ClickCease C1DA--Renovate Wards 3East and 3West (36C24624R0006) | Closed - MatchAwards

C1DA--Renovate Wards 3East and 3West

Status
Closed, the response deadline passed on Dec 5, 2023
Agency
United States Department of Veterans Affairs
Office
HAMPTON, USA
Notice type
Presolicitation
Solicitation number
36C24624R0006
NAICS
541330 - Engineering Services
PSC
C1DA - ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES
Category
Construction Related Services (4.2)
Set-aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Posted
2023-11-29
Deadline
2023-12-05
Place of performance
Asheville, 28805

Description

The purpose of this Amendment is to answer questions posed by industry. please refer to attachment titled S06 36C24624R0006-A00001. DESCRIPTION: This is a Pre-Solicitation Notice for the establishment of an Architect-Engineering (A-E) Design Contract with services to be performed at the Charles George Veterans Administration Medical Center located at 1100 Tunnel Road, Asheville, NC 28805. This requirement is being executed under a 100% Set-Aside to Service-Disabled Veteran Owned Small Business (SDVOSB) firms. THIS ANNOUNCEMENT IS NOT A REQUEST FOR PROPOSAL; NO SOLICITATION PACKAGE WILL BE ISSUED UNTIL AFTER AN EVALUATION HAS BEEN MADE ON THE PROVIDED SF-330s. The SF-330 can be downloaded through the GSA Forms Library at: http://www.gsa.gov/portal/forms/type/TOP, scroll down to locate and click on the SF-330 hyperlink entitled, Architect-Engineer Qualifications. Interested firms should submit their SF-330, Parts I and II, to Crystil.Bennet@va.gov. The SF-330s are due no later than 8:00 AM, EST, December 5, 2023. SCOPE OF WORK: This project requires the services of an Architectural Engineering Firm (AE) having special knowledge of medical facility design. The AE shall be responsible for providing services necessary to deliver a constructable design, to include but not limited to, Mechanical, Plumbing, Civil, Electrical, Fire Protection, Structural, and other such specialties which encompass the investigation and confirmation of the existing structure and the planning/design of building expansions. Intent This project is intended for the design of approximately 21,000 sq renovation of Wards 3 East and 3 West Project #637-24-103 1100 Asheville, NC. The A/E shall be responsible for the performance of the Investigative Services, Preparation of Contract Drawings and Specifications, and be responsible for providing Construction Period Services. Requirements The AE selected is expected to: Part Ia Preparation of Existing Conditions and Conceptual Design Investigative Services: Preparation of existing conditions plan and conceptual design which includes site investigation for mechanical, plumbing, and environmental hazards, such as suspect ACM, other hazardous materials. Work will consist of A/E personnel crawling in crawlspaces, removing ceiling tile and tracing ductwork above ceilings, and tracing ductwork in the building penthouse. Perform project site investigation in accordance with the Site Investigations section of the Scope of Work. Physically survey as well as review record drawings of the existing building. Inform CO/COR of supplemental information gathering that may be required. Conduct on-site work session with User Group and other members of the Integrated Project Team to discuss conceptual options. Describe all measures available to achieve the project objectives, including the benefits and drawbacks of each measure, to guide decisions by the facility during schematic design. The decision of which alternatives to select for the construction project rests with the VA. Develop and describe a construction strategy that allows existing functions to continue during Construction. Develop this strategy in development of construction documents. Participate in a conference call after VA has completed Schematic Design review. AE shall review needs identified by the IPT for the area under consideration for design and provide recommendations. In addition, the project shall be phased to minimize the impact to the Medical Center operations and patient care. Prior to submission of schematic design material, the AE shall meet with the VAMC s COR to discuss proposed phasing requirements for the project. These phasing requirements shall describe the general sequence of the project work, estimated project duration, and what VA constraints will exist that will influence the Contractor's approach to the construction project. The AE shall be responsible for documenting the phasing requirements. The AE shall make site visits as required to determine existing as-built conditions affecting this project. Information, including drawings and other documentation, provided to the AE shall be used as reference only. The AE is responsible for verifying all existing site conditions to include but not be limited to: crawling in crawlspaces, looking above ceilings and the building penthouse. Coordinate visits with the COR as assigned at the NTP. The AE shall arrange for and oversee the performance of such investigations necessary for the proper design of the project. AutoCAD background drawings shall be provided by the VA upon request if available and shall be used as reference only. The AE shall field verify every aspect that relates to the project. Perform Photographic Documentation during Investigative Services; files are to be maintained for future reference of existing conditions for construction documents and unforeseen unit costing basis. The Contractor shall prepare digital photo documentation of construction work, including sites, buildings, and field activities. Digital photos shall be submitted in JPEG format to the project website, and to a resolution sufficient and appropriate for the type of work photographed. The Contractor shall provide an index for each set of photographs submitted identifying the contractor, base, facility, project number, date, and a brief description. The Contractor shall coordinate photography of any kind through the COR. The AE shall complete all necessary site investigations prior to the 15% Schematic Design submission. Part Ib Preparation of Contract Drawings and Specifications Design Development: Preparation and submission of construction bid documents, interim design document submittals, and the final construction bid documents at the completion of the design development process in accordance with the Design Package Submission Schedule section. Design document packages shall contain a complete set of documents as specified in the Design Requirements/ Submissions section of this scope of work. The AE shall develop a design necessary to meet the requirements in the Project Scope section of the scope of work. Design shall include engineering services rendered necessary by the VA at the end of Part Ia Investigative Services within the construction cost parameters. Design and produce construction documents for implementation of the selected alternatives. Submittals must include the components listed on the A/E Submission Instructions for Minor and NRM Construction Program https://www.cfm.va.gov/ til/ ae/ aesubmin.doc. Submittal Register - Provide a list to the VA of technical submittals that will be required. Intended for long-term use, the project design specifications must provide, to the maximum extent practicable, a final product of enduring quality; Energy and water efficient; Environmentally conscious; Functional and requiring low maintenance; Durable; Flexible for changing uses; Universally accessible; Sustainable; Operationally cost effective; Compliant with appropriate codes, statutes, and VHA requirements. Construction documents must be complete, clear, specific, accurate, coordinated between disciplines, quantifiable, and explicit in quality expectations for suitable materials, systems, and workmanship. Throughout the design phases of the project, the A/E shall work closely with the COR and Integrated Project Team to ascertain and confirm all project requirements. The Contractor shall attend meetings and teleconferences to discuss technical requirements, issues, and project progress and status as required. The Contractor shall prepare, and submit for review, presentation materials for meetings and an agenda. The Contractor shall be responsible for taking meeting minutes, prepare and submit minutes for all meetings attended no later than 3 business days, with the exception of the IPT meetings as discussed in previous paragraph, after the meeting has occurred. The minutes shall be sent to the Contracting Officer and COR for coordination and approval prior to distribution. The AE shall provide an evaluation, cost estimate and conceptual plans to determine the feasibility of completing the project within project budget. Disadvantages and advantages shall be provided including impacts to patient care/medical center operations and order of magnitude cost estimates (with cost of patient care factored into the economy/feasibility) Part II - Construction Period Services: Review and provide concise recommendations on all submittals, shop drawings, product data, samples, RFI s (Questions & Clarification Requests), change order proposals, etc. in accordance with Construction Period Services section of this statement of work. Services shall include third party asbestos monitoring, if needed, that will be performed during construction by a NC DHEC Certified Asbestos Air Sampler. Services shall include providing record drawings based on finalized contractor red-line as-builts. Assist in answering questions and provide clarifications as deemed necessary by the Contracting Officer or COR during solicitation and issuing any addendums, revise drawings/Specifications, etc. necessary to fully and completely address questions any and all questions submitted by the COR, Contracting Officer and awarded Construction Contractor. Serve as an advisor and provide assistance to the VA to determine whether the contractor or subcontractor meets technical qualification requirements, assist in the review of contractor proposals for technical acceptability, support by written recommendations of any problems or litigation encountered in past performance based on first-hand knowledge. Review all submissions and provide concise direction to the VA. Provide direction within 5 business days upon request for shop drawings, product data, installation instructions, samples, etc. Provide direction within 5 business days for RFI s and change order proposals. Changes to contract documents based on errors and omissions in design will be at no cost to the VA to include cost estimates for the change. The CO shall make the final determination on what is or is not an error or omission. Provide Commissioning for all affected systems. Prepare record drawings based on contractor red-line as-built drawings with correspondence performed during construction. The AE shall provide a set of updated drawings and specifications on CD within 20 business days of construction contract completion to the COR. The AE shall function as the commissioning agent for all necessary commissioning actions. The AE shall provide testing, inspection and reporting services during construction. The AE must conduct a site visit, at least once a month, during each phase of the project, and must be present for every test or inspection and to document the outcome. Part III Construction Period Site Visits: Visit the site at the request of the VA in accordance with section Site Visits in the scope of work. The AE shall respond on site within an 8-hour period when requested. The total number of site visits during the construction period is estimated to be 32 for this project, which may be finalized after selection of the AE and during negotiation of the proposal. Each site visit shall be documented through a field report denoting the purpose and results of the site visit. Make site visits on requests of the VA and prepare documented field reports denoting the purpose and results of the site visit, to include agreed upon changes in design as determined necessary during the construction. Visits made based on errors and omissions in design will be at no cost to the VA. Participate in partial/final acceptance inspections (in-wall, above ceiling, and final) as scheduled and generate punch list items for completion. Inspections shall cover quality of installations and locations/placement of items in accordance with the contract documents. The punch list shall reference the contract documents for specific deficiencies (i.e. specification section, drawing detail, etc.). Attend the pre-bid and pre-construction conference to review and confirm project scope. During construction, allow for a minimum of site visits as negotiated for the contract, as directed and scheduled by the COR. OFFERORS WILL BE EVALUATED ON THE FOLLOWING CRITERIA: The submitted SF-330s will be evaluated on the following criteria: This acquisition will be in accordance with FAR Part 36.602-1 and VAAR Part 836.601-1. The following evaluation criteria will be used to evaluate SF 330 technical proposals: The A/E must demonstrate its qualifications with respect to the published evaluation criteria for all services. Evaluation Criteria (1) and (2) are considered the most important and listed in descending order of importance; Criteria (5) is of significantly less importance than (1) through (4) but the associated value of 1 through 4 are in a declining value and order of importance. Criterion (1) is the highest with Criterion (5) being the lowest. (1) Professional qualifications necessary for satisfactory performance of required services; (2) Specialized experience and technical competence in the type of work required, including, where appropriate, experience in energy conservation, pollution prevention, waste reduction, and the use of recovered materials; (3) Capacity to accomplish the work in the required time; (4) Past performance on contracts with Government Agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules; (5) Location in the general geographical area of the project and knowledge of the locality of the project; if application of this criterion leaves an appropriate number of qualified firms, given the nature and size of the project. CRITERION 1 - Professional Qualifications necessary for satisfactory performance of required services. Offerors will be evaluated in terms of the qualifications, competence and experience of the key personnel and technical team proposed to accomplish this work. Key personnel are individuals who will have major contract or project management responsibilities and/or will provide unusual or unique expertise. Provide a balanced licensed and or certified workforce in the following disciplines Architectural, Mechanical, Plumbing, and Electrical Design. Submission requirements: Provide resumes for all proposed key personnel. Resumes are limited to one page each and should cite project specific experience and indicate proposed role in this contract. Provide professional registration, certification, licensure and/or accreditation. Indicate participation of key personnel in example projects in the SF330 Part 1 Section G. Criterion 2 - Specialized experience and technical competence in the type of work required, including, where appropriate, experience in medical facility design. Offerors will be evaluated on specialized experience and technical competence in the performance of services like those anticipated under this contract about: Expansion of Medical Facilities Experience working in and around an operational Medical Facility Specific experience and qualifications of personnel proposed for assignment to the project and their record of working together as a team.   Submission requirements: At a minimum, interested firms are required to provide five (5) not to exceed seven (7) projects completed or substantially completed within the past ten (10) years that best illustrate specialized experience of the proposed team in the areas outlined above. Example projects shall note project s square footage. All projects provided in the SF-330 must be completed by the office/branch/regional office/individual team member proposed to manage and/or perform work under this contract. To enable verification, firms should include the DUNS number along with each firm name in the SF-330 Part 1, Section F Item 25 Firms from Section C Involved in this Project, block (1). Include a contract number or project identification number in block 21. Include an e-mail address and phone number for the point of contact in block 23(c). Include in the project description, the contract period of performance, award contract value, current contract value, and summary of the work performed that demonstrates relevance to specialized experience as outlined above. If the contractor served as a subcontractor on a project, indicate the value of the work they provided towards the performance of the overall project. If a project was performed by a joint venture, and not all joint venture partners are on the team proposed for this contract, the offeror/team should specifically address the work performed by the joint venture partner offering/teaming on this contract. Likewise, if the offeror/team member worked as a subcontractor on a project, the description should clearly describe the work performed by the offeror/team member and the roles and responsibilities of each on the project, rather than the work performed on the project as a whole. If the project description does not clearly delineate the work performed by the entity/entities offering/teaming on this contract, the project could be eliminated from consideration. Additionally, Firms are required to return and submit the Attachment B titled Criterion 2 Format, which will clearly demonstrate specific experiences and qualifications of personnel proposed for assignment to the project and their record of working together as a team. Specifically list similar scoped projects covering the previous 10 years and clearly show participation. (See SF330 Part I Section G, but not excluding other information provided on the SF330 and supporting documentation.) NOTE: If the Offeror is a joint venture, information should be submitted as a joint venture; however, if there is no information for the joint venture, information should be submitted for either joint venture partner, not to exceed a total of seven (7) projects for this criterion. Projects shall be submitted on the SF-330. For submittal purposes, a task order on an IDIQ contract is considered a project, as is a stand-alone contract award. Do not list an IDIQ contract as an example of a completed project. Instead, list relevant completed task orders or stand-alone contract awards that fit within the definition above. Examples of project work submitted that do not conform to this requirement will not be evaluated. Failure to provide requested data, accessible points of contact, or valid phone numbers could result in a firm being rated lower. All information for Criterion 2 should be submitted in Part 1, Section F of the SF-330. The Government WILL NOT consider information submitted in addition to Part 2, Section F in evaluating Criterion 2. Criterion 3 - Capacity to accomplish the work in the required time. Firms/teams will be evaluated in terms of their ability to plan for and manage work under the contract and capacity to accomplish the work in the required time. Submission requirements: Describe the firm s ability to concurrently perform and manage multiple projects in different locations to meet aggressive schedules, multiple disciplines, and control costs and the firm s capacity to accomplish multiple projects simultaneously. Additionally, Prospective contractors are required to provide a list of current projects with a design fee of greater than $10,000 currently being designed in the firms office. Indicate the availability of the proposed project team (including sub-consultants) for the specified contract performance period in terms of: (1.) both the average and maximum number of projects being worked simultaneously for the previous twelve (12) month period, for each key personnel member, (2.) the number of projects currently being worked by each key personnel member identified in the SF330, and (3.) the number of projects that could be added to workload, given size and complexity. Criterion 4 - Past Performance Offerors will be evaluated on past performance with Government agenc

Source notice

More from United States Department of Veterans Affairs posted in November 2023

More lists