C222-- 3 year Electrical Inspection Station Wide (VA-22-00037199)
- Status
- Closed (archived notice)
- Agency
- United States Department of Veterans Affairs
- Office
- LEAVENWORTH, USA
- Notice type
- Sources Sought
- Solicitation number
- 36C25522Q0222
- NAICS
- 541330 - Engineering Services
- PSC
- C222 - ARCHITECT AND ENGINEERING- GENERAL: ELECTRICAL SYSTEMS
- Category
- Construction Related Services (4.2)
- Posted
- 2022-03-31
- Deadline
- 2022-04-07
- Place of performance
- Wichita, 67218-1607
Description
This is a SOURCES SOUGHT announcement only. It is neither a solicitation announcement nor a request for proposal or quote and does not obligate the Government to award a contract. Responses to this Sources Sought must be in writing. The purpose of this Sources Sought Announcement is for market research, to make appropriate acquisition decisions, and to gain knowledge of potential qualified businesses capable of providing the following: - PROFESSIONAL TESTING AND MAINTENANCE OF ELECTRICAL SYSTEMS AND EQUIPMENT for Wichita VAMC. This is a 3 Year requirement *** See Statement of Requirement below for details *** If this is within your capability, please respond with the information below: Company Name Address Point of Contact Phone, Fax, and Email DUNS number GSA Contract (as applicable) Interested firms are reminded that in accordance with FAR 4.12, prospective contractors shall complete electronic annual representations and certifications to be considered for award. In addition, FAR 4.11 states that prospective contractors shall be registered in the System for Award Management (www.SAM.gov) database. All Service-Disabled Veteran Owned Small Businesses (SDVOSB) and Veteran Owned Small Businesses (VOSB) shall be verified in VetBiz at www.vip.vetbiz.gov. Point of Contact for this Sources Sought is: ronald.castle@va.gov (913) 946 - 1166 Department of Veterans Affairs Network Contracting Office -15 3450 S. 4th Street Trafficway Leavenworth, KS. 66048. STATEMENT OF WORK PROFESSIONAL TESTING AND MAINTENANCE OF ELECTRICAL SYSTEMS AND EQUIPMENT GENERAL: 1.1 The work under this contract shall be performed under supervision of a Registered Professional Engineer. The Registered Professional Engineer shall be on site initially to discuss with the Engineering Officer the procedures used to test, survey, report and service the equipment required to be serviced under this contract. The Registered Professional Engineer shall supervise the services personally, review the final report and discuss with the Engineering Officer the results of the services, any recommendations, future actions and professional opinions, which are contained in the report. 1.2 Field service work shall be performed directly by Field Service Engineers who have successfully demonstrated their knowledge and experience in the Field of Electrical Power Distribution Systems Testing. The Field Service Engineer shall be capable of the following: (1) testing, assessing, evaluating, servicing and reconditioning components, (2) assuring that the equipment on which work has been performed is safe, reliable and acceptable for its intended purpose, and (3) identifying defective equipment and potential safety problems, environmental hazards or code violations. 1.3 The Supervising Service Engineer must be accredited as a Certified Electrical Test Technologist by the NICET (National Institute for Certification of Engineering Technologists) or the NETA (National Electrical Testing Association) or similar certification and have a minimum of five (5) years of experience on similar major testing projects. 1.4 All other testing technicians assigned to the project must be certified by NICET, NETA, or must have an equivalent qualification certification. 1.5 Test assistants and apprentices may be assigned to the project as assistants to certified technicians at a ratio not to exceed two certified to one non-certified assistant or apprentice. 1.6 The names and certification numbers of the Registered Professional Engineer supervising the work and signing the test reports and the Supervising Field Service Engineer must be provided by the Contractor and verified by the Contracting Officer before contract award. After contract award, similar data for all certified technicians who will be assigned to work on the project must also be submitted and approved before starting work on the contract. 1.7 All work performed shall be fully documented by the Contractor. Testing shall be performed in compliance with manufacturers' recommendations and applicable NEMA, NETA, ANSI, ASTM, ASA and VA Standards and as specified for each section in specifications. 1.8 All outages shall be scheduled and approved in writing at least two weeks in advance. Outages will be scheduled only at night and on weekends. SCOPE 2.1 THREE YEAR ELECTRICAL SYSTEM MAINTENANCE AND TESTING. 2.2 Switchgear equipment. Medium Voltage Circuit Breakers and Protective Relays. 2.2.1 Record switchgear, breaker and device nameplate information and compare with the facility's one-line diagram, when available. Identify and record discrepancies. 2.2.2 Inspect all electrical equipment, including each breaker, and report damage or malfunctioning equipment, loose connections or material or any contamination that must be corrected. Clean where appropriate. 2.2.3 Check equipment for level, security to foundation and operation of doors. Report any unfavorable environmental conditions such as excessive moisture or conducting dust that must be corrected. Clean where appropriate. 2.2.4 Visually inspect the equipment ground and record the number and size of ground bus and straps. Report deficiencies. 2.2.5 Inspect the insulation system on the primary bus and assemblies. Test insulation on each bus, phase-to-phase and phase-to-ground with suitable megohmmeter. Record values, report deficiencies, and clean where appropriate. 2.2.6 Draw or rack each breaker from its cell. Remove arc chutes, clean, inspect and adjust all contacts as necessary. Measure and record contact resistance in micro-ohms and clean all insulating surfaces. Megger and record phase-to-phase and phase-to-ground. Lubricate as necessary. 2.2.7 Electrically close and trip each breaker with control switch. Manually close and trip each breaker. Trip each breaker with each of its protective devices. Tighten all connections. Record any discrepancies. 2.2.8 Remove each relay from its case. Clean, inspect and tighten all connections. Apply three multiples of relay tap current to each relay to verify manufacturer's time current characteristics. Test each relay for instantaneous pickup. Report deficiencies and adjust where appropriate. 2.3 Primary Disconnects. 2.3.1 De-energize entire substation clean all insulating surface and clean and dress all contacts. 2.3.2 Activate each switch. Insure switch completely disengages and closes clean switch and lubricate as required. 2.3.3 Measure contact resistance in micro-ohms, Megger each phase-to-ground. Record any discrepancies. 2.3.4 Clean and inspect cubicle, tighten all untapped connections, and lubricate as necessary. 2.4 Transformers 2.4.1 Record transformer nameplate information and compare with the facility's one-line diagram, when available. Record discrepancies. 2.4.2 Inspect transformer and accessories and report damage, loose connections or material, shipping blocks, or contamination that must be corrected. Clean where appropriate. Inspect for leaks and tighten all untapped connections. Clean all insulating surfaces. 2.5 Low Volta= Circuit Breakers 2.5.1 Record switchgear, breaker and device nameplate information and compare with the facility's one line diagram, when available. Record discrepancies 2.5.2 Inspect equipment and each breaker and report damage, loose connections or material, or contamination that must be corrected. Clean where appropriate. 2.5.3 Check equipment for level, security to foundation, and operation of doors. Report any unfavorable environmental conditions such as excessive moisture or conducting dust that must be corrected. Clean where appropriate. 2.5.4 Visually inspect the equipment ground and record the number and size of ground bus and straps. Report deficiencies. 2.5.5 Inspect the insulation system on the primary bus and assemblies. Test insulation on each bus, phase-to-phase and phase-to-ground with suitable megohmmeter. Record values, report deficiencies and clean where appropriate. 2.5.6 Clean and inspect each breaker. Megger phase-to-phase and phase-to-ground and measure contact resistance in micro-ohms. Test each series over-current trip device' for pickup at 200% and 300' of its rating and for instantaneous pickup. Clean and dress all contact surfaces and lubricate as necessary. 2.6 Generators 2.6.1 Record nameplate data including manufacturer, age and capacity. List fuel type, KM load under load condition, number of hours of fuel tank capacity and number of hours of accumulated run time. 3. TEST EQUIPMENT 3.1 Suitability of Test Equipment 3.1.1 All test equipment shall be in good mechanical and electrical condition. 3.1.2 Split-core current transformers and clamp-on or tong type ammeters require careful consideration of the following in regard to accuracy: 3.1.2.1 Position of the conductor within the core. 3.1.2.2 Clean, tight fit of the core pole faces. 3.1.2.3 Presence of external fields. 3.1.2.4 Accuracy of the current transformer ratio in addition to the accuracy of the secondary meter. 3.1.3 Selection of metering equipment should be based on a knowledge of the waveform of the variable being measured. Modern digital multimeters may be average or rms. sensing and may include or exclude the do component. When the variable contains harmonics or do offset and in general, any deviation from a pure sine wave, average sensing, rms. scaled meters may be misleading. 3.1.4 Field test metering used to check power system meter calibration must have an accuracy higher than that of the instrument being checked. 3.1.5 Accuracy of metering in test equipment shall be appropriate for the test being performed but not in excess of 2% of the scale used. 3.1.6 Waveshape and frequency of test equipment output waveforms shall be appropriate for the test and tested equipment. 3.2 Test Instrument Calibration 3.2.1 The testing firm shall have a calibration program which assures that all applicable test instruments are maintained within rated accuracy. 3.2.2 The accuracy shall be directly traceable to the National Institute of Standards and Technology. 3.2.3 Instruments shall be calibrated in accordance with the following frequency schedule: 3.2.3.1 Field instruments: Analog-6 months maximum: Digital-12 months maximum. 3.2.3.2 Laboratory instruments: 12 months. 3.2.3.3 Leased specialty equipment: 12 months (Where accuracy is guaranteed by lessor). 3.2.4 Dated calibration labels shall be visible on all test equipment. - 3.2.5 Records, which show date and results of instruments calibrated or tested, must be kept up-to-date. 3.2.6 Up-to-date instrument calibration instructions and procedures shall be maintained for each test instrument. 3.2.7 Calibrating standard shall be of higher accuracy than that of the instrument tested. 3.3 Test Resort 3.3.1 The test report shall include the following: 3.3.1.1 Summary of project. 3.3.1.2 Description of equipment tested. 3.3.1.3 Description of test. 3.3.1.4 Test results. 3.3.2 Furnish a copy or copies of the complete report to the owner/user's representative as directed in the maintenance contract. 4. INSPECTION AND TEST PROCEDURES 4.1 Switchgear and Switchboard Assemblies 4.1.1 Visual and Mechanical Inspection 4.1.1.1 Inspect for physical, electrical and mechanical condition. 4.1.1.2 Compare equipment nameplate information with latest one line diagram when available and report discrepancies. 4.1.1.3 Check for proper anchorage, required area clearances, physical damage, and proper alignment. 4.1.1.4 Inspect all bus connections for high resistance. Use low resistance ohmmeter, or check tightness of bolted bus joints by calibrated torque wrench method. In lieu of above tonguing perform infrared survey in accordance with Section 9. 4.1.1.5 Test all electrical and mechanical interlock systems for proper operation and sequencing. 4.1.1.5.1 Closure attempt shall be made on locked open devices. Opening attempt shall be made on locked closed devices. 4.1.1.5.2 Key exchange shall be made with devices operated in off-normal positions. 4.1.1.6 Clean switchgear. 4.1.1.7 Inspect accessible insulators for evidence of physical damage or contaminated surfaces. 4.1.1.8 Verify proper barrier and shutter installation and operation. 4.1.1.9 Lubrication. 4.1.1.9.1 Verify appropriate contact lubricant on moving current carrying parts. 4.1.1.9.2 Verify appropriate lubrication on moving and sliding surfaces. 4.1.1.10 Exercise all active components. 4.1.1.11 Inspect all mechanical indicating devices for proper operation. 4.1.2 Electrical Tests 4.1.2.1 Perform ground resistance tests in accordance with Section 4.8. 4.1.2.2 Perform insulation resistance tests on each bus section, phase-to-phase and phase-to-ground for one (1) minute. Test voltages shall be in accordance with Table 4.1.1. 4.1.2.3 Perform control wiring performance test. Use the elementary diagrams of the switchgear to identify each remote control and protective device. Conduct tests to verify satisfactory performance of each control feature. 4.1.2.4 Perform overpotential tests on each bus section, phase-to-phase and phase-to-ground. Test voltages shall be in accordance with Table 4.1.2. 4.1.2.5 Control Power Transformer - Dry Type 4.1.2.5.1 Inspect for physical damage, cracked insulation, broken leads, tightness of connections, defective wiring, and overall general condition. 4.1.2.5.2 Verify that primary and secondary fuse ratings or circuit breakers match drawings. 4.1.2.5.3 Perform insulation resistance test. Measurements shall be made from winding-to-winding and windings-to-ground. Test voltages and minimum resistances shall be in accordance with Table 4.2.1. Results to be temperature corrected in accordance with Table 4.2.2. 4.1.3 Test values 4.1.3.1 Bolt torque levels shall be in accordance with Table 8.1, unless otherwise specified by manufacturer. 4.1.3.2 Insulation resistance test shall be performed in accordance with Table 4.1.1. Values of insulation resistance less than his table or manufacturer's minimum should be investigated. 4.1.3.3 Overpotential test voltages shall be applied in accordance with Table 4.1.2-(Derived from ANSI/IEEE C37.20.2). Test results are evaluated on a go, no-go basis by slowly raising the test voltage to the required value. The final test voltage shall be applied for one (1) minutes. TABLE 4.1.1 Switchgear Insulation Resistance Test Voltage Voltage Rating Minimum dc Test Voltage Recommended Minimum Insulation Resistance In Megohms 0-250V 500V 50 251-600V 1000V 100 601-5000V 2500V 1000 5001-15000V 2500V 5000 15001-25000V 5000V 20000 TABLE 4.1.2 Field Overpotential Test Voltages* Maximum Type of Switchgear Rated TV Test Voltage kV ac de MC 4.76 14.3 20.3 (Metal Clad 8.25 27.0 37.5 Switchgear) 15.0 27.0 37.5 38.0 60.0 SC 15.5 37.5 + (Station-type Cubicle 38.0 60.0 + Switchgear) 72.5 120.0 + MEI 4.76 14.3 20.3 (Metal-Enclosed 8.25 19.5 27.8 Interrupter 15.0 27.0 37.5 Switchgear) 15.5 37.5 52.5 25.8 45.0 38.0 60.0 +Consult Manufacturer Derived from ANSI/IEEE 037.20.2, Paragraph 5.5 and C37.20.3, paragraph 5.5 4.2 Transformers 4.2.1 Transformers-Dry Type 4.2.1.1 Visual and Mechanical Inspection 4.2.1.1.1 Inspect for physical damage, cracked insulators, lightness of connections, defective wiring and general mechanical and electrical conditions. 4.2.1.1.2 Verify proper auxiliary device operation such as fans and indicators. 4.2.1.1.3 Check tightness of accessible bolted electrical joints in accordance with Table 7.1. 4.2.1.1.4 Perform specific inspections and mechanical tests as recommended by manufacturer. 4.2.1.1.5 Make a close examination for shipping brackets or fixtures that may not have been removed during original installation. Ensure resilient mounts are free. 4.2.1.1.6 Verify proper core grounding. 4.2.1.1.7 Verify proper equipment grounding. 4.2.1.1.8 Thoroughly clean unit prior to testing unless "as found" and "as left" tests are required. 4.2.1.2 Electrical Tests 4.2.1.2.1 Perform insulation resistance tests, winding to-winding and windings-to-ground, utilizing a megohmmeter with test voltage output as shown in Table 4.2.3. 4.2.2.1 Visual and Mechanical Inspection. 4.2.1.2.1.1 Test duration shall be for 10 minutes with resistances tabulated at 30 seconds, 1 minute, and 10 minutes. Dielectric absorption ratio and polarization index will be calculated. 4.2.1.2.1.2 Perform tests and adjustments for fans, controls, and alarm functions. 4.2.1.2.1.3 Verify that tap-changer is set at specified ratio. 4.2.1.2.1.4 Verify proper secondary voltage phase-to-phase and phase-to-neutral after energization and prior to loading. 4.2.1.3 Test Values 4.2.1.3.1 Insulation resistance test values should not be less than values recommended in Table 4.2.3 Results shall be temperature corrected in accordance with Table 4.2.4. 4.2.1.3.2 The polarization index should be above 1.2 unless an extremely high value is obtained initially, which when doubled will not yield a meaningful value. 4.2.1.3.3 Turns ratio test results should not deviate more than one-half of the percent (0.5%) from either the adjacent coils or the calculated ratio. 4.2.1.3.4 CH and-CL power factor values will vary due to support insulators and bus work utilized on dry transformers. The following should be expected on CHL power factors. Power Transformers: 3% or less Distribution Transformers: 5% or less 4.2.1.3.5 Winding resistance test results should compare within one percent (1%) of adjacent windings. 4.2.1.3.6 Excitation current test data pattern: Two similar current readings for outside coils and a dissimilar current reading for the center coil of a three-phase unit. 4.2.2 Transformers - Liquid Filled 4.2.2.1 Visual and Mechanical Inspection 4.2.2.1.1 Inspect for physical damage, cracked insulators, leaks, tightness of connections, and general mechanical and electrical conditions. 4.2.2.1.2 Verify proper auxiliary device operation. 4.2.2.1.3 Check tightness of accessible bolted electrical connections in accordance with Table 7.1. 4.2.2.1.4 Verify proper liquid level in all tanks and bushings. 4.2.2.1.5 Perform specific inspections and mechanical tests as recommended by manufacturer. 4.2.2.1.6 Verify proper equipment grounding. 4.2.2.2 Electrical Tests 4.2.2.2.1 Perform insulation resistance tests, winding to-winding and windings-to-ground, utilizing a megohmmeter with test voltage output as shown in Table 4.2.3. 4.2.2.2.1.1 Test duration shall be for 10 minutes with resistance's tabulated at 30 seconds, 1 minute, and 10 minutes. Calculate dielectric absorption ratio and polarization index. 4.2.2.2.2 Perform a turns ratio test between windings at designated tap position. The tap setting is to be determined by the owner/user's electrical engineer and set by the testing laboratory. 4.2.2.2.3 Perform insulation power factor tests or dissipation factor tests on all windings and bushings. Overall dielectric-loss and power factor (CHI, CL, TEL) shall be determined. Test voltages should be limited to the line to ground voltage rating of the transformer winding. 4.2.3 Test Values 4.2.3.1 Insulation resistance and absorption test. Test voltages to be in accordance with Table 4.2.3. Resistance values to be temperature corrected in accordance with Table 4.2.4. 4.2.3.2 The polarization index should be above 1.2 unless an extremely high value is obtained initially, which when doubled will not yield a meaningful value. 4.2.3.3 Tummy ratio test results shall not deviate more than one half percent (0.5%) from either the adjacent coils or the calculated ratio. 4.2.3.4 Maximum power factor of liquid filled transformers corrected to 20 degrees C shall be in accordance with Table 4.2.1. TABLE 4.2.1 Oil silicone Tetrachloride High Fire ethylene Point Hydro carbon Power Transformers 0.5% 0.5% 3.0% 0.5% Distribution Transformers 1.0% 0.5% 3.0% 1.0% 4.2.3.5 Bushing power factors and capacitances that vary from nameplate values by more than ten percent (10%) should be investigated. 4.2.3.6 Excitation current test data pattern: Two similar current readings for outside coils and a dissimilarContacts
- Castle, Ron, Contract Specialist
Email and phone are in the source notice.
More from United States Department of Veterans Affairs posted in March 2022