ClickCease C1DA--528A8-22-822 DESIGN CORRECT LINEN CHUTE… (36C24222R0082) | Closed - MatchAwards

C1DA--528A8-22-822 DESIGN CORRECT LINEN CHUTE DEFICIENCIES |

Status
Closed (archived notice)
Agency
United States Department of Veterans Affairs
Office
ALBANY, USA
Notice type
Sources Sought
Solicitation number
36C24222R0082
NAICS
541330 - Engineering Services
PSC
C1DA - ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES
Category
Construction Related Services (4.2)
Set-aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Posted
2022-06-14
Deadline
2022-07-18
Place of performance
12208

Description

Sources Sought Notice for Architect - Engineering services Project # 528A8-18-802 - Renovate 4D for CLC SYNOPSIS This is a Sources Sought Notice for Architect-Engineering services to be performed at the Stratton VA Medical Center, 113 Holland Ave, Albany, NY 12208. The magnitude of construction for the above referenced project is between $1,000,000.00 and $5,000,000.00. Set-Aside: This requirement is 100% set-aside to Small Disabled Veteran Owned Small Business (SDVOSB) firms. The NAICS code for this procurement is 541330 Engineering Services; the small business standard is $15.0M. SDVOSBs shall be verified in: www.vetbiz.gov at time of evaluation, any subsequent RFP and prior to award. The SF-330 can be downloaded through the GSA Forms Library at: http://www.gsa.gov/portal/forms/type/TOP, scroll down to locate and click on the SF-330 hyperlink entitled, Architect-Engineer Qualifications. Area of Consideration The area of consideration is restricted to firms with offices and key personnel to be assigned to the design located within a 500-mile radius of the Stratton VA Medical Center in Albany, NY as indicated by a mapquest.com driving directions search from the prime designer s main or satellite office address to the project site. Written questions pertaining to this requirement should be submitted no later than January 28, 2019 at 3:00 PM EST. Interested firms shall submit their current SF-330, Parts I and II, to Tony.Clemente@va.gov. The SF-330s are due no later than February 6, 2019 at 3:00 PM EST. SCOPE OF WORK The A/E Firm shall provide design and construction period services for the demolition and renovation of Stratton VA Medical Center 4th floor D-Wing and part of the 4th floor Core totaling approximately 13,100 square feet. The goal of the project is to transform the space into a Community Living Center residential ward with private rooms and private bathrooms in a homelike environment, in keeping with the Small House design concept. This will be a complete interior gut, abatement, and renovation. However, no exterior or building envelope work is anticipated, except as needed for minor utility and HVAC connections. Budget for construction is limited and it will be the design s team task to creatively achieve the needed scope. The AE shall conduct a survey of the project area to: Test and locate all asbestos-containing materials. Assume all pipes in all chases are wrapped in ACM insulation. Remediation measures to remove ACM shall be included in the design documents, and it is the intent that no ACM material remains in the renovated spaces. Verify location of structural and building elements against existing documents and amend as needed prior to start of design. Verify that the existing medical gas systems are in compliance with NFPA Codes and Standards to insure the new medical gases can be tied into the existing facility system. Survey results identifying deficiencies w/technical solutions shall be incorporated into the design documents. Verify existing heating hot water and chilled water supply and return risers up to the fourth floor D-wing are sized adequately to support the new HVAC system for this project as well as incorporate associated technical solutions into the design documents. A second field verification is required following demolition and abatement. Review to include, but not limited to: location and measurement of structural, building elements, utilities existing to remain or to be tied into, other existing elements that have impact on design and were not previously available for inspection. Design documents to be amended as needed and re-issued. A detailed cost estimate performed by a professional cost estimator is required at each design stage in order to ensure the final design estimate does not exceed the funding limit. It is anticipated that deduct alternates will be included. Work requirements include, but are not limited to: Complete interior demolition of Wing 4D and a part of 4th Floor Core area, including abatement. Installation of a functional CLC Neighborhood in keeping with the Small House Model, including approximately 12 residential units with individual bathrooms; Kitchen, Dining and Living Rooms; Common and Recreational Areas. All required nursing and medical support functions to maintain resident s health, safety, and day-to-day homelike living. New HVAC systems and equipment including both local and BMS controls. As part of the initial project assessment, provide a recommendation based on a comparison of at least two alternative HVAC system solutions including VAV and/or active chilled beams. Recommendation will be based on a consideration of installed cost, operating cost, and serviceability of installed equipment. Each alternative will be presented with: floor plans showing locations of major equipment; 1 line schematic drawings; preliminary equipment schedules; locations of connections to existing HW and CHW mains or risers; analysis of existing HW and CHW capacity for new HVAC system; estimated construction cost; and estimated annual operating cost. Lighting will be LED with warm spectrum, individually controlled within residences. Provide Security, Nurse Call, Telecommunications, Patient Safety, and other electrical support systems. Plumbing to include individual and common bathrooms, utility and nursing sinks, kitchen sinks, HVAC piping. Fire Protection will be extended from the building sprinkler system, and class 1A fire alarm system. Provide structural supports for hospital-selected patient lift systems. OFFERORS WILL BE EVALUATED ON THE FOLLOWING CRITERIA: The submitted SF-330s will be evaluated on the following criteria: This acquisition will be in accordance with FAR Part 36.602-1 and VAAR Part 836.602-1. The following evaluation criteria will be used to evaluate SF-330 technical proposals: The A/E must demonstrate its qualifications with respect to the published evaluation criteria for all services. Evaluation Criteria (1) through (4) are considered most important and equal among themselves; Criteria (5) and (6) are of slightly less importance than (1) through (4), but are equal value among themselves; Criteria (7) and (8) are the least important and listed in descending order of importance. Specific evaluation criteria include: 1. Specialized experience and technical competence in the type of work required, including, where appropriate, experience in energy conservation, pollution prevention, waste reduction, and the use of recovered materials. 2. Professional Qualifications necessary for satisfactory performance of required services. 3. Capacity to accomplish the work in the required time. 4. Past Performance on contracts with Government agencies and private industry in terms of cost control, quality of work and compliance with performance schedules. 5. Specific experience and qualifications of personnel proposed for assignment to the project and their record of working together as a team. 6. Location in the general geographical area of the project and knowledge of the locality of the project; provided, that application of this criterion leaves an appropriate number of qualified firms, given the nature and size of the project. 7. Reputation and standing of the firm and its principal officials with respect to professional performance, general management, and cooperativeness. 8. Record of significant claims against the firm because of improper or incomplete architectural and engineering services. Criterion 1 - Specialized experience and technical competence in the type of work required, including, where appropriate, experience in energy conservation, pollution prevention, waste reduction, and the use of recovered materials. Offerors will be evaluated on specialized experience and technical competence in the performance of services similar to those anticipated under this contract with regard to: Experience with Architectural Design within a Health Care Setting Experience with Space Planning within a Health Care Setting Experience with Space Planning within a Health Care Setting Mechanical and Electrical evaluation within a Health Care Setting. Submission requirements: Provide up to five (5) projects completed or substantially completed within the past five (5) years that best illustrate specialized experience of the proposed team in the areas outlined above. Example projects shall note project s square footage. All projects provided in the SF-330 must be completed by the office/branch/regional office/individual team member actually proposed to manage and/or perform work under this contract. To enable verification, firms should include the DUNS number along with each firm name in the SF-330 Part 1, Section F Item 25 Firms from Section C Involved in this Project, block (1). Include a contract number or project identification number in block 21. Include an e-mail address, and phone number for the point of contact in block 23(c). Include in the project description the contract period of performance, award contract value, current contract value, a summary of the work performed that demonstrates relevance to specialized experience as outlined above. If the contractor served as a subcontractor on a project, indicate the value of the work they provided towards the performance of the overall project. If a project was performed by a joint venture, and not all joint venture partners are on the team proposed for this contract, the offeror/team should specifically address the work performed by the joint venture partner offering/teaming on this contract. Likewise, if the offeror/team member worked as a subcontractor on a project, the description should clearly describe the work actually performed by the offeror/team member and the roles and responsibilities of each on the project, rather than the work performed on the project as a whole. If the project description does not clearly delineate the work performed by the entity/entities offering/teaming on this contract, the project could be eliminated from consideration. NOTE: If the Offeror is a joint venture, information should be submitted as a joint venture; however, if there is no information for the joint venture, information should be submitted for either joint venture partner, not to exceed a total of five (5) projects for this criterion. Projects shall be submitted on the SF-330. For submittal purposes, a task order on an IDIQ contract is considered a project, as is a stand-alone contract award. Do not list an IDIQ contract as an example of a completed project. Instead, list relevant completed task orders or stand-alone contract awards that fit within the definition above. Examples of project work submitted that do not conform to this requirement will not be evaluated. Failure to provide requested data, accessible points of contact, or valid phone numbers could result in a firm being rated lower. All information for Criterion 1 should be submitted in Part 1, Section F of the SF-330. The Government WILL NOT consider information submitted in addition to Part 1, Section F in evaluating Criterion 1. Criterion 2 - Professional Qualifications necessary for satisfactory performance of required services. Offerors will be evaluated in terms of the qualifications, competence and experience of the key personnel and technical team proposed to accomplish this work. Key personnel are individuals who will have major contract or project management responsibilities and/or will provide unusual or unique expertise. Provide a balanced licensed and or certified workforce in the following disciplines Architecture, Civil, Structural, Mechanical, Electrical, Plumbing Environmental, Control System, and Fire Protection Engineering Submission requirements: Provide resumes for all proposed key personnel. Resumes are limited to one page each and should cite project specific experience and indicate proposed role in this contract. Provide professional registration, certification, licensure and/or accreditation. Indicate participation of key personnel in example projects in the SF-330 Part 1 Section G. Criterion 3 - Capacity to accomplish the work in the required time. Firms/teams will be evaluated in terms of their ability to plan for and manage work under the contract and capacity to accomplish the work in the required time. Submission requirements: Describe the firm s ability to concurrently perform and manage multiple projects in different locations to meet aggressive schedules, multiple disciplines, and control costs and the firm s capacity to accomplish multiple projects simultaneously. Criterion 4 - Past Performance Offerors will be evaluated on past performance with Government agencies and private industry in terms of work quality, compliance with schedules, cost control, and stakeholder/customer satisfaction. Evaluating past performance and experience will include information provided in CPARS/ACASS for Criterion 1 projects and may include other information provided by the firm, customer inquiries, Government databases, and other information available to the Government including contacts with points of contact in other criteria. Failure to provide requested data, accessible points of contact, or valid phone numbers could result in a firm being rated lower. NOTE: Past performance information for projects listed under Criterion 1. Submission requirements: SUBMIT A COMPLETED CPARS/ACASS EVALUATION FOR EACH PROJECT UNDER CRITERION 1. IF A CPARS/ACASS EVALUATION IS NOT AVAILABLE, ensure correct phone numbers and email addresses are provided for the client point of contact. If requested by the client, questionnaires may be submitted directly to the Government's point of contact, Network Contracting Office 2 Attn: Nicholas Winne via email at Nicholas.Winne@va.gov prior to the response date. Criterion 5 - Specific experience and qualifications of personnel proposed for assignment to the project and their record of working together as a team. Submission requirements: Offerors shall submit evidence of individuals experience and qualifications in their respective fields. Additionally, documentation must be provided to show these individuals have worked together as a team on previous projects and their role. (Completing Sections E, F, and G, on the SF-330 meets the documentation requirement). Furthermore, offerors shall describe the ability of the firm to manage, coordinate and work effectively with team members, both internal staff and consultants. Discuss the history of working relationships with team members, including joint venture partners where applicable. Criterion 6 - The area of consideration is restricted to firms with offices and key personnel to be assigned to the designs located within a 500 mile radius of the Stratton VA Medical Center as measured on google maps using the measure distance feature from the prime designers address listed in Vetbiz to the Stratton VA Medical Center at 113 Holland Ave, Albany, NY 12208. Firms shall have knowledge of the locality of the project and local market conditions. Submission requirements: Indicate firms/teams location, including main offices, branch offices and any subconsultants offices and demonstrate how this will be advantageous to the Government. Criterion 7 Reputation and standing of the firm and its principal officials with respect to professional performance, general management, and cooperativeness. Submission requirements: Offerors shall provide documentation (awards, certificates, publications, commendations from within the community) as evidence of reputation and standing of its firm. Criterion 8 - Record of significant claims against the firm because of improper or incomplete architectural and engineering services. Offerors with substantiated claims against the firm as a result of improper architectural and engineering services provided in the last three (3) years. Submission requirements: Records and any other documentation of substantiated claims highlighting improper or incomplete architectural engineering services against the firm within the last three (3) years. The SF-330 shall contain a statement affirming that there are no records of significant claims because of improper or incomplete architectural and engineering services. Evaluation Scoring Evaluation factors 1, 2, 3, 5, 6, 7, and 8 will be evaluated using the following adjectival ratings as follows: Outstanding: Proposal meets requirements and indicates an exceptional approach and understanding of the requirements. Strengths far outweigh any weaknesses. Risk of unsuccessful performance is very low. Good: Proposal meets requirements and indicates a thorough approach and understanding of the requirements. Proposal contains strengths which outweigh any weaknesses. Risk of unsuccessful performance is low. Acceptable: Proposal meets requirements and indicates an adequate approach and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. Risk of unsuccessful performance is moderate. Marginal: Proposal does not clearly meet requirements and has not demonstrated an adequate approach and understanding of the requirements. The proposal has one or more weaknesses which are not offset by strengths. Risk of unsuccessful performance is high. Unacceptable: Proposal does not meet requirements and contains one or more deficiencies. Proposal is not awardable. The firm s proposal demonstrates a misunderstanding of the requirement and the approach fails to meet performance standards. The firm s proposal has major omissions and inadequate details to assure evaluators that the offeror has an understanding of requirement. The ratings identified below will be used in the evaluation of Past Performance (Criterion 4): Substantial Confidence: Based on the offeror s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort. No doubt exists based on the offeror s past performance that they can satisfy the requirements of the contract. Satisfactory Confidence: Based on the offeror s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort. Little doubt exists based on the offeror s past performance that they could satisfy the requirements of the contract. Unknown Confidence (Neutral): No recent/relevant performance record is available or the offeror s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. Limited Confidence: Based on the offeror s recent/relevant performance record, the Government has little expectation that the offeror will be able to successfully perform the required effort. Some doubt exists based on past performance that they could satisfy the terms and conditions of the contract. No Confidence: Based on the offeror s recent/relevant performance record, the Government has little expectations that the offeror will be able to successfully perform the required effort. Significant doubt exists based on the offeror s past performance that they can satisfy the requirements of the contract. SELECTION INTERVIEW: Interviews will be scheduled with firms slated as the most highly qualified. Firms slated for interviews may be asked to explain or expand on information contained in the SF-330 submittal through a formal interview or a discussion questionnaire as determined by the Contracting Officer. GENERAL INFORMATION: All design and work will conform to the current edition of the VA Master Specifications and VA Design Standards as published at the following site: www.cfm.va.gov; ASME, OSHA, IBC 2009, NFPA and NEC building codes and standards. Coordinate all work through the COR of Facilities Management Service. The A-E will provide documents at each submission as indicated in the statement of work. Requirement for Electronic Submission Unless paper offer

Attachments

Contacts

Email and phone are in the source notice.

Source notice

More from United States Department of Veterans Affairs posted in June 2022

More lists