<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/department_of_veterans_affairs/posts/106567512924268275" -->

---
title: C1DA--608-21-210, A/E Design of Radiology… (36C24121Q0629) | Closed - MatchAwards
description: C1DA--608-21-210, A/E Design of Radiology Ultrasound Suite. United States Department of Veterans Affairs. Solicitation 36C24121Q0629. NAICS 541310 - Architectural Services. Deadline 2021-07-22. A/E STATEMENT OF WORK Project 608-21-210 Radiology Ultrasound Suite 1.0 INTRODUCTION: This project will...
canonical: https://matchawards.com/department_of_veterans_affairs/posts/106567512924268275
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: C1DA--608-21-210, A/E Design of Radiology… (36C24121Q0629) | Closed
og:url: https://matchawards.com/department_of_veterans_affairs/posts/106567512924268275
og:description: C1DA--608-21-210, A/E Design of Radiology Ultrasound Suite. United States Department of Veterans Affairs. Solicitation 36C24121Q0629. NAICS 541310 - Architectural Services. Deadline 2021-07-22. A/E STATEMENT OF WORK Project 608-21-210 Radiology Ultrasound Suite 1.0 INTRODUCTION: This project will...
og:image: https://matchawards.com/system/accounts/avatars/000/000/015/original/f59915e906ee2b19.png?1638825904
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# C1DA--608-21-210, A/E Design of Radiology Ultrasound Suite

Status

Closed (archived notice)

Agency

[United States Department of Veterans Affairs](/department%5Fof%5Fveterans%5Faffairs)

Office

TOGUS, USA

Notice type

Sources Sought

Solicitation number

36C24121Q0629

NAICS

[541310 - Architectural Services](/groups/895)

PSC

C1DA - ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES

Category

[Construction Related Services (4.2)](/categories/facilities-and-construction/construction-related-services)

Posted

2021-07-12

Deadline

2021-07-22

Place of performance

Manchester, 03104

## Description

A/E STATEMENT OF WORK Project 608-21-210 Radiology Ultrasound Suite 1.0 INTRODUCTION: This project will design a new Ultrasound Suite within the Radiology department. The location for this new suite is the existing MRI suite in the Basement Level of Building 1 that is scheduled to be re-located to a new space. The area for this project is approximately 1,200 sf of existing space that will be gutted and renovated. 2.0 SCOPE: The scope of this project consists of Architectural and Engineer (A/E) services required to complete the project, as outlined in Supplements A, B , and C below. The period of performance for the design is 184 calendar days and shall begin upon issuance of the Notice to Proceed (NTP) by the Contracting Officer. 3.0 REFERENCES: The following link has guides and specifications that may be referenced in parts of the attached documents that have not been included as part of the solicitation: http://www.cfm.va.gov/til/ The A/E shall thoroughly review the information at the link above and follow all guidance applicable to this project. Supplement A, Page 1 SUPPLEMENT A A/E SCOPE OF WORK DESIGN TASK The objective of this project is to provide a complete design for Project 608-21-210 Radiology Ultrasound Suite Background Information: The existing MRI suite is nearing the end of its useful life and is scheduled to be re- located to new space within the basement footprint of the new Urgent Care addition. Access to the new MRI suite will be through the existing Ultrasound Room E31\. With the elimination of the Ultrasound Room E31, there is a need to replace the lost ultrasound space and an opportunity to create a well planned efficient ultrasound suite in place of the existing MRI suite. This project includes approximately 1,200 sf to be gutted and renovated for the new ultrasound suite. The existing 1,200 sf to be renovated are on the Basement Level of Building 1 at the east end of the Radiology department. The space is currently occupied by the MRI which is currently scheduled to move into new space in September 2022\. The Program for Design will consist of two Ultrasound rooms (connected to a shared toilet room), one office, work space for three staff, some sub-waiting, and some storage. The Program for Design should serve as the starting point for programming discussions, but should be adjusted as needed to meet the needs of the project. CONSTRUCTION BUDGET The construction budget is $1,000,000\. The intent of the design shall be a project that can be built without changes or change orders, within budget, and function as intended. During the conceptual design stage, the Architect/Engineer (A/E) shall perform a cost estimate and confirm that the established construction budget is achievable for the scope of the project. The design shall not exceed the construction budget at any stage of design past the conceptual design stage. Any design submission that exceeds the construction budget will be rejected. The A/E is responsible for correcting and resubmitting all rejected design submissions before moving on to the next submission, at no added cost to the VA. No extensions to the period of performance will be granted for resubmission of rejected design submissions. If, at any time, the A/E suspects that the project cannot be designed within the established construction budget, they shall notify the contracting officer and contracting officer s representative (COR) in writing immediately. The A/E shall incorporate deduct alternates totaling at least 10% of the construction estimate into the project. Deduct alternates shall not be used to bring the projected project costs within construction funding. DUTIES OF THE A/E The A/E shall provide complete investigative and design services needed to provide a fully coordinated, functionally integrated, and operational design and subsequent project. The work shall include: Preliminary meetings and site survey investigations to define the necessary elements of the project scope of work. A preliminary meeting shall be devoted to discussion with clinical staff on mapping the desired workflow for the new clinic. This includes presentation of preliminary layout plans with proposed alternatives to the User Group. A detailed analysis of the various options available, covering design constraints, access requirements and all applicable codes and standards; A full field investigation of all areas affected by this design. Site investigations shall measure, photograph, and document the conditions of areas to be renovated and/or impacted. This information shall be physically reviewed in the field with the COR and clearly conveyed in the construction documents. Preparation of drawings, specifications, estimates, and phasing schedules, as called for in this scope of work and within the established construction budget; Development of scopes of work and specifications for independent testing as required to confirm the quality of the installation of the construction work of this project for inclusion in the construction contract documents. The construction contractor shall be required to pay for the required testing, but the testing firm shall report the results directly to the VA. The estimated costs for testing shall be included in the A/E s construction cost estimate. Design Review Meetings: Professional architects, engineers, and related design disciplines familiar with the work shall be provided to attend the VA design reviews at the VA Medical Center in Manchester, NH. The A/E shall provide minutes of each review meeting to the Contracting Officer for review within 3 business days following the review meeting. Construction Period Administration (CPA) Services, including: Review and approval of construction submittals covering products that have been listed within the contract documents, including cut sheets, manufacturer s data/performance sheets, samples, shop drawings, schedules, and phasing plans; Recommendations associated with acceptance or rejection of alternate materials and products; Responses to Request for Information (RFI); Cost/time/impact estimates and recommendations relevant to design errors or omissions; Participation by conference call in weekly project review meetings with the contractor. Active participation in construction coordination, including: Providing the REVIT building model to all sub-contractors to use for the coordination of their trade during the construction phase of the project. Managing the REVIT model and setting the order of precedence for trade coordination. Providing resolutions to coordination issues. Utilizing the coordination option in REVIT to show all hits that occur in the model. 10 site visits, spread across the various design disciplines, as required and/or requested by the VA Contracting Officer and Project Engineer for inspection of ongoing construction, including final tests and inspections. A site inspection report shall be furnished to the Contracting Officer and Project Engineer within three work days following all site visits during the construction period. The site inspection report shall include the purpose of the inspection, items reviewed, deficiencies observed, recommendations and additional actions required. Providing a punch list within 5 working days of being notified of construction substantial completion. The A/E shall keep a log of all punch list findings and conduct follow-on site visits to verify completion of the punch list. Verification that all devices (valves, circuits, equipment, etc.) have been properly labeled and/or tagged with charts and cards as noted in the specifications or per codes. Preparation of record documents (also known as as-built documents) in accordance with Supplement B, which the VA will retain permanently. Record documents shall be based on verification of as-built conditions from contractor-supplied marked up prints, issued SK s, RFI s, coordination drawings, shop drawings, photos, and site inspections. The A/E shall be responsible for assuring that record documents are accurate at the end of the construction of the project. Provide all necessary engineering and design services for architectural, interior design, mechanical (plumbing, fire protection and HVAC), electrical, structural, asbestos abatement, signage, and other specialty consultant elements within the limits of the project goals established to support Supplement B submissions. Each discipline shall document and investigate the relevant existing conditions, review the building available information, and verify all essential elements pertinent to their discipline. At each stage of design, the VA will provide review comments. The A/E shall provide a response/resolution to each comment within one week of the design review meeting. The VA and the A/E shall agree on the appropriate resolution of each comment before the design moves forward to the next stage. Any design document submission that has not fully addressed the comments from the previous submission, or which is clearly not coordinated between disciplines, may be rejected by the VA, at the VA s discretion. The A/E is responsible for correcting and resubmitting all rejected design submissions before moving on to the next submission, at no added cost to the VA. No extensions to the period of performance will be granted for resubmission of rejected design submissions. Design shall comply with the latest editions of all applicable VA guidelines (eg, Construction Standards, Design Guides, Master Specifications, Standard Details, Special Design Criteria); NFPA; Joint Commission; and federal, state and local codes pertinent to the project scope. Comply with all applicable VA Design Guides, available at http://www.cfm.va.gov/til/dGuide.asp. Comply with all applicable VA Design Manuals, available at http://www.cfm.va.gov/til/dManual.asp. In the design of new building and alteration work under this contract, consider all requirements (other than procedural requirements) of: Depart of Labor, Occupational Safety and Health Standards, and occupancy requirements. The A/E shall provide prompt, written notification to the Contracting Officer concerning conflicts with or recommended deviations from codes, laws, regulations, standards, and opinions of review officials as described above. No work altering the scope of this contract shall be undertaken prior to receipt of written approval of the Contracting Officer. The COR/Project Engineer does not have the authority to modify the contract. The required response time for all submittals, RFIs and VA requests, unless otherwise stated by the VA, shall be 14 calendar days. If the scope of the required action is extensive, the A/E shall notify the Contracting Officer and request additional time as soon as possible. The VA may occasionally request a faster turn-around time in order to avoid construction delays. The A/E is expected to make every reasonable effort to expedite items that may cause construction delays. Construction Document Requirements: Provide in accordance with Supplement B sets of both drawings (Revit and PDF) and specifications (MS Word and PDF). Provide a separate Adobe Acrobat PDF file for each drawing. Provide a complete set of drawings in a single Adobe Acrobat PDF file. Drawing size is 30 inches by 42 inches. Drawings shall be provided in Revit format. Specifications shall be compatible with MS Word 2010\. File names shall be the drawing/specification number followed by the drawing/specification title, or as approved by the VA Project Engineer. Final specification sections shall be merged into a single pdf file to include separate full document pagination in the right-hand side of Footer without the loss of individual file Headers/Footers. Each specification section shall be bookmarked in Adobe Acrobat, with bookmark labels of the specification number and specification title (i.e. 010000 General Conditions). Renderings: Renderings shall be of professional quality and in adequate number to effectively convey the project. No less than 4 different renderings shall be prepared. Renderings shall show a sample of interior spaces such as the waiting area, lobby, check in/out areas, or a typical patient care room. Renderings shall be provided in electronic pdf format. The A/E shall provide an estimated period of performance with the final construction documents. The A/E shall employ the following professional personnel (at minimum) to perform the services required under this contract. The same person may fill two or more roles if appropriately qualified. No substitution will be made without the advance written approval of the Contracting Officer after they have reviewed the proposed replacement's experience and qualifications record submitted by the A/E with explanation of the necessity for the change. Professional Discipline Name Job Title Principle-in-Charge Project Manager Architectural Structural Civil Mechanical Electrical Plumbing Fire Protection Hardware Specialist Estimating Interior Design Industrial Hygiene Physical Security DESIGN INSTRUCTIONS Facility Standard Items: The A/E shall incorporate items from the attached list of facility standard items (Attachment B) as applicable. Brand-name products must be specified as or equal and shall include the salient characteristics of products that would be considered equal. Contracting Requirements: Address all items in the attached Specification Checklist (Attachment C) at or before the 100% Construction Document submission. Particular attention shall be given to the transition between new construction and existing spaces. The construction documents shall contain detailed information and instruction regarding the transition spaces. Specifications: VA Master Construction Specifications, available at www.cfm.va.gov/TIL/spec.asp, shall be the basis for the construction specifications. These specifications are written to cover a wide variety of project types and sizes. EACH SPEC MUST BE CAREFULLY EDITED FOR THIS PROJECT. The track changes tool in Microsoft Word shall be utilized when editing specifications so that VA reviewers can see the changes that have been made. Interior Design: All interior design services for the project area shall be included in the scope of this task order. Interior design services include recommending and coordinating all finishes, preparing story boards and color selections, and working with the VA interior designer making furniture selections to ensure that the furniture is well-coordinated with the project. Signage: All interior, and temporary signage shall be included in the design. Existing interior wayfinding signage shall be updated as required due to the project; this includes both temporary updates during construction and permanent updates at construction completion. Signage is to match that of the existing Medical Center. Emergency Power: The goal of the medical center is to be able to continue seeing all patients during a power outage. All patient care areas shall have adequate lighting and power to fully function during a power outage, including generator power for all computers and required equipment. HVAC equipment shall have generator power. Industrial Hygienist (IH): IH services shall include identification of, and abatement plans and specifications for, all hazardous materials, including asbestos, lead, and mold. Type C Construction Administration Services shall include IH asbestos abatement monitoring and sampling. The proposal shall specify how many abatement monitoring days are included in the Type C services. Seismic: The design shall comply with VA Handbook H-18-8 Seismic Design Requirements, available at http://www.cfm.va.gov/til/etc/seismic.pdf . Physical Security: Ensure that the design complies with the VA Physical Security Design Manual for Mission Critical Facilities, available at http://www.cfm.va.gov/til/PhysicalSecurity/dmPhySecMC.pdf . Security systems shall be compatible with and integrated into the medical center s existing systems. If the Physical Security guidelines cannot be met, the A/E (and/or their consultant) shall provide alternatives to the guidelines and assist with any waivers that may be required for security measures that cannot be met. Sustainability: Ensure that the design complies with the sections of the VA Sustainable Design Manual applicable to Minor Construction Projects. This project shall utilize Option A, Internal Certification, as the method of validation of compliance required by section 2.4\. Both the Sustainable Design Manual and the checklist required for validation of compliance are located at http://www.cfm.va.gov/til/sustain.asp. AVAILABLE DOCUMENTATION Documentation available from the VA includes: 2009 asbestos survey of the existing campus. 2011 electrical study of the existing campus. As-built drawings of the original 1950 Building 1 construction. As-built drawings of the 2010 MRI Project (608-09-107). The following specification sections for the project will be provided by the VA: 01 00 00 General Requirements 01 32 16 Project Schedules 01 35 26 Safety Requirements ATTACHMENTS Attachment B, Facility Standard Items Attachment C, Specification Checklist Attachment D, Historical Geotechnical Information Supplement B, Page 3 SUPPLEMENT B A/E SUBMISSIONS OF DESIGN REVIEW MATERIAL FIRST REVIEW (Conceptual Preliminary User Group Meetings & Field Surveys) 2 Sets of reduced size and PDF preliminary layout plans with proposed alternates 2 Sets of conceptual estimates with proposed alternates Renderings for the options presented. These renderings will be used to help VA staff visualize and select an option and won t be used for advertising the project, thus they do not need to be detailed or have high level finishing. SECOND REVIEW (30% Submittal Schematics) 1 Set of Revit & PDF schematic drawings in accordance with Supplement A 1 Sets of full size bound schematic layout plans/details 42 inches by 30 inches 2 Sets of half size bound schematic layout plans/details 1 Set of MS Word specification table of contents, listing the specifications expected to be included 1 Sets of hardcopy specification table of contents, listing the specifications expected to be included 1 Sets of schematic estimates 1 Set of hardcopy 3D colorized renderings 1 Set of PDF 3D colorized renderings THIRD REVIEW (60% Submittal DD Design Development) 1 Set of Revit & PDF design drawings Sets of full size bound design development layout plans/details 42 inches by 30 inches Sets of half size bound design development layout plans/details 1 Set of MS Word design specifications, edited using the track changes feature 1 Set of PDF showing the tracked changes 1 Set of hardcopy design specifications in a 3-ring binder, printed in final view, without showing the tracked changes 1 Set of design development estimates 1 Sets of design development phasing plans 1 Sets of DD project cost estimates FOURTH REVIEW (90% Submittal CD Construction Documents) 1 Set of Revit & PDF construction drawings 1 Sets of full size bound construction documents plans/details 42 inches by 30 inches 2 Sets of half size bound construction documents plans/details 1 Set of MS Word & Adobe PDF construction specifications 1 Set of PDF showing the tracked changes 1 Set of hardcopy specifications in a 3-ring binder, printed in final view, without showing the tracked changes 1 PDF set of construction documents estimates 1 PDF set of construction documents phasing schedules FIFTH REVIEW (100% Submittal Bid \[Final\] Documents) 1 Set of Revit & stamped (by registered architect or PE) PDF bid drawings 1 Set of approved full size bound bid drawings with PE stamps 1 PDF set of approved full size bound bid drawings with PE stamps 2 Set of approved half size bound bid plans/details with PE stamps 1 Sets of MS Word final specification sections 1 Set of Adobe PDF final specification sections merged with bookmarks 1 Set of final specifications paginated front to back in 3-ring binders. 1 S 

<!-- mobian-agent-ad sponsored="true" id="162c2b5e-6fa0-4ee9-ad17-013e9f83da84" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories/facilities-and-construction/construction-related-services?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup
- Pursuit brief for this NAICS code (award history, who buys, past awardees): https://matchawards.com/naics/541310/brief?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=brief

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


## Contacts

* Michael Muller, Contract Specialist

Email and phone are in the source notice.

[Source notice](https://sam.gov/opp/82d08123db0c4202b0b5049135604934/view)

[More from United States Department of Veterans Affairs posted in July 2021](/department%5Fof%5Fveterans%5Faffairs/archive/2021-07)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Professional Services Government Contracts Available Now](/contracts/professional-services)
* [Pursuit brief for NAICS 541310](/naics/541310/brief)

```json
{"@context":"https://schema.org","@type":"Demand","name":"C1DA--608-21-210, A/E Design of Radiology Ultrasound Suite","description":"A/E STATEMENT OF WORK Project 608-21-210 Radiology Ultrasound Suite 1.0 INTRODUCTION: This project will design a new Ultrasound Suite within the Radiology department. The location for this new suite is the existing MRI suite in the Basement Level of Building 1 that is scheduled to be re-located to a new space. The area for this project is approximately 1,200 sf of existing space that will be gutted and renovated. 2.0 SCOPE: The scope of this project consists of Architectural and Engineer (A/E) services required to complete the project, as outlined in Supplements A, B , and C below. The period of performance for the design is 184 calendar days and shall begin upon issuance of the Notice to Proceed (NTP) by the Contracting Officer. 3.0 REFERENCES: The following link has guides and specifications that may be referenced in parts of the attached documents that have not been included as part of the solicitation: http://www.cfm.va.gov/til/ The A/E shall thoroughly review the information at the link above and follow all guidance applicable to this project. Supplement A, Page 1 SUPPLEMENT A A/E SCOPE OF WORK DESIGN TASK The objective of this project is to provide a complete design for Project 608-21-210 Radiology Ultrasound Suite Background Information: The existing MRI suite is nearing the end of its useful life and is scheduled to be re- located to new space within the basement footprint of the new Urgent Care addition. Access to the new MRI suite will be through the existing Ultrasound Room E31. With the elimination of the Ultrasound Room E31, there is a need to replace the lost ultrasound space and an opportunity to create a well planned efficient ultrasound suite in place of the existing MRI suite. This project includes approximately 1,200 sf to be gutted and renovated for the new ultrasound suite. The existing 1,200 sf to be renovated are on the Basement Level of Building 1 at the east end of the Radiology department. The space is currently occupied by the MRI which is currently scheduled to move into new space in September 2022. The Program for Design will consist of two Ultrasound rooms (connected to a shared toilet room), one office, work space for three staff, some sub-waiting, and some storage. The Program for Design should serve as the starting point for programming discussions, but should be adjusted as needed to meet the needs of the project. CONSTRUCTION BUDGET The construction budget is $1,000,000. The intent of the design shall be a project that can be built without changes or change orders, within budget, and function as intended. During the conceptual design stage, the Architect/Engineer (A/E) shall perform a cost estimate and confirm that the established construction budget is achievable for the scope of the project. The design shall not exceed the construction budget at any stage of design past the conceptual design stage. Any design submission that exceeds the construction budget will be rejected. The A/E is responsible for correcting and resubmitting all rejected design submissions before moving on to the next submission, at no added cost to the VA. No extensions to the period of performance will be granted for resubmission of rejected design submissions. If, at any time, the A/E suspects that the project cannot be designed within the established construction budget, they shall notify the contracting officer and contracting officer s representative (COR) in writing immediately. The A/E shall incorporate deduct alternates totaling at least 10% of the construction estimate into the project. Deduct alternates shall not be used to bring the projected project costs within construction funding. DUTIES OF THE A/E The A/E shall provide complete investigative and design services needed to provide a fully coordinated, functionally integrated, and operational design and subsequent project. The work shall include: Preliminary meetings and site survey investigations to define the necessary elements of the project scope of work. A preliminary meeting shall be devoted to discussion with clinical staff on mapping the desired workflow for the new clinic. This includes presentation of preliminary layout plans with proposed alternatives to the User Group. A detailed analysis of the various options available, covering design constraints, access requirements and all applicable codes and standards; A full field investigation of all areas affected by this design. Site investigations shall measure, photograph, and document the conditions of areas to be renovated and/or impacted. This information shall be physically reviewed in the field with the COR and clearly conveyed in the construction documents. Preparation of drawings, specifications, estimates, and phasing schedules, as called for in this scope of work and within the established construction budget; Development of scopes of work and specifications for independent testing as required to confirm the quality of the installation of the construction work of this...","url":"https://matchawards.com/department_of_veterans_affairs/posts/106567512924268275","identifier":"36C24121Q0629","category":"541310 - Architectural Services","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"C1DA - ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES"},{"@type":"PropertyValue","propertyID":"CM category","name":"Category Management category","value":"4.2 Construction Related Services","url":"https://matchawards.com/categories/facilities-and-construction/construction-related-services"}],"availabilityStarts":"2021-07-12","availabilityEnds":"2021-07-22","areaServed":"Manchester, 03104","sameAs":"https://sam.gov/opp/82d08123db0c4202b0b5049135604934/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Professional services","item":"https://matchawards.com/contracts/professional-services"}]}
```