<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/department_of_veterans_affairs/posts/106652447559626715" -->

---
title: C1DA--EHRM Infrastructure Upgrades Design West… (36C77621R0182) | Closed - MatchAwards
description: C1DA--EHRM Infrastructure Upgrades Design West Palm Beach FL. United States Department of Veterans Affairs. Solicitation 36C77621R0182. NAICS 541330 - Engineering Services. SDVOSB set-aside. Deadline 2021-08-30. PRESOLICITATION NOTICE THIS IS NOT A REQUEST FOR PROPOSAL. THIS IS A REQUEST FOR...
canonical: https://matchawards.com/department_of_veterans_affairs/posts/106652447559626715
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: C1DA--EHRM Infrastructure Upgrades Design West… (36C77621R0182) | Closed
og:url: https://matchawards.com/department_of_veterans_affairs/posts/106652447559626715
og:description: C1DA--EHRM Infrastructure Upgrades Design West Palm Beach FL. United States Department of Veterans Affairs. Solicitation 36C77621R0182. NAICS 541330 - Engineering Services. SDVOSB set-aside. Deadline 2021-08-30. PRESOLICITATION NOTICE THIS IS NOT A REQUEST FOR PROPOSAL. THIS IS A REQUEST FOR...
og:image: https://matchawards.com/system/accounts/avatars/000/000/015/original/f59915e906ee2b19.png?1638825904
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# C1DA--EHRM Infrastructure Upgrades Design West Palm Beach FL

Status

Closed (archived notice)

Agency

[United States Department of Veterans Affairs](/department%5Fof%5Fveterans%5Faffairs)

Office

INDEPENDENCE, USA

Notice type

Presolicitation

Solicitation number

36C77621R0182

NAICS

[541330 - Engineering Services](/groups/897)

PSC

C1DA - ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES

Category

[Construction Related Services (4.2)](/categories/facilities-and-construction/construction-related-services)

Set-aside

[Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)](/contracts/veteran-owned)

Posted

2021-07-27

Deadline

2021-08-30

Place of performance

33410

## Description

PRESOLICITATION NOTICE THIS IS NOT A REQUEST FOR PROPOSAL. THIS IS A REQUEST FOR STANDARD FORM (SF) 330'S ARCHITECT-ENGINEER QUALIFICATION PACKAGES ONLY. ALL INFORMATION NEEDED TO SUBMIT SF 330 DOCUMENTS IS CONTAINED HEREIN. NO SOLICITATION PACKAGE, TECHNICAL INFORMATION, OR BIDDER/PLAN HOLDER LIST WILL BE ISSUED. THE GOVERNMENT WILL NOT PAY, NOR REIMBURSE ANY COSTS ASSOCIATED WITH RESPONDING TO THIS REQUEST. THE GOVERNMENT IS UNDER NO OBLIGATION TO AWARD A CONTRACT AS A RESULT OF THIS ANNOUNCEMENT. 1\. GENERAL INFORMATION: Veterans Health Administration (VHA) Program Contracting Activity Central (PCAC) is seeking sources and intends to award a firm-fixed price design contract for Architect-Engineering (A-E) services for Project #548-22-700 EHRM Infrastructure Upgrades design project located at the West Palm Beach VA Medical Center (VAMC), 7305 N Military Trail, West Palm Beach, FL 33410\. The A-E shall include site visits, field investigation, studies and user interviews to prepare drawings, specifications, and cost estimates for all facets of work and disciplines/trades to facilitate a construction project to upgrade the facilities electric and IT to allow for the new Electronic Health Record Modernization (EHRM) system. The A-E Services contract anticipated to be awarded will be procured in accordance with the Selection of Architects and Engineers Statute \[formerly known as the Brooks Architect Engineer Act\], Federal Acquisition Regulation Part 36.6 Architectural and Engineering Services, VA Acquisition Regulation 836.6, and VA Acquisition Manual M836.6 Architect-Engineer Services. In accordance with FAR 36.209 Construction Contracts with Architect-Engineer Firms, no contract for the construction of a project shall be awarded to the firm that designed the project or its subsidiaries or affiliates, except with the approval of the head of the agency or authorized representative. 2\. PROJECT INFORMATION This project is a 100% Set-Aside for Service-Disabled Veteran-Owned Small Business Concerns (SDVOSB). The NAICS Code for this procurement is 541330 Engineering Services and the annual small business size standard is $16.5M. This project requires a full design team to complete this project. The projected award for the anticipated A-E contract is mid-end of June 2021\. The anticipated period of performance for completion of design is 220 calendar days after Notice of Award (NOA). The FAR 52.236-22 Design Within Funding Limitation (APR 1984), for this project is between $20M - $50M. 3\. SCOPE OF DESIGN The scope of this project is the following infrastructure improvements to the West Palm Beach VAMC:Â A/E Part One Services (also known as Design Phase) for this design project includes site visits, field investigation, studies and user interviews to prepare drawings, specifications, and cost estimates for all facets of work and disciplines/trades to facilitate a construction project to upgrade the facilities electric and IT to allow for the new Electronic Health Record Modernization (EHRM) system. Electrical (electrical panel upgrade, power (normal, emergency)), Bonding, UPS, Building Management System interfaces, assess for new and upgrades to existing HVAC, reconfiguration, expansion and renovation of existing space (demo, new construction, finishes), Construct new Data Center (site work, utilities, fire suppression, foundation, shell, finish, Power, lighting, HVAC, UPS, cabinet relocations, cable management, physical security), physical security upgrades, assess and upgrade fiber infrastructure backbone campus wide within buildings and between buildings, hazardous material construction, patch, finish), communication infrastructure (new Data outlets, patch panels, upgrade to Cat 6A cable) in buildings as necessary, assess and upgrade fiber infrastructure backbone campus wide within buildings and between buildings, install diversified path to datacenter for WAN,Â site prep needs for training space/modular buildings, hazardous material abatement. Project Building locations include: Buildings 1, 3, 4, 6, 7, 10, 12, 14, 15, 16, 19, 22 and site. A/E Part Two Services of this design project (also known as Construction Period Services) includes responding to construction contractor Requests For Information (RFIs) during the solicitation (solicitation support) and construction phases of the construction project, attendance at pre-bid, post-award and commissioning kick off construction project conferences, review of construction material submittals and shop drawings, approximately four (4) site visits per month during construction (both scheduled and emergent) to ensure compliance with the design drawings and specifications (the construction period of performance is twelve (12) months), preparation of site visit reports, coordination with project commissioning requirements, review of any construction project modifications for cost and technical acceptability, requirement to create independent cost estimates for the VA, for any modifications, for the attendance in the final acceptance inspection, preparation of the punch list and preparation of record drawings of the completed construction project based on the construction contractor s as-built drawings. The A/E shall prepare a submittal log to be utilized by the VA during construction period services, maintain RFI log and provide meeting minutes for weekly construction meetings throughout the duration of construction. The A/E shall review the Contractor s requests for information and cost proposals for construction change orders when requested by the COR. The A/E s reply regarding his/her review of cost proposals and his/her recommendations shall include an independent breakdown of costs in detail, quantities, and unit prices and shall cover both additions and deductions of labor, materials, and equipment. The A/E shall also supply cost estimates as requested by the COR for Request for Proposals for anticipated changes. The A-E shall be professionally licensed in any state in the United States. The A-E is responsible for all services to complete the deliverables listed in the Statement of Work (SOW) (See Final SOW 7-21-21 WPB EHRM Infra). The deliverables outlined in the SOW are inclusive of the following: Quality Assurance/Quality Control Plan, basis of design (10%), design development (35%), design development (65%), contract documents (95%), final bid documents (100%), and construction period services. The deliverables schedule can be found in the SOW. Please note that the 220 calendar day period of performance for the design completion begins with the issuance of the Notice of Award and that a Notice to Proceed will not be issued for the completion of a design project. The construction period services will be option items that will be exercised after the award of the construction project. The period of performance for construction period services will match the period of performance for the construction project. 4\. A-E SELECTION PROCESS: Responsive firms submitting SF-330 s in response to this announcement not later than the closing date and time specified herein and in accordance with submission requirements, will be considered for initial selection evaluation. The selection process will be made using a two-phase process. Phase I consists of the initial evaluation of the SF-330 s and determination of the highest rated firms. A minimum of three (3) of the highest rated firms will then be short listed and invited to continue with Phase II of the process. All firms not short listed will be notified at this time. Phase II consists of Written Responses for the short-listed firms and selection of the top ranked firm to receive the solicitation and conduct negotiations. The firms selected for Written Responses will be notified by email of selection and provided further instructions and the evaluation criteria requirements. After the Written Responses are received, the firms will be evaluated and the top-ranked firm will be selected, sent the solicitation, and subsequent negotiations to follow. A site visit will be authorized for the highest rated firm during the negotiation process. Award selection will be made based on the results of the Written Responses and successful negotiation of rates for the project, and not the SF-330 qualifications from Phase I. If negotiations are not successful with the highest rated firm, they will continue with the next highest rated firm, and so on until award can be made. Please note that during the evaluation of the written responses, the prior evaluation of the SF 330s will not be taken into consideration as they are separate evaluations. 5\. PHASE I SF330 SELECTION CRITERIA: The following are listed in descending order of importance. Primary Selection Criteria: Professional Qualifications: Professional Qualifications necessary for satisfactory performance of required service. The design firm and A-E on staff representing the project or signing drawings in each discipline must be licensed to practice in any one of the United States of America. Provide Professional License numbers and/or proof of Licensure. The evaluation shall consider the specific experience (minimum of five years) and qualifications (i.e., education, training, registration, certifications, overall relevant experience, and longevity with the firm as full time employees) of personnel proposed for assignment to the project, and their record of working together as a team when evaluating professional qualifications. The lead designer in each discipline must be registered but does not have to be registered in the particular state where the project is located. Key positions and disciplines required for this project include, but are not limited to: Architect (LEED certified), CADD Technician, Registered Communications Distribution Designer (RCDD), Estimator, Civil Engineer, Electrical Engineer, Environmental Engineer, Fire Protection Engineer, Industrial Hygienist, Mechanical Engineer, Plumbing, Project Manager, Quality Assurance, Structural Engineer, and Physical Security Specialists. Offer must include the following statement of SDVOSB compliance when submitting the personnel proposed to perform the work under this requirement: I \[signatory authority\] \_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_, \[company\] \_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_, certify that the team proposed to perform under this requirement demonstrates the capability of 50% SDVOSB performance in compliance with 48 CFR 852.219-10\. The information provided in sections C through E of SF 330 will be used to evaluate this evaluation factor. Do not include this information in section H, unless it is pertinent to support the information listed in the other sections. Specialized Experience: Specialized experience and technical competence in the design and construction period services provided for network infrastructure installation, renovations, or upgrades. Projects should include fiber optics, data cable, structured cabling, electrical distribution design, electrical upgrades, uninterruptable power systems (UPS), electrical bonding, building management systems/building automation systems (BMS/BAS), HVAC, IT room renovations/expansion/relocations, Data Centers/Server Rooms reconfiguration, and physical security upgrades. Other specialized experience includes experience in critical path scheduling, fire protection, construction infection control protocols, energy conservation, and sustainable design practices. Include no more than six (6) Government and private experience projects similar in size, scope and complexity, and experience with the types of projects above. The evaluation will consider the management approach, coordination of disciplines and subcontractors, quality control procedures, prior experience of the prime firm and any key subcontractors working together on relevant projects and familiarity with VA Design Guides/Manuals, Master Specifications, and other applicable standards. The information provided in sections F and G of SF 330 will be used to evaluate this evaluation factor. Do not include this information in section H, unless it is pertinent to support the information listed in the other sections. Capacity: Capacity to accomplish work in the required time. The evaluation will consider the firm s ability to meet the compressed schedule of the overall project, as well as the available capacity of key disciplines to perform the work in the required time. Provide the available capacity of key disciplines by providing current project workload, inclusive of all projects awarded by the VA during the previous 12 months and the full potential value of any current indefinite delivery contracts. Offeror shall clearly state their available capacity presenting workload percentages for the key disciplines and/or team members. Also, the offeror must provide the completion percentages and expected completion date for the VA projects awarded in the previous 12 months. The information for this factor shall be provided in Section H of the SF 330\. Please ensure the capacity applies toward the team/personnel provided in the SF 330\. Past Performance: Past performance on contracts with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules. The past performance will be evaluated for all projects provided in section F to include a review of Contractor Performance Assessment Rating System (CPARS). The following information is required for all projects noted in section F: contract/task order number, project title, prime firm, start date, and completion date. Evaluations may also include additional performance related from the firm, customer inquiries, Government databases, publicly available sources, and additional projects in CPARS. Evaluations will consider superior performance ratings on recently completed projects as well as the reputation and standing of the firm and its principal officials with respect to professional performance, general management, and cooperativeness. Also, consider, as appropriate, the record of significant claims against the firm because of improper or incomplete architectural and engineering services. Failure to provide requested data, accessible points of contact, or valid phone numbers could result in a firm being considered less qualified. All projects provided in the SF 330 must be completed by the office/branch/individual team member performing the work under this contract. The information for this factor shall be provided in Section H of the SF 330\. If there is no CPARS data available, Past Performance Questionnaires (PPQs) will be accepted. Please utilize the attached PPQ document. \*Completed PPQs should be incorporated into the SF330 directly. PPQs should not be submitted to VHA PCAC directly. The PPQs will be counted towards the page limitations for this submission. Locality: Knowledge of the locality, to include specific knowledge of certain local conditions or project site features, such as geological features, climatic conditions, working with and local construction methods or local laws and regulations. The information for this factor shall be provided in Section H of the SF 330\. The information for this factor shall be provided in Section H of the SF 330\. Note that the intent of this factor is to showcase a firm s understanding of the site and locality, and not where the firm is located and how they would travel to the site. Information related to the firm s location, shall be provided in section H, under Secondary Selection Criteria Factor 1\. Construction Period Services: Experience in construction period services to include professional field inspections during the construction period, review of construction submittals, support in answering requests for information during the construction period, support of construction contract changes to include drafting statements of work and cost estimates, attendance at weekly conference calls, providing minutes of meetings between the AE, VA, and contractors, pre-final inspection site visits, generation of punch-list reports, and production of as-built documentation. The information for this factor shall be provided in Section H of the SF 330\. Secondary Selection Criteria: Geographic Location: Location of the firm, as measured by the driving distance (miles) between the Offeror s principal business location and the West Palm Beach VAMC in West Palm Beach, FL. Determination of the mileage will be based on Google Maps (https://www.google.com/maps/dir/). \* The secondary selection criterion is used as a tie-breaker, if necessary, in ranking the most highly qualified firms following the completion of SF330 Evaluations. The secondary selection criterion will not be applied when determining a firm s SF 330 submission Excellent, Acceptable, Good, Marginal, or Unacceptable. The information for this factor shall be provided in Section H of the SF 330\. 6\. PHASE II WRITTEN RESPONSES SELECTION CRITERIA: In accordance with FAR 36.602-3(c), discussions will be conducted in the form of written responses. The selected firms will be invited to provide their written responses to predetermined questions via email to the A-E Evaluation Board. The instructions for the written responses will be provided to the selected firms only. Each selected firm will be evaluated based on their written responses. The top-rated firm will be selected based on their rating from the written responses. The previous ratings from the SF330 evaluations are not applicable during Phase II. Below are the evaluation factors for the written responses. The factors are listed in equal order of importance. Proposed Management and Coordination Plan: Discuss confidence and approach to completing a project of this scale with an expedited period of performance. Explain quality control methods that will be used throughout each design phase, and prior to each submission. Describe strategy for control of estimated cost, and solutions for anticipated problems. Discuss proposed design team, their specific strengths, and experience that make them the best fit for this project. Discuss how the design teams will work together, and with the VA, to keep this design on schedule, within budget, and compliant with VA design requirements. Approach to Project Challenges: Discuss approach to overcome geographical obstacles considering the amount of site visits needed for this specific project (address both design phase site visits as well as CPS visits). Discuss ability, familiarization, or experience with VA design guides and directives and their interpretations and application to this design. Describe plans with this project to ensure VA requirements are kept current, and specified equipment will be TRM approved. Proposed approach to Design Development: Discuss plan to ensure specifications and drawings are well edited, accurate, all inclusive, and coordinate with each other. Discuss approach to evaluate existing site conditions and ensure new work will not conflict with existing work. Expectation for VA AE collaboration: Discuss what expectations the AE firm would have from the VA for this project. Describe strategy for collaboration meetings throughout each phase and their significance to the overall end-product. 7\. SUBMISSION CRITERIA/REQUIREMENTS: The below information contains the instructions and format that shall be followed for the submission of the SF-330 Statement of Qualifications: Submit ONE (1) SF-330 Statement of Qualifications via email to the Contract Specialist Bailey Donato at bailey.donato@va.gov. This shall include Parts I and II and any applicable attachments. The SF-330 submission is due by 2:00 PM ET on Monday August 30, 2021\. The SF-330 shall be submitted in one email and have a file size that shall be no larger than 5 MB. No hard copies will be accepted. The subject line of the email shall read: SF-330 Submission; 36C77621R0182 EHRM Infrastructure Upgrades -WPB. Th 

<!-- mobian-agent-ad sponsored="true" id="f8a4e99f-7718-4dbe-b5ab-8a9729fe79bd" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories/facilities-and-construction/construction-related-services?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup
- Pursuit brief for this NAICS code (award history, who buys, past awardees): https://matchawards.com/naics/541330/brief?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=brief

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


[Source notice](https://sam.gov/opp/067dae238c7641e4b02d9fe07d9f52ec/view)

[More from United States Department of Veterans Affairs posted in July 2021](/department%5Fof%5Fveterans%5Faffairs/archive/2021-07)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Veteran-Owned Small Business Set-Aside Contracts (SDVOSB and VOSB) Available Now](/contracts/veteran-owned)
* [Professional Services Government Contracts Available Now](/contracts/professional-services)
* [Pursuit brief for NAICS 541330](/naics/541330/brief)

```json
{"@context":"https://schema.org","@type":"Demand","name":"C1DA--EHRM Infrastructure Upgrades Design West Palm Beach FL","description":"PRESOLICITATION NOTICE THIS IS NOT A REQUEST FOR PROPOSAL. THIS IS A REQUEST FOR STANDARD FORM (SF) 330'S ARCHITECT-ENGINEER QUALIFICATION PACKAGES ONLY. ALL INFORMATION NEEDED TO SUBMIT SF 330 DOCUMENTS IS CONTAINED HEREIN. NO SOLICITATION PACKAGE, TECHNICAL INFORMATION, OR BIDDER/PLAN HOLDER LIST WILL BE ISSUED. THE GOVERNMENT WILL NOT PAY, NOR REIMBURSE ANY COSTS ASSOCIATED WITH RESPONDING TO THIS REQUEST. THE GOVERNMENT IS UNDER NO OBLIGATION TO AWARD A CONTRACT AS A RESULT OF THIS ANNOUNCEMENT. 1. GENERAL INFORMATION: Veterans Health Administration (VHA) Program Contracting Activity Central (PCAC) is seeking sources and intends to award a firm-fixed price design contract for Architect-Engineering (A-E) services for Project #548-22-700 EHRM Infrastructure Upgrades design project located at the West Palm Beach VA Medical Center (VAMC), 7305 N Military Trail, West Palm Beach, FL 33410. The A-E shall include site visits, field investigation, studies and user interviews to prepare drawings, specifications, and cost estimates for all facets of work and disciplines/trades to facilitate a construction project to upgrade the facilities electric and IT to allow for the new Electronic Health Record Modernization (EHRM) system. The A-E Services contract anticipated to be awarded will be procured in accordance with the Selection of Architects and Engineers Statute [formerly known as the Brooks Architect Engineer Act], Federal Acquisition Regulation Part 36.6 Architectural and Engineering Services, VA Acquisition Regulation 836.6, and VA Acquisition Manual M836.6 Architect-Engineer Services. In accordance with FAR 36.209 Construction Contracts with Architect-Engineer Firms, no contract for the construction of a project shall be awarded to the firm that designed the project or its subsidiaries or affiliates, except with the approval of the head of the agency or authorized representative. 2. PROJECT INFORMATION This project is a 100% Set-Aside for Service-Disabled Veteran-Owned Small Business Concerns (SDVOSB). The NAICS Code for this procurement is 541330 Engineering Services and the annual small business size standard is $16.5M. This project requires a full design team to complete this project. The projected award for the anticipated A-E contract is mid-end of June 2021. The anticipated period of performance for completion of design is 220 calendar days after Notice of Award (NOA). The FAR 52.236-22 Design Within Funding Limitation (APR 1984), for this project is between $20M - $50M. 3. SCOPE OF DESIGN The scope of this project is the following infrastructure improvements to the West Palm Beach VAMC:Â A/E Part One Services (also known as Design Phase) for this design project includes site visits, field investigation, studies and user interviews to prepare drawings, specifications, and cost estimates for all facets of work and disciplines/trades to facilitate a construction project to upgrade the facilities electric and IT to allow for the new Electronic Health Record Modernization (EHRM) system. Electrical (electrical panel upgrade, power (normal, emergency)), Bonding, UPS, Building Management System interfaces, assess for new and upgrades to existing HVAC, reconfiguration, expansion and renovation of existing space (demo, new construction, finishes), Construct new Data Center (site work, utilities, fire suppression, foundation, shell, finish, Power, lighting, HVAC, UPS, cabinet relocations, cable management, physical security), physical security upgrades, assess and upgrade fiber infrastructure backbone campus wide within buildings and between buildings, hazardous material construction, patch, finish), communication infrastructure (new Data outlets, patch panels, upgrade to Cat 6A cable) in buildings as necessary, assess and upgrade fiber infrastructure backbone campus wide within buildings and between buildings, install diversified path to datacenter for WAN,Â site prep needs for training space/modular buildings, hazardous material abatement. Project Building locations include: Buildings 1, 3, 4, 6, 7, 10, 12, 14, 15, 16, 19, 22 and site. A/E Part Two Services of this design project (also known as Construction Period Services) includes responding to construction contractor Requests For Information (RFIs) during the solicitation (solicitation support) and construction phases of the construction project, attendance at pre-bid, post-award and commissioning kick off construction project conferences, review of construction material submittals and shop drawings, approximately four (4) site visits per month during construction (both scheduled and emergent) to ensure compliance with the design drawings and specifications (the construction period of performance is twelve (12) months), preparation of site visit reports, coordination with project commissioning requirements, review of any construction project modifications for cost and technical acceptability, requirement to create independent cost estimates for the VA,...","url":"https://matchawards.com/department_of_veterans_affairs/posts/106652447559626715","identifier":"36C77621R0182","category":"541330 - Engineering Services","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"C1DA - ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES"},{"@type":"PropertyValue","propertyID":"CM category","name":"Category Management category","value":"4.2 Construction Related Services","url":"https://matchawards.com/categories/facilities-and-construction/construction-related-services"}],"availabilityStarts":"2021-07-27","availabilityEnds":"2021-08-30","areaServed":"33410","sameAs":"https://sam.gov/opp/067dae238c7641e4b02d9fe07d9f52ec/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Veteran-owned","item":"https://matchawards.com/contracts/veteran-owned"}]}
```