<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/department_of_veterans_affairs/posts/108283192982184247" -->

---
title: C1DA--Expand LRS Patient Education System (36C24622R0049) | Closed - MatchAwards
description: C1DA--Expand LRS Patient Education System. United States Department of Veterans Affairs. Solicitation 36C24622R0049. NAICS 541330 - Engineering Services. SDVOSB set-aside. Deadline 2022-06-10. DESCRIPTION: This is a Pre-Solicitation Notice for the establishment of an Architect-Engineering (A-E)...
canonical: https://matchawards.com/department_of_veterans_affairs/posts/108283192982184247
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: C1DA--Expand LRS Patient Education System (36C24622R0049) | Closed
og:url: https://matchawards.com/department_of_veterans_affairs/posts/108283192982184247
og:description: C1DA--Expand LRS Patient Education System. United States Department of Veterans Affairs. Solicitation 36C24622R0049. NAICS 541330 - Engineering Services. SDVOSB set-aside. Deadline 2022-06-10. DESCRIPTION: This is a Pre-Solicitation Notice for the establishment of an Architect-Engineering (A-E)...
og:image: https://matchawards.com/system/accounts/avatars/000/000/015/original/f59915e906ee2b19.png?1638825904
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# C1DA--Expand LRS Patient Education System

Status

Closed (archived notice)

Agency

[United States Department of Veterans Affairs](/department%5Fof%5Fveterans%5Faffairs)

Office

HAMPTON, USA

Notice type

Presolicitation

Solicitation number

36C24622R0049

NAICS

[541330 - Engineering Services](/groups/897)

PSC

C1DA - ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES

Category

[Construction Related Services (4.2)](/categories/facilities-and-construction/construction-related-services)

Set-aside

[Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)](/contracts/veteran-owned)

Posted

2022-05-11

Deadline

2022-06-10

## Description

DESCRIPTION: This is a Pre-Solicitation Notice for the establishment of an Architect-Engineering (A-E) contract with services to be performed at the Asheville VA Medical Center at 1100 Tunnel Road, Asheville, NC 28805\. This requirement is being executed under a 100% Set-Aside to Service-Disabled Veteran Owned Small Business (SDVOSB) firms. THIS ANNOUNCEMENT IS NOT A REQUEST FOR PROPOSAL; NO SOLICITATION PACKAGE WILL BE ISSUED UNTIL AFTER AN EVALUATION HAS BEEN MADE ON THE PROVIDED SF-330s. The SF-330 can be downloaded through the GSA Forms Library at: http://www.gsa.gov/portal/forms/type/TOP, scroll down to locate and click on the SF-330 hyperlink entitled, Architect-Engineer Qualifications. Interested firms should submit their current SF-330, Parts I and II, to chanel.johnson@va.gov. The SF-330s are due no later than 3:00 PM, EST, June 10, 2022\. SCOPE OF WORK: Intent Provide professional Architect/Engineer (AE) necessary to design for the Renovation of Space for Learning Resource Center (LRS) at the Charles George VAMC, Asheville, NC. Project will evaluate approximately 2,500 square feet of space to be renovated for the LRS classroom and administrative space and design for the replacement of the main in-house television head-in equipment (telecommunications) to meet the needs of these clinics. Work includes designing for wall, ceiling, flooring, and utility demolition and existing spaces and producing construction documents for providing rooms that meet VA Space Code requirements. Design includes Architectural, Mechanical, Plumbing, and Electrical disciplines. The existing area has asbestos containing in the walls. Requirements The AE selected is expected to: Part Ia Preparation of Existing Conditions and Conceptual Design Investigative Services: Preparation of existing conditions plan and conceptual design which includes site investigation for architectural, mechanical, plumbing, electrical, telecommunications, and environmental hazards, such as suspect ACM, other hazardous materials. Work will consist of A/E personnel removing ceiling tile and tracing ductwork above ceilings, tracing ductwork, electrical and plumbing. Perform project site investigation in accordance with the Site Investigations section of this scope of work. Part Ib Preparation of Contract Drawings and Specifications Design Development: Preparation and submission of construction bid documents, interim design document submittals, and the final construction bid documents at the completion of the design development process in accordance with the Design Package Submission Schedule section. Design document packages shall contain a complete set of documents as specified in the Design Requirements/ Submissions section of this scope of work. The AE shall develop a design necessary to meet the requirements in the Project Scope section of this scope of work. Design shall include engineering services rendered necessary by the VA at the end of Part Ia Investigative Services within the construction cost parameters. Part II - Construction Period Services: Review and provide concise recommendations on all submittals, shop drawings, product data, samples, RFI s, change order proposals, etc. in accordance with Construction Period Services section of this statement of work. Services shall include providing record drawings based on finalized contractor red-line as-builts. Part III Construction Period Site Visits: Visit the site at the request of the VA in accordance with section Site Visits in this scope of work. The AE shall respond on site within an 8-hour period when requested. The total number of site visits during the construction period is estimated to be 5 for this project, which may be finalized after selection of the AE and during negotiation of the proposal. Each site visit shall be documented through a field report denoting the purpose and results of the site visit. OFFERORS WILL BE EVALUATED ON THE FOLLOWING CRITERIA: The submitted SF-330s will be evaluated on the following criteria: This acquisition will be in accordance with FAR Part 36.602-1 and VAAR Part 806.6\. The following evaluation criteria will be used to evaluate SF 330 technical proposals: The A/E must demonstrate its qualifications with respect to the published evaluation criteria for all services. Criteria will be selected in order of importance. (1) Professional qualifications necessary for satisfactory performance of required services; (2) Specialized experience and technical competence in the type of work required, including, where appropriate, experience in medical facility design; (3) Capacity to accomplish the work in the required time; (4) Past performance on contracts with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules; (5) Record of significant claims against the firm because of improper or incomplete architectural and engineering services. (6) Utilization of SDVOSB firms (7) Post Award Construction Services (8) In the event that evaluations of SF330 s result in the same rating, proximity to the facility will be used as a tiebreaker. CRITERION 1 Professional Qualifications necessary for satisfactory performance of required services. Offerors will be evaluated in terms of the qualifications, competence and experience of the key personnel and technical team proposed to accomplish this work. Key personnel are individuals who will have major contract or project management responsibilities and/or will provide unusual or unique expertise. Provide a balanced licensed and or certified workforce in the following disciplines Architectural, Mechanical, Plumbing, Telecommunications, and Electrical Design. Submission requirements: Provide resumes for all proposed key personnel. Resumes are limited to one page each and should cite project specific experience and indicate proposed role in this contract. Provide professional registration, certification, licensure and/or accreditation. Indicate participation of key personnel in example projects in the SF-330 Part 1 Section G. CRITERION 2 Specialized experience and technical competence in the type of work required, including, where appropriate, experience in medical facility design. Offerors will be evaluated on specialized experience and technical competence in the performance of services like those anticipated under this contract about: Special knowledge of Hospital Space for Clinics at Medical Facilities Experience working in and around an operational Hospital Specific experience and qualifications of personnel proposed for assignment to the project and their record of working together as a team. Â Submission requirements: Provide up to six (6) projects completed or substantially completed within the past ten (10) years that best illustrate specialized experience of the proposed team in the areas outlined above. Example projects shall note project s square footage. All projects provided in the SF-330 must be completed by the office/branch/regional office/individual team member proposed to manage and/or perform work under this contract. To enable verification, firms should include the SAM (Unique Entity Identifier, UEI (GSAFSD Tier 0 Knowledge Base - How can I view the unique entity identifier (UEI) of other entities?) number along with each firm name in the SF-330 Part 1, Section F Item 25 Firms from Section C Involved in this Project, block (1). Include a contract number or project identification number in block 21\. Include an e-mail address and phone number for the point of contact in block 23(c). Include in the project description, the contract period of performance, award contract value, current contract value, and summary of the work performed that demonstrates relevance to specialized experience as outlined above. If the contractor served as a subcontractor on a project, indicate the value of the work they provided towards the performance of the overall project. If a project was performed by a joint venture, and not all joint venture partners are on the team proposed for this contract, the offeror/team should specifically address the work performed by the joint venture partner offering/teaming on this contract. Likewise, if the offeror/team member worked as a subcontractor on a project, the description should clearly describe the work performed by the offeror/team member and the roles and responsibilities of each on the project, rather than the work performed on the project as a whole. If the project description does not clearly delineate the work performed by the entity/entities offering/teaming on this contract, the project could be eliminated from consideration. Additionally, Firms are required to return and submit the Attachment B titled Criterion 2 Format, which will clearly demonstrate specific experiences and qualifications of personnel proposed for assignment to the project and their record of working together as a team. Specifically list similar scoped projects covering the previous 10 years and clearly show participation. (See SF330 Part I Section G, but not excluding other information provided on the SF330 and supporting documentation.) NOTE: If the Offeror is a joint venture, information should be submitted as a joint venture; however, if there is no information for the joint venture, information should be submitted for either joint venture partner, not to exceed a total of six (6) projects for this criterion. Projects shall be submitted on the SF-330\. For submittal purposes, a task order on an IDIQ contract is considered a project, as is a stand-alone contract award. Do not list an IDIQ contract as an example of a completed project. Instead, list relevant completed task orders or stand-alone contract awards that fit within the definition above. Examples of project work submitted that do not conform to this requirement will not be evaluated. Failure to provide requested data, accessible points of contact, or valid phone numbers could result in a firm being rated lower. All information for Criterion 2 should be submitted in Part 1, Section F of the SF-330\. The Government WILL NOT consider information submitted in addition to Part 1, Section F in evaluating Criterion 2\. CRITERION 3 Capacity to accomplish the work in the required time. Firms/teams will be evaluated in terms of their ability to plan for and manage work under the contract and capacity to accomplish the work in the required time. Submission requirements: Describe the firm s ability to concurrently perform and manage multiple projects in different locations to meet aggressive schedules, multiple disciplines, and control costs and the firm s capacity to accomplish multiple projects simultaneously. Additionally, prospective contractors are required to provide a list of current projects with a design fee of greater than $25,000 currently being designed in the firms office. Indicate the availability of the proposed project team (including sub-consultants) for the specified contract performance period in terms of: (1.) both the average and maximum number of projects being worked simultaneously for the previous twelve (12) month period, for each key personnel member, (2.) the number of projects currently being worked by each key personnel member identified in the SF330, and (3.) the number of projects that could be added to workload, given size and complexity. CRITERION 4 Past Performance. Offerors will be evaluated on past performance with Government agencies and private industry in terms of work quality, compliance with schedules, cost control, and stakeholder/customer satisfaction. Evaluating past performance and experience will include information provided in Past Performance Questionnaires (PPQs) or CPARS/ACASS for Criterion 1 projects and may include other information provided by the firm, customer inquiries, Government databases, and other information available to the Government including contacts with points of contact in other criteria. Failure to provide requested data, accessible points of contact, or valid phone numbers could result in a firm being rated lower. NOTE: Past performance information for projects listed under Criterion 1\. Project Recency: A project will be considered recent only if performance was completed within ten (10) years of the date of issuance of this public announcement. Ongoing projects will not be considered as no accurate performance record can exist for work not yet completed. Submission requirements: SUBMIT A COMPLETED CPARS/ACASS EVALUATION FOR EACH PROJECT UNDER CRITERION 1\. IF THERE IS NOT A COMPLETED CPARS/ACASS EVALUATION, the Past Performance Questionnaire (PPQ) included in this notice is provided for the offeror or its team members to submit to the client for each project the offeror includes under Criterion 1\. AN OFFEROR SHALL NOT SUBMIT A PPQ WHEN A COMPLETED CPARS/ACASS IS AVAILABLE. IF A CPARS/ACASS EVALUATION IS NOT AVAILABLE, ensure correct phone numbers and email addresses are provided for the client point of contact. Submit no less than three (3) and no more than five (5) past performance references for recent and relevant projects identified on SF330 Part I Section F. Completed PPQs should be submitted with your SF-330\. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before the response date set forth in this notice, offerors should complete and submit with their responses the first page of the PPQ (Attachment A), which will provide contract and client information for the respective project(s). Offerors may submit a PPQ previously submitted under a different Notice/RFP (legible copies are acceptable) if it is on the same form as posted with this Synopsis. Offerors should follow up with clients/references to ensure timely submittal of questionnaires. If requested by the client, questionnaires may be submitted directly to the Government's point of contact, Network Contracting Office 6, Attn: Chanel Johnson via email at Chanel.Johnson@va.gov and cc Nicholas.Ruppert@va.gov. Offerors shall not incorporate by reference into their response PPQs or CPARS previously submitted in response to other A/E services procurements. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. CRITERION 5 Claims. Record of significant claims against the firm because of improper or incomplete architectural and engineering services. CRITERION 6 Utilization of SDVOSB firms. Offerors will be evaluated on the extent to which potential contractors identify and commit to the use of service-disabled Veteran-owned small businesses, Veteran-owned small businesses, and other types of small businesses as subcontractors. Submission Requirements: Provide a list of subcontractors and their socioeconomic categories (SDVOSB, VOSB, and Multiple categories of small businesses). CRITERION 7 Post Award Construction Services. Offerors will be evaluated on the quality of the post award construction services provided. Post award construction services include but are not limited to (SEE STATEMENT OF WORK) professional field inspections, review of construction submittals, support in answering requests for information, and support of construction contract changes to include drafting statements of work, and cost estimates. Submission Requirements: Provide up to three (3) completed projects in the past ten (10) years that best illustrates the post award construction services performed by the team. Describe post award construction services provided and whether the project was completed within schedule and budget. Include a contract number or project identification, include name, telephone number, and email of the completed project stakeholder. CRITERION 8 In the event that evaluations of SF330 s result in the same rating, proximity to the facility will be used as a tiebreaker. The distance will be determined according to http://maps.google.com/. For firms that have multiple/regional offices, the location of the primary project team will be used to calculate the distance and should be provided in the SF330\. Submission requirements: Indicate firms/teams location, including main offices, branch offices and any sub consultants offices and demonstrate how this will be advantageous to the Government. SELECTION PROCESS: The agency has convened an evaluation board for the evaluation of responses to this notice. Responses will be evaluated in accordance with the Selection of Architects and Engineers Statute (Public Law 92-582), formerly known as the Brooks Act, and implemented in Federal Acquisition Regulation (FAR) 36.6\. Specifically, SF 330 submissions will be evaluated to identify the most highly qualified firms, using the selection criteria identified above. Discussions will be held with at least three (3) of the most highly qualified firms. Interviews may be conducted. The processes at FAR 36.602-4 and FAR 36.606 will then be followed. SELECTION INTERVIEW: Interviews shall be scheduled with firms slated as the most highly qualified. Firms slated for interviews will be asked a series of established questions. Elaborate presentations are not desired. GENERAL INFORMATION: All design and work will conform to the current edition of the VA Master Specifications and VA Design Standards as published at the following site: www.cfm.va.gov; ASME, OSHA, IBC 2009, NFPA and NEC building codes and standards. Coordinate all work through the COR of Facilities Management Service. Contractor is responsible for all cleanups and refuse disposal throughout the construction period. The A-E firm will prepare drawings and specifications in enough detail such that qualified outside General Contracting companies can prepare accurate and timely proposals for the desired construction work. Microsoft Project scheduling and management software will be used by both the A-E and Contractors to allow for regular tracking of schedules and work by the VA Medical Center. Schedules with MS Project will be regularly sent to the COR upon project initiation and whenever significant changes occur in the schedule. The estimated magnitude of construction is between $250,000 and $500,000\. The A-E will provide an initial estimate of cost to perform the above work and will design only those items that can be provided within the cost limitation. The Estimated Cost of Construction (ECC) shall only be provided to the Contractor in which a formal proposal is sought for the purposes of providing a proposal. The Medical Center must remain operational throughout the construction period and a detailed sequence of work will be provided by the A-E to minimize impact of the construction. The A-E will provide documents at each submission as indicated in the statement of work. The NAICS code for this procurement will be 541330, Engineering Services. The current small business size standard for 541330 is $16.5 Million. DESIGN COSTS: All offerors are advised that in accordance with VAAR 836.606-71 the total cost of the architect or engineer services contracted for must not exceed six percent (6%) of the estimated cost of the construction project plus any fees for related services and activities. Additionally, FAR 52.236-22 Design Within Funding Limitations, will be applicable to this procurement action. Design limitation costs will be provided to the most highly rated A-E firm(s) selected in accordance with the outlined process. LIMITATIONS ON SUBCONTRACTING: In accordance with VAAR 852.219-10, VA Notice of Total Service-Disabled Veteran-Owned Small Business Set-Aside and 13 CFR 125.6, a service disabled veteran-owned small business concern (SDVOSB) agrees that, in the performance of the contract, it will not pay more than 50% of the amount paid by the government to firms that are not similarly situated. Firms that are similarly situated are those that are also CVE-registered SDVOSBs. Requirement for Electronic Submission Unless paper offers are spe 

<!-- mobian-agent-ad sponsored="true" id="6eac76cb-77f5-4ee7-8b27-f31fc5dc4eb2" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories/facilities-and-construction/construction-related-services?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup
- Pursuit brief for this NAICS code (award history, who buys, past awardees): https://matchawards.com/naics/541330/brief?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=brief

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


## Contacts

* CHANEL JOHNSON, CONTRACT SPECIALIST

Email and phone are in the source notice.

[Source notice](https://sam.gov/opp/0ae803ec4c714c0bb8c76e7932337a98/view)

[More from United States Department of Veterans Affairs posted in May 2022](/department%5Fof%5Fveterans%5Faffairs/archive/2022-05)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Veteran-Owned Small Business Set-Aside Contracts (SDVOSB and VOSB) Available Now](/contracts/veteran-owned)
* [Professional Services Government Contracts Available Now](/contracts/professional-services)
* [Pursuit brief for NAICS 541330](/naics/541330/brief)

```json
{"@context":"https://schema.org","@type":"Demand","name":"C1DA--Expand LRS Patient Education System","description":"DESCRIPTION: This is a Pre-Solicitation Notice for the establishment of an Architect-Engineering (A-E) contract with services to be performed at the Asheville VA Medical Center at 1100 Tunnel Road, Asheville, NC 28805. This requirement is being executed under a 100% Set-Aside to Service-Disabled Veteran Owned Small Business (SDVOSB) firms. THIS ANNOUNCEMENT IS NOT A REQUEST FOR PROPOSAL; NO SOLICITATION PACKAGE WILL BE ISSUED UNTIL AFTER AN EVALUATION HAS BEEN MADE ON THE PROVIDED SF-330s. The SF-330 can be downloaded through the GSA Forms Library at: http://www.gsa.gov/portal/forms/type/TOP, scroll down to locate and click on the SF-330 hyperlink entitled, Architect-Engineer Qualifications. Interested firms should submit their current SF-330, Parts I and II, to chanel.johnson@va.gov. The SF-330s are due no later than 3:00 PM, EST, June 10, 2022. SCOPE OF WORK: Intent Provide professional Architect/Engineer (AE) necessary to design for the Renovation of Space for Learning Resource Center (LRS) at the Charles George VAMC, Asheville, NC. Project will evaluate approximately 2,500 square feet of space to be renovated for the LRS classroom and administrative space and design for the replacement of the main in-house television head-in equipment (telecommunications) to meet the needs of these clinics. Work includes designing for wall, ceiling, flooring, and utility demolition and existing spaces and producing construction documents for providing rooms that meet VA Space Code requirements. Design includes Architectural, Mechanical, Plumbing, and Electrical disciplines. The existing area has asbestos containing in the walls. Requirements The AE selected is expected to: Part Ia Preparation of Existing Conditions and Conceptual Design Investigative Services: Preparation of existing conditions plan and conceptual design which includes site investigation for architectural, mechanical, plumbing, electrical, telecommunications, and environmental hazards, such as suspect ACM, other hazardous materials. Work will consist of A/E personnel removing ceiling tile and tracing ductwork above ceilings, tracing ductwork, electrical and plumbing. Perform project site investigation in accordance with the Site Investigations section of this scope of work. Part Ib Preparation of Contract Drawings and Specifications Design Development: Preparation and submission of construction bid documents, interim design document submittals, and the final construction bid documents at the completion of the design development process in accordance with the Design Package Submission Schedule section. Design document packages shall contain a complete set of documents as specified in the Design Requirements/ Submissions section of this scope of work. The AE shall develop a design necessary to meet the requirements in the Project Scope section of this scope of work. Design shall include engineering services rendered necessary by the VA at the end of Part Ia Investigative Services within the construction cost parameters. Part II - Construction Period Services: Review and provide concise recommendations on all submittals, shop drawings, product data, samples, RFI s, change order proposals, etc. in accordance with Construction Period Services section of this statement of work. Services shall include providing record drawings based on finalized contractor red-line as-builts. Part III Construction Period Site Visits: Visit the site at the request of the VA in accordance with section Site Visits in this scope of work. The AE shall respond on site within an 8-hour period when requested. The total number of site visits during the construction period is estimated to be 5 for this project, which may be finalized after selection of the AE and during negotiation of the proposal. Each site visit shall be documented through a field report denoting the purpose and results of the site visit. OFFERORS WILL BE EVALUATED ON THE FOLLOWING CRITERIA: The submitted SF-330s will be evaluated on the following criteria: This acquisition will be in accordance with FAR Part 36.602-1 and VAAR Part 806.6. The following evaluation criteria will be used to evaluate SF 330 technical proposals: The A/E must demonstrate its qualifications with respect to the published evaluation criteria for all services. Criteria will be selected in order of importance. (1) Professional qualifications necessary for satisfactory performance of required services; (2) Specialized experience and technical competence in the type of work required, including, where appropriate, experience in medical facility design; (3) Capacity to accomplish the work in the required time; (4) Past performance on contracts with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules; (5) Record of significant claims against the firm because of improper or incomplete architectural and engineering services. (6) Utilization of SDVOSB firms (7) Post Award...","url":"https://matchawards.com/department_of_veterans_affairs/posts/108283192982184247","identifier":"36C24622R0049","category":"541330 - Engineering Services","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"C1DA - ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES"},{"@type":"PropertyValue","propertyID":"CM category","name":"Category Management category","value":"4.2 Construction Related Services","url":"https://matchawards.com/categories/facilities-and-construction/construction-related-services"}],"availabilityStarts":"2022-05-11","availabilityEnds":"2022-06-10","sameAs":"https://sam.gov/opp/0ae803ec4c714c0bb8c76e7932337a98/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Veteran-owned","item":"https://matchawards.com/contracts/veteran-owned"}]}
```

