ClickCease C1DZ--652-23-108 Renovate MH and Polytrauma… (36C24623R0076) - MatchAwards

C1DZ--652-23-108 Renovate MH and Polytrauma Courtyard

Status
Closed (no response deadline listed, posted Nov 22, 2023)
Agency
United States Department of Veterans Affairs
Office
HAMPTON, USA
Notice type
Special Notice
Solicitation number
36C24623R0076
NAICS
541330 - Engineering Services
PSC
C1DZ - ARCHITECT AND ENGINEERING- CONSTRUCTION: OTHER HOSPITAL BUILDINGS
Category
Construction Related Services (4.2)
Posted
2023-11-22
Deadline
Not stated

Description

Page 1 of This request for A-E firm qualifications packages is a 100% set-aside for Service-Disabled Veteran Owned Small Business (SDVOSB) concerns under VAAR 852.219-73, VA Notice of Total Service-Disabled Veteran-Owned Small Business Set-Aside/ VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE (NOVEMBER 2020) (DEVIATION). THIS IS NOT A REQUEST FOR PROPOSAL. THIS IS A REQUEST FOR SF 330'S ARCHITECT/ENGINEER QUALIFICATION PACKAGES ONLY. ALL INFORMATION NEEDED TO SUBMIT SF 330 DOCUMENTS IS CONTAINED HEREIN. NO SOLICITATION PACKAGE, TECHNICAL INFORMATION, OR BIDDER/PLAN HOLDER LIST WILL BE ISSUED. THERE WILL BE NO SITE VISITS ARRANGED DURING THIS PHASE OF THE REQUIREMENT. PUBLIC ANNOUNCEMENT FOR PROCUREMENT OF ARCHITECT-ENGINEERING (A/E) SERVICES: This is a request for Standard Form 330, Architect-Engineer Qualifications only. A-E Services are being procured in accordance with the Selection of Architects and Engineers Statute (Public Law 92-582), formerly known as the Brooks Act, and implemented in Federal Acquisition Regulation (FAR) subpart 36.6. All submissions will be evaluated in accordance with the below selection criteria. Please submit SF 330 packages to the point of contact(s) listed below. The Government will not pay, nor reimburse, any costs associated with responding to this request. The Government is under no obligation to award a contract as a result of this announcement. Firms will be selected based on demonstrated competence and qualifications for the required work. Any resulting award for the proposed A/E services will be procured under a negotiated Firm-Fixed Price contract in accordance with (IAW) FAR Part 15. GENERAL INFORMATION: Design shall comply with VA guidelines and specifications. Design manuals and specifications can be found at http://www.cfm.va.gov/TIL/. Proposed work is located at Central VA Health Care System (CVVHS), Richmond, Virginia, 23667. The Estimated Construction Magnitude in accordance with Federal Acquisition Regulation (FAR) 36.204 (b) is between $500,000 and $1,000,000. The A/E Services listed herein is being procured in accordance with the Federal Acquisition Regulation (FAR) 36.6 and VAAR 836.6. All offerors are advised that in accordance with VAAR 836.606-71 the total cost of the architect or engineer services to produce and deliver designs, plans, drawings, and specification must not exceed the application of the six percent (6%) architect-engineering fee limitation of the estimated cost of the construction. Potential contractors must provide credentials that confirm registration of Architects or Engineers registered to practice in this particular professional field involved in Virginia, must be registered in SAM (www.sam.gov) and Veteran Small Business Certification (VetCert): http://veterans.cerify.sba.gov at time of submission of their qualifications in order to be considered for an award. As a prospective offeror for this Service-Disabled Veteran-Owned Small Business (SDVOSB) set aside, you are verifying your company meets the status requirements of a SDVOSB concern as established by VAAR 852.219-73. NOTE - Offerors are referred to 852.219-73 (d)(1) Services. In the case of a contract for services (except construction), it will not pay more than 50% of the amount paid by the government to it to firms that are not VetCert-listed SDVOSBs. In order to assure compliance with this clause, all firms submitting a SF330 for this Special Notice are required to indicate what percentage of the cost of contract performance will be expended by the concerns employees and in which discipline(s) and percentage of cost of contract performance to be expended (and in what disciplines) by any other subcontracted or otherwise used small or large business entity(s). Any subcontracted or otherwise business entity(s) used must be identified by name, office location and size/type of business (i.e. SDVOSB, VOSB, 8(a), large, etc.). All submissions will be evaluated in accordance with the evaluation selection criteria as specified herein. The Central VA Health Care System is a working facility and phasing plans for minimizing downtime, and provisions for continuation of service during outages is critical to this project. Past Performance Questionnaire and SF 330 are due Thursday December 22, 2023 by 2:00 PM EST. Complete package page limit is 45 pages. Page limitation does not include past performance data (i.e CPARS, PPQs). Points of Contact: Moses Deng, Contract Specialist at moses.deng2@va.gov will be the primary contact. Please cc: Contracting Officer: Madeline Lucena Pulst at madeline.lucena-pulst@va.gov on all time sensitive submissions. PROJECT INFORMATION: Project No: 652-23-108 Project Title: Architect - Engineer Design Renovate Mental Health and Polytrauma Courtyard Central VA Health Care System (CVVHS) 1201 Broad Rock Blvd Richmond, Virginia 23249 The NAICS Code for this procurement is 541330, Engineering Services and the applicable Small Business Size Standard is $25.5 million annual revenue. The projected award date for the anticipated A/E contract is on or before February 21, 2024. The anticipated period of performance for completion of Architectural Design service to include final report with recommendations and renovation processes is 280 Calendar Days after the Notice to Proceed (NTP). Procurement time frame is 180 Calendar Days after completion of design completion. Construction Period Services (CPS) for the project is 365 Calendar Days after Notice to Proceed. Therefore, the ultimate completion time frame for this project is: 825 Calendar Days. An Architect & Engineer (A/E) contract will be negotiated. The A/E shall provide a cost estimate of future repairs. Cost estimates detailing quantities of materials, labor, profit, overhead, insurance, taxes, etc. in the format found at https://www.cfm.va.gov/til/aeDesSubReq.asp for Minor and NRM Projects. ARCHITECT-ENGINEER DESIGN SCOPE OF WORK RENOVATE MENTAL HEALTH AND POLYTRAUMA COURTYARDS CENTRAL VA HEALTH CARE SYSTEM (CVVHS) PROJECT NO: 652-23-108 PROJECT NAME: Renovate Mental Health and Polytrauma Courtyards ESTIMATED CONSTRUCTION MAGNITUDE: Between $500,000 and $1,000,000 1. SUMMARY OF SERVICES Provide professional Architect/Engineer (AE) and healthcare planning services necessary to create an acceptable and within budget design to renovate approximately 7400 square feet of existing courtyard space (3200 sf for Mental Health and 4200 sf for Polytrauma). The intent of this design is to renovate the courtyards to provide a visually attractive area for patients to meditate and heal. Services required of this A/E contract shall include, but are not limited to: Part I Preparation of Existing Conditions and Conceptual Design Investigative Services: Preparation of existing conditions plan and schematic design SD (15%) which includes site investigation for existing architectural, landscape design, equipment/ furnishings, mechanical, plumbing, electrical, security, and telecommunication. Perform project site investigation in accordance with the Site Investigations section of this scope of work. Part II Preparation Drawings and Specifications Design Development: Preparation and submission for VA review interim design development document packages DD1, and DD2. Design development packages shall be submitted in accordance with the terms of the Design Package Submission Schedule section of the Scope of Work. Packages shall contain a complete set of documents as specified in the Design Requirements/Submissions section of this scope of work. The A/E shall develop a design necessary to meet the requirements listed in the Project Scope section. Design services shall include the following disciplines: architectural, landscape design, equipment/ furnishings, mechanical, plumbing, electrical, security, and telecommunication. Part III Preparation of Drawings and Specifications - Construction Documents Preparation of construction bid documents, CD1 (95%), CD2 (100%) and BD (Final Bid Documents) at the completion of the design development process in accordance with the Design Package Submission Schedule section. Final construction document packages shall contain a complete set of documents as specified in the Design Requirements/Submissions section of this scope of work. The AE shall finalize the design that meets the requirements in the Project Scope section of this scope of work and the construction budget. Design shall include the following engineering services: architectural, landscape design, equipment/ furnishings, mechanical, plumbing, electrical, security, and telecommunication. Part IV - Construction Period Services: Review and provide concise direction on all submittals, shop drawings, product data, samples, RFI s, change order proposals, etc. in accordance with Construction Period Services section of this statement of work. Services shall also include: Construction Laboratory Testing services as required by design specifications Providing record drawings based on finalized contractor red-line as-builts. Part V - Site Visits: Visit the site at the request of the VA in accordance with section Site Visits in this scope of work. The AE shall respond on site within a two-hour period when requested. A total of five (5) site visits during construction shall be included. Each site visit shall be documented through a field report denoting the purpose and results of the site visit. 2. PROJECT SCOPE 2.1 General Requirements AE is responsible for providing all services necessary for design of this project i.e. architectural, landscape design, equipment/ furnishings, mechanical, plumbing, fire protection, electrical, security, and telecommunication. AE will review needs identified by the Integrated Project Team for the area under consideration for design and provide recommendations. A minimum of two conceptual layout options that address the identified needs will be presented to the VA for review. Prior to submission of Schematic Design material, the AE shall meet with the VAMC s COR to discuss any proposed phasing requirements for the project. These phasing requirements shall describe the general sequence of the project work, estimated project duration, and what Government constraints will exist that will influence the Contractor's approach to the construction project. The AE shall be responsible for documenting the phasing requirements. The AE shall provide an evaluation, cost estimate, and conceptual plans to determine the feasibility of completing the project within project budget for each of the three options submitted. Disadvantages and advantages will be provided including impacts to patient care/medical center operations and order of magnitude cost estimates (with cost of patient care factored into the economy/feasibility). Design will have modern finishes selected in coordination with VA. Finishes shall incorporate recycled materials. AE shall provide finish boards at the DD2 (65%) and CD1 (95%) submissions with samples, manufacturer names, series, colors, etc. for easy clarification. Project design will require the construction contractor to recycle demolished materials to the greatest extent possible. Documented quantities, disposal method and final certified documents noting that demolition materials have properly been recycled. At the CD1 (95%) design submission, the AE shall finalize a construction plan showing any temporary conditions for construction, per phase, to ensure general conditions, life safety and infection control requirements are designed, identified and specified including: identify contractor laydown area, trash, delivery, and pedestrian/construction routes. identify temporary utilities for contractors use as necessary identify utilities/systems passing through construction space or that require bypass during construction to be maintained/bypassed to ensure continuity of services in adjacent areas The following items shall be addressed with the design: All spaces shall be ADA compliant and meet VA Barrier Free Design Standard Patient and Hospital Wi-Fi in all areas Always minimize impacts to continuity of care. Phase construction as required to minimize impacts to continuity of care as the work is being completed. 2.2 Specific Requirements Provide professional engineering services for the design and construction administration to renovate approximately 7400 square feet of existing exterior courtyard space located as part of the Mental Health Unit in Building 500 and the courtyard for the Polytrauma Clinic at Building 514. The renovation shall involve all the space indicated in Attachment G, Project Location Plan. The project design will outline and specify (but is not limited to) the following construction activities: Demolition of the existing exterior features, landscaping and finishes. Installation of any new utilities and structures in the courtyard areas. Installation of new landscaping, plantings, features, improvements, equipment, furniture and all items necessary to have a pleasant and inviting courtyard areas for veteran patients. The courtyard for the inpatient mental health unit must be designed in accordance with VA Inpatient Mental Health and Residential Rehabilitation Treatment Program Facilities design guide. The courtyard for the Polytrauma Clinic must be designed in accordance with the VA Architectural Design Guide and the VA Healing Environment Design Guidelines. This renovation project must also functionally mesh with the surrounding functional spaces. The A/E shall take into consideration the functions of surrounding areas in determining placement features within the renovation. The estimated cost of construction for this project must always be within the programmed construction budget of between $500,000 and $1,000,000. If during the design process the estimated cost of construction exceeds the budget, the A/E is to immediately notify the VA and work with the Integrated Project Team (IPT) to reduce the scope of the design to bring the project within the construction budget. Once measures to reduce the estimated cost are finalized the A/E shall provide a summary of the changes to the design scope for VAMC and VISN 6 approval. 3.0 SITE INVESTIGATIONS 3.1 As-Built Investigations The AE will make site visits as necessary to survey and document all existing conditions. The AE shall make site visits, as required, to determine the existing as-built conditions of areas contained in this project. Information, including drawings and other documentation, provided to the AE shall be used as reference only. Original as-built and historical drawings are available upon request. The AE shall verify all as-built condition related to this project despite the presence of as-built drawings. The AE shall coordinate visits with the COR as assigned at the NTP. The AE shall arrange for and oversee the performance of such investigations necessary for the proper design of the project. AutoCAD background drawings may be provided by the VA upon request and shall be used as reference only. The AE shall field verify every physical aspect that relates to the project using onsite investigation methods. 4.0 DESIGN PACKAGE SUBMISSION SCHEDULE The AE shall submit review packages, so they are received on the day noted in the schedule below. Attachment Tasks/Submissions Schedule Duration Calendar Days Completion Date - Calendar Days after NTP Initial Investigation - Integrated Project Team (IPT) meeting 1 day 14 days A Generate/Submit Schematic Design SD (15%) (2 options) 35 days 49 days IPT Review 28 days 77 days B Design Development DD1 (35%) design submission 28 days 105 days IPT Review 21 days 126 days C Design Development DD2 (65%) design submission 28 days 154 days IPT Review 21 days 175 days D Construction Documents CD1 (95%) design submission 28 days 203 days IPT Review 21 days 224 days E Construction Documents CD2 (100%) design submission 28 days 252 days IPT Review 14 days 266 days F FINAL Construction Bid Documents BD submission 14 days 280 days The issuance of the NTP may be performed virtually and will be an introduction of the AE team to the IPT. The IPT will consist of at a minimum, the following members: Impacted clinical services Impacted administrative services Engineering (safety, biomed and M&O) OIT Infection Control Quality Management Patient Safety Physical Medicine and Rehabilitation Service Mental Health Service Other members of the medical center who have vested interests in the design, compliance and accreditation for the medical center. The period between the NTP and the initial IPT meeting shall be used for the AE to gather data/information to be well prepared to discuss their design intent and to ensure project requirement/restraints are understood to make a highly productive meeting at the initial IPT meeting. This time shall also be used to gather as-builts and begin investigative services. AE will be required to attend and take minutes at each IPT meeting. Minutes will be submitted electronically to the COR and Contracting Officer within five (5) calendar days of each meeting. AE is responsible for documenting through meeting minutes all comments received at the IPT on-site reviews including but not limited to written, typed, drawing mark-ups, verbal etc. The first five working days of the IPT review time will be for the VA to determine minimum acceptability of the design submission.  If the VA finds the design submission to be unacceptable, the AE will be required to resubmit the submission. The VA review time will not be impacted and shall remain the same number of allotted days with the first five working days for the VA to determine acceptability of the design submission. The AE will be responsible for maintaining the overall design completion date and is responsible for making up lost time due to unacceptable design submissions. An incomplete submission is defined as a submission lacking any piece of information outlined in Attachments A F of this SOW, or failure of submission to include a required item as outlined by PG-18-15, Volume C. All documents submitted shall comply with the CAD standards contained in the VA Building Information Model Standards. 5.0 DESIGN REQUIREMENTS/SUBMISSIONS 5.1 General Requirements The AE shall submit complete review package in accordance with the following requirements and guidelines outlined in PG 18-15 A/E Submission Requirements, Vol. C and in accordance with this scope of work. Please pay specific attention to the schematic, design and construction submission requirements. As appropriate depending upon the complexity of the design, the AE may elect to delete individual submissions where not required (i.e. Do not address A. Site Development, Landscaping for interior renovation projects) Deliver all design packages in person directly to the COR on the established dates to allow the VA IPT to meet as scheduled. A transmittal letter is required to go to the Contracting Officer on the same day as delivery. Include all information required for each submittal as outlined in Program Guide PG-18-15, Volume C and as modified in the Attachments A F, with the attachments taking precedence. AE shall provide a checklist of all submittals, certifications, tests, and inspections required per drawing and specification section. All designs shall be accomplished in accordance with VA guidelines and specifications, which are available on the Internet at the Office of Construction and Facilities Management, Technical Information Library. As a minimum, design shall comply with the applicable sections from the following VA standards and guidelines found at the web site above: PG-18-1 Master Construction Specifications PG-18-3 Design & Construction Procedures PG-18-4 Standard Details and CAD Standards PG-18-5 Equipment Guide List H-18-8 Seismic Design Handbook (Seismicity = Low, Risk Category = IV, Site Class = D, Seismic Design Category = C, Component Importan

Source notice

More from United States Department of Veterans Affairs posted in November 2023

More lists