J061--Tri-annual switch gear maintenance
- Status
- Closed (archived notice)
- Agency
- United States Department of Veterans Affairs
- Office
- MURFREESBORO, USA
- Notice type
- Sources Sought
- Solicitation number
- 36C24922Q0592
- NAICS
- 238210 - Electrical Contractors and Other Wiring Installation Contractors
- PSC
- J061 - MAINT/REPAIR/REBUILD OF EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT
- Posted
- 2022-08-10
- Deadline
- 2022-08-22
- Place of performance
- Louisville, 40206-1433
Description
This is a Sources Sought notice. This is NOT a solicitation for proposals, proposal abstracts, or quotations. The purpose of this notice is to obtain information regarding the availability and capability of all qualified sources to perform a potential requirement. Background: This section of work includes the testing, inspecting, adjusting, & repairing of High Voltage Transformers, Switchgear Equipment, Circuit Breakers, Protective Relays, Lightning Arrestors, Generators & Transfer Switches. All electrical equipment, switchgear, primary switches, breaker, relays, connections, and such other devices as specified herein shall be cleaned, tested and adjusted so that the distribution system is left highly reliable, and is operational within industry and manufacturer s tolerance. The Contractor shall verify conditions as they exist prior to bidding the project and assume the responsibility for safety precautions to prevent accidental energizing of a circuit secured for maintenance to be performed on. The installation of safety grounding sets shall be the responsibility of contractor. The Contractor shall plan on reconditioning of operating mechanism of Primary Switch # 5 in Substation to industry standard. Purpose and Objectives: Your responses to the information requested will assist the Government in determining the appropriate acquisition method. NAICS code: 238210 and sized standard is $16.5M. NOTE: Respondent claiming SDVOSB and VOSB status must be registered and CVE verified in VetBiz Registry www.vetbiz.gov. Please advise of status when replying back to RFI. Project requirements: Anticipated period of performance: October 15, 2022 to December 30, 2022 Other important considerations: See Statement of Work (SOW) Capability statement /information sought: Response to this announcement shall not to exceed 10 pages and should include the following information: (1) A tailored capability statement indicating the firm s ability to provide a product and related services; (2) The respondents DUNS number, organization name, address, point of contact, and size and type of business (e.g., SDVOSB/VOSB, etc,) pursuant to the applicable NAICS code; (3) Information should be provided electronically in a Microsoft Word or Adobe PDF format. Please e-mail your response with the above information to robert.belisle1@va.gov with the subject line "Sources Sought Notice # 36C249-22-Q-0592 by 10:00 a.m. on (08/22/2022). Any question should be emailed to robert.belisle1@va.gov. Disclaimer and Important Notes. This notice does not obligate the Government to award a agreement or otherwise pay for the information provided in response. The Government reserves the right to use information provided by respondents for any purpose deemed necessary and legally appropriate. Any organization responding to this notice should ensure that its response is complete and sufficiently detailed to allow the Government to determine the organization s qualifications to perform the work. Respondents are advised that the Government is under no obligation to acknowledge receipt of the information received or provide feedback to respondents with respect to any information submitted. After a review of the responses received, a pre-solicitation synopsis and solicitation may be published in Federal Business Opportunities. However, responses to this notice will not be considered adequate responses to a solicitation. Confidentiality. No proprietary, classified, confidential, or sensitive information should be included in your response. The Government reserves the right to use any non-proprietary technical information in any resultant solicitation(s). Statement of Work TRI-ANNUAL YEAR GEAR MAINTENANCE VA Medical Center 800 Zorn Ave Louisville KY 40206-1433 Part I GENERAL DESCRIPTION This section of work includes the testing, inspecting, adjusting, & repairing of High Voltage Transformers, Switchgear Equipment, Circuit Breakers, Protective Relays, Lightning Arrestors, Generators & Transfer Switches. All electrical equipment, switchgear, primary switches, breaker, relays, connections, and such other devices as specified herein shall be cleaned, tested and adjusted so that the distribution system is left highly reliable, and is operational within industry and manufacturer s tolerance. The Contractor shall verify conditions as they exist prior to bidding the project and assume the responsibility for safety precautions to prevent accidental energizing of a circuit secured for maintenance to be performed on. The installation of safety grounding sets shall be the responsibility of contractor. The Contractor shall plan on reconditioning of operating mechanism of Primary Switch # 5 in Substation to industry standard. PERFORMANCE The Contractor shall provide all material, equipment, labor, and technical supervision to perform such tests and inspections. The Contractor shall have a minimum of 10 years of specialized continuous experience in testing, inspection, cleaning, adjusting, installing, and appraising electrical distribution systems and apparatus to assure their reliable operation. All work performed shall be fully documented by the Contractor. Testing shall be performed in compliance with manufacturers recommendations and applicable NEMC, NEC, ANSI, IEEE, NETA, OSHA, and VA codes and standards. Test Report: The test report shall include the following: Summary of project Description of equipment tested Description of test Test results Conclusions, recommendations, and summary evaluation of systems Appendix, including appropriate test forms List of test equipment used Furnish three (3) copies of the completed bound report to the Contracting Officer s Technical Representative (COTR) from Facility & Plant Management Service (FPMS) no later than 15 business days after testing is completed. Final acceptance will be withheld until the reports are submitted and explained to the COTR and his designees. Upon completion of the tests and inspections noted in these specifications, a label shall be attached to all serviced devices. These labels will indicate date serviced and the Testing Contractor responsible. The tests and inspections shall determine suitability for continued reliable operations All outages shall be scheduled and approved in writing by the COTR no less than two (2) weeks in advance. Outages will be scheduled only at night and/or weekends. Bldg 21 is an exception. Weather permitting for non-cooling conditions HV circuits #3 and #9 and associated transformers and switchgear may be interrupted for maintenance and testing with weather permitting for non-cooling conditions of Bldg 1. The Contractor shall not interrupt service to any portion of the Medical Center by the opening or closing of any switch or breaker without coordination and under direct supervision of the COTR. SUBMITTALS 1. Certifications: Documentation supporting requirement of part I Item 1.2-2. Provide complete copies of all tests performed, showing required data as indicated, including technical data sheets, appraisals and summary recommendations. Reporting: All work performed shall be fully documented by the Contractor as by Part I, Item 3 and submitted in three completed bound reports to the COTR no later than fifteen (15) business days after testing has been completed. Final Payment and acceptance will be withheld until completed reports are submitted and explained to the COTR and/or their designees. The Contractor shall submit three bounds copies of a report containing the following: A summary evaluation of the system pointing out any significant deficiencies. An evaluation of the overall reliability of the emergency generation system. Report any deficiencies. A record of nameplate information on all equipment included in the evaluation together with legend and notation to indicate location on the one-line diagram. Test reports on individual equipment items such as transformers, circuit breakers, relays generators, etc. Include time/current test results on protective relays. The Contractor shall furnish a corrected one-line diagram of the system. This shall be an inked transparency on a sheet approximately 28 x 42 and of workmanship comparable to the existing drawing. The existing drawing may be corrected or a new drawing may be provided. The transparency must be of such quality as to provide good reproductions. PRODUCTS: All testing equipment shall be UL listed and used in accordance with the NEC. All oil samples from transformers shall be sent to an independent laboratory for testing with copies of results submitted in the final report to the COTR. EXECUTION: 1. Transformers: a. Transformer insulation liquids shall be sampled and tested and, if found to be contaminated, will be evacuated from the system and disposed of in obtaining licenses or permits required. He, likewise, shall refill to proper level and liquid found below acceptable levels. In no case will clean liquid be added to that which is contaminated. b. All transformers listed shall be inspected. Cables, connections, and switches will be inspected and cleaned. Infrared the transformer fins for indications of blockage. c. Oil from transformers shall be sampled in accordance with ASTM procedures and analyzed by an independent laboratory for: Color Acidity Interfacial tension Dielectric strength Dissolved gas-in-oil Power factor Also analyzed oil for PCB contaminants and determine parts per million content in accordance with either ASTM or EPA procedures. d. Test insulation resistance, power factor, and turns ratio. e. Replace gaskets as needed f. Liquid filled transformers shall have the cooling liquid checked and replaced when test indicates that it no longer meets manufacturers requirement. High Voltage (13.8 KV) Equipment: A. Record switchgear, breaker, or other device nameplate information. Compare with facility s one-line diagram. Identify and record discrepancies. Inspect all electrical equipment, including each breaker. Report damaged or malfunctioning equipment, loose connections and material or contamination that must be removed or corrected. Tighten loose connections. Clean where appropriate. Check equipment for level, security to foundation and operation of doors. Report any unfavorable environmental conditions such as excess moisture or conducting dust that must be corrected. Visually inspect the equipment ground. Check and/or tighten connections. Record the number and size of ground buses and straps. Report deficiencies. Inspect the insulation system on the primary bus and assemblies. Test insulation on each bus, phase-to-phase and phase-to-ground with suitable megohmmeter. Record values. Record deficiencies. Clean where appropriate. Circuit Breakers: Draw each breaker from its cell Remove arc chutes Clean, inspect and adjust all contacts Measure and record resistance of each contact in micro-ohms Clean all insulating surfaces Megger and record phase-to-phase and phase-to-ground resistance Lubricate as necessary Electrically close and trip each breaker with control switch Manually close and trip each breaker Trip each breaker with each of its protective devices Tighten all connections Record any discrepancies Protective Relays: Remove each relay from its case Clean and inspect Tighten all connections Apply three multiples of relay tap current to each relay to verify manufacturer s time current characteristics Test each relay for instantaneous pickup Adjust where appropriate Report deficiencies Check each panel-mounted instrument over its range. Record discrepancies. Primary Disconnects: Lock out circuit when it is deenergized by the Medical Center electrician Connect temporary safety ground Clean and inspect cubicle Clean all insulating surfaces Clean and dress all contacts Measure contact resistances in micro-ohms. Record any deficiencies Tighten all untapped connections Lubricate as necessary Remove safety ground Megger each phase-to-ground. Record any deficiencies Remove safety lock, thereby returning control of circuit to the Medical Center electrician Primary Feeders (6): Open and drop out main substation circuit breaker Open and lock out primary disconnects and/or transfer switches Inspect exposed sections for physical damage Inspect for shield grounding, cable support, and termination Inspect for visual jacket and insulation condition Terminations shall be properly corona suppressed Ho-Pot with DC to a maximum of 28KV Record results noting any deficiencies Remove safety lock(s), thereby returning control of circuit to the Medical Center electrician. Low voltage Equipment: Record switchgear, breaker or other device nameplate information. Compare with facility s one-line diagram. Identify and record discrepancies. Inspect equipment. Report damage, loose connections and material or contamination that must be removed or corrected. Tighten untapped loose connections. Clean where appropriate. Check equipment for level, security to foundation and operation of doors. Report any unfavorable environmental conditions such as excess moisture or conducting dust that must be corrected. Visually inspect the equipment ground. Check and tighten, as required, all untapped connections. Record the number and size of ground buses and straps. Report deficiencies. Inspect the insulation system on the bus and assemblies. Clean where appropriate. Test insulation phase-to-phase and phase-to-ground with suitable megohmmeter. Record values and report deficiencies. Circuit breakers: Draw each breaker from its cell Vacuum, thoroughly clean and inspect breaker Clean and dress all contacts Megger phase-to-phase and phase-to-ground Inspect arc chutes Measure contact resistance in micro-ohms Lubricate as necessary Test each over-current trip device for instantaneous pickup and for pickup at 200% and 300% of its rating Clean and inspect cubicle Tighten untapped connections Record any deficiencies Check each panel-mounted instrument over its range. Record any discrepancies. Generators and Transfer Switches: Record generator and transfer switch nameplate data. Include manufacturer, age and capacity of generator. List fuel type, hours of fuel tank capacity and accumulated hours of run time. Test run generator in loaded condition. Record transfer time. Record KW load. Check generator drive engine for satisfactory performance as to smoothness of operation, fuel and oil pressures, coolant temperature, etc. Record results. Verify proper time-out of generator set. Record results. Perform the following visual inspection of transfer switches: Record nameplate information Clean and inspect cubicle Check operation of doors Check equipment ground Lubricate as necessary Visually inspect insulation, connections and contacts for evidence of heating or deterioration Report any unfavorable environmental conditions such as excess moisture or conduction dust which needs correction Report any additional deficiencies NOTE: Exercise full caution during inspection of transfer switches, as power flow through switch must be maintained. 5. Molded Case Circuit Breakers (225 amps or less): a. All molded case circuit breakers (frame sizes 225 amp or less) shall be exercised open and re- closed, documented and done during the outage to specific equipment in conjunction with scheduled outages of gear. This work will be performed by VA staff. WORK SCHEDULING Contractor shall furnish to the COTR three (3) weeks in advance of scheduled work, a written proposal of scope of work and the equipment to minimize outages to effected areas. Power Outages: The power outage for work on Building #21 may be scheduled for a time convenient to both parties, Medical Center and Contractor. Main Substation Breakers #3 and #9 may be opened, disconnecting the feeders, to make available the equipment within the building for work. Maintenance and testing of the Medical Center s emergency power generators and associated equipment will require close coordination between the two parties. Power outages will only be permitted at night or on weekends. Separate outages must be scheduled for maintenance on each generator. Generators to be serviced are (1) 125 KW generator located in Building #6, (2) 600 KW (480V) generator located in Generator Room attached to Building #1, (3) 600 KW generator located in Generator Room attached to Building #1, and (4) 400 KW generator located in Generator Room attached to Building #1. (1) 100kw generator located in bldg 11, and (1) 125 KW generator located in bldg 12. Outages effecting D-wing addition and Buildings 3, 4, 5, and 12, and Breaker #5 in the main substation shall be scheduled to be deactivated. This will permit work to be done on the primary side of the 480 V system and pad-mounted Transformers T-4, T-12, and T-1. After work has been completed on the feeder from Breaker #5, the main substation shall be scheduled down for work on the primary system. During this period, only emergency generator power will be available. After work on the substation has been completed, the power outage to Buildings #1, #6, and #19 may be scheduled. During this outage, Breakers #6 and #10 in the main substations are turned off. During this outage, power will be applied to all the 480 V circuits in Building #1. Also, by withdrawing Breakers #18, #19, and #22 from, their racks in the main switchgear in subbasement #2 of Building #1 and Breaker #5 of the 208 V distribution switchgear for the C&E Addition of Building #1, emergency power from the 600 KW generator can feed panels EEQ, ELS, EC and EDPE4 without endangering persons working on Feeders #6 and #10 and their associated gear. Breaker #8 will be turned off to inspect and test 480 V switchgear in A001. It should be noted that no work can be performed on the aforementioned panels if the 600 KW generators is not running during this period. Also, during this outage, power will be supplied to the Boiler House, Building #8, by the 125 KW generator located in Building #6. By withdrawing Breaker #2 from the switchgear in Building #6, the Contractor can safely work on the switchgear in that building. At a time convenient to both parties, Breaker #4 of the main substation can be deenergized to permit work on pad-mounted Transformer T-2, T-7, and associated distribution panels of Building # 7. Service to other portions of the Medical Center is not affected by Breaker #4 being off only Buildings #T-20 and Building #7. The following work may be done within the normal five day work week during the heating season months of October through March or at a time to be determined by the VA Medical Center when load is at a level to permit testing: Building #21 primary system work Hi-Pot of Building #21 feeders from Circuit Breakers #3 and #9 Low voltage breakers in Building #21 Within the normal five day work week during months of milder temperatures: Generator and transfer switches: Generator test run should be scheduled as well for evening or weekend times. Weekend or evening hours work during milder months: Main substation work with one side of the substation, Clifton or Hillcrest, being scheduled down during a weekend. Primary side of system fed from Circuit Breaker #5. Hi-Pot the feeder during this outage. This work will preferably be scheduled at the same time as work on the Hillcrest side of the main substation. Hi-Pot on feeders from Circuit Breakers #6 and #10. Available one at a time, during evening hours on weekend days. Weekend or evening hours work not affected by weather or season: Low voltage work on buses, breakers and switches (Building #1, #6 and #19). Proposed 5 day work schedule: SCHEDULE Plan for evening start 6pm to possibly 12:30am: Check for Occupancy of Bldg. 7, T20, T22, T27 Provide Temp Lighting for Substation Ext. Cord to power Jon Bloom s equipment and Bill Smith Check plants receptacles feeds prior to work to plan on what sections will be out. Plant takes chillers off line of section of switchgear working on prior to substation breaContacts
- Robert Belisle, Contract Specialist
Email and phone are in the source notice.