ClickCease N059--Air Blown Fiber Install (36C26221Q1034) | Closed - MatchAwards

N059--Air Blown Fiber Install

Status
Closed (archived notice)
Agency
United States Department of Veterans Affairs
Office
Gilbert, USA
Notice type
Combined Synopsis/Solicitation
Solicitation number
36C26221Q1034
NAICS
238210 - Electrical Contractors and Other Wiring Installation Contractors
PSC
N059 - INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS
Category
Facility Related Services (4.4)
Posted
2021-08-11
Deadline
2021-08-17
Place of performance
Long Beach, 90822

Description

5. PROJECT NUMBER (if applicable) CODE 7. ADMINISTERED BY 2. AMENDMENT/MODIFICATION NUMBER CODE 6. ISSUED BY 8. NAME AND ADDRESS OF CONTRACTOR 4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE 9A. AMENDMENT OF SOLICITATION NUMBER 9B. DATED PAGE OF PAGES 10A. MODIFICATION OF CONTRACT/ORDER NUMBER 10B. DATED BPA NO. 1. CONTRACT ID CODE FACILITY CODE CODE Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers E. IMPORTANT: is extended, (a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended. 12. ACCOUNTING AND APPROPRIATION DATA (REV. 11/2016) is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A. 15C. DATE SIGNED B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b). RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF: D. OTHER Contractor 16C. DATE SIGNED 14. DESCRIPTION OF AMENDMENT/MODIFICATION 16B. UNITED STATES OF AMERICA Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect. 15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER 15B. CONTRACTOR/OFFEROR STANDARD FORM 30 PREVIOUS EDITION NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.) (Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.) (If required) (SEE ITEM 11) (SEE ITEM 13) (X) CHECK ONE 13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT (Signature of person authorized to sign) (Signature of Contracting Officer) 1 9 0001 8-11-2021 600-21-4-5666-0998 00262 Department of Veterans Affairs Network Contracting Office 22 4811 Airport Plaza Drive Suite 600 Long Beach CA 90815 00262 Department of Veterans Affairs Network Contracting Office 22 4811 Airport Plaza Drive Suite 600 Long Beach CA 90815 To all Offerors/Bidders 36C26221Q1034 X X X 1 This amendment is issued to update the statement of work to provide clarification on the period of performance. Changes are highlighted in the enclosed updated SOW. All other terms and conditions remain unchanged. Page 9 of 9 2. Statement of Work. 2.A. Scope. VA Long Beach Healthcare System is seeking a contractor to install fiber optic cables from the Main Distribution Frame (MDF) to the new Individual Distribution Frame (IDF) closet in the Kitchen area of bldg 126, 2nd floor of bldg 164, and 1st floor of bldg 166, as well as network drops in the basement of building 126. Contractor shall furnish all necessary labor, materials, supplies, equipment and services (except as otherwise specified herein) and perform the work set forth within this Statement of Work to install the fibers and network drops listed below. VA Long Beach Healthcare System is seeking a contractor to install Future Flex Air Blown fiber from the basement of building 126 Main Distribution Frame (MDF) to the Individual Distribution Frame, IDF closet in building 164, 2nd floor and 166, 1st floor. Period of Performance: Contractor shall begin work within 2 weeks from notice to proceed. - Phase I: Contractor should complete the fiber installation in building 164, second floor and building 166, first floor within 60 working days after the award. - Phase II: the kitchen area in bldg. 126 is currently under construction. It is expected to be ready for contractor to install the network drops and fibers in January 2022. Contractor shall complete the installation within 100 working days from notice to proceed. 2.A.1. Building 126 new IT closet Installation: 2.A.1.a. Contractor shall provide and install (3) 4 inches EZ path firestop pathways or equivalent. 2.A.1.b. Contractor shall provide and install the 2 hours fire rate plywood on the walls that closest to the equipment racks. 2.A.1.c. Contractor shall provide and install (3) 4 post equipment racks, 4 inches vertical cable management on the sides of the racks and 6 vertical cable management in between the racks. 2.A.1.d. Contractor shall provide and install horizontal ladder racks above the racks for cables and fibers management. The ladder racks should make a T-shape to the wall. 2.A.1.e. Contractor shall provide and install electrical grounding bus bar. All new ladder racks and equipment racks will be grounded to the bus bar. 2.A.1.f. Contractor should provide and install other necessary equipment to complete the IDF closet requirement. 2.A.1.g. Lagrand hardware or equivalent is required in the IDF closet. 2.A.2. Building 126 Air Blown Fiber Installation: 2.A.2.a. Contractor shall provide and install (1) 7 tube cell bundle from the MDF in the basement of building 126 to the new IDF closet in the Kitchen are on the same floor, approximately 300 ft. 2.A.2.b. Contractor shall provide and install 24 strands multi-mode fiber, OM 4 from MDF in the basement of building 126 to the new IDF closet in the Kitchen area on the same floor, approximately 300 ft. Multi-mode fibers shall be terminated on the new 2 U Fiber Termination Unit (FTU) on the rack with LC connectors. 2.A.2.c. Contractor shall provide and install 1 new 2U Fiber Termination Unit (FTU) on the equipment rack. 2.A.2.d. Contractor shall provide and install 1 new TDU in the MDF and 1 new TDU in the IDF. 2.A.2.e. Contractor shall provide 8 Cisco certified 1 Gigabit Optical transceiver (SFP) for Multi-mode fiber. VA will install them. Contractor shall submit the SFP s Cisco Certified document along with the SFP. 2.A.2.f. Contractor shall make any additional penetrations and install sleeve as required along the fiber pathway. 2.A.2.g. Contractor shall be Sumitomo certified because fiber backbone infrastructure at VA Long beach is Air blown fiber system. 2.A.3. Building 126 Network drops installation: 2.A.3.a. Contractor shall provide labor and all material such as patch panels, cable managements, horizontal wire managements, jack modules, faceplates, sleeves, etc. to complete the installation of network drops in new IDF closet in the Kitchen area as described below 2.A.3.a.1. 39 network drops within the new renovated kitchen area as shown in the drawing. The new IDF is located inside the kitchen area. The longest distance within this area to the IDF closet is approximately 130 ft. Each network drop will be a 3-cable combo, CAT 6A plenum rated blue cables, the jacks must follow the color scheme: gray, blue, white and should be terminated at the workstations and in the IDF closet. 2.A.3.a.2. 4 network drops for wall phones as shown in the drawing, each of them has 1 green cable and terminate with green jacks at both ends. All network drops for wall phones shall be terminated in a separate patch panel. 2.A.3.a.3. Contractor shall provide and install 48-port modular patch panels for the network drops above. 2.A.3.a.4. Contractor shall provide and install cable tray system from the IDF to the workstations as well as any penetration and sleeve along the cable pathways. 2.A.3.a.5. After all new network drops and fiber are installed and connected on the network, contractor shall remove 12 existing telecom cables from the workstations in the kitchen area to the MDF and cover the opening on the wall with the blank covers. 2.A.3.b. All cable pathways are to be supported by cable trays. Only Velcro can be used to bundle the cables inside and outside the IDF closet. 2.A.3.c. Legrand hardware or equivalent is to be used in this area. 2.A.3.d. Each network drop will be terminated on the corresponding color RJ-45 connector on 4-jack faceplate (gray, blue, white) and labeled in accordance with local standard operating procedure (SOP) IMS 07-13, Cable Installation, Labeling and Testing. SOP IMS 07-13 is attached. e. Contractor shall test and certify all new network drops after installed. Test report must include at a minimum 2.A.3.the following information: Test date; test location; cable type; wire map; length; insertion loss (Attenuation); NEXT Loss; PS NEXT Loss; ACR-F Loss, pair to pair; PS ACR-F Loss; Return Loss; Propagation Delay; Delay Skew. Contractor must be prepared to show the last calibration date on the testing equipment. Equipment must be calibrated within the last calendar year of the acceptance of award. 2.A.3.f. A hard copy and an electronic copy of testing result must be submitted to OIT personnel. 2.A.4. Building 164, 2nd floor: 2.A.4.a. Contractor shall identify the existing tube cell bundles from MDF to IDF building 164, 2nd floor and perform the pressure test for these tube cells. 2.A.4.b. Contractor shall provide material and labor to install 24 strands OS2 single-mode fiber from the MFD in the basement of building 126 to the IDF in building 164, 2nd floor. It is approximately 1000 linear feet. Fiber shall be terminated with LC connectors. These fiber strands shall be installed in the tested tube cell in para 2.A.4.a. above. 2.A.4.c. Contractor shall provide and install 1 U Fiber Termination Unit. 2.A.4.d. Contractor shall provide 4 Cisco certified 1 Gigabit Optical transceiver (SFP) for single-mode fiber. VA will install them. Contractor shall submit the SFP s Cisco Certified document along with the SFP. 2.A.5. Building 166, 1st floor: 2.A.5.a. Contractor shall identify the existing tube cell bundles from MDF to IDF in building 166, 1st floor and perform the pressure test for these tube cells. 2.A.5.b. Contractor shall provide material and labor to install 24 strands OS 2 single-mode fiber from the MFD in the basement of building 126 to IDF in building 166, 1st floor. It is approximately 1000 linear feet. Fiber shall be terminated with LC connectors. These fiber strands shall be installed in the tested tube cell in para 2.A.5.a. above. 2.A.5.c. Contractor shall provide and install 2 U Fiber Termination Unit. 2.A.5.d. Contractor shall provide 4 Cisco certified 1 Gigabit Optical transceiver (SFP) for single-mode fiber. VA will install them. Contractor shall submit the SFP s Cisco Certified document along with the SFP. 2.A.6.a. Testing: 2.A.6.a.1. All testing shall be done in accordance with TIA/EIA-526 2.A.6.a.2. All fiber optic strands will be bi-directionally tested for loss and attenuation. All test results will be turned in to the Long Beach IT Department in PDF format (CD) and the summary report in hard copy form. 2.A.6.a.3. The FTUs will be labeled with machine printed labels following the VA specified labeling scheme. 2.A.6.a.4. All existing and new tube cells will be labeled with machine printed label following the VA specified labeling scheme. 2.A.6.a.5. Existing spare tube cells must be pressure tested before to ensure optimum passage of ABF. Pressure test(s) shall be submitted to the VA and must include: 1. Test date 2. Installer s name 3. Tube Cable ID 4. Tube # (in) 5. Tube # (out) 6. Test Pressure (P.S.I.) 7. Time held 2.A.6.a.6. Existing spare tube cells must be tested for obstruction to ensure optimum passage of ABF. Obstruction test(s) shall be submitted to the VA and must include: 1. Test date 2. Installer s name 3. Tube Cable ID 4. Tube # (in) 5. Tube # (out) 6. Span Length 7. Travel time 8. P.S.I. test rate 2.A.6.a.7. All indoor tube cables shall be composed of dielectric materials and properly rated (i.e. plenum/riser/general purpose) per application. 2.A.6.a.8. During installation, tube cable ends are to be completely sealed per manufacturer s recommended procedures to prevent ingress of contaminants. 2.A.6.a.9. The minimum bend radius shall be 20 times the cable diameter during installation and 10 times the cable diameter after installation. 2.A.6.a.10. Upon completion of tube cable installation, all tubes shall pass the standard 150 psi pressure test and 5 mm bead obstruction test per the cable manufacturer s recommended procedures. 2.A.6.a.11. All unoccupied tubes shall be plugged on both ends per manufacturer s specifications. 2.A.6.a.12. A NEMA-rated enclosure, suitable for the site environmental conditions shall be provided for tube distribution, routing, and termination. 2.A.6.a.13. All labeling shall be in accordance with IMS SOP 07-013 Cable Installation Labeling and Testing. 2.A.6.a.14. A hard copy and an electronic copy of testing result must be submitted to OIT personnel. 2.B. Specific Requirements. 2.B.1. Contractor shall provide warranty service for fiber and copper material and labor. Material warranty shall base on the cable manufacturer warranty policy and labor warranty is one year after the work has been accepted by Veteran Affair Department. 2.B.2. Contractor is required to submit a hard copy and a CD of VISIO and FPD drawing to include all fibers terminated in each IDF, the cable single-line signals and their ID labels, IDF of origin, room of origin, faceplate number, patch panel ID and date installed to Contracting Officer or OIT personnel. In accordance with local SOP. 2.B.3. Contractor shall provide a detailed quote breakdown for both material and labor. 2.B.4. All deliverables will be inspected by the VA for completeness, and conformance to the items listed above by OI&T and Contracting Officer. 2.B.5. Work activities must be supervised by a hospital representative. The following must be completed during activities: 2.B.5.a. Containerize and cover all debris being removed from this area 2.B.5.b. Follow Class precautions listed and general requirements under that class 2.B.5.c. Clean areas at end of work 2.B.5.d. At all the job sites listed above, contractor shall keep the areas clean, safe and shall clean up at the end of each day. 2.B.6. Acceptance of Work: Non-conforming products or services will be rejected. Deficiencies will be corrected by the contractor within 5 business days of rejection notice. If deficiencies cannot be corrected within 5 business days, the contractor must immediately inform the Contract Officer of the reason for the delay and provide a corrective action plan within 2 business days. 2.C. Contractor Qualifications. Potential contractors must submit the following information as part of their offers. 2.C.1. Sumitomo certification for air blown fiber installation 2.C.2. Certification of Training for FutureFLEX® Air Blown Fiber® cable products. 2.C.3. Contractor must have 30 hours OSHA training for Project manager/Leader and 10 hours OSHA training for each contractor s employee. Contractor must indicate in the proposal that they meet all OSHA training requirement and certifications shall be submitted to Contracting Officer before starting the job. 2.C.4. Contractor must have Confined Space Permits and Safety Instruction to work at the manholes to install the cable. 2.C.5. Contractor is required to have TB test for all contractors employees who work on the job sites. TB test report shall be submitted to OIT POC before starting the job. 2.D. Information/Information Technology Requirements 2.D.1. Information System Security. The Contractor shall ensure adequate LAN/Internet, data, information, and system security in accordance with VA standard operating procedures and standard contract language, conditions laws, and regulations. The Contractor s firewall and web server shall meet or exceed the Government minimum requirements for security. All Government data shall be protected behind an approved firewall. Any security violations or attempted violations shall be reported to the VA project manager and the VBA Headquarters Information Security Officer as soon as possible. The Contractor shall follow all applicable VA policies and procedures governing information security, especially those that pertain to certification accreditation. 2.D.2. Electronic and Information Technology Standards 2.D.2.a. Internet/Intranet The Contractor shall comply with Department of Veterans Affairs (VA) Directive 6102 and VA Handbook 6102 (Internet/Intranet Services). VA Directive 6102 sets forth policies and responsibilities for the planning, design, maintenance support, and any other functions related to the administration of a VA Internet/Intranet Service Site or related service (hereinafter referred to as Internet). This directive applies to all organizational elements in the Department. This policy applies to all individuals designing and/or maintaining VA Internet Service Sites; including but not limited to full time and part time employees, Contractors, interns, and volunteers. This policy applies to all VA Internet/Intranet domains and servers that utilize VA resources. This includes but is not limited to va.gov and other extensions such as, .com, .edu, .mil, .net, .org, and personal Internet service pages managed from individual workstations. VA Handbook 6102 establishes Department-wide procedures for managing, maintaining, establishing, and presenting VA Internet/Intranet Service Sites or related services (hereafter referred to as Internet ). The handbook implements the policies contained in VA Directive 6102, Internet/Intranet Services. This includes, but is not limited to, File Transfer Protocol (FTP), Hypertext Markup Language (HTML), Simple Mail Transfer Protocol (SMTP), Web pages, Active Server Pages (ASP), e-mail forums, and list servers. VA Directive 6102 and VA Handbook 6102 are available at: Internet/Intranet Services Directive 6102 http://www.va.gov/pubs/directives/Information-Resources-Management-(IRM)/6102d.doc Internet/Intranet Services Handbook 6102 http://www.va.gov/pubs/handbooks/Information-Resources-Management-(IRM)/6102h.doc Internet/Intranet Services Handbook 6102 Change 1 updates VA's cookie use policy, Section 508 guidelines, guidance on posting of Hot Topics, approved warning notices, and minor editorial errors. http://www.va.gov/pubs/handbooks/Information-Resources-Management-(IRM)/61021h.doc In addition, any technologies that enable a Network Delivered Application (NDA) to access or modify resources of the local machine that are outside of the browser's sand box" are strictly prohibited. Specifically, this prohibition includes signed-applets or any ActiveX controls delivered through a browser's session. ActiveX is expressly forbidden within the VA while .NET is allowed only when granted a waiver by the VA CIO *PRIOR* to use. JavaScript is the preferred language standard for developing relatively simple interactions (i.e., forms validation, interactive menus, etc.) and Applets (J2SE APIs and Java Language) for complex network delivered applications. 2.D.3. Section 508 2.D.3.a. The Contractor shall comply with Section 508 of the Rehabilitation Act (29 U.S.C. § 794d), as amended by the Workforce Inve

Contacts

Email and phone are in the source notice.

Source notice

More from United States Department of Veterans Affairs posted in August 2021

More lists