<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/department_of_veterans_affairs/posts/107405534868744532" -->

---
title: 1230--674A4-21-108 Upgrade Fire Alarm System… (36C25722B0003) | Closed - MatchAwards
description: 1230--674A4-21-108 Upgrade Fire Alarm System Campus Wide - Waco. United States Department of Veterans Affairs. Solicitation 36C25722B0003. NAICS 236220 - Commercial and Institutional Building Construction. Deadline 2021-12-10. Page 18 of 18 PROJECT NAME: PROJECT #674A4-21-108 UPGRADE FIRE ALARM...
canonical: https://matchawards.com/department_of_veterans_affairs/posts/107405534868744532
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: 1230--674A4-21-108 Upgrade Fire Alarm System… (36C25722B0003) | Closed
og:url: https://matchawards.com/department_of_veterans_affairs/posts/107405534868744532
og:description: 1230--674A4-21-108 Upgrade Fire Alarm System Campus Wide - Waco. United States Department of Veterans Affairs. Solicitation 36C25722B0003. NAICS 236220 - Commercial and Institutional Building Construction. Deadline 2021-12-10. Page 18 of 18 PROJECT NAME: PROJECT #674A4-21-108 UPGRADE FIRE ALARM...
og:image: https://matchawards.com/system/accounts/avatars/000/000/015/original/f59915e906ee2b19.png?1638825904
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# 1230--674A4-21-108 Upgrade Fire Alarm System Campus Wide - Waco

Status

Closed (archived notice)

Agency

[United States Department of Veterans Affairs](/department%5Fof%5Fveterans%5Faffairs)

Office

ARLINGTON, USA

Notice type

Solicitation

Solicitation number

36C25722B0003

NAICS

[236220 - Commercial and Institutional Building Construction](/groups/212)

PSC

1230 - FIRE CONTROL SYSTEMS, COMPLETE

Posted

2021-12-07

Deadline

2021-12-10

## Description

Page 18 of 18 PROJECT NAME: PROJECT #674A4-21-108 UPGRADE FIRE ALARM SYSTEM, CAMPUS-WIDE, WACO, VAMC SOLICITATION NUMBER: #36C25722B0003/36C257-22-B-0003 AMENDMENT A00003: BID DUE DATE: FRIDAY, DECEMBER 10, 2021 @ 1:00 PM, CST, SUBMIT VIA EMAIL TO gaila.lowe@va.gov 1\. RFI #5 and #6 direct that existing multi-mode fiber is to be used and that if new fiber is needed, this would be a change to the contract. 5\. The campus riser diagram on drawing G002 does not indicate if the campus fire alarm loop is new, what size and type cable nor the routing of the cable? Please clarify if the campus fire alarm loop is new and if there is an existing underground conduit between the buildings? COR RESPONSE: Existing multi-mode fiber is to be used. Note: A/E team is looking at wireless system.Â 6\. If there are new conduit between the buildings can we bore under the roadways using HDPE conduit? COR RESPONSE - If a new conduit or fiber is needed, this would be a change to the contract.Â Â A/E SECONDARY CLARIFICATION RESPONSE: This is actually in conflict with #22\. Per the contract, only work inside the buildings is included under this project. Anything regarding the fiber loop would be additional to the base contract. In theory, if the GC doesn t touch anything outside the building it wouldn t matter about the fiber loop. But, as discussed, several times we do know the loop needs to be replaced and the infrastructure is already in place with an empty duct bank. I think the response is that anything outside the building envelope would be in addition to the base contract. COR SECONDARY CLARIFICATION RESPONSE: Amendment #2, item #5: If fiber existing network is found to be damaged or inoperable, is contractor responsible for replacement of fiber? COR Response: If it is working now, we expect it to be working with new equipment. The Contractor would not be responsible for something outside limits of construction. 2\. RFI #23 conflicts with RFI #5 and #6.Â RFI#23 states that the contractor is responsible for replacement of fiber if it is found to be damaged or inoperable. 23\. If fiber existing network is found to be damaged or inoperable, is contractor responsible for replacement of fiber? A/E RESPONSE: YesÂ COR SECONDARY CLARIFICATION RESPONSE: (Again Amendment #2, item #5 same as above) -- Amendment #2, item #5: If fiber existing network is found to be damaged or inoperable, is contractor responsible for replacement of fiber? COR Response: If it is working now, we expect it to be working with new equipment. The Contractor would not be responsible for something outside limits of construction. 3\. How do you want contractors to proceed?Â Full replacement of the existing multi-mode fiber is in the magnitude of $250,000\. Â Â COR SECONDARY CLARIFICATION RESPONSE: Excerpt from Amendment #A00001: 5\. The campus riser diagram on drawing G002 does not indicate if the campus fire alarm loop is new, what size and type cable nor the routing of the cable? Please clarify if the campus fire alarm loop is new and if there is an existing underground conduit between the buildings? COR RESPONSE: Existing multi-mode fiber is to be used. Note: A/E team is looking at wireless system. 6\. If there are new conduit between the buildings can we bore under the roadways using HDPE conduit? COR RESPONSE - If a new conduit or fiber is needed, this would be a change to the contract. Do not include the full replacement of the existing multi-mode fiber. 4\. Also, RFI #77 response directs contractors to comply with VA Fire Protection Design Manual and the specifications.Â Neither provide guidance on whether a Class A or Class B system is to be used.Â It is up to the Authority Having Jurisdiction (VA) and the customer (VA) to determine the class of system to install. How do you want contractors to proceed?Â Should contractors bid the entire system as Class A or Class B? 77\. Is Class A or Class B fire alarm wiring required? A/E RESPONSE: Comply with requirements of the VA Fire Protection Design Manual and the specifications. A/E SECONDARY CLARIFICATION RESPONSE: Excerpt from the VAFPDM addressing wiring class: Excerpt from the spec addressing wiring class: 

<!-- mobian-agent-ad sponsored="true" id="bcaaed17-e549-431e-84b4-cd225bab35c9" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


## Attachments

* [Attachment 1](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/2bba93889586444ab1d7a9123f88b6f8/download)
* [Attachment 2](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/f0ca60e8e0114537a831bf44ef792e12/download)
* [Attachment 3](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/90a6d450ad594eaa95fc042e85be7c68/download)
* [Attachment 4](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/360eafe2bb744af590aad5bc84af98f4/download)
* [Attachment 5](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/e0ac32e249024176b2f7fc2d97a69bef/download)
* [Attachment 6](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a5c10c4842c54538af12f48c0255913a/download)

## Contacts

* Gaila Lowe, Contract Specialist

Email and phone are in the source notice.

[Source notice](https://sam.gov/opp/8a9d199b29a94449bc7b53a3e2d21160/view)

[More from United States Department of Veterans Affairs posted in December 2021](/department%5Fof%5Fveterans%5Faffairs/archive/2021-12)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Construction Government Contracts Available Now](/contracts/construction)

```json
{"@context":"https://schema.org","@type":"Demand","name":"1230--674A4-21-108 Upgrade Fire Alarm System Campus Wide - Waco","description":"Page 18 of 18 PROJECT NAME: PROJECT #674A4-21-108 UPGRADE FIRE ALARM SYSTEM, CAMPUS-WIDE, WACO, VAMC SOLICITATION NUMBER: #36C25722B0003/36C257-22-B-0003 AMENDMENT A00003: BID DUE DATE: FRIDAY, DECEMBER 10, 2021 @ 1:00 PM, CST, SUBMIT VIA EMAIL TO gaila.lowe@va.gov 1. RFI #5 and #6 direct that existing multi-mode fiber is to be used and that if new fiber is needed, this would be a change to the contract. 5. The campus riser diagram on drawing G002 does not indicate if the campus fire alarm loop is new, what size and type cable nor the routing of the cable? Please clarify if the campus fire alarm loop is new and if there is an existing underground conduit between the buildings? COR RESPONSE: Existing multi-mode fiber is to be used. Note: A/E team is looking at wireless system.Â 6. If there are new conduit between the buildings can we bore under the roadways using HDPE conduit? COR RESPONSE - If a new conduit or fiber is needed, this would be a change to the contract.Â Â A/E SECONDARY CLARIFICATION RESPONSE: This is actually in conflict with #22. Per the contract, only work inside the buildings is included under this project. Anything regarding the fiber loop would be additional to the base contract. In theory, if the GC doesn t touch anything outside the building it wouldn t matter about the fiber loop. But, as discussed, several times we do know the loop needs to be replaced and the infrastructure is already in place with an empty duct bank. I think the response is that anything outside the building envelope would be in addition to the base contract. COR SECONDARY CLARIFICATION RESPONSE: Amendment #2, item #5: If fiber existing network is found to be damaged or inoperable, is contractor responsible for replacement of fiber? COR Response: If it is working now, we expect it to be working with new equipment. The Contractor would not be responsible for something outside limits of construction. 2. RFI #23 conflicts with RFI #5 and #6.Â RFI#23 states that the contractor is responsible for replacement of fiber if it is found to be damaged or inoperable. 23. If fiber existing network is found to be damaged or inoperable, is contractor responsible for replacement of fiber? A/E RESPONSE: YesÂ COR SECONDARY CLARIFICATION RESPONSE: (Again Amendment #2, item #5 same as above) -- Amendment #2, item #5: If fiber existing network is found to be damaged or inoperable, is contractor responsible for replacement of fiber? COR Response: If it is working now, we expect it to be working with new equipment. The Contractor would not be responsible for something outside limits of construction. 3. How do you want contractors to proceed?Â Full replacement of the existing multi-mode fiber is in the magnitude of $250,000. Â Â COR SECONDARY CLARIFICATION RESPONSE: Excerpt from Amendment #A00001: 5. The campus riser diagram on drawing G002 does not indicate if the campus fire alarm loop is new, what size and type cable nor the routing of the cable? Please clarify if the campus fire alarm loop is new and if there is an existing underground conduit between the buildings? COR RESPONSE: Existing multi-mode fiber is to be used. Note: A/E team is looking at wireless system. 6. If there are new conduit between the buildings can we bore under the roadways using HDPE conduit? COR RESPONSE - If a new conduit or fiber is needed, this would be a change to the contract. Do not include the full replacement of the existing multi-mode fiber. 4. Also, RFI #77 response directs contractors to comply with VA Fire Protection Design Manual and the specifications.Â Neither provide guidance on whether a Class A or Class B system is to be used.Â It is up to the Authority Having Jurisdiction (VA) and the customer (VA) to determine the class of system to install. How do you want contractors to proceed?Â Should contractors bid the entire system as Class A or Class B? 77. Is Class A or Class B fire alarm wiring required? A/E RESPONSE: Comply with requirements of the VA Fire Protection Design Manual and the specifications. A/E SECONDARY CLARIFICATION RESPONSE: Excerpt from the VAFPDM addressing wiring class: Excerpt from the spec addressing wiring class:","url":"https://matchawards.com/department_of_veterans_affairs/posts/107405534868744532","identifier":"36C25722B0003","category":"236220 - Commercial and Institutional Building Construction","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"1230 - FIRE CONTROL SYSTEMS, COMPLETE"}],"availabilityStarts":"2021-12-07","availabilityEnds":"2021-12-10","sameAs":"https://sam.gov/opp/8a9d199b29a94449bc7b53a3e2d21160/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Construction","item":"https://matchawards.com/contracts/construction"}]}
```

