<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/department_of_veterans_affairs/posts/108673892356950845" -->

---
title: J061--Preventive maintenance for Transformer and… (36C24122Q0714) | Closed - MatchAwards
description: J061--Preventive maintenance for Transformer and high voltage switchgear. United States Department of Veterans Affairs. Solicitation 36C24122Q0714. NAICS 238210 - Electrical Contractors and Other Wiring Installation Contractors. Deadline 2022-08-01. Questions and Answers from Mandatory Walk...
canonical: https://matchawards.com/department_of_veterans_affairs/posts/108673892356950845
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: J061--Preventive maintenance for Transformer and… (36C24122Q0714) | Closed
og:url: https://matchawards.com/department_of_veterans_affairs/posts/108673892356950845
og:description: J061--Preventive maintenance for Transformer and high voltage switchgear. United States Department of Veterans Affairs. Solicitation 36C24122Q0714. NAICS 238210 - Electrical Contractors and Other Wiring Installation Contractors. Deadline 2022-08-01. Questions and Answers from Mandatory Walk...
og:image: https://matchawards.com/system/accounts/avatars/000/000/015/original/f59915e906ee2b19.png?1638825904
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# J061--Preventive maintenance for Transformer and high voltage switchgear

Status

Closed (archived notice)

Agency

[United States Department of Veterans Affairs](/department%5Fof%5Fveterans%5Faffairs)

Office

TOGUS, USA

Notice type

Combined Synopsis/Solicitation

Solicitation number

36C24122Q0714

NAICS

[238210 - Electrical Contractors and Other Wiring Installation Contractors](/groups/227)

PSC

J061 - MAINT/REPAIR/REBUILD OF EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT

Posted

2022-07-19

Deadline

2022-08-01

Place of performance

Bedford, 01730

## Description

Questions and Answers from Mandatory Walk through on July 13, 2022 Solicitation # 36C24122Q0714 Preventative Maintenance on Transformers Department of Veterans Affairs VA Medical Center 200 Springs Road Bedford, MA 01730 Facility POC/COR: Gaurav Contracting Office, Contracting Specialist: Krisanne Dernago 1\. What time will off hour start and end? Off hours varies by Buildings. In general, off hours start at 5:00 PM 6:00 AM. 2\. Who is responsible for shutting down the VA equipment (most time VA is)? The contractor is responsible for shutting down all equipment such as high voltage switchgears, transformer, feeders/sub feeders, panels etc. 3\. Can I get a one-line diagram of the distribution system? \*Please see the attached one-line diagram. 4\. Can I get a spreadsheet of the make, model of each piece of equipment being tested? VA is currently looking at past electrical study to find this information. 5\. Can I get a copy of the sign in sheet? Only three contractors went to the "mandatory" walk-through, so I am going to assume only three contractors are qualified to bid only. N/A 6\. Can I get the most recent electrical distribution study? This is a 1239-page document. Is there any specific information that is required? 7\. Can I get a copy of the most recent triennial inspection report completed? Bedford VAMC does not possess the most recent triennial inspection report. 8\. All needs to be done in a single outage or several. Weekday or Weekend? Shutdown shall occur on weekends. VA shall be provided at least 2 weeks notification prior to the intended day of the shutdown for coordination purposes. 9\. Can you please provide map of Bedford VA campus? \*Please see the attached campus map 10\. Please confirm how many of the transformers are oil filled. All transformers are oil filled 11\. Are the pickup values available for the relays? The VA does not possess pickup values for the relays. 12\. Can we have the list of mandatory site walk attendees please. N/A 13\. Can we have model # of the 34 transformers The VA does not have the model # for the 34 transformers. Per scope, the contractor shall Record all serial numbers, all name plate data and label and document all locations. 14\. Can you please provide the Breaker Settings? The VA does not have info on specific breaker settings. All transformers are fed from the 13.8kv switch gear room. 15\. Can you please provide Relay Settings for CO relays and Cutler Hammer relay settings? The VA does not have info on these relay settings 16\. What tests are needed to be performed on the oil filled transformers? Testing requirements must be met per ASTM. 17\. Please provide the time frame for isolation of equipment per building. There is no set time for isolation of equipment per building, The contractor shall propose isolation time frame with Facility POC of equipment per building and the VA will assess it for approval. 18\. Can you please provide the Isolation schedule? Only one sub-feeder can be taken down at a time during scheduled shutdown. 19\. Can the VA provide 480V source for HI Pot Test to be connected? The VA cannot provide 480 V source for HI Pot test. The contractor shall provide 480V source for HI Pot testing. 20\. Has the VA added any extra load, and if so, would the customer need a new Power System Study? The scope of work does not include a new power system study 21\. Can you provide one-line drawings? \*Please see the provided one lines, attached 22\. Do all XMFRs have sampling ports available? To best of VA knowledge, all transformers have sampling port. 23\. Can you provide the required oil testing specs What is the Scheduling requirements of outages? 24, 48 72 hours? All testing shall meet requirements per ASTM standards. Contractor shall provide a two weeks notice to the VA before any shutdown. The notification and request shall be assessed by the VA before approval. 24\. The contractor is to operate the switches for outages. Will the facility provide the inspection of the re energization process? The facility will not provide the inspection of re energization process. The contractor shall hire third party for the inspection. 25\. Is there and will the Facility provide and connect any critical power back power supply for critical infrastructure during outages? There are emergency generators for buildings. During outages for normal power, the generator kicks in and provides emergency power for the building. 

<!-- mobian-agent-ad sponsored="true" id="4cc48882-da59-4582-80aa-fdaa86f216ba" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


## Contacts

* Krisanne Dernago, Contract Specialist

Email and phone are in the source notice.

[Source notice](https://sam.gov/opp/d9fd984910114cd788b738f4cc8aa11c/view)

[More from United States Department of Veterans Affairs posted in July 2022](/department%5Fof%5Fveterans%5Faffairs/archive/2022-07)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Construction Government Contracts Available Now](/contracts/construction)

```json
{"@context":"https://schema.org","@type":"Demand","name":"J061--Preventive maintenance for Transformer and high voltage switchgear","description":"Questions and Answers from Mandatory Walk through on July 13, 2022 Solicitation # 36C24122Q0714 Preventative Maintenance on Transformers Department of Veterans Affairs VA Medical Center 200 Springs Road Bedford, MA 01730 Facility POC/COR: Gaurav Contracting Office, Contracting Specialist: Krisanne Dernago 1. What time will off hour start and end? Off hours varies by Buildings. In general, off hours start at 5:00 PM 6:00 AM. 2. Who is responsible for shutting down the VA equipment (most time VA is)? The contractor is responsible for shutting down all equipment such as high voltage switchgears, transformer, feeders/sub feeders, panels etc. 3. Can I get a one-line diagram of the distribution system? *Please see the attached one-line diagram. 4. Can I get a spreadsheet of the make, model of each piece of equipment being tested? VA is currently looking at past electrical study to find this information. 5. Can I get a copy of the sign in sheet? Only three contractors went to the \"mandatory\" walk-through, so I am going to assume only three contractors are qualified to bid only. N/A 6. Can I get the most recent electrical distribution study? This is a 1239-page document. Is there any specific information that is required? 7. Can I get a copy of the most recent triennial inspection report completed? Bedford VAMC does not possess the most recent triennial inspection report. 8. All needs to be done in a single outage or several. Weekday or Weekend? Shutdown shall occur on weekends. VA shall be provided at least 2 weeks notification prior to the intended day of the shutdown for coordination purposes. 9. Can you please provide map of Bedford VA campus? *Please see the attached campus map 10. Please confirm how many of the transformers are oil filled. All transformers are oil filled 11. Are the pickup values available for the relays? The VA does not possess pickup values for the relays. 12. Can we have the list of mandatory site walk attendees please. N/A 13. Can we have model # of the 34 transformers The VA does not have the model # for the 34 transformers. Per scope, the contractor shall Record all serial numbers, all name plate data and label and document all locations. 14. Can you please provide the Breaker Settings? The VA does not have info on specific breaker settings. All transformers are fed from the 13.8kv switch gear room. 15. Can you please provide Relay Settings for CO relays and Cutler Hammer relay settings? The VA does not have info on these relay settings 16. What tests are needed to be performed on the oil filled transformers? Testing requirements must be met per ASTM. 17. Please provide the time frame for isolation of equipment per building. There is no set time for isolation of equipment per building, The contractor shall propose isolation time frame with Facility POC of equipment per building and the VA will assess it for approval. 18. Can you please provide the Isolation schedule? Only one sub-feeder can be taken down at a time during scheduled shutdown. 19. Can the VA provide 480V source for HI Pot Test to be connected? The VA cannot provide 480 V source for HI Pot test. The contractor shall provide 480V source for HI Pot testing. 20. Has the VA added any extra load, and if so, would the customer need a new Power System Study? The scope of work does not include a new power system study 21. Can you provide one-line drawings? *Please see the provided one lines, attached 22. Do all XMFRs have sampling ports available? To best of VA knowledge, all transformers have sampling port. 23. Can you provide the required oil testing specs What is the Scheduling requirements of outages? 24, 48 72 hours? All testing shall meet requirements per ASTM standards. Contractor shall provide a two weeks notice to the VA before any shutdown. The notification and request shall be assessed by the VA before approval. 24. The contractor is to operate the switches for outages. Will the facility provide the inspection of the re energization process? The facility will not provide the inspection of re energization process. The contractor shall hire third party for the inspection. 25. Is there and will the Facility provide and connect any critical power back power supply for critical infrastructure during outages? There are emergency generators for buildings. During outages for normal power, the generator kicks in and provides emergency power for the building.","url":"https://matchawards.com/department_of_veterans_affairs/posts/108673892356950845","identifier":"36C24122Q0714","category":"238210 - Electrical Contractors and Other Wiring Installation Contractors","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"J061 - MAINT/REPAIR/REBUILD OF EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT"}],"availabilityStarts":"2022-07-19","availabilityEnds":"2022-08-01","areaServed":"Bedford, 01730","sameAs":"https://sam.gov/opp/d9fd984910114cd788b738f4cc8aa11c/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Construction","item":"https://matchawards.com/contracts/construction"}]}
```

