<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/department_of_veterans_affairs/posts/108719190892992117" -->

---
title: Z1DA--CON | REPLACE THE EXISTING WATER TOWER… (36C25622R0127) | Closed - MatchAwards
description: Z1DA--CON | REPLACE THE EXISTING WATER TOWER PUMP | PR 598-22-4-8847-0003. United States Department of Veterans Affairs. Solicitation 36C25622R0127. NAICS 236220 - Commercial and Institutional Building Construction. Deadline 2022-08-05. 1. How long does the 8 line run to building 170? In the...
canonical: https://matchawards.com/department_of_veterans_affairs/posts/108719190892992117
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: Z1DA--CON | REPLACE THE EXISTING WATER TOWER… (36C25622R0127) | Closed
og:url: https://matchawards.com/department_of_veterans_affairs/posts/108719190892992117
og:description: Z1DA--CON | REPLACE THE EXISTING WATER TOWER PUMP | PR 598-22-4-8847-0003. United States Department of Veterans Affairs. Solicitation 36C25622R0127. NAICS 236220 - Commercial and Institutional Building Construction. Deadline 2022-08-05. 1. How long does the 8 line run to building 170? In the...
og:image: https://matchawards.com/system/accounts/avatars/000/000/015/original/f59915e906ee2b19.png?1638825904
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# Z1DA--CON | REPLACE THE EXISTING WATER TOWER PUMP | PR 598-22-4-8847-0003

Status

Closed (archived notice)

Agency

[United States Department of Veterans Affairs](/department%5Fof%5Fveterans%5Faffairs)

Office

RIDGELAND, USA

Notice type

Solicitation

Solicitation number

36C25622R0127

NAICS

[236220 - Commercial and Institutional Building Construction](/groups/212)

PSC

Z1DA - MAINTENANCE OF HOSPITALS AND INFIRMARIES

Category

[Facility Related Services (4.4)](/categories/facilities-and-construction/facility-related-services)

Posted

2022-07-27

Deadline

2022-08-05

## Description

1\. How long does the 8 line run to building 170? In the amended SOW, this requirement has been replaced with four (4) isolation valves. 2\. What building do we pull the new power from? Power is being pulled from B-26 (structures Shop). 3\. Please provide a spec for the new vault including, wall and bottom thickness, what type of top / access is needed. 3x3 Vault Sub attachment added. 4.Â On page 6 of the SOW packet, paragraph 1.16, sub paragraphs A & 1, it states the the GC will be furnished mechanical drawings.Â There are no drawings of any kind in any of the downloaded files for this project. Attached drawings for the Vault and intended path. 5.Â On page 3 in the SOW packet, paragraph 1.05 sub paragraph D it talks about new potable/domestic water connections & piping.Â At the site visit it was determined that this pipe should be a 8" OD pipe.Â This pipe will tie in to existing piping near the security station at the front entrance and run to appox. midway of B170 where it will tie into the building there.Â That distance is almost 1/2 mile.Â This pipe will have to go under parking lots, streets, sidewalks and the ground.Â Is the VA wanting this to be bored all they, dug up and covered and patched all the way or a combination of both.Â It would help to have a plan to show the desired route to lay out the piping so that everyone is bidding apples to apples. Attached Drawing. 6..Â On page 7, paragraph 1.26 Tests sub paragraph A calls for commissioning.Â In the price schedule breakdown there is no line item to cover this as this will be a substantial price.Â Will the VA make a new price schedule or do we put it under General Requirements or Special Construction? New Price Schedule attached. 7.Â The Contractor Evaluation Form and the Contractor Safety Form that says the are included in the packet but do not appear in any of it, so VA will need to furnish correct forms. Attached Safety Form and Evaluation Form for projects not reported in CPARS. 8\. Will compliant NSF pumps be allowed or is it required to be certified? I m looking to provide FloFab pumps, and they are Compliant but not Certified NSF61\. Yes, they need to be NSF61 Certified. 9\. Would it be possible to get the current serial number and/or data nameplate that is on the existing unit? The current pump is undersized and will be removed by VA shop personnel. 10\. I m not seeing any specs or sizes the valves and headers need to be. If there is a plan view drawing available that would be great. Â Specifically, I m looking for the size in inches, connection type like flanged, and classification class like 150# or 250#. Â The valves will be standard water gate valves and standard water check valves with flanged connections.Â Both will be 6 and classification class will be 250#. 11\. Can you confirm the voltage the VFD s will be supplied with? It looks to be 3phase, 480v. Since VFD s are not dual rated like motors I ll need to know specifically. Do these VFD s need to be in a panel? If yes, there are several questions I have about that. Or do the VFD s need to be wall mounted and will they be tied into an existing panel for tank level control? If wall mounted what enclosure class needs to be provided? The VFD requirement is being removed from this requirement. This pump will have a start/stop function. Â 

<!-- mobian-agent-ad sponsored="true" id="817b2986-9058-489e-9fd2-5eaf350e22cd" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories/facilities-and-construction/facility-related-services?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


## Attachments

* [Attachment 1](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/17f9cd82dacc4442902acfc0061a0d42/download)
* [Attachment 2](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c9ed159c26c4452fbe033b469bd7f8af/download)
* [Attachment 3](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ad721f7f49444664af4309a140db2885/download)
* [Attachment 4](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/2170fad082104289934f3753d4ca8b66/download)
* [Attachment 5](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/6ea671ceaeee44908e6c9847c9cfa228/download)
* [Attachment 6](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/fb39b4018a5348a3bde0fad06b38025d/download)
* [Attachment 7](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a4b5da02fd464976928ec9a0391452fc/download)
* [Attachment 8](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/f89b507774b34e3c8016066d4bf4075c/download)
* [Attachment 9](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/4a9740454891491f8f5b91fe6545b914/download)
* [Attachment 10](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/64e509a53f8e4d59bbad3fee23a86508/download)
* [Attachment 11](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/1fab3fd44efe47b08bf983955d9cbb61/download)

## Contacts

* Andrew T Misfeldt, Contract Specialist

Email and phone are in the source notice.

[Source notice](https://sam.gov/opp/71f6eb5b46ad45cfa76f3ec81146cda1/view)

[More from United States Department of Veterans Affairs posted in July 2022](/department%5Fof%5Fveterans%5Faffairs/archive/2022-07)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Construction Government Contracts Available Now](/contracts/construction)

```json
{"@context":"https://schema.org","@type":"Demand","name":"Z1DA--CON | REPLACE THE EXISTING WATER TOWER PUMP | PR 598-22-4-8847-0003","description":"1. How long does the 8 line run to building 170? In the amended SOW, this requirement has been replaced with four (4) isolation valves. 2. What building do we pull the new power from? Power is being pulled from B-26 (structures Shop). 3. Please provide a spec for the new vault including, wall and bottom thickness, what type of top / access is needed. 3x3 Vault Sub attachment added. 4.Â On page 6 of the SOW packet, paragraph 1.16, sub paragraphs A \u0026 1, it states the the GC will be furnished mechanical drawings.Â There are no drawings of any kind in any of the downloaded files for this project. Attached drawings for the Vault and intended path. 5.Â On page 3 in the SOW packet, paragraph 1.05 sub paragraph D it talks about new potable/domestic water connections \u0026 piping.Â At the site visit it was determined that this pipe should be a 8\" OD pipe.Â This pipe will tie in to existing piping near the security station at the front entrance and run to appox. midway of B170 where it will tie into the building there.Â That distance is almost 1/2 mile.Â This pipe will have to go under parking lots, streets, sidewalks and the ground.Â Is the VA wanting this to be bored all they, dug up and covered and patched all the way or a combination of both.Â It would help to have a plan to show the desired route to lay out the piping so that everyone is bidding apples to apples. Attached Drawing. 6..Â On page 7, paragraph 1.26 Tests sub paragraph A calls for commissioning.Â In the price schedule breakdown there is no line item to cover this as this will be a substantial price.Â Will the VA make a new price schedule or do we put it under General Requirements or Special Construction? New Price Schedule attached. 7.Â The Contractor Evaluation Form and the Contractor Safety Form that says the are included in the packet but do not appear in any of it, so VA will need to furnish correct forms. Attached Safety Form and Evaluation Form for projects not reported in CPARS. 8. Will compliant NSF pumps be allowed or is it required to be certified? I m looking to provide FloFab pumps, and they are Compliant but not Certified NSF61. Yes, they need to be NSF61 Certified. 9. Would it be possible to get the current serial number and/or data nameplate that is on the existing unit? The current pump is undersized and will be removed by VA shop personnel. 10. I m not seeing any specs or sizes the valves and headers need to be. If there is a plan view drawing available that would be great. Â Specifically, I m looking for the size in inches, connection type like flanged, and classification class like 150# or 250#. Â The valves will be standard water gate valves and standard water check valves with flanged connections.Â Both will be 6 and classification class will be 250#. 11. Can you confirm the voltage the VFD s will be supplied with? It looks to be 3phase, 480v. Since VFD s are not dual rated like motors I ll need to know specifically. Do these VFD s need to be in a panel? If yes, there are several questions I have about that. Or do the VFD s need to be wall mounted and will they be tied into an existing panel for tank level control? If wall mounted what enclosure class needs to be provided? The VFD requirement is being removed from this requirement. This pump will have a start/stop function. Â","url":"https://matchawards.com/department_of_veterans_affairs/posts/108719190892992117","identifier":"36C25622R0127","category":"236220 - Commercial and Institutional Building Construction","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"Z1DA - MAINTENANCE OF HOSPITALS AND INFIRMARIES"},{"@type":"PropertyValue","propertyID":"CM category","name":"Category Management category","value":"4.4 Facility Related Services","url":"https://matchawards.com/categories/facilities-and-construction/facility-related-services"}],"availabilityStarts":"2022-07-27","availabilityEnds":"2022-08-05","sameAs":"https://sam.gov/opp/71f6eb5b46ad45cfa76f3ec81146cda1/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Construction","item":"https://matchawards.com/contracts/construction"}]}
```

