<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/department_of_veterans_affairs/posts/108832437103747239" -->

---
title: 6515-- INTENT TO SOLE SOURCE Replacement Ceiling… (36C24722Q0980) - MatchAwards
description: 6515-- INTENT TO SOLE SOURCE Replacement Ceiling Lifts. United States Department of Veterans Affairs. Solicitation 36C24722Q0980. NAICS 339112 - Surgical and Medical Instrument Manufacturing. 10 The Department of Veterans Affairs, Network Contracting Office 7 located in Charleston, SC intends to...
canonical: https://matchawards.com/department_of_veterans_affairs/posts/108832437103747239
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: 6515-- INTENT TO SOLE SOURCE Replacement Ceiling… (36C24722Q0980)
og:url: https://matchawards.com/department_of_veterans_affairs/posts/108832437103747239
og:description: 6515-- INTENT TO SOLE SOURCE Replacement Ceiling Lifts. United States Department of Veterans Affairs. Solicitation 36C24722Q0980. NAICS 339112 - Surgical and Medical Instrument Manufacturing. 10 The Department of Veterans Affairs, Network Contracting Office 7 located in Charleston, SC intends to...
og:image: https://matchawards.com/system/accounts/avatars/000/000/015/original/f59915e906ee2b19.png?1638825904
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# 6515-- INTENT TO SOLE SOURCE Replacement Ceiling Lifts

Status

Closed (archived notice)

Agency

[United States Department of Veterans Affairs](/department%5Fof%5Fveterans%5Faffairs)

Office

AUGUSTA, USA

Notice type

Special Notice

Solicitation number

36C24722Q0980

NAICS

[339112 - Surgical and Medical Instrument Manufacturing](/groups/582)

PSC

6515 - MEDICAL AND SURGICAL INSTRUMENTS, EQUIPMENT, AND SUPPLIES

Category

[Medical Equipment and Accessories and Supplies (10.2)](/categories/medical/medical-equipment-and-accessories-and-supplies)

Posted

2022-08-16

Deadline

Not stated

## Description

10 The Department of Veterans Affairs, Network Contracting Office 7 located in Charleston, SC intends to issue a sole source firm fixed priced delivery order against GSA Federal Supply Schedule (FSS) contract to HANDICARE USA INC. The order will be placed in accordance with the applicable Federal Supply Schedule ordering under FAR Part 8\. A Limited Sources Justification has been prepared. The contract will be to procure supplies of Motor 625 A-series and Motor 1000 C-series motors, extra parts, and structural calculating systems to match existing equipment throughout the Birmingham VA Health Care System and for compatibility with the railing system that has already been installed. This procurement is being conducted in accordance with FAR 13.106-1(b) (1)(ii), Soliciting from a Single Source. The NAICS code utilized for this procurement is 339112 Surgical and Medical Instrument Manufacturing with a Small Business Size Standard of 1000 employees. THIS NOTICE OF INTENT IS NOT A REQUEST FOR COMPETITIVE QUOTES. However, Contractors may submit a capability statement, proposal, or quotation which shall be considered by the contracting officer whether to continue with the sole source procurement or to provide for competition. Such responses MUST be received no later than August 22, 2022 at 2:00 PM EST. Forward responses by e-mail to Contract Specialist, Moses Deng at moses.deng2@va.gov. Due to technical issues, please allow additional time if you re using electronic means. All responses received will be evaluated; however, a determination by the Government not to compete the proposed procurement based upon responses received to this notice is solely within the discretion of the Government. The Department of Veterans Affairs, NCO 7 will NOT be responsible for any costs incurred by interested parties in responding to this notice of intent. Only written responses will be considered. All responses from responsible sources will be fully considered. As a result of analyzing responses to this notice of intent, the Government shall determine if a solicitation will be issued. Any prospective contractor must be registered in the System for Award Management (SAM) in order to be eligible for award. Also, prospective contractor shall be an Original Equipment Manufacturer (OEM) authorized dealer, authorized distributor, authorized reseller. Interested parties are encouraged to furnish information by email only with RFQ# 36C24722Q0980 - Replacement Ceiling Lifts in the subject line. All documents submitted will not be returned. All interested parties shall submit clear and convincing documentation demonstrating their capabilities to satisfy the requirements listed to Contract Specialist, Moses Deng by email at moses.deng2@va.gov. The capability documentation should include general information and technical background describing in detail the prospective contractor's capabilities and experience that will demonstrate the ability to support this requirement. STATEMENT OF WORK (SOW) GENERAL INFORMATION Title of Project: Ceiling Lift Motor Replacement in the Birmingham Veteran Affairs Medical Center (BVAMC) Scope of Work: The contractor shall provide all resources necessary to accomplish the deliverables described in this statement of work (SOW), except as may otherwise be specified. The contractor shall provide all labor, supervision and all other resources required to deliver the requirements stated herein, except as may otherwise be specified in this statement of work. The A625 or C1000 Handicare lifts, and all associated equipment and parts will be delivered, installed, and tested, starting in September 2022 days of award as presented in quote 4466969792\. De-install, removal, and disposal of old lifts is the contractor s responsibility. All work must be coordinated with COR and Supply Chain Management Services in order to coordinate paperwork, and all new and decommissioned lifts must be taken to PPM in the Warehouse for inventory record/sticker purposes. Installation/replacement will need to be timed according to availability of rooms. Background: Ceiling lifts have been installed in many places throughout BVAMC. The Handicare C-625 are approaching end of life and are breaking down often enough to warrant replacement. This set of upgrades will include systems that have docking stations and require continuous charge in rail charge upgrade including A-series motor. Period of Performance: The contractor has up to 1 year from award to complete the work required under this SOW and coordinate installation with room availability unless otherwise directed by the Contracting Officer (CO). It is anticipated that this quantity of lift replacements may require between 180 to 365 days to complete. If the contractor proposes an earlier completion date, and the Government accepts the contractor s proposal, the contractor s proposed completion date shall prevail. Installation dates and designs must be coordinated with Contracting Officer Representative (COR), and dates for installation in installation projects may be adjusted by the Government as required if engineering changes are required and delayed CONTRACT AWARD MEETING The contractor shall not commence performance on the tasks in this SOW until the CO has conducted a kickoff meeting or has advised the contractor that a kickoff meeting is waived. GENERAL REQUIREMENTS All installation must comply with requirements of Patient Safety Alert AL14-07, including the Checklist for Installation and Relocation. The installation checklist must be filled out for each installed lift, in addition to any checklist required by the manufacturer, and supplied to the COR. AL14-07PSAChecklist forInstallationandRel Contractor will provide evaluation of existing structure where ceiling lift motors are needed and submission of plans to BVAMC Engineering service, to assure that workable systems are installed and comply with VA design requirements and relevant standards. Contractor will coordinate with Engineering service to verify access to engineering mechanical, HVAC, and fire systems components within the mounting area of the lift units. Contractor will coordinate with Contracting Officer Representative (COR) to schedule installations. Contractor will provide information on minimum clearances for operation of each lift, to be presented with the bid. Contractor will provide a list of all construction or modifications required to install these lifts, to be presented with the bid. The goal is to install around any obstructions without requiring VA to make construction modifications. Contractor will provide all qualified personnel, materials, equipment and services necessary to install ceiling lifts for the rooms described below under Location, including lifts, tracks, spreader bars, attachment hardware, and all other equipment necessary for safe operation. Contractor will provide installation and testing of all equipment for ceiling lifts, according to VA checklist requirements Vendor will provide training on equipment use for all new types of equipment included in this contract, one session per shift for up to 2 shifts of personnel in each affected area and for onsite trainers (up to 10 sessions scheduled after installation and before use), in coordination with COR. Contractor will provide evidence of testing of all lift systems provided and schedule testing when it can be overseen by COR. Contractor will mitigate any new hazards created by installation Contractor will meet construction safety requirements, including construction orientation, safety training requirements, dust control requirements from the Infection Control Risk Assessment, TB testing, electrical safety requirements, and Above Ceiling Permit requirements including re- sealing any penetrations of fire barriers. SPECIFIC MANDATORY TASKS AND ASSOCIATED DELIVERABLES Description of Tasks and Associated Deliverables: The contractor shall provide the specific deliverables described below within the performance period stated in Section A.4 of this SOW. Task One: The contractor shall provide a detailed work plan and briefing for the VA project team, which presents the contractor's plan for completing the task order. The contractor's plan shall be responsive with this SOW and describe, in further detail, the approach to be used for each aspect of the task order as defined in the technical proposal. Area Room # Scale lbs. Design Timing Annex 1B141 Y 625 Existing docking station rail, New A- 625 installed with in-rail charging. Coordinated with COR and Annex staff 6B 6228 Y 625 Existing docking station rails, New A-625 installed with in-rail charging. Coordinated with COR and 6Main staff 6B 6227 Y 625 Existing docking station rails, New A-625 installed with in-rail charging. Coordinated with COR and 6Main staff 6B 6226 Y 625 Existing docking station rails, New A-625 installed with in-rail charging. Coordinated with COR and 6Main staff 6B 6217 Y 625 Existing docking station rails, New A-625 installed with in-rail charging. Coordinated with COR and 6Main staff 6B 6204 Y 625 Existing docking station rails, New A-625 installed with in-rail charging. Coordinated with COR and 6Main staff Safe Harbor 6116 Y 625 Existing docking station rails, New A-625 installed with in-rail charging. Coordinated with COR and 6Main staff BH 6430 Y 1000 Existing docking station rails, New C-1000 installed with in-rail charging. Coordinated with COR and 6Main staff BH 1435I Y 625 Existing continuous-charge rail, New A-625 installed with in- rail charging. Coordinated with COR and 1Main staff BH 6219 Y 625 Existing docking station rails, New A-625 installed with in-rail charging. Coordinated with COR and 6Main staff BH 5210 Y 625 Existing docking station rails, New A-625 installed with in-rail charging. Coordinated with COR and 5Main staff BH 4604 Y 625 Existing docking station rails, New A-625 installed with in-rail charging. Coordinated with COR and 4Main staff BH 4336A Y 625 Existing docking station rails, New A-625 installed with in-rail charging. Coordinated with COR and 4Main staff BH 4336B Y 625 Existing docking station rails, New A-625 installed with in-rail charging. Coordinated with COR and 4Main staff BH 4336C Y 625 Existing docking station rails, New A-625 installed with in-rail charging. Coordinated with COR and 4Main staff BH 4336D Y 625 Existing docking station rail, New A- 625 installed with in-rail charging. Coordinated with COR and 4Main staff BH 4335 Y 625 Existing docking station rails, New A-625 installed with in-rail charging. Coordinated with COR and 4Main staff BH 4334 Y 625 Existing docking station rails, New A-625 installed with in-rail charging. Coordinated with COR and 4Main staff BH 4333 Y 625 Existing docking station rails, New A-625 installed with in-rail charging. Coordinated with COR and 4Main staff BH 4331 Y 625 Existing docking station rails, New A-625 installed with in-rail charging. Coordinated with COR and 4Main staff BH 4330 Y 625 Existing docking station rails, New A-625 installed with in-rail charging. Coordinated with COR and 4Main staff BH 3811 Y 625 Existing docking station rails, New A-625 installed with in-rail charging. Coordinated with COR and 3Main staff BH 3810 Y 625 Existing docking station rails, New A-625 installed with in-rail charging. Coordinated with COR and 3Main staff BH 3335 Y 625 Existing continuous-charge rail, New A-625 installed with in- rail charging. Coordinated with COR and 3Main staff BH 3233 Y 625 Existing docking station rails, New A-625 installed with in-rail charging. Coordinated with COR and 3Main staff BH 2608 Y 625 Existing docking station rails, New A-625 installed with in-rail charging. Coordinated with COR and 2Main staff BH 2343 Y 625 Existing docking station rails, New A-625 installed with in-rail charging. Coordinated with COR and 2Main staff BH 1817 Y 625 Existing docking station rails, New A-625 installed with in-rail charging. Coordinated with COR and 1Main staff BH 1435P Y 625 Existing docking station rail, New A- 625 installed with in-rail charging. Coordinated with COR and 1Main staff BH 1435O Y 625 Existing docking station rails, New A-625 installed with in-rail charging. Coordinated with COR and 1Main staff BH 1435M Y 625 Existing docking station rails, New A-625 installed with in-rail charging. Coordinated with COR and 1Main staff BH 1435M Y 625 Existing docking station rails, New A-625 installed with in-rail charging. Coordinated with COR and 1Main staff BH 1435M Y 625 Existing docking station rails, New A-625 installed with in-rail charging. Coordinated with COR and 1Main staff BH 1435K Y 625 Existing docking station rails, New A-625 installed with in-rail charging. Coordinated with COR and 1Main staff PM&R 8305 Y 625 Existing docking station rails, New A-625 installed with in-rail charging. Coordinated with COR and 8Main staff PM&R 8305A Y 625 Existing docking station rails, New A-625 installed with in-rail Charging. Coordinated with COR and 8Main staff BH 6116 Y 625 Existing docking station rails, New A-625 installed with in-rail charging Coordinated with COR and 6Main staff Deliverable One: Task Two: Ceiling Lifts shall meet all Underwriters Laboratory requirements, life safety codes, national electric codes, fire safety codes, and all other applicable federal, state and local codes. Appropriate documentation should be provided. Lifts must be capable of picking patients up off the floor. Scales must have a readout in the controller and must not decrease the lifting height of the system. Lifts must not beep or flash during normal operation. Contractor shall not breach any firewalls during installation of these lifts. Any fire barrier that must be penetrated must be discussed with VA safety personnel and must immediately have fire barrier repaired. An Above Ceiling Permit must be filled out before ceiling work, and the COR will check the ceiling after ceiling work, to make sure any fire barrier penetration was repaired. Each room where lifts are installed shall be returned to original condition Ceiling lift motors shall be capable of lifting at least 625 or 1,000 pounds, as specified on the Location list. Lifts must be capable of picking patients up off the floor. Scales must have a readout in the controller and must not decrease the lifting height of the system. Lifts must not beep or flash during normal operation. Each room where lifts are installed shall be returned to original condition Ceiling lift motors shall be capable of lifting at least 625 or 1,000 pounds, as specified on the Location list. Warranty shall include all travel or shipping associated with any warranty repair. New lifts shall accept generic type replacement batteries without voiding any warranties. Ceiling lifts must recharge automatically, by recharging at any location on the rail. Ceiling lifts must include safeguards to prevent patients from being trapped or hurt, such as emergency stop buttons or emergency lowering devices in case of power failure. Use of emergency lowering devices must not require tools or ladders Deliverable Two: Vendor shall provide the following: Provide proof of ongoing service quality and consistent management, including failure reports and any other applicable documentation. Contractor shall provide certified in-service training for all shifts of direct patient care staff in units where lifts are installed at no additional cost to the Government, for any equipment new to this facility (up to 10 sessions in coordination with the COR). This training must include hands-on lift use and be extensive enough to prepare participants to train others. Training must include each new type of equipment and sling used in an area. Contractor shall provide certified in-service training on each site, multiple times in a day, for biomedical engineering staff in coordination with the COR. shall provide electronic copies of the user manuals and repair manuals for each different model of lift installed under this order or contract at no additional cost to the government. Each room s lift system shall be weight and function tested after installation in compliance with the VHA checklist required by Patient Safety Alert AL14-07\. Each checklist shall be provided to Contracting Officer Technical Representative along with any checklist required by the manufacturer. Any changes in inspection requirements during the period of installation will be communicated to the Contractor immediately. All employees and subcontractors must wear a visible name and company identification when onsite. When more than one person is onsite performing work under this contract, one must be designated as a supervisor and must be fully responsible for the work to be performed. The Contractor shall provide all supplies, materials, equipment, qualified personnel, supervision, management, and transportation to perform all tasks as identified herein. All work is to be performed in accordance with the guidelines established by Federal, State, and local ordinances and The Joint Commission. The Contractor s procedures and quality control procedures shall conform to these guidelines. Contractor personnel must conduct their work so as not to interfere with the normal functioning of the facility and will stop work if asked BVAMC personnel. The Contractor shall take all precautions necessary to protect the lives and health of occupants of the building. The Contractor must follow procedures required by BVAMC Infection Control personnel and the construction safety committee, to include any required dust control specified in the Infection Control Risk Assessment. The Contractor must state what efforts will be made to minimize noise during installation of equipment. The Contractor shall immediately correct any fire and safety deficiencies caused by his personnel. If the contractor fails or refuses to correct deficiencies promptly, the Contracting Officer may issue an order stopping all or any part of the work and may hold the contractor in default of the contract. The Contractor shall comply with applicable Federal, State, and local safety and fire regulations and codes which are in effect at the beginning of the contract period. The contractor shall keep abreast of any changes in these regulations and codes applicable to the contract. All material and equipment will be removed from the facility or stored properly at the end of each workday and secured during the workday in the areas specified by the Contracting Officer s Technical Representative. The Contractor is responsible for supplying, completing, and submitting all reports required or requested by Federal, State, or local ordinances which pertain to any duties contained in the contract. The Contractor will be required to furnish the BVAMC with material safety data sheets for all chemicals used during installation. This information is required by the VA for emergency treatment in the event of ingestion of and/or contact with the material by humans and is required by OSHA regulations. The Contractor s onsite lead installer must attend a BVAMC construction safety orientation and supply job hazard analyses as required by Construction Safety Officer to show how hazards to Contractor and BVAMC personnel are being minimized. All Contractor personnel must have OSHA 10-hour construction safety training cards. The Contractor s personnel shall follow applicable policies of the BVAMC, to include policies concerning fire and disaster preparedness programs. The contractor shall furnish at his own expense all labor, materials, machinery, and appliances which may be necessary or appropriate in the performance of this contract. All accumulated rubbish is to be collected and placed in the dumpster. F. SCHEDULE FOR DELIVERABLES G. 1\. The contractor shall complete the Delivery Date column in Attachment A for each deliverable specified. Unless otherwise specified, the number of draft copies and the number of final copies shall b 

<!-- mobian-agent-ad sponsored="true" id="ba3e0bb7-246f-485f-9691-11f608d09842" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories/medical/medical-equipment-and-accessories-and-supplies?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


## Contacts

* Contract Specialist, Moses Deng

Email and phone are in the source notice.

[Source notice](https://sam.gov/opp/92aacb38eb2e455781fc98be9ffe863b/view)

[More from United States Department of Veterans Affairs posted in August 2022](/department%5Fof%5Fveterans%5Faffairs/archive/2022-08)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Manufacturing Government Contracts Available Now](/contracts/manufacturing)

```json
{"@context":"https://schema.org","@type":"Demand","name":"6515-- INTENT TO SOLE SOURCE Replacement Ceiling Lifts","description":"10 The Department of Veterans Affairs, Network Contracting Office 7 located in Charleston, SC intends to issue a sole source firm fixed priced delivery order against GSA Federal Supply Schedule (FSS) contract to HANDICARE USA INC. The order will be placed in accordance with the applicable Federal Supply Schedule ordering under FAR Part 8. A Limited Sources Justification has been prepared. The contract will be to procure supplies of Motor 625 A-series and Motor 1000 C-series motors, extra parts, and structural calculating systems to match existing equipment throughout the Birmingham VA Health Care System and for compatibility with the railing system that has already been installed. This procurement is being conducted in accordance with FAR 13.106-1(b) (1)(ii), Soliciting from a Single Source. The NAICS code utilized for this procurement is 339112 Surgical and Medical Instrument Manufacturing with a Small Business Size Standard of 1000 employees. THIS NOTICE OF INTENT IS NOT A REQUEST FOR COMPETITIVE QUOTES. However, Contractors may submit a capability statement, proposal, or quotation which shall be considered by the contracting officer whether to continue with the sole source procurement or to provide for competition. Such responses MUST be received no later than August 22, 2022 at 2:00 PM EST. Forward responses by e-mail to Contract Specialist, Moses Deng at moses.deng2@va.gov. Due to technical issues, please allow additional time if you re using electronic means. All responses received will be evaluated; however, a determination by the Government not to compete the proposed procurement based upon responses received to this notice is solely within the discretion of the Government. The Department of Veterans Affairs, NCO 7 will NOT be responsible for any costs incurred by interested parties in responding to this notice of intent. Only written responses will be considered. All responses from responsible sources will be fully considered. As a result of analyzing responses to this notice of intent, the Government shall determine if a solicitation will be issued. Any prospective contractor must be registered in the System for Award Management (SAM) in order to be eligible for award. Also, prospective contractor shall be an Original Equipment Manufacturer (OEM) authorized dealer, authorized distributor, authorized reseller. Interested parties are encouraged to furnish information by email only with RFQ# 36C24722Q0980 - Replacement Ceiling Lifts in the subject line. All documents submitted will not be returned. All interested parties shall submit clear and convincing documentation demonstrating their capabilities to satisfy the requirements listed to Contract Specialist, Moses Deng by email at moses.deng2@va.gov. The capability documentation should include general information and technical background describing in detail the prospective contractor's capabilities and experience that will demonstrate the ability to support this requirement. STATEMENT OF WORK (SOW) GENERAL INFORMATION Title of Project: Ceiling Lift Motor Replacement in the Birmingham Veteran Affairs Medical Center (BVAMC) Scope of Work: The contractor shall provide all resources necessary to accomplish the deliverables described in this statement of work (SOW), except as may otherwise be specified. The contractor shall provide all labor, supervision and all other resources required to deliver the requirements stated herein, except as may otherwise be specified in this statement of work. The A625 or C1000 Handicare lifts, and all associated equipment and parts will be delivered, installed, and tested, starting in September 2022 days of award as presented in quote 4466969792. De-install, removal, and disposal of old lifts is the contractor s responsibility. All work must be coordinated with COR and Supply Chain Management Services in order to coordinate paperwork, and all new and decommissioned lifts must be taken to PPM in the Warehouse for inventory record/sticker purposes. Installation/replacement will need to be timed according to availability of rooms. Background: Ceiling lifts have been installed in many places throughout BVAMC. The Handicare C-625 are approaching end of life and are breaking down often enough to warrant replacement. This set of upgrades will include systems that have docking stations and require continuous charge in rail charge upgrade including A-series motor. Period of Performance: The contractor has up to 1 year from award to complete the work required under this SOW and coordinate installation with room availability unless otherwise directed by the Contracting Officer (CO). It is anticipated that this quantity of lift replacements may require between 180 to 365 days to complete. If the contractor proposes an earlier completion date, and the Government accepts the contractor s proposal, the contractor s proposed completion date shall prevail. Installation dates and designs must be coordinated with Contracting Officer...","url":"https://matchawards.com/department_of_veterans_affairs/posts/108832437103747239","identifier":"36C24722Q0980","category":"339112 - Surgical and Medical Instrument Manufacturing","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"6515 - MEDICAL AND SURGICAL INSTRUMENTS, EQUIPMENT, AND SUPPLIES"},{"@type":"PropertyValue","propertyID":"CM category","name":"Category Management category","value":"10.2 Medical Equipment and Accessories and Supplies","url":"https://matchawards.com/categories/medical/medical-equipment-and-accessories-and-supplies"}],"availabilityStarts":"2022-08-16","sameAs":"https://sam.gov/opp/92aacb38eb2e455781fc98be9ffe863b/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Manufacturing","item":"https://matchawards.com/contracts/manufacturing"}]}
```

