ClickCease Z1DA--PROJECT: 676-20-004 REPLACE CHEMISTRY… (36C25222B0011) | Closed - MatchAwards

Z1DA--PROJECT: 676-20-004 REPLACE CHEMISTRY ANALYZER

Status
Closed (archived notice)
Agency
United States Department of Veterans Affairs
Office
MILWAUKEE, USA
Notice type
Solicitation
Solicitation number
36C25222B0011
NAICS
236220 - Commercial and Institutional Building Construction
PSC
Z1DA - MAINTENANCE OF HOSPITALS AND INFIRMARIES
Category
Facility Related Services (4.4)
Posted
2022-02-25
Deadline
2022-03-03

Description

SOLICITATION 36C25221B0017 AMENDMENT A0001 February 14, 2022 Project: Replace Chemistry Analyzer Project Number: 676-20-004 Location: Tomah VA Medical Center, Tomah, WI Amendment 0003 hereby incorporates the following clarifications/change(s) into the solicitation package. Solicitation RFI s/Questions and Answers Q1. There are three sections in Div. 27. None of them address the type of cable, jacks, patch panels, faceplates etc. that we are to provide. R1. Use the electrical and low voltage drawings together. If the low voltage sub only looks at the two low voltage sheets, they will be missing information. Q2. There is no spec provided for the controls on this project. Can you please ask who is responsible for controls and what they are, JCI? If we need to include them, can they provide specs and information about whether or not the temporary RTU is to be tied into the BAS controls? R2. The existing control system is JCI. The intent is for the temporary unit to run continuously with its packaged controls to maintain a constant discharge temperature (50F match existing system). The unit should only be operational as long as necessary to replace the coil component of the existing air handling unit (expecting days, not weeks). All efforts should be made to minimize the use of the temporary unit. Q3. There is a 10 exhaust duct connection to existing duct in phase 2 at location D.5/x3.2, which drops down below an existing 34x10 SA duct. There is no indication if this exhaust duct is going to a hood or grille. The phase 2 demo plan shows that it is deleted from a nearby location, but again doesn t state what it is going to. R3. The duct in question serves an existing fume hood. The fume hood is temporarily relocated in Phase 1 near E/2.1. In Phase 2 the unit is relocated to its final location near D/3.4. B. Bid Schedule BID Opening DATE / TIME: Thursday, March 3, 2022 at 1:00 p.m. CST. LOCATION: Honey Creek Business Park 115 S. 84th Street - Suite 101 Milwaukee, WI 53214-1476. ALL QUESTIONS REGARDING THIS SOLICITATION SHALL BE SENT TO THE FOLLOWING INDIVIDUALS: Donita Grace -- Donita.Grace@va.gov Kristi Kluck --- Kristi.Kluck3@va.gov This solicitation can be monitored at https://beta.sam.gov/opp/a8d8f6ac82824111870acc5a792b45e2/view?keywords=36C25220B0011&sort=-relevance&index=&is_active=true&page=1&refresh=y Contractors shall ensure all amendments are acknowledged on Page 2 of the SF-1442.

Attachments

Contacts

Email and phone are in the source notice.

Source notice

More from United States Department of Veterans Affairs posted in February 2022

More lists