), VA Barrier Free Design Guide (PG-18-13) and latest edition of the VA Plumbing Design Manual. Selection Criteria: Only ANSI-approved eyewashes and drench showers shall be purchased and installed. ANSI-approved self-contained eyewashes are acceptable upon review and approval by the facility Safety Manager. Portable eyewash stations must also meet ANSI Z358.1-2014 requirements. Personal eyewash flushing bottles are acceptable only if the hazard is biological. Installation: Emergency eyewashes and drench showers will be installed in accordance with manufacturer's specifications, VA specifications and ANSI installation standards. The equipment must be installed on a system capable of delivering the required quantity and temperature of water. Provide Domestic Cold and Hot water lines for each emergency eyewash/ shower Station. Refer to Attachment #1 for additional requirements. Provide new Isolation valves on the Domestic Cold & Hot water supply lines for maintenance purposes. Provisions shall be made to prevent unauthorized shut off. The tepid water line shall be supplied by an ASSE approved Thermostatic Mixing Valve (TMV). All emergency eyewashes and drench showers will deliver tepid water (60-100 degrees Fahrenheit). No emergency eyewash or drench shower will be connected solely to a hot water supply. Obtain COR approval prior to setting the final TMV temperature set point. Emergency showers shall be capable of delivering flushing fluid at a minimum of 20 GPM for a minimum of 15 minutes. Emergency eyewashes shall be capable of delivering flushing fluid to the eyes not less than 0.4 GPM for 15 minutes. Emergency shower shall provide a flushing fluid column that is at least 82in and not more than 96 in. in height from the surface on which a user stands. Control valve shall remain open without the use of the operator s hands until intentionally closed. All new domestic water pipe, fittings and components shall be insulated and labeled properly. Portable wall hung emergency eyewash units shall be properly fastened to the wall / structure. Confirm and coordinate with COR prior to installing for review and approval of fastening method. Removal/Demolition: Emergency eyewashes and drench showers determined to no longer be needed are to be tagged as Do Not Use , water supply turned off, work order submitted for priority removal, and removed from service as soon as possible. Dedicated fixture water supply piping leading to decommissioned emergency eyewash and/ or drench shower units will be cut back to the nearest active branch/main and capped to prevent dead legs. All removed/ discarded devices shall remain on-campus until determined otherwise by COR. Activation and Testing: 1. Engineering Service will maintain emergency eyewashes and drench showers in accordance with the manufacturer's specifications and ANSI Z358.1. Modifications that void the ANSI approval are not allowed. Each new and existing device shall be fitted with a new test tag (from the manufacturer). Water preservative solution bottles shall be administered as required and documented. 1.1 NARA RECORDS MANAGEMENT Contractor shall comply with all applicable records management laws and regulations, as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. chs. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a). These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion. In accordance with 36 CFR 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of 44 U.S.C. chapters 21, 29, 31, and 33, the Freedom of Information Act (FOIA) (5 U.S.C. 552), as amended, and the Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation. In accordance with 36 CFR 1222.32, Contractor shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law. Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data. The Department of Veterans Affairs Northport Medical Center and its Contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of The Department of Veterans Affairs Northport Medical Center or destroyed except for in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, Contractor must report to Northport V.A. The agency must report promptly to NARA in accordance with 36 CFR 1230. The Contractor shall immediately notify the appropriate Contracting Officer upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know. The Contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records and/or equipment is properly protected. The Contractor shall not remove material from Government facilities or systems operated or maintained on the Government s behalf, without the express written permission of the Head of the Contracting Activity. When information, data, documentary material, records and/or equipment is no longer required, it shall be returned to The Department of Veterans Affairs Northport Medical Center control, or the Contractor must hold it until otherwise directed. Items returned to the Government shall be hand carried, mailed, emailed, or securely electronically transmitted to the Contracting Officer. Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Paragraph (4). The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, contracts. The Contractor (and any sub-contractor) is required to abide by Government and The Department of Veterans Affairs Northport Medical Center guidance for protecting sensitive, proprietary information, classified, and controlled unclassified information. The Contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with The Department of Veterans Affairs Northport Medical Center policy. The Contractor shall not create or maintain any records containing any non-public The Department of Veterans Affairs Northport Medical Center information that are not specifically tied to or authorized by the contract. The Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected from public disclosure by an exemption to the Freedom of Information Act. The Department of Veterans Affairs Northport Medical Center owns the rights to all data and records produced as part of this contract. All deliverables under the contract are the property of the U.S. Government for which The Department of Veterans Affairs Northport Medical Center shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Any Contractor rights in the data or deliverables must be identified as required by FAR 52.227-11 through FAR 52.227-20. Training. All Contractor employees assigned to this contract who create, work with, or otherwise handle records are required to take VHA-provided records management training. The Contractor is responsible for confirming training has been completed according to agency policies, including initial training and any annual or refresher training. 1.2 INFORMATION SECURITY PRIVACY Information made available to the Contractor or subcontractor by VA for the performance or administration of this contract or information developed by the Contractor/subcontractor in performance or administration of the contract shall be used only for those purposes and shall not be used in any other way without the prior written agreement of the VA. This clause expressly limits the Contractor/subcontractor's rights to use data as described in Rights in Data - General, FAR 52.227-14(d) (1). The term security incident means an event that has, or could have, resulted in unauthorized access to, loss or damage to VA assets, or sensitive information, or an action that breaches VA security procedures. The Contractor/subcontractor shall immediately notify the COTR and simultaneously, the designated ISO and Privacy Officer for the contract of any known or suspected security/privacy incidents, or any unauthorized disclosure of sensitive information, including that contained in system(s) to which the Contractor/subcontractor has access. The contractor Certification & Accreditation (C&A) requirements do not apply, and a Security Accreditation Package is not required, as stated in Privacy Form 6500.6. This Contract does not involve VA sensitive information and Contractor personnel do not require access to VA systems. Information made available to the Contractor or subcontractor by VA for the performance or administration of this contract or information developed by the Contractor/ subcontractor in performance or administration of the contract shall be used only for those purposes and shall not be used in any other way without the prior written agreement of VA. 1.3 CONTRACTOR CONFINED SPACE ENTRY REQUIREMENTS Contractor will be informed by the Medical Center s COTR, (in-charge of the confined space work), if the workplace is a permit-required or non-permit required confined space, and if that confined space entry is allowed only through compliance with a permit space program meeting the requirements of Medical Center Memorandum 001-183 Confined Space Program. Contractor will be informed by the COTR of any hazards known to the Medical Center for the space in question and will determine if a confined space work permit is required. Contractor will be apprised by the Medical Center s COTR, (in-charge of the confined space work), of any precautions or procedures that the Medical Center has Implemented for the protection of employees in or near permit space where contractor personnel will be working. The Medical Center s COTR, (in-charge of the confined space work), will advise the Contractor of how to fill out the required forms and gain the necessary Confined Space Entry Permits from the VA Fire Department and be responsible for the Contractor following the requirements of CM 001-183 Confined Space Program. The Medical Center s COTR, (in-charge of the confined space work), and contractor will coordinate entry operations when both Medical Center personnel and contractor personnel will be working in or near permit spaces as required by 29 CFR 1910.146(d)(11) and 1926.21(b)(6). Contractor will obtain any available information regarding permit space hazards and entry operation from the Medical Center s COTR, (in-charge of the confined space work). At the conclusion of the entry operations, the Medical Center s COTR, (in-charge of the confined space work), and contractor will discuss any hazards confronted or created in permit spaces. The contractor is responsible for complying with this Medical Center Memorandum 001 183 Confined Space Program, 29 CFR 1910.146(d) through (g) and 1926.21(b)(6). The Medical Center will provide rescue and emergency services required by 29 CFR 1910.146(k) and 1926.21(b)(6). Prior to awarding a contract to commence entry operations, the Contractor shall submit proof of training required under 29 CFR 1910.146(g) to the Medical Center Contracting Officer and the Medical Center s COTR, (in-charge of the confined space work). Questions regarding the Medical Center s permit-required confined space entry program can be addressed to the VA Fire Department (ext. 2769) and COTR. 1.4 INFECTION CONTROL RISK ASSESSMENTS (ICRA / WICRA) - GENERAL NOTES The VAMC requirements shall be met at all times. The ICRA Status will be reviewed weekly by the COR. Contractor will coordinate all work with COR. Contractor shall utilize Critical Branch Power for any dust mitigation equipment, i.e., Negative Air Machine (NAM). If Critical Branch Power is not readily accessible, Contractor shall run a temporary critical circuit back to the nearest critical branch panel. At no time shall there be extension cords and/ or temporary wiring laid out within the egress corridors and/ or Veteran patient areas. Any temporary wiring shall be installed in the ceiling space. Contractor shall maintain all exits during construction in compliance with NFPA 101 Life Safety Codes including: NFPA 101-4.6.10 2015 Construction, Repair, and Improvement Operations. NFPA 101-7.1.10 2015 Means of Egress Reliability. NFPA 101-18.7.9 2015 Requirements for Emergency Lighting Systems. NFPA 241 2010 Standard for Safeguarding Construction and Demolition Operations. Contractor shall provide a zippered door at entrance to the work area. Containment barriers shall seal work area air-tight. Place tacky mats at entrance and exit of work area. Contain construction waste before transport in tightly covered containers. Coordinate access routing of materials, waste, and personnel through the facility with the COR. Seal ventilation grills and open ducts in work area with VISQUEEN. Contractor shall submit a Water Infection Control Risk Assessment (WICRA) form for each work location. 2.0 TASKS Project tasks are as follow: Task 1: Remove Selected, Existing Emergency Eyewash and/ or Drench Shower units Task 2: Install New Emergency Eye/Face wash, Combination shower & Eye/Face units Task 3: Upgrade Existing Emergency Eyewash and/ or Drench Shower Units Task 4: SignageMore from United States Department of Veterans Affairs posted in December 2023