S215--36C261-22-AP-1981 | Ancillary Services Contract VA261-15-A-0029 Source Sought
- Status
- Closed (archived notice)
- Agency
- United States Department of Veterans Affairs
- Office
- MATHER, USA
- Notice type
- Sources Sought
- Solicitation number
- 36C26122R0026
- NAICS
- 238390 - Other Building Finishing Contractors
- PSC
- S215 - HOUSEKEEPING- WAREHOUSING/STORAGE
- Category
- Logistics Support Services (7.2)
- Posted
- 2021-12-30
- Deadline
- 2022-01-10
- Place of performance
- Palo Alto, 94304
Description
FF&E Comprehensive Support Services VA Palo Alto Health Care System 12/14/2021 Page 1 of 10 Page 5 of 5 Page 1 of 10 PERFORMANCE WORK STATEMENT (PWS) 1.0 BACKGROUND The Veterans Health Administration (VHA) Palo Alto VA Medical Center/Healthcare System (VAPAHCS) requires Furniture, Fixtures and Equipment (FF&E) support services including furniture installation, moves, minor repairs, inventory management, IT field technician, electrical and data, carpentry, plumbing, commercial painting, flooring installation, activation/deactivation project management, and warehousing support services to supplement existing capacity at all project and facility request levels. 2.0 SCOPE OF WORK 2.1 The contract is to provide a full range of FF&E installation, ancillary construction services and warehouse operations in support of the VAPACHCS. Assembly, installation, and connections of fixtures, furniture, and equipment, and IT hardware Disassembly, disconnection, and removal of fixtures, furniture, and equipment, and IT hardware Relocation of existing FF&E, IT hardware items, and related materials from a location, transport the items to a new location and install/place them according to the direction of the Contracting Officer Representative (COR) or Designated Technical Expert (DTE) Minor repairs and/or modifications to existing furniture as required Ancillary construction services are required such as: interior wall repair and commercial painting, removal and installation of carpet, VCT/LVT, tile, and various commercial flooring products, lighting fixture installation, electrical and data line installation/relocation (low voltage), light carpentry, and minor plumbing Comprehensive Activation and Deactivation project management services Pre-move planning including coordination, drawing review, and quality control checks Inventorying and Warehousing of Veteran Affairs property including comprehensive warehouse facility management and labor Online comprehensive inventory website including daily validation and management Detailed daily scheduling and communication of pending and completed task orders Loading, unloading, packing, crating services using eco-friendly materials and methods per VAPAHCS standards Trash removal, recycle, excess, and disposal as per VAPAHCS policy 2.2 In support of this initiative, the contractor shall provide The Contractor shall provide the appropriate personnel per required position and provide a comprehensive list of staff including full name, position, title, qualifications, professional certifications, and detailed minimum years of experience in their respective field as detailed below. All staff shall be proficient in basic to advanced computer/software skills and digital project management based on position requirement. Position Minimum number of Staff Typical Annual Hours Required Field Experience Required Computer/ Software Senior Program Manager 1 2080 Min 10 Yrs. AutoCAD/Revit/PlanGrid Microsoft Office Suite Inventory Control Specialist 1 2080 Min 5 Yrs. PlanGrid/ Microsoft Office Suite Warehouse Manager 1 2080 Min 5 Yrs. PlanGrid/ Microsoft Office Suite Warehouse Laborers 2 4160 Min 3 Yrs. PlanGrid/ Microsoft Office Suite Scheduler/ Administrative Assistant 1 2080 Min 3 Yrs. PlanGrid/ Microsoft office Suite Activation/Deactivation Project Manager, PMP 1 400 Min 5 Yrs. AutoCAD/Revit/PlanGrid Microsoft Office Suite Project Team/Crew Lead Installer 3 6240 Min 5 Yrs. PlanGrid/ Microsoft Office Suite Furniture Installers/Movers 9 18,720 Min. 3 Yrs. PlanGrid/ Microsoft Office Suite Commercial Painter 1 500 Min. 3 Yrs. PlanGrid/ Microsoft Office Suite It Field Technician Hardware Support 1 700 Min. 3 Yrs. PlanGrid/ Microsoft Office Suite Commercial Flooring Installer 1 300 Min. 3 Yrs. PlanGrid/ Microsoft Office Suite Certified Electrician 1 150 Min. 5 Yrs. PlanGrid/ Microsoft Office Suite Certified Plumber 1 80 Min. 3 Yrs. PlanGrid/ Microsoft Office Suite General Carpenter 1 40 Min 3 Yrs. PlanGrid/ Microsoft Office Suite 2.3 These services shall be provided to the following VAPAHCS facility locations: VA Palo Alto Division, 3801 Miranda Ave., Palo Alto, CA 94304 VA Menlo Park Division, 795 Willow Road, Menlo Park, CA 94025 VA Livermore Division, 4951 Arroyo Road, Livermore, CA 94550 VA Capitola Community Based Outpatient Clinic (CBOC), 1350 41st Ave, Suite 102, Capitola CA 95010 VA Fremont CBOC, 39199 Liberty Street, Fremont, CA 94538 VA Modesto CBOC, 1225 Oakdale Road, Modesto, CA 95355 VA Monterey CBOC, 201 9th Street, Marina, CA 93933 VA San Jose CBOC, 5855 Silver Creek Valley Place, San Jose, CA 95138 VA Sonora CBOC, 13663 Mono Way, Sonora, CA 95370 VA Stockton CBOC, 7777 South Freedom Road, French Camp, CA 95231 VA Mountain View Site, 1776 Old Middlefield Way, Mountain View, CA 94043 VA Sunnyvale Research Center, 1080 Innovation Way, Sunnyvale, CA 94089 VA Cooperative Studies Program Coordinating Center, 701 N. Shoreline Blvd., Mountain View, CA 94043 2.4 The Contractor s administrative offices and warehouse shall be co-located in the same building and shall be within a 35-mile radius from the VA Palo Alto main campus, located at 3801 Miranda Ave., Palo Alto, CA 94304 2.5 Estimated number of projects/task orders to be approximately 1,600- 1,800 per year, which will include varying scopes and a combination of services. Below outlines the number of projects small, medium and large obtained from historical data this year, starting April-June 2021 (Fiscal Year/Quarter 3). Based on this information, our projections for a fiscal year are provided below: Description Small (1 day) Medium (2 days) Large (3+ days) Fiscal Q3 only (April-June 2021) 400 5 7 Projections for 1 Fiscal Year 1,600 20 28 2.6 Contracting Officer s Representative (COR) will be assigned to represent the Contracting Officer (CO) in furnishing technical guidance and advice under this contract. The delegation letter will specify the limits of the COR s authority. The letter is not to be construed as authorization to interpret or furnish advice and information to the Contractor relative to the financial or legal aspects of the contract. Those matters are the responsibility of the CO and shall not be delegated. 2.7 Contractor shall provide supervision, project management, staffing, equipment, computer hardware and software, transportation, warehousing, storage, packing supplies/materials, all tools, and supplies to perform all required tasks. 2.8 Contractor shall ensure that all work by staff and subcontract staff comply with all contract requirements and with Federal, VA, State, & City regulations. 3.0 PROVISIONS AND SUPPLIES 3.1 The Contractor shall provide an effective communication system to all staff during service hours including cellular phones that are in good working order with charging capabilities and 2-way radios due to interference in our buildings and frequency issues. Contractor crews and team leads must be always reachable during the periods of task performance. 3.2 Contractor shall ensure staff including subcontractors arrive to job sites with all necessary tools, supplies and equipment in good working condition necessary to complete required tasks without support of VA. Examples of tools and equipment (not inclusive) Various sizes of hand trucks and dollies Floats Wheel carts (enclosed and open) Roller lifts Heavy lifting and furniture moving equipment straps, glides Stair crawlers Various sizes of ladders Line laser and handheld levelers Tractor-trailer Electrical tools and supplies Plumbing tools and supplies Wall repair materials Painting equipment and supplies Wall hanging tools and security installation hardware Full range of handheld and motorized tools Full range of fastener supplies 3.3 The Contractor shall be responsible for providing office software and equipment (e.g., laptops, tablets) and internet connectivity to all Contractor staff while working on Activation Projects. 3.4 The Contractor shall use a web-based software, such as PlanGrid or equivalent, to manage the installation of FF&E and information technology (IT) items for all Activation Projects. 3.5 The Contractor shall include twelve (12) PlanGrid licenses or equivalent, with unlimited sheet downloads/uploads for the VAPAHCS s use for one year to include all projects, starting fourteen (14) calendar days after each activation project kick-off meeting. 3.6 The Contractor shall provide twelve (12) hand-held computing tablets with keyboard and folio case. PlanGrid or equivalent software shall be installed and an unlimited data plan, established on the tablet for the VA s use for one year, to start fourteen (14) calendar days after each activation project kick-off meeting. These items must include warranty for the duration of the contract per SOW. All technical issues shall be resolved by the Contractor within 24 hours of notification. 4.0 PERFORMANCE PERIOD The period of performance (PoP) of this Firm Fixed Price [Level of Effort] contract is as follows: Base period: 4/1/2022 - 3/31/2023 Option Period 1: 4/1/2023 - 3/31/2024 Option Period 2: 4/1/2024 - 3/31/2025 Option Period 3: 4/1/2025 - 3/31/2026 Option Period 4: 4/1/2026 - 3/31/2027 5.0 HOURS OF PERFORMANCE 5.1 The Contractor including all positions shall be available to perform duties (7) days a week, (24) hours a day and within less than 24-hour notice. Approximately 70% of task orders occur during normal business hours, Monday through Friday, 8:00 am to 4:30 pm and approximately 30% of task orders occur during non-business hours including weekends, due to access restriction and areas of direct patient care. Specialized positions including electrician, plumber, and carpenter shall perform duties during both business and non-business hours within 72-hour notice. 5.2 Federal Holidays - Contractor shall not be required to perform duties on Federal holidays as observed by the VAPAHCS and any other day specifically declared by the President of the United States to be a Federal holiday. 6.0 KICKOFF MEETING 6.1 The Government will host an in-person or virtual kickoff meeting within five (5) business days after contract award (if required) to be attended by Contracting Officer, Contracting Officer Representative, Contractor Senior Program Manager and others as determined by the COR. 7.0 SERVICES AND TASKS 7.1 Contractor Senior Management and Administrative Support Services 7.1.1 The Contractor Senior Program Manager shall act as Point of Contact (POC) to work with the COR or Designated Technical Expert (DTE). The Senior PM (POC) shall have a comprehensive knowledge of full scope of required services. 7.1.2 The Senior Program Manager shall be responsible for oversight of all services, program support, and provide comprehensive staffing coordination to meet all requirements as detailed in the contract per the required timelines. 7.1.3 The Senior PM (POC) shall be available for inspection site visits by either the COR or DTE within 24 hours of notice. 7.1.4 The Senior Program Manager shall attend all status update and requested meetings as scheduled by the COR in person or virtually. 7.1.5 The Senior PM (POC) shall have the authority to accept and manage all service requests on the Contractor's behalf. 7.1.6 The Senior PM (POC) shall have technical and administrative knowledge of all job requests pending, in-progress and completed. 7.1.7 Contractor shall include all costs related to warehousing and business operations including relevant software licenses and required hardware in the contract price. 7.1.8 Contractor s staff including subcontractors must all be US citizens or have appropriate work permits such as I-9 certification. The Contractor shall comply with VA security, access, and badging requirements. 7.1.9 Contractor shall coordinate and communicate in advance with the COR/DTE on each & every relocation project to ensure that all resources assigned to the project are provided as required. 7.1.10 Contractor shall provide a shared online calendar of task order requests with confirmation of task orders including all pertinent details including but not limited to confirmation of product availability and reservation hold, date, time and estimated hour for task order completion, names of crew members and lead, name of DTE, required tools and materials, project location and meeting location. Calendar to be updated within 24 hours of task order request, except when authorized COR. Calendar to be updated daily and accessible to VA COR 24/7. 7.1.11 The Contractor shall provide fully functional hoteling workstation and internet connection for at least one (1) VA COR/DTE in warehouse. 7.2 Task Order Support Services 7.2.1 Contractor shall perform daily Facility Request services to support VAPAHCS end-user FF&E requirements which may require deploying multiple, varying size crews to VA sites as scheduled by COR/DTEs. 7.2.2 The Contractor shall coordinate with COR/DTE in planning, execution and completion of scheduled tasks. Typical questions asked of the Contractor will include, but not be limited to the following: Estimated labor hours from start to finish Required quantity and skill set of Contractor staff to perform the task Required materials and supplies Required vehicles Required break/lunch schedules during service period Confirmation of Crew Lead 7.2.3 The COR will provide the Senior PM (POC) a list of DTEs by full names who will be given authority to request services. The list will be maintained by the Senior PM (POC) and any changes will be updated as needed. 7.2.4 Contractor shall ensure that requests for services are received only from COR/DTEs. Services rendered in response to requests from other than authorized personnel, shall be at the risk of the Contractor and any cost related thereto, shall be borne by the Contractor. 7.2.5 Contractor staff assigned to services shall report for duty to COR/DTE at start of scheduled services at location of job site unless otherwise directed by COR/DTE. 7.2.6 Contractor shall confirm in advance and adhere to designated parking and loading/unloading spaces as determined by COR/DTE. 7.2.7 The Contractor shall submit a daily report of completed services to the COR to include: Date and time (start to finish) Location(s) Crew Lead Names of staff Itemized description of completed services 7.2.8 Contractor shall notify COR/DTE of incomplete services prior to end of task end time and schedule completion no later than next business day, unless otherwise directed by COR/DTE. Rescheduling of incomplete tasks shall not interrupt nor delay completion of other scheduled tasks in queue. 7.2.9 Contractor staff shall not abandon job sites prior to completion of tasks with exception to break schedules, unless authorized by COR/DTE. 7.2.10 Contractor shall perform daily quality control checks of all items loaded into truck and/or scheduled for delivery to job sites and ensure all items are accounted for and free of damage prior to deployment. 7.3 Furniture Installation and Relocation Support Services 7.3.1 Installation tasks include assembly and reconfiguration of new and used FF&E components from existing inventory or shipments received. Assemble and install workstations, desk systems, panel systems, ergonomic accessories, storage and other units requiring field assembly. Modification may be required to pull parts from other in-stock components to complete installations. 7.3.2 Installation of wall-mounted items including artwork with a 3 or 4-point anchor system, whiteboards, signage, displays, pamphlet holders and similar items require securing (bolting) all items that meet safety requirements and shall be level and plumb. 7.3.3 Contractor furniture installation staff must all be fully qualified/certified and have the necessary experience to install Steelcase modular systems FF&E. The installers certificates of Steelcase training shall be provided to the CO and COR upon Award. The Contractor will bear the costs to have the installers trained and fully certified. 7.3.4 Deinstallation and relocation services include but not limited to furniture systems, storage cabinets, pedestals, tables, chairs, lounge seating, desk units, panel systems, lockers, keyboard trays, tack boards, whiteboards, displays, pamphlet holders, coat hooks, whiteboards, tack boards, signs and display, broken FF&E and excess items. 7.3.5 The Contractor shall assess, evaluate, verify, and confirm existing site conditions prior to FF&E/IT items delivery. 7.3.6 The Contractor s equipment or tools shall not block exits, corridors, or impede access to entrances/exits or rooms and shall always be in the control of the contractor. When leaving the work site, tools shall be removed from premises or secured in locked location at Contractor s risk. VA is not liable for any damages or loss/theft of items left on VA premises. 7.4 Inventory Control Management Support Services 7.4.1 The Contractor shall provide an online electronic inventory management system which can be accessed by unlimited number of VAPAHCS personnel as determined by COR. The inventory system must be internet or cloud based and must include: Integrated work request/task order capability Detailed scheduling for multiple sites and jobs within a period of service performance Customizable reporting capabilities Displays all FF&E inventory availability Requested locations of services Integrated check out cart feature Photos of each item Description, dimensions and features of all items Real-time updates of incoming and outgoing items Reservation/hold notations including names and dates Standardized naming codes/conventions to be provided by COR Capability to query the system using an associates reference number Include username and password protection 7.4.2 Contractor shall place hold tags on reserved FF&E with detailed information, DTE name, and request number corresponding to the online shared calendar. 7.4.3 Contractor shall include inventory management system software license and update services as part of operational costs. 7.4.4 Contractor shall ensure inventory management system is maintained and fully operational throughout period of performance. In event of inventory system dysfunction, Contractor shall ensure restoration of system within (3) business days. 7.4.5 Biannual physical inventory of all VAPAHCS goods shall be conducted by the Contractor utilizing a blind-double count methodology items brought into the warehouse will be tagged with an item number and designated location; the product will be counted and entered directly into a data collection device. This will be done by 2 separate individuals and at a date agreed upon by the parties. A full written report of the inventory shall be promptly given to the VA COR within 72 hours. The Contractor will take such additional physical inventories as requested by the COR. Representatives of the VAPAHCS may be present during any inventory count or inspection. 7.4.6 Inventory Control Specialist shall ensure daily maintenance and tracking of all VA property located in warehouse, including confirming available and reserved stock updates in the electronic inventory management system. 7.4.7 Inventory Control Specialist shall perform physical product checks and provide detailed information to COR/DTE upon request. 7.5 Warehouse & Receiving Management Support Services 7.5.1 The Contractor shall provide 20,000 square feet of storage space with multilevel shelving and storage capability during the Base Year of the contract. Final warehouse selection must be reviewed and approved by the CO or COR. Additional and ad hoc storage space up to a total of 35,000 square feet will be required in future Option Years based on project need. Additional storage may be in the form of separate locations depending on project location, storage containers, or as part of the primary warehouse location. Environmental and security requirements for additional storage to be detailed by VA in advance. 7.5.2 Contractor warehouse space shaContacts
- James Postell, Contract Specialist
Email and phone are in the source notice.
More from United States Department of Veterans Affairs posted in December 2021