<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/department_of_veterans_affairs/posts/108526672339101455" -->

---
title: Z2DA--Replace H2 Wood doors (36C25922Q0401) | Closed - MatchAwards
description: Z2DA--Replace H2 Wood doors. United States Department of Veterans Affairs. Solicitation 36C25922Q0401. NAICS 236220 - Commercial and Institutional Building Construction. SDVOSB set-aside. Deadline 2022-07-01. 2 Statement of Work Replace H2 Wood Doors Project Number 554-22-133 Rocky Mountain...
canonical: https://matchawards.com/department_of_veterans_affairs/posts/108526672339101455
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: Z2DA--Replace H2 Wood doors (36C25922Q0401) | Closed
og:url: https://matchawards.com/department_of_veterans_affairs/posts/108526672339101455
og:description: Z2DA--Replace H2 Wood doors. United States Department of Veterans Affairs. Solicitation 36C25922Q0401. NAICS 236220 - Commercial and Institutional Building Construction. SDVOSB set-aside. Deadline 2022-07-01. 2 Statement of Work Replace H2 Wood Doors Project Number 554-22-133 Rocky Mountain...
og:image: https://matchawards.com/system/accounts/avatars/000/000/015/original/f59915e906ee2b19.png?1638825904
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# Z2DA--Replace H2 Wood doors

Status

Closed (archived notice)

Agency

[United States Department of Veterans Affairs](/department%5Fof%5Fveterans%5Faffairs)

Office

Greenwood Village, USA

Notice type

Solicitation

Solicitation number

36C25922Q0401

NAICS

[236220 - Commercial and Institutional Building Construction](/groups/212)

PSC

Z2DA - REPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES

Category

[Facility Related Services (4.4)](/categories/facilities-and-construction/facility-related-services)

Set-aside

[Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)](/contracts/veteran-owned)

Posted

2022-06-23

Deadline

2022-07-01

Place of performance

Aurora, 80045

## Description

2 Statement of Work Replace H2 Wood Doors Project Number 554-22-133 Rocky Mountain Regional Veterans Affairs Medical Center (RMRVAMC) 1.0 Objective: The Department of Veterans Affairs has a requirement to remove existing wood wicket doors and replace with steel wicket doors in the inpatient Mental Health unit at the Rocky Mountain Regional VA Medical Center. The existing wood wicket doors in Mental Health and associated areas are experiencing excessive amounts of chipping, flaking, etc. around the wicket entrance. This is an unacceptable condition as it allows opportunities for patients to utilize damaged areas of the doors to harm themselves or staff. The intent of this contract is to mitigate this risk of damage and improve durability of the patient room doors. Scope of Work: Contractor shall remove thirty-seven (37) existing wood patient room wicket doors and replace with steel wicket doors. Thirty-two (32) of the doors are located in the inpatient Mental Health ward in Building H and five (5) of the doors are located in the Emergency department in Building D.Typical patient room door sizes are 3 -8 x 7 -0 x 1 Â¾ , and typical bariatric and group room door sizes are 4 -0 x 7 -0 x 1 Â¾ . Reference attached door and framing schedule. 3.0 Requirements: Contractor shall preserve existing metal door frames in place. Steel wicket door replacements shall have a steel core with a minimum thickness of 16 gauge. Replacement door hardware shall be appropriate for an inpatient mental health setting (no sharp edges, ligature points, non-ligature safety screws and connectors utilized, etc.) Contractor may re-use existing door hardware if compatible with replacement doors. VA locksmith can re-key doors as necessary. Twenty-five (25) of the existing doors have been outfitted with over-the-door patient tampering/anti-ligature alarm systems. Replacement doors shall be compatible with this system. Contractor shall remove these alarms taking care not to damage them and re-install/re-use them and confirm function after work is complete. Reference attached product submittals for the alarm devices and system. Replacement doors shall be primed and painted with powder coat in a light brown shade to match environment. Replacement doors shall be full panel steel/wicket and shall not have windows, vision/day light panels, or similar. Replacement doors shall have a single continuous hinge to mitigate sharp edges and ligature points that may allow for patient/staff harm. No smoke or fire rating is necessary for the replacement doors. 4.0 General: The Dept. of Veterans Affairs (VA) requires strict adherence to the Code of Federal Regulations 29, Part 1926\. This includes the requirement that the contractor have a Competent Person on the job at all times (must have a 30-hour Occupational Safety and Health Administration (OSHA) card), and that all contractor employees have received a minimum of ten (10) hours of OSHA construction safety training. Documentation of these requirements shall be submitted and approved prior to performing the work. Contractor must submit a company Site Specific Safety Plan (SSSP) that must be reviewed by VA Safety prior to work beginning. This plan shall detail fire, construction, and health-related safety measures, in addition to listing training records for all employees for the previous year. A company standard or boilerplate safety plan will not be acceptable plan should contain a detailed hazard analysis for each element of construction to be performed such as an Activity Hazard Analysis (AHA) or Job Hazard Analysis (JHA). This entire project shall conform to 100% of all VA standards and specifications, OSHA, American Institute of Architects (AIA) Construction Guidelines, Joint Commission Environment of Care Standards, and applicable building codes. The Contractor is responsible for protection of existing finishes, and VA property located in the areas preventative maintenance and repair work is being performed, as well as along paths of travel to and from these areas. Both exterior and interior finishes and property must be maintained. The contractor is liable for any damage to VA property during the course of the contract. Any damage to existing finishes must be repaired by the Contractor to equal or greater quality than existing finishes. All tasks accomplished by the Contractor personnel will be performed to preclude damage or disfigurement of government-owned furnishing, fixtures, equipment and architectural or building structures. Contractor will report any damage or disfigurement to these items when caused by the Contractor s personnel and will perform repairs or replace government-owned equipment, fixtures, furnishings, grounds and architectural or building structures to their previously existing condition. 5.0 Project Management: Based on the above list of work items the, general contractor selected must complete, maintain, and submit the following documentation and managerial requirements: Construction schedule including sequencing and durations. The schedule will be provided to the Contracting Officer s Representative (COR) ten (10) working days prior to the start of work. Site-Specific Safety Plan (SSSP) with an emphasis on tasks to be performed during the work. The SSSP must: Include a detailed description of how the work will be performed and be submitted with sketches, supporting documents, submittals etc. Include a Job-Safety-Analysis (JSA) for all tasks associated with Statement of Work (SOW) Be reviewed and commented by VA-Safety and COR prior to commencement of work. Maintain site supervision by a competent individual(s) with OSHA-30 certificates. OSHA-30 certified technician shall be onsite anytime work is being performed. Obtain VA identification PIV badges for all employees. Contractor to consider lead-time for badge procurement. Manage job-site access and security. Implement and maintain required ICRA and ILSM measures. 6.0 Applicable & Supporting Documents: VA Drawing & Specification sections: Combined Drawings Combined Spec Additional generic specification sections can be found at http://www.cfm.va.gov/til/dGuide.asp Supporting: VA Drawings/Submittals: Existing Wood Door Product Info Existing Door Alarm Support Hardware Product Info Existing Door Alarm Switch Product Info Existing Door Alarm Electrical Components Product Info Combined Drawings Photographs: Existing Door Photos 1-3 7.0 Code and Regulation Compliance: The Contractor shall comply with public laws and statutes including all changes and amendments to federal, state and local environmental statutes and regulations in effect the date of issuance of this delivery order, including applicable portions of the documents cited in the basic contract and below: NFPA 99-2015 Healthcare Facilities Codes. ANSI/ASSE Z359 NFPA 101 Life Safety Code Architectural Barriers Act (2005) International Code Council (ICC): IBC: International Building, 2015 Building Officials and Code Administrators International (BOCA), 1999 International Conference of Building Officials (ICBO): UBC 1997: Uniform Building Code 29 CFR 1910 Occupational Safety and Health Standards 29 CFR 1926 Safety and Health Regulations for Construction Federal Occupational Safety and Health Act (OSHA) Underwriters Laboratories 8.0 Special Considerations for Work in Mental Health Space: This project is to be performed in an occupied inpatient Mental Health area populated with patients at special risk for harming themselves or others and/or escape from the area. Contractor shall exercise extreme caution in performing work around these patients, and in mitigating any site condition that could harm a patient or allow for escape. Contractor shall check in with the COR, who shall check them in with the Mental Health charge nurse, immediately upon arriving on site for the day and check out with COR upon completion of work for the day. Charge nurse may recommend contractor not bring certain items into the Mental Health space, and leave keys, wallets, cell phones, etc. in a secure area outside Mental Health. Contractor shall have at minimum two (2) workers in the immediate vicinity of work being performed at all times, at least one of whom is monitoring any equipment the contractor may have with them to prevent loss or theft. Contractor shall report any incident between contractor staff and any patients immediately to the COR. Contractor shall take special caution during clean-up of area each day to ensure no equipment or hazardous site condition is left behind. 9.0 Submittals: Contractor shall submit the following prior to beginning scope of work: Project schedule with sequencing, durations, phasing, and cost loading within 10 working days of Notice to Proceed (NTP), and monthly with invoices. Site Specific Safety Plan (SSSP) SSSP to be submitted to VA Safety staff and COR for review 10 working days after issuance of NTP. SSSP to be reviewed and commented by VA Safety staff and COR prior to start of construction activities. Construction Demolition/Removal Plan Inspection reports, manufacturer approval certificates, and warranties as noted in specifications. Penetration and or hot work permits as necessary. Manufacturer and construction warranties as noted in specifications. Project Schedule including sequencing and durations. SOV Schedule of Values The schedule will be provided to COR 10 working days prior to start of the work. Site superintendent OSHA-30, and tradesmen/laborer OSHA-10 certificates. OSHA-30 certified technician shall be onsite anytime work is being performed. Material Submittals Submit for COR approval Manufacturer s specifications for all materials and equipment planned for installation. Inspection reports, manufacturer approval certificates, and warranties as noted in specifications. Technical literature and/or descriptions of all materials, equipment and tools proposed for use by the Contractor shall be submitted to the Contracting Officer or his/her designee for approval prior to contract start and whenever a change is required. All Contractor-furnished materials, equipment and tools used shall be standard products all manufacturers regularly engaged in the production of such items. The Contractor shall secure all materials. The Government assumes no liability for loss of or damage to Contractor-owned property held upon Government premises. Contractor shall submit hours worked, full report of completed piping which shall include: location, hours worked, the full name of Contractor s employees on site, and digital photographs before and after work is completed. Reports shall be submitted within one day upon completion of work performed. Contractor will provide a completed redline drawing of the completed routing of piping. If necessary, a secondary report shall be submitted after any repairs outside of the Work Required have been completed. Reports shall be provided in hard copy as well as in an agreeable and compatible electronic format such as, but not limited to, pdf or Microsoft Word. 10.0 Resources The Government will not furnish any resources for the fulfillment of the work required under this contract other than electricity for area where work is being conducted. Under this contract, the contractor must provide all tools, equipment, materials, transportation, professional expertise, personnel, supervision, and for testing and maintenance required for completion of this contract. Contractor shall provide all necessary parts and equipment to complete the objective of this contract in accordance with manufacturer specifications. All new equipment including parts and labor shall be preapproved by the COR. Prices for parts shall be invoiced at no more than 10% above contractor s costs, including shipping and handling. Verification of contractor s cost shall be included with all invoices. Contractor shall provide all necessary equipment to perform the work required. Technical literature and/or descriptions of all materials, equipment and tools proposed for use by the Contractor shall be submitted to the Contracting Officer or his/her designee for approval prior to contract start and whenever a change is required. All Contractor-furnished materials, equipment and tools used shall be standard products all manufacturers regularly engaged in the production of such items. The Contractor shall secure all materials. The Government assumes no liability for loss of or damage to Contractor-owned property held upon Government premises. The Contractor shall instruct his/her personnel in utilities conservation practices. The Contractor shall be responsible for operating under conditions which preclude the waste of utilities which shall include but not necessarily be limited to: Lights shall be used only in areas where and at the time when work is actually being performed unless otherwise directed. Contractor s personnel will not adjust mechanical equipment controls for heating, ventilation and air conditioning systems. Government telephones shall not be used for personal reasons or for any toll or long-distance calls 11.0 Personnel Assignments: The Contractor shall assign the appropriate quantity and type of personnel to successfully complete all functions specified in this SOW. The Contractor shall maintain throughout the life of this contract, a current list of technicians and their credentials available for inspection by the Government at any time. 12.0 Acceptance Standards: The VA reserves the right to dispute completion of contract scope if contract work is found not in accordance with manufacturer recommendations, is not satisfactorily executed, or if the system is not properly tested and inspected to achieve certification. All work completed by the Contractor must be reviewed and approved by the VA. 13.0 Safety and Fire Prevention: In the performance of this contract, the contractor shall take such safety precautions as necessary to protect the lives and health of occupants of the building. The Contractor shall immediately correct any fire and safety deficiencies caused by his/her personnel. If the Contractor fails or refused to correct deficiencies promptly, the Contracting Officer may issue an order stopping all or any part of the work and hold the contractor in default of the contract. The Contractor shall comply with applicable Federal, State and local safety and fire regulations and codes which are in effect at the beginning of the contract. The contractor shall keep abreast of and comply with changes in these requirements and codes applicable to the contract. The requirements include but are not limited to, those found in Federal and State Occupational Safety and Health Act (OSHA) statutes and regulations, such as applicable provisions of Title 29, Code of Federal Regulations (CFR) Parts 1910 and 1926\. Contractor is solely responsible for determining the legal requirements that apply to activities, and shall ensure safe and healthful working conditions for its employees The Contractor s personnel shall follow applicable facility policies concerning fire/disaster programs. All materials and equipment will be removed from the facility or stored properly at the end of the workday and secured during the workday. Under no circumstances will the Contractor allow for any equipment to be left unattended for any length of time. The Contractor shall comply with all applicable Federal, State and local legal requirementsregarding workers health and safety. Contractor shall assume the responsibility to guard against causing of fires and/or explosions and to protect Government Property. The Contractor shall perform the work in a manner consistent with the area security and fire safety regulations especially with regard to exits and exit way access. Utility shutdowns shall notcompromise security, communication or fire safety for occupants. No flammable liquids shall be stored or used in the medical center. The necessary number and appropriate types of portable fire extinguishers are required per National Fire Protection Agency (NFPA) 10 and NFPA 241\. Contractor shall keep certification onsite at all times of extinguisher inspections. The Contractor shall receive from the COR a permit for all cutting, welding, and soldering 24 hours in advance. All permits shall be prominently displayed during all construction. All necessary precautions shall be taken by the contractor to prevent accidental operation of any existing smoke detectors or sprinkler heads. The Contractor shall assume responsibility of environmental protection of all material storage. 13.1 Accident Prevention: Precaution shall be exercised at all times for the protection of persons (including employees) and property. These shall include, but not be limited to, the installation of adequate safety guards and protective devices for all equipment and machinery, whether used in the performance of work or permanently installed as part of the work. Contractor shall comply with all applicable laws relating to safety precautions, including the safety regulations of the Division of Industrial Safety, Department of Industrial Regulations of the state. 13.2 Environmental Protection: In order to provide for abatement and control of all environmentally hazardous materials arising from demolition and/or construction activities, the Contractor shall comply with all applicable environmentally hazardous material control and abatement and all applicable provisions of the Corps of Engineers Manual EM 385-1-1, General Safety Requirements as well as the specific requirements stated elsewhere in the Contract Documents. The Contractor is responsible for daily cleanup of all areas affected by its work. Areas in use or affected shall be returned to condition in which they were turned over or initially found. VA Housekeeping shall not be dispatched for cleaning associated with contractor work. The Contractor shall take every precaution in preserving flooring, finishes, equipment, and furniture in areas of work. The Contractor shall repair or replace any damage incurred during its work at their expense. Contractor shall use freight elevators for transmission of materials and personnel. Contractor shall take every precaution in preserving the elevators, including the hoist way and lobby doors, interior finishes, and shall conduct all good practices in observing lifting and motor components tolerances. Any damage incurred to any elevator component due to negligence will be repaired at expense of the contractor, within the work day of incurred damage. 14.0 Work Standards and ICRA/ILSM; Work site shall be free of debris and returned to original condition upon completion of preventative maintenance or repairs. All work is to be performed in areas used daily by facility patients and staff. Contractor will take suitable measures to control all material and equipment to produce a minimum of interference in facility routine. All work shall be performed in a safe and prudent manner. Contractor shall coordinate all closures of rooms with COR who will coordinate with VA-Chiefs. Contractor shall so perform all work as to offer the least possible obstruction and inconvenience to staff, patients and shall have under construction, no greater amount of work than can be completed promptly and properly with due regard to the rights of staff and patients. Any person the COR may deem incompetent or disorderly shall be promptly removed from the facility and not be allowed to return for the duration of the agreement. The Contractor shall comply with an Infection Control Risk Assessment (ICRA) which will be developed with the COR and the Infection Control Practitioner. Multiple ICRA s may be necessary to address specific risks at various stages of the project and must be approved prior to proceeding on each phase. VA anticipates an overall ICRA level II for this project. 15.0 Hazardous Material Reporting: The Contractor shall maintain hazardous material inventories and mater 

<!-- mobian-agent-ad sponsored="true" id="1a10661a-d389-4c11-a0ff-3af13bd50884" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories/facilities-and-construction/facility-related-services?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


## Contacts

* Jared Detton (CS), Contract Specialist

Email and phone are in the source notice.

[Source notice](https://sam.gov/opp/5f3cee527e904488ac3a849177bd7930/view)

[More from United States Department of Veterans Affairs posted in June 2022](/department%5Fof%5Fveterans%5Faffairs/archive/2022-06)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Veteran-Owned Small Business Set-Aside Contracts (SDVOSB and VOSB) Available Now](/contracts/veteran-owned)
* [Construction Government Contracts Available Now](/contracts/construction)

```json
{"@context":"https://schema.org","@type":"Demand","name":"Z2DA--Replace H2 Wood doors","description":"2 Statement of Work Replace H2 Wood Doors Project Number 554-22-133 Rocky Mountain Regional Veterans Affairs Medical Center (RMRVAMC) 1.0 Objective: The Department of Veterans Affairs has a requirement to remove existing wood wicket doors and replace with steel wicket doors in the inpatient Mental Health unit at the Rocky Mountain Regional VA Medical Center. The existing wood wicket doors in Mental Health and associated areas are experiencing excessive amounts of chipping, flaking, etc. around the wicket entrance. This is an unacceptable condition as it allows opportunities for patients to utilize damaged areas of the doors to harm themselves or staff. The intent of this contract is to mitigate this risk of damage and improve durability of the patient room doors. Scope of Work: Contractor shall remove thirty-seven (37) existing wood patient room wicket doors and replace with steel wicket doors. Thirty-two (32) of the doors are located in the inpatient Mental Health ward in Building H and five (5) of the doors are located in the Emergency department in Building D.Typical patient room door sizes are 3 -8 x 7 -0 x 1 Â¾ , and typical bariatric and group room door sizes are 4 -0 x 7 -0 x 1 Â¾ . Reference attached door and framing schedule. 3.0 Requirements: Contractor shall preserve existing metal door frames in place. Steel wicket door replacements shall have a steel core with a minimum thickness of 16 gauge. Replacement door hardware shall be appropriate for an inpatient mental health setting (no sharp edges, ligature points, non-ligature safety screws and connectors utilized, etc.) Contractor may re-use existing door hardware if compatible with replacement doors. VA locksmith can re-key doors as necessary. Twenty-five (25) of the existing doors have been outfitted with over-the-door patient tampering/anti-ligature alarm systems. Replacement doors shall be compatible with this system. Contractor shall remove these alarms taking care not to damage them and re-install/re-use them and confirm function after work is complete. Reference attached product submittals for the alarm devices and system. Replacement doors shall be primed and painted with powder coat in a light brown shade to match environment. Replacement doors shall be full panel steel/wicket and shall not have windows, vision/day light panels, or similar. Replacement doors shall have a single continuous hinge to mitigate sharp edges and ligature points that may allow for patient/staff harm. No smoke or fire rating is necessary for the replacement doors. 4.0 General: The Dept. of Veterans Affairs (VA) requires strict adherence to the Code of Federal Regulations 29, Part 1926. This includes the requirement that the contractor have a Competent Person on the job at all times (must have a 30-hour Occupational Safety and Health Administration (OSHA) card), and that all contractor employees have received a minimum of ten (10) hours of OSHA construction safety training. Documentation of these requirements shall be submitted and approved prior to performing the work. Contractor must submit a company Site Specific Safety Plan (SSSP) that must be reviewed by VA Safety prior to work beginning. This plan shall detail fire, construction, and health-related safety measures, in addition to listing training records for all employees for the previous year. A company standard or boilerplate safety plan will not be acceptable plan should contain a detailed hazard analysis for each element of construction to be performed such as an Activity Hazard Analysis (AHA) or Job Hazard Analysis (JHA). This entire project shall conform to 100% of all VA standards and specifications, OSHA, American Institute of Architects (AIA) Construction Guidelines, Joint Commission Environment of Care Standards, and applicable building codes. The Contractor is responsible for protection of existing finishes, and VA property located in the areas preventative maintenance and repair work is being performed, as well as along paths of travel to and from these areas. Both exterior and interior finishes and property must be maintained. The contractor is liable for any damage to VA property during the course of the contract. Any damage to existing finishes must be repaired by the Contractor to equal or greater quality than existing finishes. All tasks accomplished by the Contractor personnel will be performed to preclude damage or disfigurement of government-owned furnishing, fixtures, equipment and architectural or building structures. Contractor will report any damage or disfigurement to these items when caused by the Contractor s personnel and will perform repairs or replace government-owned equipment, fixtures, furnishings, grounds and architectural or building structures to their previously existing condition. 5.0 Project Management: Based on the above list of work items the, general contractor selected must complete, maintain, and submit the following documentation and managerial requirements:...","url":"https://matchawards.com/department_of_veterans_affairs/posts/108526672339101455","identifier":"36C25922Q0401","category":"236220 - Commercial and Institutional Building Construction","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"Z2DA - REPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES"},{"@type":"PropertyValue","propertyID":"CM category","name":"Category Management category","value":"4.4 Facility Related Services","url":"https://matchawards.com/categories/facilities-and-construction/facility-related-services"}],"availabilityStarts":"2022-06-23","availabilityEnds":"2022-07-01","areaServed":"Aurora, 80045","sameAs":"https://sam.gov/opp/5f3cee527e904488ac3a849177bd7930/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Veteran-owned","item":"https://matchawards.com/contracts/veteran-owned"}]}
```