ClickCease J045--Boiler Inspection and Safety Device… (36C26222Q1287) | Closed - MatchAwards

J045--Boiler Inspection and Safety Device Testing A-600-23-1-5665-0002 (VA-22-00074686)

Status
Closed (archived notice)
Agency
United States Department of Veterans Affairs
Office
Gilbert, USA
Notice type
Sources Sought
Solicitation number
36C26222Q1287
NAICS
238220 - Plumbing, Heating, and Air-Conditioning Contractors
PSC
J045 - MAINT/REPAIR/REBUILD OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT
Category
Facility Related Services (4.4)
Posted
2022-07-15
Deadline
2022-07-25

Description

Sources Sought Announcement: This is a SOURCES SOUGHT ANNOUNCEMENT ONLY , it is neither a solicitation announcement nor a request for proposals or quotes and does not obligate the Government to award a contract. Requests for a solicitation will not receive a response. Responses to this sources-sought must be in writing. The purpose of this sources sought announcement is for market research to make appropriate acquisition decisions and to gain knowledge of potential sources capable of providing the services described below. Documentation of technical expertise must be presented in sufficient detail for the Government to determine that your company possesses the necessary functional area expertise and experience to compete for this acquisition. Responses to this notice shall include the following: (a) company name (b) address (c) point of contact (d) phone, fax, and email (e) DUNS number (f) Cage Code (g) Tax ID Number (h) Type of business, e.g. small or other, as appropriate and (i) must provide a capability statement that addresses the organization s qualifications and ability to perform as a contractor for the work described below in italics. BACKGROUND: The VA Long Beach boilers and boiler plant are essential to the operation of the VA Long Beach Medical Center (VALBMC) by providing steam, space heating, hot water (for sanitation, food production and preparation, infection control), heat for processing equipment, and a salutary environment for the delivery of healthcare. Veterans Health Administration (VHA) required high pressure boiler(s) and boiler plant inspection and testing service is required for the safe and reliable operation of the equipment and systems and is required to remain in compliance with VHA Directive 1810(1) Boiler and Boiler Plant Operations. SAFETY DEVICE TESTING & CALIBRATION REQUIREMENTS: The contractor shall perform the required semiannual maintenance specified by VHA Directive 1810 Boiler and Boiler Plant Operations . The VHA Boiler Plant Safety Device Testing Manual (Latest Edition) shall be used as a guide for testing all Boiler Safety Devices. Site specific procedures shall be used to test all Boiler Safety Devices and provided upon request. All Boiler Safety Device Inspections shall be scheduled with the COR and Boiler Plant Supervisor. The Contractor MUST coordinate with COR and/or Boiler Plant Supervisor to minimize the number of equipment outages/bypasses required to complete all items in this Contract. Equipment outages must be operationally segregated to where no more than one boiler is offline/bypassed at one time for purposes of executing work on this contract. Equipment outages must be operationally segregated to only either the condensate tank, deaerator, or blow down receiving tank are offline/bypassed at one time. No two items will be offline/bypassed at the same time for purposes of executing work on this contract. A detailed report of inspection for each safety device tested shall be supplied to the COR and Boiler Plant Supervisor in a timely manner. All failures shall be immediately reported. VAMC will have the boilers that are to be serviced prepared for the technicians upon their scheduled arrival. This includes having the boilers clean of soot and loose scale; fully warmed and at normal steam pressure; steam exhaust silencer system operable; all boiler, burner and fuel train pressure gages and thermometers calibrated; fuel meters in accurate operation (pressure/temperature correction factors provided, if applicable); boiler steam flow, stack temperature and flue gas oxygen instruments operating. VAMC will comply with any other requirements of the test personnel that are considered reasonable by VAMC and have been presented in writing at least two weeks prior to the scheduled testing. A summary of the work is as follows: Review boiler plant log sheets and alarm and trouble reports. Review records that show combustion performance (flue gas oxygen and carbon monoxide). Perform overall visual inspection of systems. Verify that systems comply with referenced codes and VAMC requirements stated in this contract. Test and record the operation and set points of all burner/boiler safety devices described in VHA Directive 1810 (1) frequency chart, items 6a, 6b, 7a, 8, 9, 10, 11, 12, and 17a 17nn. Make adjustments as necessary and record the new settings. The operation of a device must result in burner shutdown and/or proper alarm operation. All testing must be in accordance with site specific procedures for testing safety devices. VA will provide site specific procedure upon request. If a site-specific procedure is not available, use procedure provided in VHA Boiler and Associated Plant Safety Device Testing Manual Latest Edition. Operate burner(s) on each fuel from low fire to high fire and back to low fire in at least six increments and record combustion performance (flue gas oxygen, carbon monoxide, NOx where applicable), fuel train pressures, atomizing train pressures, burner pressures, stack temperatures, boiler steam output. Compare the combustion performance data with VAMC requirements (see below) and previous readings. If necessary, adjust the fuel flow and combustion air controllers, control valves and dampers to obtain the required performance. Record the new performance data. Verify accuracy of instrumentation listed below. Verify that all devices are properly selected for the application in terms of type, size, set point range, performance, code approval. Calibrate all instruments, monitoring, and control systems. Calibrate or replace all local pressure gauges and local thermometers yearly. Affix tags/stickers on each gauge indicating date when last calibration was performed. Check and log furnace pressure. Check for combustion gas leaks into the boiler room. Immediately inform COTR and Utility Plant supervisor of any recommended repairs or modifications both verbally and in writing. All interlocks and safety devices to be inspected and tested on each boiler/burner/equipment are contained in the VHA Boiler Plant Safety Devices Testing Manual (Latest Edition), along with testing procedures. Site specific testing procedures and documentation is to preferably be used and is available upon request. Required Burner Performance (natural gas and fuel oil): Turndown (ratio of maximum and minimum firing rates): 10/1 8/1 5/1 4/1 (Refer to original burner specification). Achieve, but do not exceed, boiler maximum steam flow output rating. Measure fuel input at minimum and maximum firing rates. Maximum carbon monoxide: 200 parts per million (ppm). Maximum nitrous oxide must comply with South Coast Air Quality Management District permit to Operate: 5 ppmy or less (at 3% 02) Flue gas oxygen: 2.5-4.2 percent (Up to 5.2 percent at loads below 40 percent of maximum steam output, no upper limit at minimum firing rate, oxygen can be one percentage point higher on oil firing on single-point positioning systems). Flue gas oxygen (low excess air burners): 1.0-2.0 percent (Up to 2.5 percent at loads below 40 percent of maximum steam output, no upper limit at minimum firing rate: oxygen can be one percentage point higher on oil firing on single point positioning systems). No visible smoke, except on heavy oil fuel maximum opacity is 20%. Comply with local Southern California Air Quality Management District (SCAQMD) regulation in accordance with Long Beach VAMC Permit to Operate for each boiler and pollution control system. Copies of the applicable emissions regulations must be available in the boiler plant office. Flames shall be stable with no pulsations, shall be retained near burner, no blowoff or flashbacks, no constant flame impingement on refractory or waterwalls. List of instrumentation and controls to be inspected and calibrated: Steam flow transmitters (all). Steam flow recorders/computer readout. Flue gas oxygen sampling, analyzing and recorder/computer readout. Boiler and economizer stack temperature transmitters and recorder/computer readout. Master steam pressure and combustion controllers. Boiler outlet draft controllers. Boiler water level controllers. Feedwater deaerator and condensate storage tank water level controllers including overflow. All pressure and temperature sensors and transmitters. All signal processing and readout devices. VHA DIRECTIVE 1810(1) APPENDIX B INSPECTION/TESTING SERVICES: Testing and inspection must be executed and documented by a qualified boiler operator, or the required services may be procured from a qualified inspector if required. The following items must be accomplished by a qualified inspector as determined by local VA medical facility management staff. Such a determination must be carefully made for each item and each individual. Semi-Annual Requirements: (Two Times Per year) Deaerator tank level alarms and overflow testing. Condensate storage tank level alarms and overflow testing. Economizers safety Valve testing. CO and combustible gas detection and alarm system testing. Adjust burner combustion settings and calibrate oxygen trim. Check vibration of burner fans. Calibrate instrumentation, monitoring, and control systems. High-steam pressure cut-out (recycle). High-steam pressure cut-out (non-recycle). Steam safety valves lift test. Check gas vent valve for leaks. High-gas fuel pressure cut-off. Low-gas fuel pressure cut-off. Gas fuel safety shut off valves proof of closure. Leak test gas fuel safety shut off valves. High-fuel oil temperature cut-off (heated fuel). Low-fuel oil temperature cut-off (heated fuel). Low-atomizing pressure for fuel oil. High-fuel oil pressure cut-off Fuel oil safety shut off valves proof of closure. Leak test fuel oil safety shut off valves. Check operation of Liquid Petroleum Gas pilot. Low-pilot gas pressure cut-out. Forced draft fan motor interlock. Forced draft fan damper wide open for purge. Boiler outlet damper wide open for purge. Purge air flow interlock. Timing for pre-purge. Timing for post-purge. Igniter timing. Low fire position interlock. Combustion air interlock. Main flame out; i.e., time to close valves. Ignition flame out; i.e., time to close valves. Minimum igniter flame test. Scanner not sensing ignition spark. Low-oxygen alarm and/or cut-out. Pre-purge setting of flue gas recirculation damper. Interlock of building outside air damper with burner controls. Burner control. Check furnace pressure. Check combustion gas leaks into boiler room. Deaerator steam pressure/ temperature control and Safety testing. Annual Requirements: (One Time Per year) Condensate internal tank cleaning and visual inspection. Deaerator Interior cleaning and visual inspection. Blowdown receiving tank (basement) internal tank cleaning and visual inspection. Test plant and boiler emergency stop buttons and gas valves. Calibrate pressure gages and thermometers. Clean waterside of boilers. Clean fireside and repair refractory. Review written procedures. Steam safety valves (accumulation test at high fire). VHA DIRECTIVE 1810(1) APPENDIX B QUALIFIED PROFESSIONAL INSPECTOR (QPI) SERVICES: Qualified Professional Inspector (QPI). A QPI is any one or combination of the following: A boiler inspector who has a valid and current certificate from the National Board of Boiler and Pressure Vessel Inspectors; A boiler inspector who has qualified for licensure by passing a written examination under the laws, rules, and regulations of a jurisdiction of the State and holds a current State license; A boiler inspector who is currently employed as a boiler inspector/testing by a jurisdiction that has adopted and administers one or more sections of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code as a legal requirement, and has a representative serving as a member of the ASME Conference Committee; or A boiler inspector who is currently employed by an insurance company that has been licensed or registered by the appropriate authority of a State to write boiler and pressure vessel insurance. The following items must be accomplished by a documented Qualified Professional Inspector (QPI). Annual QPI Requirements: (One Time Per year) High pressure boilers (15 psig or greater): Inspect furnace and other internal surfaces, closures, and accessories. High pressure boilers (15 psig or greater): Inspect exterior of Unit, casing, supports, closures, accessories, valves, controls. All Boilers for fouling and combustion gas flow check Tube leak check on all boiler types. General Requirements: Contractor will follow the recommended inspection guidelines for inspections as set forth in the National Association of Corrosion Engineers (NACE) document RP0590-96 item Number 21046, the National Board Inspection Code [NBIC/ANSI 23] and VHA Directive 1810. Contractor shall review O&M history. Perform visual inspection. Prepare preliminary and final assessment report with recommendations. Work will commence with a meeting of Contractor personnel and Boiler Plant Supervisor. This meeting will serve to address the following items: Review plant safety regulations and lockout/tag out procedures Discuss the nature of the planned inspection activities Coordinate inspection activities with other outage events Inspection Activity: Visually inspect the following items and document the locations with a sketch or pictures. Any adverse findings must be documented with pictures and notes in detail. All data shall be included in the final report as supporting documentation. Review the boilers history including operating conditions, date of last inspection, current inspection certificate, ASME stamping, National Board registration number, materials of construction, extent of post weld heat treatment, history of repairs and modifications. Assess the external parts of the boilers and boiler accessories and piping and valves for safety, accessibility, proper maintenance and operation, cleanliness, and compliance with ASME codes. Inspect for evidence of leakage of combustion gases or fluids, externally and internally, including all gaskets. All welded and threaded pipe connections to the boiler shell or drum for signs of leakage or defects in the welded areas. Defects must be documented as to location with a sketch or picture and be non-destructively tested. Inspect foundations for signs of stress such as cracking or movement. All furnace tubes and all accessible convection tubes for alignment, evidence of corrosion, erosion, bulges, sagging, defective or deteriorated welds. Inspect boilers externally and internally for defects including bulges, blisters, cracks, wasted or eroded material, warping, general corrosion, grooving and pitting, and damaged insulation. Inspect all accessible internal surfaces for waterside and fireside deposits, including scaling, sediment, debris, and carbon deposits. Examine all stays and stayed plates. Inspect gas side baffles. Inspect internal drum surfaces and steam separating internals. Inspect tubes, tube ends and tube alignment. Check for sagging tubes. Inspect seating surfaces of manways and hand-holes. Check for missing items such as bolts and nuts. Examine all valve and pipe connections to the pressure vessel. Inspect refractory for cracking, shifting, sagging, bulging, or general deterioration including burner throat, expansion joint, bull ring, furnace seals, furnace walls and floor. Verify proper alignment of burner assembly. Inspect furnace for evidence of flame impingement. Test operation of water level gage glass. Perform mechanical and electrical inspection of disassembled low water cutouts (Disassembly by others). After reinstallation test operation. Test low water cutouts on hot boilers by lowering water level gradually. Verify that Boiler steam pressure gage is properly calibrated. Test operation of Boiler high steam pressure cutouts on hot boilers by raising steam pressure. Inspect safety valve installations and verify that the valves have proper capacity and set pressure, and valves, drains, and vents are properly installed. Verify that valve locking seals are not broken. On boilers that are hot, perform an operation test under pressure to confirm operation at proper set pressures. Operate boiler with burner at high fire to verify adequate steam flow capacity of the safety valves ( accumulation test ). Inspect piping to the water column, low water cutoffs and alarms, and gage glass. Verify that interior of piping is clear of obstructions. Verify that all nozzles of internal piping such as feed water admission and bottom blow-off collection are clear with no obstructions. Inspect valves on Boilers, Feed water, Blowdown, Drains and Steam Systems. Internal areas of steam drum and mud drum (inside boiler shell in fire tube boilers): Welded outlet connections. Surface of drums for pitting or surface discontinuities. Ligament areas between tube holes for cracking. Each tube end and internal surface of representative number of tubes for pitting, erosion, corrosion, and excessive scale buildup. Utilize fiber optic inspection equipment to inspect interior of tubes. Clean and inspect shell or tube sheet between tube holes for cracking. Six (6) Year QPI Requirements: (One Time Every Six (6) years) Deaerator: Inspection and wet magnetic particle testing of welds of pressure vessel interior. Condensate storage tank: Inspection and wet magnetic particle testing of welds of pressure vessel interior. Blow down receiver tank: Inspection and wet magnetic particle testing of welds of pressure vessel interior. General Requirements: Contractor will follow the recommended inspection guidelines for deaerator inspections as set forth in the National Association of Corrosion Engineers (NACE) document RP0590-96 item Number 21046, the National Board Inspection Code [NBIC/ANSI 23] and VHA Directive 1810. Contractor shall review O&M history. Perform visual inspection, and 100 % magnetic particle examination of welds. WFMT testing includes related activities for final surface preparation of welds. Removal of nominal surface deposits will be provided by means of power wire brushing. Perform ultrasonic measurement of material thickness. UT testing includes related activities for final surface preparation of contact surfaces. Removal of nominal surface deposits will be provided by means of power wire brushing and/or light surface grinding. Prepare preliminary and final assessment report with recommendations. Work will commence with a meeting of Contractor personnel and Boiler Plant Supervisor. This meeting will serve to address the following items: Review plant safety regulations and lockout/tag out procedures Discuss the nature of the planned inspection activities Coordinate inspection activities with other outage events Inspection activity: Visual inspection: A qualified inspector will inspect the deaerator to evaluate conditions relevant to the operational and mechanical integrity of the unit. Specific observations include documenting: Operation and maintenance practices Surface corrosion, including significant pitting Condition of internal components Integrity of internal attachment welds Condition of external supports, insulation, piping, and instrumentation/controls Wet fluorescent magnetic particle testing (WFMT): Examine all accessible internal welds for indications of relevant surface discontinuities. Examined areas include: Circumferential Longitudinal Nozzle penetrations Internal surfaces opposite externally welded attachments Testing includes related activities for final surface preparation of welds. Removal of nominal surface deposits will be provided by means of power wire brushing. Personnel qualified as a Level II/MT (minimum) and certified in accordance with the ASNT SNT-TC-1A, 2011 Edition will conduct the test and qualified inspector will evaluate the test results. Ultrasonic testing (UT): Document material thickness of the storage section shell and heads. Quantify areas of isolated thinning resulting from m

Contacts

Email and phone are in the source notice.

Source notice

More from United States Department of Veterans Affairs posted in July 2022

More lists